M. EngineeringBOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: November 15, 2006 Division: Engineering Bulk Item: Yes _ No Department: Engineering_ Staff Contact Person: David S. Koppel AGENDA ITEM WORDING: Discussion and approval of a Guaranteed Maximum Price for the construction of the McCoy Terminal Complex at the Key West International Airport, with The Morganti Group, Inc. ITEM BACKGROUND: PREVIOUS RELEVANT BOCC ACTION: CONTRACT/AGREEMENT CHANGES: STAFF RECOMMENDATIONS: TOTAL COST: COST TO COUNTY: BUDGETED: Yes SOURCE OF FUNDS: No REVENUE PRODUCING: Yes No AMOUNT PER MONTH Year APPROVED BY: County Atty OMB/Purchasing Risk Management _ DOCUMENTATION: Included Not Required DISPOSITION: Revised 8/06 AGENDA ITEM # Guaranteed Maximum Price Proposal November 15, 2006 Key West International Airport New Terminal Building and Renovation Project Key West, Florida Monroe county, a Submitted by: The Morganti Group Owner: Political Subdivision of the State of Florida 1100 Simonton Street Key West, FL 33040 Ga MORGANTI McCoy Terminal Complex KEY WEST INTERNATIONAL AIRPORT (New Terminal Building and Renovation Project) GUARANTEED MAXIMUM PRICE PROPOSAL Table of Contents Summary of Work GMP Price Summary / Cost Reduction List Scope Clarifications and Assumptions Detailed Estimate of Direct Cost Items Bid Tabulations and Recommendations Preliminary Construction Schedule Contract Documents — Drawing List and Specification List SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 SECTION 7 MORGANTI yr) McCoy Terminal Complex KEY WEST INTERNATIONAL AIRPORT MARATHON AIRPORT HURRICANE DAMAGE REPAIRS (New Terminal Building & Renovation Project) GMP Proposal Section 1 Key West Summary of Work The new McCoy Terminal Complex will serve as a threshold to welcome visitors to Key West still exuding the old charm yet boasting the latest in modern convenience and will deliver a more safe and efficient terminal for passengers, ensuring a pleasant traveling experience. Construction will occur over a twenty-four (24) month period with the following sequence of events to be coordinated with the project schedule and phasing plan for the project. 1. Underground Utilities 2. Auger Cast Piles / Caps 3. New Terminal Structure / Finishes 4. Existing Site Parking relocated to beneath the new Terminal Building 5. Ramp Up to the new elevated Terminal Building serving departing passengers 6. Installation of Temporary Facilities in Existing Terminal 7. Turn over of new Terminal Building 8. Renovation of Existing Terminal 9. Removal of temporary facilities in Existing Terminal 10. Turn Over of Renovated Existing Terminal and Completion of the Project The main floor of the new McCoy Terminal will be elevated, consisting of ticketing, luggage and security areas for departing passengers, with a central area for concessions, restrooms, restaurant and circulation. Arriving passengers will enter through a ground level baggage claim where car rental companies, restrooms and a customer service office will be located in the renovated existing terminal. Passengers will move through the new terminal building to their flights from ticketing through security then cross a separate skyway down to a holding area in the renovated existing terminal. This area will seat 400 and contain restrooms, snack bar, patio seating and other related service areas. The GMP includes monies approved for Construction Authorization #1 and Construction Authorization #2. Construction Authorization #1 was approved on August 4, 2006 and Construction Authorization #2 was approved on August 4, 2006. Construction Authorization #1 includes set up of the contractor's trailer compound, lay down area, power and water to the trailer compound, installation of the security and construction fence, rough layout of the project, relocation of the Republic Parking booth, relocation of monuments, signage, equipment and vehicles from the construction area, installation of walkways and pathways through the construction area to the existing terminal building for passengers and employees. Construction Authorization #1 also includes general conditions items to equip the owner offices with computers, DSL lines and software, as well as other general conditions expenses as shown in Article 9 of the contract agreement signed in October 2005. Construction Authorization #1 includes costs incurred from April 2006. Construction Authorization #2 includes continuation of the work outlined in Construction Authorization #1 as well as start up activities for the underground site utility work. Also included is the auger cast test pile program including costs for testing and monitoring services and reports. Based upon the outcome of the test program Construction Authorization #2 includes production auger cast piles for the Phase 1 and Phase 2 construction areas. Marathon Summary of Work The hurricane damage repair work at the Marathon Airport will provide renovated areas in time for the start of expanded flight services. Completion of these repairs will deliver a more safe and efficient terminal for passengers, ensuring a pleasant traveling experience. Construction will occur over a seven (7) month period with completion expected by November 1, 2006. The GMP includes monies approved for Construction Authorization #1 and Construction Authorization #2. Construction Authorization #1 was approved on July 27, 2006 and Construction Authorization #2 was approved on July 27, 2006. Construction Authorization #1 includes water damage remediation work, removal of case work, wall finishes and flooring. Also included is mold mitigation, grout cleaning, ceiling cleaning and miscellaneous activities required to begin remodeling work for the lower terminal arrival/departure area. Temporary storage of existing furniture and equipment and general conditions costs were also included. Construction Authorization #2 includes work to seal metal studs, walls and entrances to a height of two (2) feet above finish floor as well as replacement of wall finishes and new terrazzo flooring. Also included is electrical work required to raise outlets and conduits, new ceramic tile for toilet rooms, new window sills, miscellaneous doors and hardware and new ticket and rental car counters. KEY WEST INTERNATIONAL AIRPORT TERMINAL BUILDING AND RENOVATION MARATHON AIRPORT HURRICANE REMEDIATION GUARANTEED MAXIMUM PRICE SUMMARY 11/15/2006 KEY WEST INTERNATIONAL AIRPORT NEW TERMINAL BUILDING AND RENOVATION DIVISION 2 - SITE WORK (incl Landscaping).................................................... $ 2,695,029.00 DIVISION 3 - CONCRETE................................................................................ $ 6,146,628.00 DIVISION 4 - MASONRY............................................................................... $ 433,111.00 DIVISION5 — STEEL..................................................................................... $ 2,315,000.00 DIVISION 6 — CARPENTRY.......................................................................... $ 471,398.00 DIVISION 7 - THERMAL/MOISTURE................................................................ $ 1,161,660.00 DIVISION 8 - WINDOWS AND DOORS............................................................. $ 1,332,907.00 DIVISION 9 - FINISHES.................................................................................. $ 3,964,779.00 DIVISION 10 - SPECIALTIES......................................................................... $ 442,335.00 DIVISION 11, 13, & 14 - EQUIPMENT, SPECIAL CONST., & CONVEYING ............. $ 1,870,140.00 DIVISION 15 - MECHANICAL......................................................................... $ 4,074,274.00 DIVISION 16 - ELECTRICAL...................................................................... $ 5,538,650.00 INITIAL CONSTRUCTION CONTINGENCY (Held By Owner) ............................... $ 0.00 GENERAL CONDITIONS (Reimbursable Expenses) .......................................... $ 672,000.00 INSURANCE AND BONDS............................................................................. $ 633,330.00 TOTAL (Divisions 2-16 not including cost reductions) ................................ $ 31,751,241.00 COST REDUCING ALTERNATES (as of 11/9/06)........................................... $ -3,612,708.00 KWIA SALES TAX SAVINGS GOAL................................................................ $ -225,000.00 TOTAL (Divisions 2-16 incl cost reductions & sales tax savings) ....................... $ 27,913,533.00 KWIA PRECONSTRUCTION PHASE FEE ......................................................... $ 200,000.00 KWIA CONSTRUCTION PHASE FEE........................................................... $ 2,500,000.00 KWIA OVERHEAD & PROFIT......................................................................... $ 1,000,000.00 KWIA SUBTOTAL...................................................................................... $ 31,613,633.00 KEY WEST INTERNATIONAL AIRPORT TERMINAL BUILDING AND RENOVATION MARATHON AIRPORT HURRICANE REMEDIATION MARATHON AIRPORT CONSTRUCTION AUTHORIZATION#1......................................................... $ 376,848.00 CONSTRUCTION AUTHORIZATION#2......................................................... $ 869,985.00 BALANCE OF CONTRACT AMENDMENT...................................................... $ 1,920,917.00 MARATHON PRECONSTRUCTION PHASE FEE ..................................... $ 29,744.00 MARATHON CONSTRUCTION PHASE FEE (Staff) .................................. $ 371,803.00 MARATHON OVERHEAD & PROFIT ...................................................... $ 148,729.00 MARATHON SUBTOTAL............................................................................ $ 3,718,026.00 TOTAL GUARANTEED MAXIMUM PRICE AFTER SALES TAX SAVINGS............. $ 35,331,559.00 s Y I i I I -- I I o ? o 0 o c o 0 0 0 o o 0 0 0 0 0 0 o c w w w w w w w w w w 0 '0 0 z z z z Z z z z z 0 N O O Q O O O N tG ci O O O O a o w w w w w � N N N N N N N N N N N N N N N N cY � CL K K K K CL m H m u� m C a � N N � C - U N ^ C a a C a C M O N N N M d Z Q Q Q OI � M l� m c c m f J J v 00 N U U y Q 'E O1 N a E c N n a a a 8 a a a ti 3 o n o N N N V N N N N N N N N ❑ ❑ ❑ ❑ ❑ ❑ N ❑ N CL L U O Z O d m oa od O O L L a o a a n L 0 0 y O O Q O O Q m E > d > 8 t m d v v v V u w Z w Z W f n a o 0 0 o o 0 0 0 z N N N N b Vl N N N O l N N a F W N N N y N N N N � � D O O d J > > 7 Q 2 p d N N O Z Z c c N 2 Z Z Z Z f O W o oo, c e o e e o 0 a �0 A < WJ y<j N w W Vr N N N N a d d d a d v d v F � ts v w d d d a I �I Q H a ry � W S U m U C m E V E N 2 t5 t5 r y O O 3 j j N m y m U 0 A m V O v m v 'm 'v 'v 'm 'w w w r m 2 ry w z 0 N m 0 O F t0 O ry Z W u? O O J N N N C E a N m m J N C 'j l0 T ❑ W m a o 0 0 0 0 O � w a a a a a K K K K y Z Z Z Z 2 O W o 0 o O o 0 0 0 O ¢ 0 O N j N N w Vl N N q N N w ¢ ~ I N N N N ¢ N N N N Q Q Q N K Q W I A c c E N P N 2 .dn O M N IC N J C 6 O J U a C C O N N C L E E rn E o L J O d N V N N L C W c J N n E 20 0 O m N N < C t N m w C J C OI N 3 N V i N N N N L N N L OI ❑ ❑ � W U ❑ ❑ U d U U W W N N N jZ N N N M N w a � N w ° o E E u o J n n n O E E U o O > > O O 0 0 Z Z O w LL w w N Q '7 Q J N j N 7 N 0J = v J p 2 O pN1 pNI V V O O c c N Z Z Z Z Z W O w~ o o e e e e ? 'o W O O O O O O O 2 O O O O O O O W p q M fD W W J N w p N N y N N N N N N a v O N W m o ry U � 'o N U E L N N ?� � N N U a > NE2N n = N N C = m E E c 2 m 3 o E c N N C 3 d P N o y E E E E v E U p ^ 9 N T J J O N W E a >JERE a ccv `2E E o mmm5 OiN U U r°' °' > w wwmW m > 4z L 3 P J! C N Z w E � n � v a 5 m c m a � Z O O W o o � � o 0 0 0 F- f9 0 0 0 6 0 0 0 0 0 2 K o c o c c o 0 0 OO N N N q q q q N h N q Q W F N N Y N N N N N N r r r r r r N N N N W N = N N CY m rn O Z O Z O Z O Z O Z O Z O Z O Z O Z � o 0 O O O O O O Q Q O n H N y q q N N Wj w N W I � aavl N N N N W N W N ~ N N p N N N N N N N N u N v j O E 0 O n s cJ o _ `u o v L n C C N E2 J o O 1O E Q � a v v J p rn a u _ a H a < t U E E O p y j a C 3 y C L m A y y O a Z 4 3 v w c O ou c a c En c m '3 'y .: a N N 6 3 a o v o n v p o E m y m m `m t N a u O cu C W L O o o E y N U p p p N m V E N N p W N N U U N C N N U W M1� Ot N N N N N N N J C C C � O w w Z m E �- E E ° Z o W rn � n c O 3 d U 3 a N N N W W W Z Z O W N d O O O O O O p O O O O O (J M O O O O O O ci O O 2 m n o o e o o ? 0 p � LL N W N p w N a O C O O O O N — Z Z 2 Z O W r o 0 0 0 0 o O p p w ~ o 0 0 0 S o S LL N h O O O S 0 O 0 O p O O 20 S S S O S O O W 1 O N O O N N O w h (�I J W a N VI W N 1A l9 N N N N N W N m N UN V U V C d I O m C C 7 O N C a A O o � c O 2 5 L m c � a J C C O N U � d 41 D ¢ d V d U d C d N O C D O O d U ry m a Vj n w a N d w N n c O 0 O N N O > L L O = O N d N d N N � •.• ..• d d C � N N 'E N m a O N a 10¢ m a w O i� w w vl V1 O 1(I N W ? [O > z 0 vi � o O — F N d E O N z o d .E W ` > N y ._ N o ` O U 3 m c O m y w e o c LL !L w q Q w d K K K K m o 0 0 0 Oc v m 2 2 Z 2 p W 0 0 0 o e o p O O o o o n H� O O O w O Ip W W J V�i N M W w w w w N N N N N N N Q N N N N J F O m y N N E N N _ N y C y E E 5 c o 2 'u m o Z n 00 D O � O a C U N m c C N � a � N = O o E 0 a N I O > H N N d D a m o U c 9 = 3 c n L U N O O 6 y N� 6 d yO N Nzi U U � K w W W � > Z �/9 , , - } \\ \ \ \ \ \} 7/) z< }} // \ } \ \ } ) } } } } } } �0 ) ® 2 0\ cc \ } \ \ \ \ \ 2 } qj C \ } \ \ \ } / } \ } \ EE (§ i� 20 - - - - f { -Z5ET - / + ( - - - 76 \\ \\ � \ \\ } } \ \ \ \ \ �� c0 N a j o a m O E n L > L c n � a a c ¢+ j w Ina 0 o a o 0 0 o 0 o 0 0 0 O ci o o C 0 o a w o J 5 0 0 0a 0 > O w o e o 0 0 0 0 0 w ¢ � O O O O O O C O O V W O O O O O O O N O O Y O O Iq N N N= J W W M w N w iq N w � a a a 22 ¢ v J a H N C Y O a N U C O O L L O U ; o n o a & w n � m n � o - L N � 0 Ip N O m a L ; Y N O C C 3 n d W C N N d V A O OI 'C N d m E a E a d� rn g a 4 N O v �I LL Y � W O N > Y N N N d' p Cp O a O 6 a m O U N N C y p� p� O C � L d L ry ry L O i� w w m m m m rn m rn m rn �� j Z KEY WEST INTERNATIONAL AIRPORT NEW TERMINAL BUILDING AND RENOVATION PROJECT GUARANTEED MAXIMUM PRICE (GMP) CLARIFICATIONS AND ASSUMPTIONS 1. The GMP does not include any work related to the Mario Sanchez Park or any budget for Art in the Airport. 2. The GMP is based on certain modifications indicated as item 35 below that will need to be incorporated into the drawings and specifications indicated in section 7 of this GMP Proposal. Bulletin Number Two issued by URS Corporation and dated August 4, 2006 is included in the GMP. 4. The GMP does not include any permit fees and/or deposits. It is our understanding that any and all required permit fees will be waived. The GMP does not include any costs associated with the services of a threshold inspector. It is assumed that all costs for threshold inspections, if necessary, will be provided by others. 6. It is assumed all costs associated with certified inspectors or inspections for permits provided by SFWMD, DEP, NPDES and all other governing agencies that may be applicable to this project will be waived or paid for by others. 7. The GMP does not include any utility fees including but not limited to tap fees, impact fees, or utility services. The Owner shall pay for all permanent meters. 8. The GMP does not include any costs associated with natural gas/propane holding tanks or the associated underground piping and regulators for gas service to the meter. It is our understanding that this work, if necessary, will be covered by the Owner and other parties under separate contract. 9. Cost of relocation or removal of any power poles, overhead utilities, and underground utilities not indicated to be relocated on the construction documents is not included. 10. The Owner shall perform any and all surveys, removal, and/or abatement services of any environmentally hazardous material encountered or discovered during the course of the work. 11. The GMP excludes any cost associated with the removal, either from its existing location, or from the site of any unsuitable subsurface materials including but not limited to deleterious materials, rock, hazardous waste, etc. 12. Firesafing and firestopping may be installed by multiple individual subcontractors and not by a single subcontractor. 13. Builders risk insurance premiums and deductibles shall be paid for by the Owner as indicated in Article 13.3.5 of the Agreement between County and Construction Manager. 14. Specification section 09680 Carpet is included in the project specification manual but no carpet is shown on the construction drawings. Therefore the GMP does not include any cost associated with carpet. 15. A seating allowance of $225,000 has been included in the GMP. 16. An allowance of $150,000 is included in the GMP for interior signage, exterior signage and monument signs, all of which have yet to be designed. 17. No window treatments are indicated on the construction drawings and the GMP does not include any cost associated with window treatments. 18. The GMP includes landscaping. 19. The GMP does not include any irrigation systems for the landscaping. 20. Sprayed on fireproofing is not indicated in the construction documents. Therefore, the GMP does not include any cost associated with fireproofing. 21. All granite has been deleted per item 35g. A 4" rubber base has been included at locations where granite base is shown on the construction documents. 22. Brick type and color are not indicated in the construction documents, and a unit price of $300.00 per thousand has been used to establish the GMP. 23. An allowance for concrete of $128 per cubic yard including sales tax is included in the GMP. 24. The following clarifications pertain to door hardware. a. All hardware will be provided as indicated in the finish hardware sets listed in 08710, Door Hardware. Any violations of governing building and fire codes or inconsistencies with other hardware are the responsibility of others. b. The warranties provided shall be limited, if necessary, to the maximum standard duration available from each manufacturer. 25. All work related to modifications to the existing master antenna system and satellite dish shall be by others. No cost associated with the master antenna system or satellite dish is included in the GMP. 26. Locating and/or relocating the existing 6" C900 PVC or DR-18 as indicated on C- 111.4 is not included as the extent of this work is not clearly defined on the construction drawings. 27. It is assumed the Owner will provide all necessary power for construction activities for the entire duration of construction. No cost has been included in this GMP to supply power. 28. A cost and/or resource loaded schedule is not required per contract and is not included. 29. Since the elevation of groundwater will fluctuate due to tidal, seasonal and rainfall variations, a well -point system, effluent disposal, and any additional erosion and sediment control devices that may be required are not included in the GMP as this can not be fully defined at this time. Any related issue that may arise will be considered a concealed or unforeseen condition and the subcontractors and/or the Construction Manager, as applicable, will be compensated accordingly. 30. Certain items in the project specification manual are not applicable for construction within Monroe County, Florida, and the Construction Manager reserves the right to review and amend these requirements as needed throughout the construction phase. 31. The Substantial Completion date (7/18/08) is based on a construction duration of 24 months after receiving approval of Construction Authorization # 1 (August 4, 2006) and approval of this GMP on November 15, 2006. 32. Division 1, General Requirements, was not available when the Agreement between the Owner and Construction Manager was established. Where Division 1 items conflict with the Agreement between the Owner and Construction Manager, the Agreement terms will govern unless specifically indicated otherwise and budgeted accordingly in this GMP Proposal. 33. A meeting was held on September 18, 2006 to discuss potential issues of phasing and cost associated with Owner occupancy of the existing terminal building during construction. An allowance of $50,000 has been included in the GMP for temporary facilities that may be required. 