00/01-18 , . f3~p - 't /'3 0/ 0) PURCHASE I SERVICE ORDER FOR MONROE COUNTY Description of Services: (See attached Scope of Services) Multiple of Direct Salaries Lump Sum X Days to Complete 180 Reimbursable Expense Fee this Service Order $ 10.780.00 Payment for Services shall be in their entirety as per PSA, as amended. Prepared by: MiIford~ ~- Recommended by: ~o Date: 3-19-0 I Date: s- ZI-Ol Date: 3-19-01 Date: '1-.1- jj;f N~5\lllII1-l&.WPD DRAFf Scope of Services Runway Extension Feasibility Study Marathon Airport TASK 1) Site Reouirements - Coordinate with client to review basic assumptions, the planning criteria for the study, established goals and objectives, and identify potential runway development preferences. The following information and basic requirements need to be discussed: · Basic assumptions for study scope of services; · Review functional runway design requirements including identification of critical design aircraft (e.g. ADG C-I1 70-seat Regional Jets/Cabin-Class Business Jets, Charters, etc.), probable stage lengths, takeoff weights, minimum takeoff and landing lengths, etc. · Review FAA Part 77 and TERPS approach surface criteria _ charted obstruction heights, threshold siting criteria, and other potential obstruction issues restrictions in approach zones. · Review and confirm runway design and geometric requirement criteria _ Review all the applicable FAA runway design and geoemetric planning criteria and established guidelines with the client (FAA Coordination?) for study and planning purposes. · Review runway,extension requirements including pavement strength requirements, NA V AIDS, safety setback and geometric layout requirements etc. · Review physical site constraints i.e. existing runway/taxiway geometry, OFA, OFZ, BRL etc. TASK 2) Deve.oD Preliminary RunwavlExtension Lavou~ _ Using the agreed upon planning criteria, concept alternatives (no more than 4) will be developed showing alternative runway extension or shifting options. · RunwayfI'axiway layout would include: runway extension, safety areas, OFA's, OFZs, POFA's, lighting, NAVAIDS etc. · Determine runway length based on critical aircraft, takeoff weights, stage lengths, winds, and temperatures. (6,500' runway is the objective) · Check existing aircraft parking apron capabilities to accommodate ADG'. C-I1 aircraft · Determine land required for the runway extension · Check airspace for obstructions within approaches · Use declared distances on at least one option . M:1MInIIlaa\T_ !.doc 3/14101 tify potential environmental impact issues (i.e. Noise, . Wetlands, etc.) associated with these extension options. TASK 3) Review - Submit alternatives for review and comments to client TASK 4) DeveloD Preferred Runwav Extension Plan · Develop a preferred runway extension plan · Detennine land that needs to be acquired if any · Detennine potential impacted surrounding land use area · Detennine land that needs avigation easements if any TASK 5) Review - Submit preferred alternative with preliminary project cost for review and comments. TASK 6) Recommended Plan - As a result of the preferred alternative review, a recommended plan shall be prepared incorporating the Airport Staff, thoughts and ideas. TASK 7) Draft ReDort - A draft report will be prepared which would include: summary of recommendations, the planning criteria used, the recommended runway extension plan proposed and budget cost estimates. Upon completion, a draft document shall be presented to the Airport Staff for review and final approval. TASK 8) Final ReDort - Upon receiving approval from the client, a final document shall be prepared. M:.........'T... l.doc 3'14101 !DIRECf LABOR ! : 1. C1usffieation r l ! l I , Manhoul] Satan Ratt ~ 8 $135 $ 1,080 60 $95 $ 5,700 16 $65 $ 1,040 24 $60 $ 1,440 8 $40 $320 Subtotal 59.580 r 1 I I f ~ 1 i f : 2. i Project Director Senior PlanninglEnginecr PlannerlEnginecr CADD Technician/Graphics Word Processor Out of Poeket Travel: Air - 2 round trip TP A to EYW @ $350.00 Auto - Rental Car @ $50/day x 2 days @ - S50.00 a day x 2 days x 1 person (Rcpons, Blueprints, etc.) (Phone, Mail, FAX. etc.) $700 $100 $100 $200 $100 Per Diem Printing: Miscellaneous: Subtotal 5 1,200 TOTAL PROJECf 510,780 Memo To: Belle & Pam, Clerks Office From: Bevette, Airports e c fY'../ Date: 05/30/01 Re: URS PSG - 00/01/18, Runway Extension Feasiblity Study - MTH Attached are copies of the above referenced PSG. As I mentioned to you on the phone, the original was sent to URS after it was signed by the Administrator. I usually send copies of all the PSO's to Tina, but I have attached an extra in case Finance keeps a master file. /bev attachments . Page 1