00/01-18
, .
f3~p - 't /'3 0/ 0)
PURCHASE I SERVICE ORDER
FOR
MONROE COUNTY
Description of Services:
(See attached Scope of Services)
Multiple of Direct Salaries
Lump Sum X
Days to Complete 180
Reimbursable Expense
Fee this Service Order
$ 10.780.00
Payment for Services shall be in their entirety as per PSA, as amended.
Prepared by:
MiIford~ ~-
Recommended by:
~o
Date: 3-19-0 I
Date:
s- ZI-Ol
Date: 3-19-01
Date:
'1-.1- jj;f
N~5\lllII1-l&.WPD
DRAFf
Scope of Services
Runway Extension Feasibility Study
Marathon Airport
TASK 1) Site Reouirements - Coordinate with client to review basic assumptions, the
planning criteria for the study, established goals and objectives, and identify
potential runway development preferences. The following information and
basic requirements need to be discussed:
· Basic assumptions for study scope of services;
· Review functional runway design requirements including identification of
critical design aircraft (e.g. ADG C-I1 70-seat Regional Jets/Cabin-Class
Business Jets, Charters, etc.), probable stage lengths, takeoff weights,
minimum takeoff and landing lengths, etc.
· Review FAA Part 77 and TERPS approach surface criteria _ charted
obstruction heights, threshold siting criteria, and other potential obstruction
issues restrictions in approach zones.
· Review and confirm runway design and geometric requirement criteria _
Review all the applicable FAA runway design and geoemetric planning
criteria and established guidelines with the client (FAA Coordination?) for
study and planning purposes.
· Review runway,extension requirements including pavement strength
requirements, NA V AIDS, safety setback and geometric layout
requirements etc.
· Review physical site constraints i.e. existing runway/taxiway geometry,
OFA, OFZ, BRL etc.
TASK 2) Deve.oD Preliminary RunwavlExtension Lavou~ _ Using the agreed upon
planning criteria, concept alternatives (no more than 4) will be developed
showing alternative runway extension or shifting options.
· RunwayfI'axiway layout would include: runway extension, safety areas,
OFA's, OFZs, POFA's, lighting, NAVAIDS etc.
· Determine runway length based on critical aircraft, takeoff weights, stage
lengths, winds, and temperatures. (6,500' runway is the objective)
· Check existing aircraft parking apron capabilities to accommodate ADG'.
C-I1 aircraft
· Determine land required for the runway extension
· Check airspace for obstructions within approaches
· Use declared distances on at least one option
.
M:1MInIIlaa\T_ !.doc 3/14101
tify potential environmental impact issues (i.e. Noise,
. Wetlands, etc.) associated with these extension options.
TASK 3) Review - Submit alternatives for review and comments to client
TASK 4) DeveloD Preferred Runwav Extension Plan
· Develop a preferred runway extension plan
· Detennine land that needs to be acquired if any
· Detennine potential impacted surrounding land use area
· Detennine land that needs avigation easements if any
TASK 5) Review - Submit preferred alternative with preliminary project cost for review
and comments.
TASK 6) Recommended Plan - As a result of the preferred alternative review, a
recommended plan shall be prepared incorporating the Airport Staff, thoughts
and ideas.
TASK 7) Draft ReDort - A draft report will be prepared which would include: summary
of recommendations, the planning criteria used, the recommended runway
extension plan proposed and budget cost estimates. Upon completion, a draft
document shall be presented to the Airport Staff for review and final approval.
TASK 8) Final ReDort - Upon receiving approval from the client, a final document
shall be prepared.
M:.........'T... l.doc 3'14101
!DIRECf LABOR
!
: 1. C1usffieation
r
l
!
l
I
,
Manhoul] Satan Ratt ~
8 $135 $ 1,080
60 $95 $ 5,700
16 $65 $ 1,040
24 $60 $ 1,440
8 $40 $320
Subtotal 59.580
r
1
I
I
f
~
1
i
f
: 2.
i
Project Director
Senior PlanninglEnginecr
PlannerlEnginecr
CADD Technician/Graphics
Word Processor
Out of Poeket
Travel:
Air - 2 round trip TP A to EYW @ $350.00
Auto - Rental Car @ $50/day x 2 days
@ - S50.00 a day x 2 days x 1 person
(Rcpons, Blueprints, etc.)
(Phone, Mail, FAX. etc.)
$700
$100
$100
$200
$100
Per Diem
Printing:
Miscellaneous:
Subtotal 5 1,200
TOTAL PROJECf 510,780
Memo
To: Belle & Pam, Clerks Office
From: Bevette, Airports e c fY'../
Date: 05/30/01
Re: URS PSG - 00/01/18, Runway Extension Feasiblity Study - MTH
Attached are copies of the above referenced PSG. As I mentioned to you on the phone, the
original was sent to URS after it was signed by the Administrator.
I usually send copies of all the PSO's to Tina, but I have attached an extra in case Finance
keeps a master file.
/bev
attachments
. Page 1