34. Where allowances have been established for scope included in the GMP or where agreed upon estimated amounts have been used for cost reduction items it is agreed that should the allowance amounts be exceeded or should the estimated savings for cost reduction items not be reached the GMP amount shall be adjusted if necessary to account for these additional costs. The GMP shall only be adjusted after all other cost saving alternatives, including further scope reductions, have been exhausted. 35. The following cost reducing alternates have been implemented in the GMP in order to meet the Owner's budget. a. Delete elevator #4 at bag make-up area. (Cost reduction list item #15) b. Delete elevator #1 at the passenger bridge. (Cost reduction list item 416) c. Reduce the number of "G" type windows from three to two between all pilasters. (Cost reduction list item #24) d. Delete hurricane shutters and provide uninsulated impact glass. (Cost reduction list item #26) e. Delete linear metal ceilings at soffits and fascia and replace with stucco. (Cost reduction list item #27) f. Change granite countertops to solid surface and use 304-4b stainless steel for surface metal, toe kicks and reveals. (Cost reduction list item 428) g. Delete metal ceiling at room 204 and S 101 and replace with 2x2 acoustical ceiling. (Cost reduction list item #32) h. Allow alternative electrical equipment manufacturers. (Cost reduction list item #34) i. Allow alternative light fixture manufacturers. (Cost reduction list item #37) j. Change domestic water piping to schedule 80 PVC in lieu of copper. (Cost reduction list item #39) k. Change cast iron piping specification to schedule 40 PVC. (Cost reduction list item #40) 1. Reduce scope of renovation work in existing terminal. (Cost reduction list item #48) m. Change specification for toilet partitions from solid surface to polymer. (Cost reduction list item #51) n. Change specification for site lighting conduit from PVC coated rigid conduit to PVC conduit. (Cost reduction list item 452) o. Change stainless steel balustrade panels on the inside of the escalator unit to glass. (Cost reduction list item #53) p. Change specification for HVAC to allow plenum rated cable in lieu of cable in conduit. (Cost reduction list item #57) q. Reduce scope of MUFIDS system. (Cost reduction list item #59) r. Limit spare electrical conduits to an allowance of $25,000. (Cost reduction list item #60) s. Reduce electrical scope added between design development and construction documents. (Cost reduction list item #65) t. Delete dormers. (Combination of cost reduction list items #23 & #67) u. Change dumbwaiter specification to a less expensive model. (Cost reduction list item 968) v. Reduce windows on east elevation to one bay. (Cost reduction list item #69) w. Reduce windows on west elevation to one bay. (Cost reduction list item #70) x. Change TSA security screen walls metal studs and drywall. (Cost reduction list item #71) y. Reduce seating allowance included in the GMP by $25,000. (Cost reduction list item #72) z. Change ceilings in elevators from laminate to stainless steel. (Cost reduction list item 474) aa. Delete elevator hall lanterns, position indicators and stainless steel reveals. (Cost reduction list item #75) bb. Change specification to allow owner to pay for warranty travel as needed. (Cost reduction list item #76) cc. Delete architectural relief on one side of precast panels. (Cost reduction item #78) dd. Delete exterior painting of existing terminal building. (Cost reduction list item #79) cc. Change linear metal ceiling specification for new building to a less expensive system. (Cost reduction list item #81) ff. Reduce size of new emergency generator fuel tank. (Cost reduction list item #82) gg. Change integral gutter system to surface mounted gutter system at curb overhang. (Cost reduction list item #85) hh. Change ARFF mezzanine to expanded metal deck from poured pan. (Cost reduction list item #87) ii. Eliminate parking deck curb and use wheel stops. (Cost reduction list item #88) J. Change concrete design specification from a 5,000 psi mix to a 3,500 psi mix. (Cost reduction list item #90) kk. Reduce scope of asphalt paving. (Cost reduction list item #91) 11. Reduce level of finish at beach front dining. (Cost reduction list item #92) mm.Change the curtain wall, storefront and automatic door finish specification to dark bronze anodized. (Cost reduction list item 493) nn. Reduce the landscaping scope to county code requirements. (Cost reduction list item #94) ESTIMATE SUMMARY FOR KEY WEST INTERNATIONAL AIRPORT TERMINAL BUILDING NOVEMBER 15, 2006 MONROE COUNTY THE MORGANTI GROUP INC. GMP PHASE - URS DOCUMENTS DATED June 26 or August 4 Bid Package Bid Package Description Quantity Units Unit Cost GMP Estimate Remarks KWIA Construction Authorization It 1 $ TAningrary Fence / Rent - Compound 1 Is 12125.00 $ 12.125 go fence Temporary Fence Rent / Repair / Relocation 1 Is 25000.00 $ 25,000 go fence Temporary Sidewalks & Entrances Is $ to inos Ticket Booth Temporary Power 1 Is 4000.00 $ 4,000 Misc. Relocation of Existing Si na e, Structures 1 Is 5000.00 $ 51000 Temporary Parkin Is $ 2A Demolition - She Is $ in site earthwork: deeel. Remove Storm Structures 7 as $ Remove Storm Piping 653 If $ Remove Sanitary Structures 3 1 as $ Remove Sanitary Cleanouts 41 as $ Remove Sanitary Piping 131 If $ Remove Water Piping 86 6 $ Remove Electrical Pullboxes 1 as $ Sawcut Asphalt 894 If $ Sawcut Concrete 66 0 $ _ Remove Asphalt Paving 143,089 sf $ Remove Asphalt Paving Base 31,013 sf $ Remove Concrete Paving/Walks 11,142 sf $ Remove Concrete Curb 86 If $ Remove Concrete Curb & Gutter 2.592 1 h $ Remove Planters 470 1 If $ Remove Parking Control Structure / Gates 1 I as $ Remove Chain Link Fencing 930 1 If 8 Remove She SI na e 7 1 as $ Remove She Monuments 31 as $ Remove Parking Meters 7 as $ _ Remove Flagpoles 3 as $ Remove Lightpoles 13 ea $ Remove Lightpoles 7 ea $ Relocate PowerDoles 5 ea $ _ Remove Metal Shed 586 of $ 1 Story Building Foundation 1,500 at $ 2B Demolition - Building1 Is 219950.00 $ 219,950 Ilvi Demo Ticket Counter, Run -Out Conveyors If lin baggage handling Demo Plumbing Is n Plumbina Demo Fire Protection Is Iin fire protection Demo HVAC Is in hvac Demo Electrical Is in electrical Saabs 3,551 at $ - included Partitions 16,618 at $ - included Columns 25 as $ included Roof System 1,964 sf $ - included Canopies 8,176 at $ - included Mezzanin / Stairs 264 sf $ - included Casework 217 If $ - included Toilet Partitions 10 ea $ included Fire Shutters 8 as $ included Overhead Doors 1 ea $ included Roof Ladder 1 as $ - included Remove Doer/ Window Units 120 ea $ included Relocate Plague 1 ea $ - included Relocate ATM as $ _ Remove & Reinstall Intact Tile Murals 2 ea $ included Seating 105 ea $ lincluded Ceilings 17,279 sf $ lincluded Floor Finishes 17,081 sf $ - included 2C Site Earthwork / Develop merit 1 Is 670,091.00 $ 670,091 to inns Mobilization 1 Is $ included Bond 1 Is $ - included Traffic Control $ - included Clear Grub $ - included n Erosion Control $ Siltation Fence 2$ =If - included Basin Silt Screens $ included NPDES Testin not included ESTIMATE SUMMARY FOR KEY WEST INTERNATIONAL AIRPORT TERMINAL BUILDING NOVEMBER 15, 2006 MONROE COUNTY THE MORGANTI GROUP INC. GMP PHASE - URS DOCUMENTS DATED June 26 or August 4 Bid I Package Bid Package Description Ouantity Units Unit Cost GMP Estimate Remarks Bld . Pad Fill Parking Ramps 2,403 c $ - included Proofroll Building Pad 19,244 at $ - included Cut Paving 515 c $ included Balance She Fill 431 c $ - included She Fill Berms cy not required Grade She 52,615 at $ - included Surveying 1 1 Is 1 40700.00 $ 40,700 Inn oYl nn Restakina Is 15000.00 $ 15,000 allowance 2D Asphalt Paving& Acc. Is 460622.00 $ 460,622 affordable I"Type P-401 As alt Paving s $ - included 2' T P-401 Asphalt Paving s $ - included 1-1/2'T "S" Milled As ah Pavin P12,765 s $ - included 8"Limerock Base s $ included 4' Limerock Base s $ - Included 12" Stabilized Su rade s $ - included Precast Wheel Sto 0 As halt ea $ - included Precast Wheel Sto 0 Concrete as $ included Paving Markings $ 12' Cross Walk Markings 1,524 If $ - lIncluded 24" Stop Bars 150 If $ - included Handicap Parking Symbols 12 as $ included Handicap / Service Lines 3,275 If $ included 4' Parking Lines 8 190 If $ - included 6" Roadway Lines 2,003 If $ - included BI-Directional RPM's 40 as $ - included Traffic Arrows 14 as $ included Traffic Si na e $ Slop Signs 10 as $ included Do Not Enter Signs 2 as $ included No Parkin Signs 4 ea $ included HandicapParkin Signs 12 as $ included Turn Directional Signs 9 as $ included Overly ExistingPavings not required Temp. Access Roads s not required Curbs Is $ in site earthwork i devel. Curbs T D 6,512 If $ - included Curbs T F 385 If $ - included 2E Concrete Walks / Pavin Is $ in site earthwork; devel. Sidewalks 0 Parkin at $ lincluded Sidewalks Hand Excavate Thickened Walks 18 c $ Sidewalks Backfill Thickened Walks 9 c $ Sidewalks Fine Grade 1.021 at $ Sidewalks Edge Forms 299 at $ Sidewalks Expansion Joints 80 It $ Sidewalks Broom & Trowel Finish 1,021 at $ Sidewalks Protect & Cure 1,021 sf $ Sidewalks Wire Mesh 1,123 1 at 1 $ Sidewalks Reber 0.13 to $ Sidewalks Concrete - 5000 psi 31 c $ Sidewalks 0 Building sf $ Sidewalks Hand Excavate Thickened Walks 20 c $ Sidewalks Backfill Thickened Walks 10 c $ Sidewalks Fine Grade 12,712 sf $ Sidewalks Ede Forms 242 sf $ Sidewalks Expansion Joints 1,470 If $ Sidewalks Broom & Trowel Finish 12,712 at $ Sidewalks Protect & Cure 12,712 1 sf 1 $ Sidewalks Wire Mesh at $ Sidewalks Reber to $ Sidewalks Concrete - 5000 psi c $ Airside Apron Concrete Paving sf 6.53 $ 49,00011Airside A ron Concrete Pavin 07,500 Is 49,000.00 $ 49,000 inay. JAirside A rons Hand Excavate T A rons c $ irsideA ronsBackfill Thickened A rons c $ Airside A rons Fine Grade sf $ Airside A rons Ede Forms sf $ Airside Aprons Ek ansion Joints 990 I If $ ESTIMATE SUMMARY FOR KEY WEST INTERNATIONAL AIRPORT TERMINAL BUILDING NOVEMBER 15, 2006 MONROE COUNTY THE MORGANTI GROUP INC. GMP PHASE - URS DOCUMENTS DATED June 26 or August 4 Bid Package Bid Package Description Units Unit Cost GMP Estimate Remarks Airside Aprons Broom & Trowel Finish sf $ Airside Aprons Protect & Cure at $ - Airside Aprons Wire Mesh at $ Airside Aprons Reber to $ Airside Aprons Concrete - 5000 psi c $ HandicapRam si $ - included 2F Precast Concrete Pavers 18,"347 Is not required 2G Site Drainage / Utilities $ Site Drainage Is $ in site earthwork: dcvel. Catch Basin Structures ea $ included COS Structures ea $ - included Curb Inlet Structures ea not re uired Storm Manhole Structures ea S Included Storm Control Structure ee not re uired Bubble U Structures ea not r uired Mitered End Section w/ Grates as not r uired Core & Bore Existin Structures as $ Included Modify Existing Structures 11 as $ included Storm Piping If 6" DIP 86 If $ - included 8' DIP 45 If $ - Included 8" RCP 177 If $ - included 12" RCP 275 If $ - Included 15" RCP 206 If $ lincluded 18" RCP 110 If $ - lincluded Trench Drain 64 If $ - lincluded Exfiltration Trenches I If not required Site Roof Drainage Collection $ Roof Drain Connections w/ Cleanouts 20 as $ included Yard Drains 3 as $ included PVC Storm Rain Leaders 1,800 If $ . included DIP Storm Rain Leaders 250 8 $ . included Site Utilities - Water 1 Is 394933.00 $ 394 933 to inos / gory plumbing Domestic Water Piping it $ 2-1/2' Piping 511 If $ - included 2' Piping 40 If $ - included 1" piping 47 it $ - included Valves & Fittings 16 as $ included 4" Backflow Preventor 1 as $ included Relocate Meter Assembly 1 ea $ - Included Sample Points / Test 4 as $ - included Connect Existing Services 3 as $ included Site Utilities - Fire Is Fire Line Piping If $ 8" Piping 344 If $ lincluded 6" Piping 16 If $ - included 4' Piping 234 If $ - Included Remove Existing H drant Assembly as not r uired Hvdrant Assembl 2 ea $ included Fire Department Connection 2 ea $ included Valves & Fittings 17 ea $ included Roadway Boxes & Covers 3 as $ included 8" Double Check Valve Assembly 1 ea $ included Tie In Building Services 31 ea 1 $ included Site Utilities - Sewer Is $ in site earthwork, dcve-I. Manhole Structures 1 as $ included Relocate 6" C-900 PVC Piping If $ - not included or defined Sanitary Piping If $ 6' Piping 139 If $ - included 4" Piping 467 If $ - included 2" Piping 74 If $ - included Condensate Piping 315 $ included Fittings 15 as $ Included Grease Traps ea in lumbin Tie In BuildingServices 7 ea $ included Tie In Existing Services 21 ea 1 1$ 1 lincluded Rehabilitate Existing Manhole I I ea I I I Inot required ESTIMATE SUMMARY FOR KEY WEST INTERNATIONAL AIRPORT TERMINAL BUILDING NOVEMBER 15, 2006 MONROE COUNTY THE MORGANT GROUP INC. GMP PHASE - URS DOCUMENTS DATED June 26 or August 4 Unit GMP Bid Bid Packs Desert Ion Ouent Units cost Estimate Remarks Packs at $ 2H She Fencin Is in ass construction Tom to Fence / Rem - Com and in ase construction Tern ra Fence / it /Relocation It Is 10000.00 $ 10,000 allowance Tennis Nettin ® Beach Dining Is not included 2J Ird lion 1 Is 217000.00 $ 217,000 o landsca in 2K Landsca 'n - Allowance Included Ornamental Trees ea included Palms ea included Shrubs / Ground Cover ea st included Sod c included Plantin Soil c included Plantin Mulch wks Included Maintenance - i Year $ - 2L Au or Piles 82 Is ea 809.78 $ 50,000 lu ant. 'lu ant. Au r Piles . Phases 1 & 2 437 ea445,808 included Au er Piles - Phases 3 -a $ - 16" Au er Piles 10,810 If If - Included Remove S Is 10,810 519 as 163.78 $ 85,000 american ile cunin Cut Piles Incl. Excavation & Stone 1 Is 40,000.00 $ 4o,000 american indn. Test Pro ram Included 2M She Im rove ments 2 695 029 DIVISION TWO 3A Cast - Place -Concrete Buildin s 1 Is 5250000.00 $ 5,250,000 a ex sf $ included Cast -Place -Concrete Gare Concrete Foundations - Build n s $ included Foundation Excavation - Machine 152 1,152 c $ included Foundation Backfill - Machine c $ included Foundation Excavation - Hand 547 c $ - included Foundation Backflll - Hand 377 $ - included Foundation Fine Grade 3,402 of $ - included Foundation Ed a Form Continuous 450 sf $ - includetl Foundation Edge Form Column 819 sf $ included Foundation Edge Form Pile Caps 8,528 sf $ - included Grade Beam E e Forms 1 153 1 at $ - Included Set Anchor Bogs 550 I ea $ - included Grout Column Base Plates 96 ea $ - includetl Foundation Reber 14 to $ included Foundation Concrete Continuous - 5000 i 18 I c Foundation Concrete Column . 5000 nsi 28 c $ included Foundation Concrete Pile Ca - 5000 si 551 c $ Included Foundation Concrete Grade Beams - 5000Psi 8 c $ includetl Concrete Foundations - Garage c $ included Foundation Excavation 1,316 c $ - includetl Foundation Backfill 898 c $ included Foundation Fine Grade 4,485 st $ - included Foundation Ede Form Continuous 1,420 at $ included Foundation Ed a Form Column 84 sf $ included Foundation Etl Form Pile Ca 6,434 at not r ulred Set Anchor Bohs oa not required Grout Column Base Plates ea $ included Foundation Reber 10.62 to $ included Foundation Concrete Continuous - 5000 at 147 c Foundation Concrete Column - 5000 psi 3 c $ - Included Foundation Concrete Pile Caps - 5000 ps, 1 378 c:, $ included Concrete Slabs on Grade - Buildin s Isf $ included Subsoil Termite Treatment 1 17,454 1 sf Slab on Grade Fine Grade 1 17,454 sf 1 4- $ included Slab on Grade Hand Excay. T. Slab 42 c Slab on Grade Backfill T. Slab 17 c $ - included Slab on Grade 10 Mil Vis ueen 19,199 sf $ - included Slab on Grade Trowel Finish 17,454 st $ includetl Slab on Grade Prated & Cure 17,454 sf $ included Slon Grade Control Joints ab 3,621 If $ . included Slab on Grade Ed a Form 2,100 sf $ included Slab on Grade 1/2" Exp. Joints 1,386 If $ - included ESTIMATE SUMMARY FOR KEY WEST INTERNATIONAL AIRPORT TERMINAL BUILDING NOVEMBER 15, 2006 MONROE COUNTY THE MORGANTI GROUP INC. GMP PHASE - URS DOCUMENTS DATED June 26 or August 4 Bid Packs a Bid Package Description Quantity Units Unit Cost GMP Estimate Remarks Slab on Grade Wire Mesh 19,199 st $ - included Slab on Grade Reber 0.32 in $ - included Slab on Grade Concrete - 5000 i 436 c $ - included Concrete Slabs on Grade - Garage sf in site walks 2e Concrete Trenches - Garage c Trenches Hand Excay. T. Slab 37 c $ included Trenches Backfill T. Slab 12 c $ - included Trench Forms 1,188 sf $ included Trenches Point & Patch Concrete 1,188 at $ - included Trench Reber 1.65 to $ - included Trench Concrete - 5000 psi 48 c $ included Concrete Walls - Buildin s c Wall Forms 9,039 sf $ - included Wall Point & Patch Concrete 9,008 st $ - included 2x4 Wall Keyways 178 If $ - included 6' PVC Wall Watersto 142 If $ - included Wall Form Hardware 4,504 1 sf I $ - included Well Reber to $ - included Wall Concrete - 5000 psi c $ - included Concrete Walls - Garage c Wall Forms sf $ - Included Well Point & Patch Concrete P4.675 sf $ - Included 2x4 Wall Ke a s If $ - included 6' PVC Wall Watersto If not r ulred Wall Form Liner sf $ - included Wall Form Hardware sf $ included Wall Reber 10 to $ - included Wall Concrete - 5000 psi 82 c $ - included Concrete Columns - Buildings c Column Forms 11,778 at $ - included Chanter Strips 3,584 If $ - included Column Forms - 24" Dia. 46 If $ included Column Forms - 36' Dia. 276 0 $ included Column Form Liner 2,137 sf 1 $ W Included Column Point & Patch Concrete 14,665 1 sf $ - included Column Reber 43 to $ included Column Concrete - 5000 psi 393 c $ included Concrete Columns - Garatie c Column Forms 20,877 sf $ - included Chamfer Strips 6,985 If $ - included Column Form Liner 4,900 at $ included Column Point & Patch Concrete 20,877 at $ - included Column Reber 68 to $ lincluded Column Concrete - 5000 psi 625 c $ included Concrete Beams - Buildings I c Beam Soffit Forms 7,476 sf $ - included Beam Side Forms 16,930 at $ included Chamfer Strips 5,687 If $ - Included Beam Point & Patch Concrete 24,405 sf $ - Included Beam Reber 132 to $ included Beam Concrete - 5000 psi 916 c $ included Concrete Beams - Garage c Beam Soffit Forms 14,020 sf $ - Included Beam Side Forms 28,040 sf $ lincluded Chamfer Strips 9,347 If $ - included Beam Point & Patch Concrete 42,061 sf $ - Included Beam Reber 171 to $ included Beam Concrete - 5000 psi 1,682 c $ included Supported Slabs - Buildings sf Supported Slab Forms 459 sf $ - included Supported Slab Edge Forms 98 sf included Key Formed Slab Construction Joint If $ not required Supported Slab Trowel / Broom Finish 459 sf $ - included Supported Slab Point & Patch Concrete 459 sf $ - included Supported Slab Protect & Cure 459 sf $ - included Supported Slab Reber 1 to 1 $ - I lincluded Supported Slab Concrete - 5000 psi 1 91 c $ Included ESTIMATE SUMMARY FOR KEY WEST INTERNATIONAL AIRPORT TERMINAL BUILDING NOVEMBER 15, 2006 MONROE COUNTY THE MORGANTI GROUP INC. GNP PHASE - URS DOCUMENTS DATED June 26 or August 4 Bid Packs Description Quantity Units Unit Cost GMP Estimate Remarks / Finish PSI Slab System - Buildings Formed Slab Construction Joint 243 If $ - included F PSI Slab System Trowel Finish 37,991 sf $ - included F PSI Slab System Protect & Cure 37,991 sf $ - included F PSI Slab System Reber 33 to $ - included F PSI Slab S stem Concrete - 5000 psi ISecondary 779 c $ - Included / Finish PSI Slab System - Garage Formed Slab Construction Joint 228 If $ - included F PSI Slab System Trowel / Broom Finish 64.942 sf $ - included F PSI Slab System Protect & Cure 64.942 sf $ - included F PSI Slab System Reber 93 to $ - included F PSI Slab System Concrete - 5000 psi 1.227 c $ - Included nds Lt. Wei M To 'n Slab - Buildin s 26.309 sf 5.32 $ 140,000 allowance onds Lt. Wt. Topping Slabs Trowel Finish 26,309 at $ - Seconda Lt. Wt. Topping Slabs Protect & Cure 26,309 sf $ - Seconde Lt. Wt. T n Slabs Conc - 3000 1 338 c $ Seconds To in Slabs on Deck - Buildings Seconds Topping KeyFormed Slab Const. Jt. 243 If $ Seconds To 'n Slabs Trowel /Broom Finish 33,099 sf $ - Seconde To n Slabs Protect & Cure 33,099 at $ Seconds To 'n Slabs Wire Mesh 36,408 sf $ Seconds Topping Slabs Concrete - 3000 i 366 c $ Seconds Topping Slabs on Deck - Garage Seconds To in Slabs Curb Ede Forms 2,762 If $ - included Seconds To n Slabs Trowel / Broom Finish 15,970 sf $ - included Seconds Topping Slabs Protect & Cure 15,970 sf $ - included Seconds Topping Slabs Wire Mesh 17.567 at $ Seconds Topping Slabs Concrete - 3000 psi 311 c $ - Included Slab over Metal Deck - Buildingssf Slab over M i. Deck KeyFormed Slab Const. Jt. 38 If $ Slab over Metal Deck Trowel Finish sf $ - included Slab over Metal Deck Protect & Cure sf $ - included Slab over Metal Deck Wire Mesh sf $ - included Slab over Metal Deck Reber to $ Slab over Metal Deck Concrete - 5000 LW i c $ Slab over Metal Deck Concrete - 5000 i c $ - included Place & Finish Metal Pan Stairs - Buildingssf 1426 Metal Pan Stairs Finish sf $ - included Metal Pan Stairs Protect & Cure Slabs sf $ - included Metal Pan Stairs Concrete - 3000 I c $ included Cast -In Place Stairs - BuildingsIs Cast -In Place Stairs Finish sf $ - included Cast -In Place Stairs Point & Patch sf $ - Included Cast -In Place Stairs Protect & Cure at $ lincluded Cast -In Place Stairs Form 1,175 sf $ - included Cast -In Place Stairs Set Safety Nosin If $ not required Cast -In Place Stairs Reber 0.91 to $ included Cast -In Place Stairs Concrete - 5000 psi 20 c $ included Cast -In Place Stairs - Garage Is Cast -In Place Stairs Finish 330 sf $ included Cast -In Place Stairs Point & Patch 644 sf $ - included Cast -In Place Stairs Protect & Cure 330 sf $ - included Cast -In Place Stairs Form 969 sf $ included Cast -In Place Stairs Set Safety Nosing If $ inot required Cast -In Place Stairs Reber 0.80 to $ lincluded Cast -In Place Stairs Concrete - 5000 psi 16 c $ included Tilt -Up Panels Is not required Equipment Pads sf $ Equipment Pads Trowel Finish 776 sf $ Included Equipment Pads Protect & Cure 776 sf $ included Equipment Pads Ede Form 1 145 1 sf 1 $ included Equipment Pads 1/2" Exp. Joints 30 If 1 $ - Included Equipment Pads Wire Mesh 853 at $ included Equipment Pads Concrete - 3000 psi 10 c $ - included Monumental Sign / Entry Wall Concrete I inot required Flag Pole Foundation as not re uired Set Bike Racks ea $ - ESTIMATE SUMMARY FOR KEY WEST INTERNATIONAL AIRPORT TERMINAL BUILDING NOVEMBER 16, 2006 MONROE COUNTY THE MORGANTI GROUP INC. GMP PHASE - URS DOCUMENTS DATED June 26 or August 4 Bid Packag011 Bid Package Description Quantity Units Unit Cost GMP Estimate Remarks Excavation 20 c $ lincluded Concrete 20 c $ included Set Bike Racks 10 as $ - included Set Pipe Bollards as $ Excavation 6 c $ included Concrete 6 c $ included Set Bollards 10 1 ea 1 $ included 3B Precast Concrete Systems 1 Is 756628.00 $ 756,628 cds manufacturing Precast Slab Systems Buildings 37,991 sf $ - Included Precast Slab Systems Garage 64,942 sf $ included Precast Wall Panel Systems - Buildings 985 sf $ lincluded Precast Wall Panel Systems - Garage 9,304 sf $ lincluded DIVISION THREE $ 6 148 628 4A Unit Masonry 1 Is 433111.00 $ 433,111 and arnold masonry Set / Grout HM Frames Door 11 1 as 1 $ included Set / Grout HM Frames Window as 1 $ not required Exterior CMU Walls at Mortar 44 c $ included 8x8x16 Standard Weight CMU 8,016 ea $ - Included 12x8x16 Standard Weight CMU 10,661 as $ lincluded 8x8x16 Standard Weight CMU Bond Beam 2,794 as $ - included 12x8x16 Standard Weight CMU Bond Beam 1,391 ea $ - included Precast Lintel 206 If $ - included 8' Dur-A-Wall Mill Galvanized 5,188 If $ - included 12' Dur-A-Wall Mill Galvanized 1 6,894 If $ - included Thru-Well Flashing w/ Weep Holes If $ not required Asphalt DamDroofino Troweled sf $ not required V Rigid Insulation sf $ in drywall div. 9 Masonry Reber 12.72 to $ - included Fill CMU Voids w/ Concrete 227 cy Included Exterior Tubular Scaffolding 16,537 sf $ - included Exterior Brick Tile Walls Is Mortar 7 c $ included Standard 4x2-2/3x8 Face Brick 7 m $ - included Standard 4x1x8 Face Brick Tile 5 m $ - included Soldier Face Brick 62 If $ Precast Cap Band 63 If $ - included Brick Wall Ties 8 Anchors 1 m $ included Steel Lintel 62 8 $ - included Clean Face Brick 1,608 sf $ lincluded Exterior Tubular Scaffolding 1,608 sf $ - Included Interior CMU Walls sf Mortar 5 c $ included 4x8x16 Standard Weight CMU 308 as $ 6x8x16 Standard Weight CMU 509 ea $ 8x8x16 Standard Weight CMU 1,896 ea $ - included 12x8x16 Standard Weight CMU I as 1 $ - not required 8x8x16 Standard Weight CMU Band Beam 344 ea $ - included 12x8x16 Standard Weight CMU Bond Beam as $ - not required Precast Lintel 25 If $ lincluded 4" Dur-A-Wall Mill Galvanized 399 If $ 6" Dur-A-Wall Mill Galvanized 656 If $ 8" Dur-A-Wall Mill Galvanized 1 1,492 It $ - included 12" Dur-A-Well Mill Galvanized If $ - not required A5 half Dam roofin Troweled sf Masonry Reber 0.95 to $ included Fill CMU Voids w/ Concrete 10 1 c $ included Interior Tubular Scaffolding 1,559 sf $ included Monumental Sign / Entry Wall CMU $ not r uired DIVISION FOUR $ 433,111 SA Structural Steel - Buildings 1 Is 1995000.00 $ 1,995,000 trwit Structural Steel - Garage st included Cost Impact BullBtn 1 to Bulletin 2 1 Is 85000.00 $ 85,000 trinity ESTIMATE SUMMARY FOR KEY WEST INTERNATIONAL AIRPORT TERMINAL BUILDING NOVEMBER 15, 2006 MONROE COUNTY THE MORGANTI GROUP INC. GMP PHASE - URS DOCUMENTS DATED June 26 or August 4 Bid Package Bid Package Description Quantity Units Unit Cost GMP Estimate Remarks FAA Buy American Act 1 Is 100000.00 $ 100,000 trinity Structural Steel Framing - Buildings to included Structural Beams 381 to $ included Structural Columns 48 to $ included Structural Channels 1 to $ 7 included Structural An les 47 to $ included Structural Plates 45 1 to $ - included Structural Tubes 50 to $ included Structural Pipe Columns 6 to $ lincluded Anchor Botts Material Only) 2,329 lb $ - included Shop Paint Steel 970 s $ - included Structural Steel Framing - Truss I Bridge Framing to Structural Beams 8 to $ included Structural Columns 6 to $ included Structural An les 2 to $ - included Structural Plates 2 to I $ included Shop Paint Steel 45 1 s $ - included Structural Steel Framin - Dormer Framing to included Misc. Metals - Buildings to Misc. Steel Till -Up to inot required Misc. Steel Beams 0.11 to $ - included Misc. Steel Channels 0.22 to $ - included Misc, Steel Angles 0,33 to $ - included Misc. Steel Plates 0.80 to $ - included Structural Pipe Columns 0.22 to $ - included Shop Paint Misc. Steel 3 s $ - included Concrete Filled Pipe Bollards 10 as $ - included Stair Safety Nosing 553 If $ - included Elevator Pit Ladders 48 If $ - included Steel Stair / Horizontal Handrail 134 If $ lincluded Steel Wall Handrail 304 If $ fincluded Aluminum Stair Wall Handrail 111 If $ - Included Aluminum Wall Handrail If $ not required Stainless Steel Railing & Glass Panel System 244 at 1 98.22 $ 24,000 allowance Structural Metal Pan Stair System 12,173 lb $ - included Misc. Metals - Gars Is $ Precast Connection Welds 1 Is 20000.00 $ 20,000 allowance Stair Safety Nosing 560 If $ - included Aluminum Stair Wall Handrail 140 If $ - included Aluminum Wall Handrail If $ - included Steel Joists - Buildings to $ Steel Joists Sense K 4 to $ - lincluded Steel Joist Bridging 0.42 to $ - included Metal Decks - Buildings sf I I included 1 - 1/2' Metal Floor Decks 12,548 sf $ - included 2' Metal Floor Decks 912 sf $ - Included 9/16" Metal Wall Decks 12,448 at 1.61 $ 20,000 trinity 1 - 1/2' Metal Roof Decks 10,691 sf $ - included 3' Metal Roof Decks 50,512 sf $ - included Field Touch -Up Painting - Buildings 1,019 s $ - included Monumental Sign / Entry Wall Misc. Metals Is $ not required 5B Pre -Engineered Trusses sf $ inot required 5C Expansion Joint Covers 1 Is 71000 $ 71,000 capital Expansion Joint Covers - Type 1 FI - FI 443 1 If 1 $ Expansion Joint Covers - Type 2 FI - FI 263 If $ Expansion Joint Covers - Type 3 FI - FI 59 If $ Expansion Joint Covers - Type 4 W - Cr 75 It $ Expansion Joint Covers - Type 4 W - Cl 43 It $ Expansion Joint Covers - Type 5 W - W 19 If $ Expansion Joint Covers - Type 6 W - Cr 103 If $ Expansion Joint Covers - Type 7 R 59 If $ in div. 7 roofing DIVISION FIVE $ 2 315 O00 6A Rough Carpentry 1 Is 39851.00 $ 39,851 allowance Exterior Rou h Ca ant Is b trades Interior Rou h Car ant i Bucks sl bv trades ESTIMATE SUMMARY FOR KEY WEST INTERNATIONAL AIRPORT TERMINAL BUILDING NOVEMBER 15, 2006 MONROE COUNTY THE MORGANTI GROUP INC. GMP PHASE - URS DOCUMENTS DATED June 26 or August 4 Bid Package Bid Package Description Quantity Units Unit Cost GMP Estimate Remarks 6B Millwork & Casework 1 Is 401547.00 $ 401,547 concepts plus Rome'Car Counters 66 If included Plastic Laminate Counter Tops 39 If included Rest Room Solid Surface Counter Tops 70 If included Coffee Bars Lower & Upper Caomets 9 If $ - included Ticketina Booths 42 If included Snack Bar If I not reciuired Resturant Bar 41 If not reauired Gift Shop Counter 29 If included Counter / Shelving 20 If included Tickelino Counters 112 If included Solid Surface Sills & Aprons 343 If 87.40 $ 30,000 allowance Frieght 1 Is $ - included Installation 430 8 $ - included DIVISION SIX $ 471,396 7A I(Caulking & Sealants 26,6671 If 3.64 $ 97,000 capital DamDoroofina Elevator / Escalator Pits 712 at included Water Repellents 6,635 Is 2.08 $ 13,800 capital Traffic Coatino 72,765 at 2.26 $ 164,800 capital Caulkino Exterior Window Joints If In aluminum storefronts Caulkino Interior Joints If in painting 7B Sprayed Fireproofing sf $ not required 7C Roofina & Sheet Metal Is 1 $ Modiified Bituminous Roolino 218 sq 830.26 $ 181,000 structural restoration Modilfled Bituminous Roofing 218 s Modiified Bituminous Roofing - Parapets 20 s 2" Roof Insulation 20,934 sf Aluminum Sheetmetal 4,535 sf Aluminum Gutters 248 8 Aluminum Downspouts 156 If Roof Scuppers 16 as 4'x4' Roof Drain Sumps 19 as Patchino Around New / Existing Equipment at 1 $ Included Modified Bituminous Roofing 6 s 2" Roof Insulation 589 at Aluminum Sheetmetal 372 at Standino Seam Metal Rootina 507 sq 1274.04 $ 645,940 structural restoration Standing Seam Metal Roofing 507 s Material Price Increases Is $ not required 2" Roof Insulation 1,642 at 4" Roof Insulation 49,093 Aluminum Sheetmetal 8,634 at Aluminum Downspouts 155 If Roof Expansion Joints 88 0 669.92 $ 59,120 structural restoration Equipment Screen Is not required Flashin & Sheetmelai Is included Manufactured Roof Specialties $ Roof Walkway Pads sf included DIVISION SEVEN It 1,161 660 8A Hollow Metal Doors & Frames 1 Is 136120.00 $ 136,120 nrr, one HIM Door Frames 110 as 1 $ HM Door Frames w/ Side Lites as $ HIM Window Frames 5 as $ HIM Window Frames Special 1 as $ HIM Doors - Flush 87 as $ HIM Doors - Half Glass 1 as $ HIM Doors - Full Glass as $ HIM Doors - Lre Kits 37 as $ 8B Wood Doors as I Inot r uired 81C Finish Hardware 136 sets $ in h,;llow ..nrtal d & f 8D Door / Hardware Installation 1 Is 54730.00 $ 54,730 arc one Door Installation 136 ea $ Hardware Installation 1361 sets I $ -11 ESTIMATE SUMMARY FOR KEY WEST INTERNATIONAL AIRPORT TERMINAL BUILDING NOVEMBER 15, 2006 MONII COUNTY THE MORGANTI GROUP INC. GMP PHASE - URS DOCUMENTS DATED June 26 or August 4 Unit GMP Bid Packa Bid Package Descrl on GueMl Unite Cost Estlmela Remarks 8E Overhead Doors / Grilles 1 Is 148810.00 $ 148,810 oh doors of s. fl. Overhead Doors 64 sf $ $ - Included Fire Shutters 108 143 sf sf $ - included Smoke Curtains 565 sf $ - includetl Secu' / Fire Shutter Shutters Smoke Curtains Existing Buildings 1 Is 30000.00 $ 30.000 allowance 8F Aluminum ,/ Storefronts & Windows 1 Is 963247.00 $ 963,247 southern walls Aluminum Storefronts I lincluded Curtain Well S stem 4,620 1 lincluded Aluminum Windows 367 sf included Structural Glazing 126 383 sf included Glass & Glazing sf Wall Mounted Mirrors 360 sf included eG Auto-Slidin Doors 11 ea DIVISION EIGHT 1,332,907 9A Stucco / Plaster / Drywall 1 Is Is 353700.00 $ - $ 353 700 nealhany const. Exterior Stucco Packa e If $ - included 6" Runner Track 3,507 If $ - included 6" Metal Studs 9,755 $ - included Stucco Exterior Matal Lath 3,338 s Stucco Exterior Walls 3,408 s $ included Exterior Cementious Coalin s 9,897 s $ in aintin Cast - In - Place Columns 2,650 s $ linclucea Cast - In - Place Beams 7,247 s $ - included Stucco Exterior Soffit / Ceiling Package s $ - included Stucco Exterior Hanging Rods 3,399 If $ - included Stucco Exterior 1-1/2Channel Framing 3,756 If $ - included Stucco Exterior 314" Channel Framing 11,284 If $ - included Stucco Exterior 2 1/2" Metal Runner Rrack 947 If $ - included Stucco Exterior 2 1/2" Metal Stud Framin 2 138 If $ - included Stucco Ezterlor 3 5/8' Metal Runner Track 1,660 It $ - Included Stucco Exterior 3 5/8' Motel Stud Fremin 829 If $ - includetl Stucco Exterior Matal Lath 2,033 s $ - included Stucco Extedor Sotttts / Ceilings 1,875 s $ - included Interior Plaster Packa e sv not required Ent Wall Stucco not required Interior D all Packa aI Wall S tams 1 Is 1708317.00 $ 1,708,317 interior details 6" Metal Studs 6,805 If $ - included 6' Metal Stud Track 1,122 If $ - included 3-5/8' Metal Studs 28,541 If $ - included 3-5/8" Metal Stud Track 6.260 if $ - included 3l4' Metal Furdn Channel 7,308 If $ - included 5/8' Gypsum Board 118,480 sf $ - lincluded Drywall Screws & Hardware 97.545 sf I $ - lincluded Perfatape & Joint Cement 97.545 sf $ - included 6" Batt Insulation 14,182 sf $ - included 4" Batt Insulation 36.286 sf $ - included 1" Rigid Insulation 9,274 at $ - included Interior D all Packa a Ceilin S stems Is $ 6" Metal Studs 3,455 If $ - included 6" Metal Stud Track 1,156 If $ - included 3-5/8' Metal Studs 22,624 If $ - included 3-518" Metal Stud Track 26,116 If - included 7-1/2" Metal Studs 228 If $ - included 7-1/2" Metal Track 449 If $ - included Resilient Furrin Channel If $ - Included Han in Rods 8 $ - Included 5/8" G sum Board sf $ - included Pedata e & Joint Cement sf $ - included D wall Screws &Hardware sf $ - included Site Im rovements 435 Is not included Glass Reinforced G um Fabrications - Walls sf $ included Glass Reinforced Gypsum Fabrications - Columns ea $ - includetl Tile Is $ In terrazzo flo)rinc Floors sf included Base If included ESTIMATE SUMMARY FOR KEY WEST INTERNATIONAL AIRPORT TERMINAL BUILDING NOVEMBER 15, 2006 MONROE COUNTY THE MORGANTI GROUP INC. GMP PHASE - URS DOCUMENTS DATED June 26 or August 4 Bid Packa Bid Package Description Units Unit Cost GMP Estimate Remarks Ceramic Tile Walls sf included Ouar Tile Floors 06,220 st included Ouar Tile Base If included Ouar Patchin sf 6.61 $ 10,000 allowance Marble Sills If not re uired 9C Floor Finishes Is 37780.00 $ 37,780 acousti Vinyl Tile Floors 3,681 1 sf I Included Sheet Vinyl Floors 2,689 sf fincluded Carpet Matta st not required Floor Preparation 6,370 sf 1.18 $ 7,500 allowance Terrazzo Floating 34,999 sf 22.23 $ 778,148 artistic surfaces Cost Impact Bulliten 1 to Bulletin 2 1 Is 23859.00 $ 23,859 artistic surfaces Rubber Base 6,649 If included Carpet Base If not required 9D Acoustic Ceilings / Walls 1 Is 516,100 $ 516,100 interior details Acoustical Ceilings 24,487 at $ - included Acoustical Metal Ceilings - Interior 7,177 1 at 1 $ - included Acoustical Metal Ceilings - Exterior 8,728 sf $ - lincluded Acoustical Wall Panels sf not required 9E Metal Wall Panels 1,364 sf $ - included 9F Painting Buildings 1 Is 242373.00 $ 242,373 spectrum Cost Impact Bulliten 1 to Bulletin 2 1 Is 287002.00 $ 287,002 spectrum Paint Exterior Walls Stucco sf included Exterior Cementious Coatings sf included Paint Exterior Soffits / Ceilings sf included Paint Exterior Exposed Ceilings sf included Paint Exterior Door Faces 28 1 as included Paint Pipe Bollards as lincluded Seal Interior Floors at included Paint Interior Walls sf included Paint Interior Soffits / Ceilings sf included Paint Interior Exposed Ceilings sf included Paint Interior Door Faces 258 as included Paint Interior Metals sf included Epoxy Coat Walls sf included Epoxy Coat Ceilings sf not required 9G Brush Blast Concrete Finish Garage Is not required DIVISION NINE 3,964,779 10A Marker / Tack Boards Is not required 10B Toilet Partitions / Screens 1 Is 177000.00 $ 177,000 descon Partitions STD as Included Partitions HC as included Screens as I included 10C Flagpoles 3 as 5466.67 $ 16,400 descon Relocate Monuments 3 as $ in site earthwork: devei. 10D Identifying Devices / Si na e 1 Is 150000.00 $ 150,000 allowance / owner Restroom w/ HC Symbol as included Room Name 8 Number ea included Room Capacity as included Pull Station Inside ea included Fire Extinguisher Inside as included No Smoking as included Aluminum Plaque as I included Exterior Metal Letters included 10E Relocate Existing Si na a 14 as 475.00 $ 6,650 allowance 10F Metal Shelving Is inot required 10G Lockers Is not required 101-1 Toilet Accessories Is $ in toilet adilier_ Framed Mirror as included Paper Towel / Waste Receptacle as included Toilet Tissue Dispenser ea included 32" Straight Grab Bar as included 42" Straight Grab Bar ea included SoapDispenser ea included Sanitary Napkin Dispenser as I included ESTIMATE SUMMARY FOR KEY WEST INTERNATIONAL AIRPORT TERMINAL BUILDING NOVEMBER 15, 2006 MONROE COUNTY THE MORGANTI GROUP INC. GMP PHASE - URS DOCUMENTS DATED June 26 or August 4 Bid Package Bid Package Description Quantltv Units Unit cost GMP Estimate Remarks Sanitary Napkin Disposal as included Folding Ba Changing Table as included Moo & Broom Holder as included 10J Fire Extinguishers / Cabinets 1 Is 11200.00 $ 11,200 descon Cabinet / Extinguishers as included Wall Bracket Extinguishers as included 10K Well / Corner Protection 266 1 If 25.001 $ 6,650 allowance ioM Wire Mesh Partitions at Inot required ION Operable Walls sf Inot required 10P Aluminum Shade Devices at not required 10Q Storm Shutters as not included 10R Canvas Awnings not r uired JOS Tennis Screen Roof Enclosure 3,300 sf in fencing & s.steel div. 5 10T Bike Racks 2 as 1857.50 $ 3715 descon General Cleaning& Misc. Labor 1,536 lure 20.00 $ 30,720 Final Cleaning 85,497 i sf 0.47 $ 40,000 DIVISION TEN $ 442 335 11A Food Service Equipment Is by building tenant Bar Service Equipment Is by building tenant Kitchen Hood Fire Suppression System Is by building tenant 11 B Domestic Appliances sf not required 11C Projection Screens Is not required 10' x 10' Motorized as included 5' x 5' Manual I as I not required 1113 Parking Equipment 1 Is 85180.00 $ 85,180 me ann Ticket Spitler 1 as $ - Included Cashier Booth 1 as $ - included Barrier Gates 2 as $ Included DIVISION ELEVEN $ $5 180 12A Window Treatment Is not required or spaced 12B Entrance Floor Mats Is not required or spaced 12B Lab Casework Is I not required 12C Airport Seating 1 Is 225000.00 $ 225,000 allowance / owner Material as $ Frieght ea $ Installation as $ DIVISION TWELVE S 225000 13A Pre -Engineered Buildings sf not required DIVISION THIRTEEN 1 1 $ 14A Elevators 1 Is 516260.00 $ 516,260 thyssenkrupp Elevator 2 - Stop Pasen er 5 ea included Elevator 2 - Dumbwaiter 1 as 65700.00 $ 65,700 1hyssenkrupp 14B Escalators 1 as included 14C Baggage Handling Systems 1 Is 978000.00 $ 978,000 q&s mech. Demolition Existing Equipment Is Included Demolition Existing Claim Unit 76 If included Demolition Existing Ticket Conveyor ill If included Ticket Counter Conveyor 95 1 If I included Power Turns & Indexing Equipment 7 as included Inclined / DeclineTranspon Conveyor 72 If included Queue Conveyor 18 If included Mere Conveyor 5 If included Transport Conve or 154 If included Forward & Store Conveyor 50 If included Slope Plate Make -Up Unit 1 107 If included Claim Unit 60 If included Flat Contingency Chute 36 If lincluded Fire / Security Doors 5 ea Iincluded Draft Curtains 6 ea I lincluded ESTIMATE SUMMARY FOR KEY WEST INTERNATIONAL AIRPORT TERMINAL BUILDING NOVEMBER 15, 2006 MONROE COUNTY THE MORGANTI GROUP INC. GMP PHASE - URS DOCUMENTS DATED June 26 or August 4 Bid Packe Desert Ion Ouantl Units Unit Cost GMP Estimate Remarks trol Stations 26 as included to Sensors 28 ea included r Control Panels 3 ea included in Horns 12 ea included rail 193 If included sition Crossover Rails 2 ea included r' Check -In E ui ant N Is not r uired ION FOURTEEN $ 1559960 Gn 1 Is 688475.00 $ 688,479 fidwell olition 1 Is $ includetlase Tra ea includedestic Water If includedta Sewer If included Condinsate If included Root Drainage If Included Fixtures ea Included Gas Piping not required 158 Fire Protection Buildings 1 Is 723799.00 $ 723,799 1 lcox fire protection Water Curtains $ included 1000 gpm Fire Pump Included Fire Protection Garage I5 $ included 15C HVAC 1 Is 2662000.00 $ 2,662,000 Isuperior Demolition 1 Is $ Included E ui em included Dud Work / Distribution Devices included Fans / VAV Boxes included Louvers / Vents included Controls included Testing & Balance by owner DIVISION FIFTEEN It 4,074,274 16A Electrical Buildings / Site 1 Is 5538650.00 $ 5,538,650 florida ke s electric Electrical Garage sf lincluded Demolition 1 Is $ - included Lighting included Power included Emergency Power included Wiring included Fire Alarm included Lightning Protection included Telecommunications / Security included Telephone Specialties Wall Mounted Pay Phones Pedestal P2y Phones Kiosk Pay Phone Units PA Systems included Marquee Sign Stub Out included DIVISION SIXTEEN $ 6,638,650 Construction Conthilency Is $ r contract Alternates & VE Items 1 Is 3262708.00 $ 3,262,708 KW IA Sales Tax Savings Goal 1 Is 225000.00 $ 225,000 SUB TOTAL - DIVISIONS 2 - 16 $ 26 958 203 Bud et for General Requirements 1 Direct Cost Items General Requirements 1 Is 672000.00 $ 672,000 Insurance & Bands $ Payment / Performance Bond Is $ - 1st 7.5MiI. i Is 64,500.00 $ 64,500 Balance 22,078,050 Is 0.0068 $ 149,600 11 General Liability Insurance 29,578,000 Is 0.0131 $ 386.450 ESTIMATE SUMMARY FOR KEY WEST INTERNATIONAL AIRPORT TERMINAL BUILDING NOVEMBER 16, 2006 MONROE COUNTY THE MORGANTI GROUP INC. GMP PHASE - URS DOCUMENTS DATED June 26 or August 4 id Packs a Descrl Ion Ouantit Units Unit Cost GMP Estimate Remarks k 29,578,000 Is Is 0.0011 $ 32,780 b owner %Pre-ConstrucgfionFee - REIMBURSABLE DIRECT COST ITEMS S 1 305 330 Budgete Items ction Fee Construction Phase Fee Construction Mena ement Fee 1 1 1 Is Is Is 200000.000 2500000.00 goo $ 200,000 $ 2,600,000 $ 1,000.000 per contract per contract per contract SUB TOTAL - FEES 3 700 000 TOTAL KWIA ESTIMATE 262 372 /sf $ 121.83 $ 31,963,533 GENERAL CONDITIONS FOR KEY WEST INTERNATIONAL AIRPORT MONROE COUNTY THE MORGANTI GROUP INC. 3MP PHASE - URS DOCUMENTS DATED JUNE 26 or AUGUST 4 NOVEMBER 15, 2006 Utilization ITEM DESCRIPTION Rate QTY. Unit Unit Cost Subtotal Total Cost 1 - tNJ N LAYOUT Is. $ Layout Partitions sf. by trades $ Independent Surveyor Is. in 02100 $ As -Bulk Survey Is. in 02100 $ $ TEMPORARY FACILITIES Is. see below $ Field Office - Owner sf./ma. n/a $ Field Office - A/E sf./mo. n/a $ Field Mestina Trailer mo. n/a $ Set-up & Removal ea. n/a $ Field Office Trailer - Contractor 1 24 mo. 1341.67 $ 32,200 Set-up & Removal 1 1 ea. 5000.00 $ 5,000 Field Office Entry Platforms 1 24 mo. 75.00 $ 1,800 Set-up & Removal ea. 1000.00 $ - desks 1 4 ea. 500.00 $ 2,000 office chairs 1 41 ea. 100.00 $ 400 secretary desk 1 1 ea. 225.00 $ steel foldina chairs 1 151 ea. 15.00 $ 225 task chairs 1 1 ea. 165.00 $ 4-drawer fireproofed lateral file cabinet d rese marker board 1 21 ea. 822.50 $ 1,645 ea. 75.00 $ - Job Toolhouse mo. n/a $ - ;hemical Toilets - Contractor 10 21 mo 95.24 $ 20.000 Chemical Toilets - Owner / A/E MO. n/a $ - Se tic Holding Tanks - Owner mo n/a $ Septic Holding Tanks - Contractor mo n/a $ - Computer Servlee Set U 1 1 Is. 1000.00 $ 1,000 FO Computer Network ConnJCable Access 1 24 mo. 150.00 $ 3,600 Internet Access Connection I Provider 1 24 mo. 75.00 $ 1,800 Field Office Computer Stations - Contractor 1 4 ea. 1100.00 $ 4,400 Field Office Computer Stations - Owner 1 11 ea. 22000.00 $ 22,000 Network Maintenance 1 241 mo. 500.00 $ 12,000 TEMPORARY CONSTRUCTION Is. see below $ Temporary Job Fence / Rent If. in div. 2 $ Temporary Job Fence Repair / Relocation If. in div. 2 $ Wetland Barricades If. n/a $ Temporary Road sf. in div. 2 $ Temporary Parkin sf. n/a $ - Job Signs 1 1 Is. 6000.00 $ 6,000 Protect Trees I ea. n/a $ - Temporary Stairs 2 10 mo. 350.00 $ 7,000 Floor Protection sf. n/a $ OSHA Perimeter Protection/Safety 1 1 Is. 3500.00 $ 3,500 OSHA Opening Protection sf. Ind. $ - Safety Nets sf.atrades $ - Tem ors Covered Walkways1 10 mo.00 $ 20,000 Barricades 1 1 Is.00 $ 7,500 Scaffoldingsf. $ - Tem ore Partitions al. $ - Tem ors Fire Protection 1 1 Is.00 $ 1,250 Weather Protection MO.00 $ - Concrete Protection Is. $ Cut & Patch For Trades Is. $ Field Office Security System MO. n/a $ On -Site Security Guard mo. n/a $ 1of3 GENERAL CONDITIONS FOR KEY WEST INTERNATIONAL AIRPORT MONROE COUNTY THE MORGANTI GROUP INC. GMP PHASE - URS DOCUMENTS DATED JUNE 26 or AUGUST 4 NOVEMBER 15, 2006 Utilization ITEM DESCRIPTION Rate QTY. Unit Unit Cost Subtotal Total Cost CLEAN UP Is. see below $ General Cleaning & Misc. Labor hrs in div. 10 $ Final Cleaning sf in div. 10 $ Clean Paved Areas sf. by trades $ Clean Glass sf. incl. $ Trash Chutes fl. n/a $ 30 YO - Dum star 10 23 mo 776.13 $ 178,510 10 YD - Dum star ea. n/a $ - PERMITS allowance 1 1 Is. 2500.00 $ 2,500 Sanitary HookuP Is. n/a $ - Fire Line HookuP Is. n/a $ Police Detail - Street Opening day n/a $ Other Permits Is. SFWMD $ $ TESTING Is. $ SUPPLIES Is. see below $ Copier Paper 1 24 mo. 208.33 $ 5,000 Reimbursable PettyCash 1 1 Is. 500.00 $ 500 Copier Maintenance I ea. n/a $ - Digital Camera 1 1 ea. 350.00 $ 350 Progress Photos - Aerials mo. 100.00 $ ')rInkIng Water, lee & Cups 3 24 mo. 75.00 $ 5,400 Coffee Service mo. n/a $ - Reproduction Expenses 1 100 set 400.00 $ 40,000 As -Built Drawings 1 1 set 1000.00 $ 1,000 Final As -Built Survey Is. in site survey $ - Mlcrofilm Construction Documents Is. n/a $ UTILITIES Is. see below $ Trailer Water / Sewer Hook Up 1 1 Is. 7900.00 $ 7,900 TomporaryWiring Is. by trades $ Electric Service to Offices 1 1 Is. 9390.00 $ 9,390 Electric Service ® Offices 1 24 mo 312.50 $ 7,500 Telephone Hookup ea. n/a $ - Job Phone - Contractor w/Id 1 24 mo. 625.00 $ 15,000 Cellular Phones 4 24 mo. 156.25 $ 15,000 Job Phone - O/A 1 241 mo. 291.67 $ 7,000 Fax Machine w/o mo charges mo. 200.00 $ - Constructlon Power mo. incl. $ Construction Power - Initial mo. by owner $ Construction Power - w/ AC 1 5 mo. by owner $ Checkout Power Consumption mo. incl. $ - Water & Sewer Usage 1 24 mo. 450.00 $ 10,800 Water Connection Q Offices ea. 840.00 $ - Temporary Heat - fuel & maint. Is. n/a $ Early Cut On Permanent HVAC ea. n/a $ Fuel Costs Using Permanent HVAC mo. n/a $ HOISTING Is. by trades $ Irene Rental MO. b trades $ Scissor Lift Rental MO. by trades $ Freight For Hoist Is. by trades $ Material Hoist mo. b trades $ Personnel Hoist mo. b trades $ Tower Hoist mo. by trades $ 2 of 3 GENERAL CONDITIONS FOR KEY WEST INTERNATIONAL AIRPORT MONROE COUNTY THE MORGANTI GROUP INC. 3MP PHASE - URS DOCUMENTS DATED JUNE 26 or AUGUST 4 NOVEMBER 15, 2006 Utilization ITEM DESCRIPTION Rate OTY. Unit Subtotal Total Cost Hoist Foundation ea.$ - ea.$ Tem ore Loadin Dock Erect & Dismantle Hoist ea.$Jum $ - s O.T. For JUm s .$Hoist Int Platforms a.$Hoist Power Consum tion mo.$Hoist mo.$EOUIPMENT O rator Is. w $Field s.0.00 $ - Office E ul : O/A 1 1 ea.0.00 $ 6,500co co lerlar e&maintenance $ 700 ler small .0.00 wks. n/a $ Watchmen Service 1 1 Is. 25000.00 $ 25,000 Travel Ex nses 1 1 Is. 25000.00 $ 25,000 L I Services Is. n/a $ - Audltin Ex nses Is. n/a $ S lei Consultants $ WMBE Consultant Is. Is. n/a $ Deal n Fees Is. $ Architectural Fees $ MIE/P Design Fees Is. $ Structural Design Fees Is. $ iite Civil Engineering Fees is. $ Geotechnical Desi n Fees Is. $ Landscaping / Irri ation Design Fees Is. Food Service E ui ment Desi n Fees Is. $ Miscellaneous Design Fees Is. $ Project Closeout 1 1 Is. 3000.00 $ 3,000 Training Sessions Is. 2000.00 $ Testing & Turnover wks. 1 1 $ Ground Breaking1 1 Is. 3600.00 $ 3,600 SUB TOTAL REIMBURSABLE GENERAL CONDITIONS $ 672 000 3of3 gg m m m m m m m m 8 m m m m e E EVE b w Ila P a m w w NC qq n m N N w b 8 8 .e e e .e III e'.e a GUGUGUGU G .G G G M y INNNIN INN INN eS^C NN W l RR SIN N NON rLn Oc y_ EE Y o mmy � E Y� yO' .ICI LL Cm I I Y Z Q 3 IC. IN N�ilf0 �>, 9 k FK ! § ,k !!\ ))B Z§} . . Li ! ! � § � ,3 ��J ■f! /� �.��- k.� , \ { i/` /! � /�� Eco \{) \(; { & E 1f&}\\ !4 E - \) F3ƒ»iiii $7f) « >;r CIA Ell ¢ I d18 d J 3 d aO pp my �_ ID y Ol V O O CO J m C C m J V m C N C C C T {>y N m m O L C J¢ O r 8 J IL C T n n O O OC � C p� d cm T C C C T 'O d LL i z 3¢ c m 3 � d m coN Nm j N v,H 69 a m t m �mn t Z uLL LL — ME 10 E I N m m 2 coT JI O Y Y V N J L C (mLL ,1 C—— O 'O `O 4-1 a E CL m d c°' WI J �a ILL U)i 'm aui Y Z Q �¢ mm IU a I i II �+ LOUUI U; N C N C C co C C C O r U m N CLL N m d E R — m E, $ m Lm m is E a E � H �LL Hca � � n m N U G t O m Y c�p m C J LL d U p n to to� C O a� LL C 8 E a E of m N elm IeV5cn � a CO c o yca C7 c� Z C N o oyRiD o a f �7J. m I'a m e m c YZQ of 0 E' o p¢ L? 'o c`p'O 3 Il U a (0 =a0F m� i i I I II I, I LL pOp ' py pO C _ LL tam � 1q�1 '.. J 00 J m � J tr C� '. C *� C C O S «O 5r0. 7 g g c UyU 'pry yy y@ LL 2 q Cm m LL M M 8 8� YJ 8 C m OLL N J J JO j .. O a LL 2 ._ 3 m Ct C Cf C Cl C f0 O C O C WLi N 0 f9 f9 .. O c 0 12 p0W EpOp J J JO, J O G s wl J r OD �Q I m 3 r ¢ c Jo _ z '� ic�c c c C ca 'm g iLl :5 0 W J .= a C c p cpLy„ N C G V E $I i� N0 C N U Q Z o m U N N h >.-LIim C J W N'W. 5 J IC7 xza 3 Q iLI a is 0 mfs �> m' i I O 2 R C III O �O OW m f9I C ICa If9 T CL 'j ', Y C O y O^1 �p C C L C 8O c c L Oj ¢� �Dp�O C C IC O C 01 c m a fir a m d m p m LL O 8 0 8 — ii m N m 55 SS S 15.., m'm .�0—„ � a d C J — f yt m R A o am`r< n 3Cc a > s 6 o m U LU Er N O 7 W # y f7 N 0 0 LL m r J J f9 C W WCO (CO CC C Q ry zA O D U III a ym O c > a 0 E miO ' N U OBI cr co Ez ifoCCF N o ym i 0;=gymY w z Q l 3V Ua m m I 0 .n F v ro r q a) E w co8 co cmco :� cq ,. � $'. to 2- c 0 Sc c c S d o $ I Vl O Q 'y^ ii33 N m O �(] p V D L V m 1 O 6. E I� y N m O U C C N 0)1 c C C C �C o- 6 6 p j a mi o Lp o a ¢ a III I I N m O J Q c c F y Q U W V i...l VI Z E d Y c Irnl la' '9 OI jC iJ W jC U) N C 0 C p .O W L:. y C N m I'll Y Z ¢ 3 yl LE U a m ow 1=S °I i> Im' Oro rn CO c $ 3 Q, v h v 69 V! C m co m as m m � a a E 0 y rn to L r 888 8 8 y N coN �Di .... f0 mi�S y a�D O Go O dLO 'a'�. C O V C f� C C c c 6% 44 y m a N v C y V Nn a J n CL° 0 O . 00 U J c� YU g n 69 J LL r C B m 2 L N pl., M N ma NI00 O m LL faNQ Q G O W 0 n a U O O -=a Co o C C CO #I' qNgN }I GD W a' U N y 4I Z m V# LL. I I Eni Z o� ' Aj OL ' s IQi m 3 0 Y Z¢ 0 c a`Im t 'I 8 v ap ii�' -)I a m x° m- >I co g g C O Q NE c F N fp9 - � O 8 N O N N WE 119 C Z j C .� 'C m C N n^ I p LT N 5A? r n.�oJp_J0 N`a C CIN LL �� ` n -tV C 0 00 C CIS C CCU C Q n .� a C CO C r N N L C m c CU c N I N N.E E �'�O N!rn 01 to E D N N On cQ m.m� �. m I� W tdN N c oi:cyy�op - mm N'cE� O L .. N ayO ii U� o. - m ffi i O W x a i L fp C O_ H 9 m s. a, a C � N �T• -QC1 � N r c O N U O O U O '9 h tea` I! y °0 o �p ml -2I c c co 'n z EoE - CD a) m � � CE U) y Z l % Qd dE �za ci', i !m '3 o �y 'mac7 li CID c Y z¢ 0 a o oiplai m F-I o m W T ' Y � Y N C_ Y j L m O �+ Z W - U C O C C C V C C C C T C C.• S. E Y pU > N C C C C C C" O F- � F � m �qQ o 88 8 a i 19 n m N g p N g 'p N p N g a CO Yf i0 CI 1� II D �N . S m U 01 9 O l7 C J C C yJy C J C z J .O N l h a j 3 C z O E a ' E c r` J3Ey n LL LL FL m •- x n '..n vi Y LL m R N O y IL m E0 21 01 Co v m ❑ O �i R'.. E Q VIA! V 9 C j �j Q O O J V pp AJ J YSm N i�U J LL m N C N O G. 'NC' CO O B. OYC _C g L'�. L N Y�LIVJ NN aJ C m� C H 10 O WI 'A N 3 �m N N YzQ Z L 3 M Cg a mIN' tRUt//C7 CAI fix csI I > m 2 z' 0 m c 8 C O h GGU11 C C .Q mm o Nm ¢ tt�VnV N m p 'O p O00 j y a iLL 'O Cp0 m 'O 'MO Im C cc:`i m� � m� y'N c� OHO cic �c° O c 1 C m 3 N ^o N m � y o m g a)� 'O cm a r0 ¢ p! pg N O �, p$ 8 O 1� B �' _ ' e? y > LL Co m U m N g O m 3 &t 2 H 7t O y) y) L CO) C O v � m cc � E g d n E _ a m N po � C r co U m N E U v (A }III `-' O O C13 ¢ � � QpQQ m N C I .a 8 LL m m a0 p_� I� Of O CC O `p a)V m m'v Y IC T cl m a -I �O I"! ifA I O 'O N co m O Z C C > C± O y in-E o dLL g z E Io N o I�ik U N Cc U1 m Z J o y IOf ! c w m c Ih tII Im' YZQ 3 u U a m =m° J ti sa n 8 3 Y N LL p p p m o.•g c m o g to xm ;: E chi' F% cccc c n 3 io c- T m tpoo Vpi �Q cccg'g^ T g E m �Q g c Y N C oc C O "' c V• N C O C C C g ¢ jmm Sm m o n $ 0'n o I m CL c g U � a` c m c o c c o u E ;�J'. ICIJE a) an N loa U, F U £ !e mm ix LyJ jd Q' m'E �Im >.3 a)dc 0 O' €I c y aim•'-� Y z Q 3 ¢ ii' ci a m i'� � 10 i ag �' > a Vim' �� II I I I ( I I I, 6 i a lV) O C S' i3 `y C ca Ern 'm t Wa C 7 m $; m 69 f9. H U m v ¢ 8g 8 W a -a y. o rn C m o N > > of . c= N LL m .. C C' G C W a. � c c c a r m aD D7 C_ LL p J � O x N i 2 2, UCD C LL V p p <� T 00 aa O Jo: o p� LQ� �0 I0) L 8 tO l W Ilc c Oc °ci tf U. 0= 3LL E .�Ze Imo, III, m Q z Co Q �, O o v V f9 f9 fq ?DCL { OI c j E m N m c c E 'o'iIm Ali I € W C I = I N F Q (n 0,i IU Z pL� pI=DA LE h i 3 0 I J i E'' ° c o L cI 10 'D 100p m m N N c O O� = 0 L.9 �. iuj. Y Z Q 3 S iL! 0 a m:EIL xm F > m i { \ !� B � ( 2! E ! 0 - ;�_ / «0A ] ! kt 0 'D �9 k\_ �` §� � §\ 0 kk \ � \ , ;\ § E » }§ . E /t COk\ w 2 0 `! ' ^< IL � - � � 2 c k) ca {\ § \ ` !z ) \\_ e §CO � o # . % /! )} (\\ \ 30 ; � �J ) � /0 f 0\ CD k k= — \ {a / i I� E ) ƒ m` } i' §2) �! f k \2 \ \ 0 I !°$ \ # // \ j '. _ )(La ƒk} C OI LL N A C 0 A mpp' N 1 1 W Q C7 � co( m N U c M' v 6 69 C O L° l0 J LL I y O 8 c y F U W V O LL Z Cl)2 VJ iL vi fn c o N 7 E m � � m m m f i� m C O = N •�• �j, 0 x r6" J op L N S f0 2 °c pc p .. c _ - - - c C% m dg$ S m ca F � m 6% cy v R f2 m = 0to �_ C7 c t c Z � o > Y cb N N Q N f m LOr' R mo N Got�0 1 NA N 6s C7 ca £ 9 ^ �m 0 Q (: L (vl 0 C1 Ip r NamICLL Q OI I� 3'E L I� m n Q 0� Q °' �te o m a J u;' _ mi ` m o E O 3 a U)i W yl 08 Inc gala mi m 3 c �o Y Z ¢ 3� 0 ii vl a isccpi n m m° > m' - \ .� 16 I � / \ . ■ � � .> f ! a - 2 . ^� '6 ` 7 - ` ! > 2 ; § ��^ §kLi}|{7� $ / / k _- It =|«2 § £� . ,�i� ,',����I�!. y \� ! ��'�'' } \ ) \ / ƒ ,.! �f!: } /acr & E 2k§ } '\ \; . �2 ))<! 0 r t;/®f :uj (){2 &£ ]w i L N C O 1 W 7 L W � � H 'O m o c 4 W N LZU p CL cc cm oZ 2 m jo Y N Y c c w, w 'b > €CD as o H a of N J W Vim N m EE BN s ILL w '... c p m m N N C Y Z Q O 3 Q C I C a iL c t v o' c 0' IU N ui c7 = a ao =m ` >m iILL I i i, I I I Ili I � L to c 0 a v m o c x "U E A t0�a , c m Ott C y m p c � J �_ r O f/%LL N p J C o d y m W— � F C C_ f0 .�Eo # • N O u1 ' ' N d � yak a F cc 3 ) 2 1 V. �j r IJ y a W m C •� m > a 1 c ?m Y Z< a0 o io ' �j I 0 gp n� C � n J ui L � r 8 8 J 5 5 i 5 5 C . 9 @LL g� � > m ^o w Q .:m m8bp W9T ; pmp m C9 z o Z 3 j Z a CL w pcp p N i c0 O c m c m G n€ D y m' W N H 3 U Z � Ijw E�'m32G3 .yv.¢ N N C YZ¢ o 3 a i,�' C'wi O OC O 2mm W _m O v a mLLam❑s'o x o�.r 2I > 22 m tN ¢ 2 v J N L p y C ONE N p] U N C la � la On) n C yy T pJ yyy c C T a N E c 2 r NNO p U) Im �adM Yj �0120_�� J, �� pp J {p N OO cc r F VN Ol '...�-CCC 19 �.. cccg C F d lA f9 9 W r s y yUy C y O f N f7 Sj J (p f f9 (9 0 O O C _ W = � U c y 3 N Y O F FLL N . O N O F W c �v x 2ci F- O� o o $ $ LLf,, Q$ Of m CL_C C a i cc cc oI'IU 0'o o u Q N U Ui m N N ! O ��� JI N aa) 4) o! p E u. c o �.E ���Iy, ,.��� �� m� �.� m YZ¢ 3 al o a maO4-Nr xmr- m � I' 'I r C 0 W W C N N o n U Ea � � N m C j n t U yrn g g g + Z WLL m anD Cf U N U � O O U y ,� m.�a` O I E -a o E o' 2 g E a U N d'�. W j a H¢ tYj' J z E c LL - rnI 'mid w m ',d aTi a3i c `o W' E �� o v 0 FL F x z ¢ 3 ¢ ii v a c3 ¢ f'ci' x° m° O ICI Im' g N� O m N 3 E;g^(� O Cf y � ai y N n O Q N N m Uyy1 . Nc1 co N Wb �i m pnp N fiOD f0 'O C C ,. C C, � 'ONU 92 J W Q ZZ i J_ u y M 3 J 5 mEL O y U E R Go N ;o v ZL I E= a '� W' E CO v o of J u € Q F Eddy �� ��I y IUI ��� '.Q ° H m E cl `o anal m Im aa) aa) c x z¢ o C�1 3 < L� �L), a m ci« CL m= x°Im � I>� m _GO �'I I I I III 1.9 t C _ c O a v am �j O Lb W ^_ 6s H¢ m C t!(QQQ pp gq _O 'p .L d t W o y f7 O O m$ 0 � C N � V N N - !Q p60 ^ U N 8 8 8 0 0 0 0 C d O _ 2 ��tBn A� N co :� o O 8 O> NS (rj Pn9. a° N O ON�M1A NOO f7 spy IN a^D E U' u�...� Co N C a) C ,., T ((yy (Nm�� O U Obi m 8 a � n C - c. f9 f9 (A W CO E rn a „� m O n Q A a Q- n - a n cn c h n F 2 N f9l fA N CL m o c c w III c UI IL^ � C $` ryry (S a y € IO 'N IhLDL~ U 0 I N¢-ola . =oyE=ICI 'a1 a 0 >U m 0m coo I I i r N C O_ �W 7 A H 'O N y J G co C N Wy R _m c d o J p W U E 8O 00 8g N$ = c a J 0 O v UU C J y N 0 mLO c c T p 3 Wl! ' 0 A y d O co QQQ� N F CO O C a W oa oI cu _ CD o of al c c i� C U E o'�I WL O. O. N J J IU c N o€ LL > 3 a E d my a; W m e m N N Y z ¢ i0 3 H iL U. ta;e a 'm O W '.� xlm � >i mJ i f9 ty L N C O 7 F- 'O — m � � y m N m— c C V0 m L co O Of QQ QLL O .L O S j U � (7j c vi O O �d Ey ;. o � a I m O 2- Q J) ~ (0 o --�- -T- - t _ _ co CoCL c y 0 m 0; c j cc c cis .€ Ni ap'I W E i I .n c D o. G aI o € N LL j j H N z a p a 3 a QI Ei ° r Hi- aI m, m a> a� C Y Z Q o J o t 8 3 LL ILLS U d m 0 o'OI wj =Ira F- - Im f fA b9 L N C _O 7 L of � � F 9 m c a c z a7 F c C J 0 :.. fZ75 G O 40 N S 8 c �[ p N p C o G^ (pJ � LL E O' O aQ}l 'O J TiN N N Ol C C c C 0 Z ¢ Ri PO ^ N:� C c C *' — N .0 CL Q L11 pNp U o -o O ¢l- W j . c �a c (� �I Z E o E o H E cq o U cli € a) o W Z E W c w li c >. 3 0 m a> o Ix E 9 `o D m 0° Y Z Q 3 lL LL U cL. m 2�m IIO 9 >I 5 M th i I I i I «� 6 t c 0 � a a co 6% .. f T 4b M O <5 'o A � n m ) C io c A e �p m 'O m V Go U C U C U C U C O C O N aa}} C.�. Z fooA 6 V o o9 W . W v LO C m 0 mLL c O C Q LL i LU of » » 69 cc 9 N yy 3 ci E W D �LL F nn cq ro Cl � _ aDi :. v tf a TC J h N n N N T U C^ U C O C g r � S Y U LL V f9 j j LU oaa2 m, c m ji c CD ¢' �I c c W' o �@ O C7 i f W Y 'u. H ��d ',� w e a 3 16 2 �° c m, L D¢ m m Y Z Q O a ` 3 L ii o c� .c° 'o a mml m''. m� 0 Bch- 3 c7 m°,O m i .. X N. . N H d Hp m < G ~ o° . .'n S'm 4 mA� � c _ b�ga O 3 y ap v g t m O N b .cc N Gm0 p� iNN>Ir ppp tO p N f�O N a o �5 O .E OAL a a.v a co tdc Q o C m — _ > ac O a w I --'E o � c a is Tai oJQc0o € Y Z W i ~ U= O p� O 8 p 8 V% .w N N m n p 0N VV c of N G ~ $ i n OR c�i C di coi C a�'i T z c a m CW � 4' 8 Obi N 0 yN CO)t_. Ya a a '"c g cio of D. a. ., 8N 8 UU N p8 D O c U E Lo m C7U 'cam C � 43 88 G O m n 88$ I Q88 S8 U) IT xm > d pi c7N �� io y O 0)c 3� N -0 V m c. Z--3—- i m :3 a I m o c c> d W o ro IN Z E ULu of ILL l F Ic, N d c t z¢ o a' o 3 m iL U a ilm° to m m C b 8 C O co O a �a w3' ` H � Y m W 4 g a N Lo- Lq ui C W r 00 cm n O E O N CIE C V T E O ~ m O C N fA f9 fA f9 /9 U c I .. f0 Q C O c E S S S E'er E �lO C O dlV C «NI C _N m rn `A ca a` C m O r Ri N C C_ RS E O at a> 2' O I N 1! a S~¢ I , UI N W m m Y Z Q O J is 3 a ii v o a m CO: '', �Ic'H �I xO1r8'�o.> 0 m' l I I m< 8 88 8 09 U 1a� O n S � f9 f9 fA �+ ai jy 0 O ds n W �LL .G U) � W F D N Y N ' c c tl � q C fh O C y C F N MM a. E m O o col U' IL S' `0 <' Coil m m a3i c o E c DUI v y v d �tA �� Y Z Q 3� IL LL d m' 'Zlm ! I I I ,i I CO S yyO Nt n N OV pp W T N N F w n n In 8 N 88 8 o N U N O :. f9 C 19 i9 f9 8 88 8 O O o V � c c O a L A I� '• En trl N S � 8 C J O !g O nQ !D _LL Q N N ai M c C u O IC �- F O � O C 2a .. ca = Cc " E o m ae N ,_ C 0' o Q I�'FI m N O m aa)i aa) c YZQ of j' E' 3! FLU c `o a u _C� 'm' _ m h §� )t 2k co \ _e!|aE ^■ � }7\ d i� 2� f k\® . . 0 c - k) � a «u . . . 2 IL10 :® - / 22t 2■! $ »$ (!7 (\ 2 !!tz f, ; )y777777 f]A E {/ q ° c \ °7k \® \\!);\ \ Zo f \ ` \ \ //� \�\ / �\ \OL —j k//I;,���� ; E20 f u ! \ \ 2 5{k \ £ a * 2 ■/\/\ »�` « \ \ 6 / f 2 k i J£ EM�\$\ \/§ 5 I I i i f l i 69 �I i l I I I t o ' W69 f- v 'm C V 5 m c Z a CO�_, E a o zi °—� s" °� ci U $a » , 69 vi E m- y p8 :3co IZ j c LU O D O yj C C ayi LL C m Z O C_.. CD c o m 'm Z, c m o y _ ZZ :cc n C C i U ICI j j N f- to J Ili `p I Jul CI W 1«. c N N C of ZI1 E of 0 v to lam; I m � Ia Y Z Q 3 LL IL! U a m m F m Im W4 a_Io � o l a_Na �0 O O N {{N_pp OIS O O O O,O O 0 0 W_N 4 O I� N N N N ^] M M V aa aa Y1 N tp tp �p 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O OiO O O OO O O10 O O O O,0�010 mi Q O O O OI NI NI �I NI � N OI � O NI OO IY I I 0I i Is m pil y; I Oif UI U N l N � C rniL Iaw rnal rnml Alai 3i � j E of :o 'U�' k, AF2 NI �<01 �1 CI#I dfi� jNw _ p jOQm L ' °� �ILLIa �pI m ol�l m Cl 21 €I fl n �Uj 'a°I.E. am y M"e J�W I lEmo a 1IIC1 IyN� �m: D �Da i Ia0 O 7o lII�a nmN mm 0 i t 'Cc E 7 wl, \\ m \ N m Flo W.j co t #� OI 'N olo .old ml oo mo' c1=1 >yl m�'wl 0!0 c kQ QCIU wjz' T_— .�. m 01000 O OIO 01010 01010 O O O m Nay U O O O'er O O O OHO 0D �2 N NIO U O II oa °• m c c _o a c m m m0 a' m m o- m E ! E `m Er oAll m �waU�naUv'�inii, li olo'o�a'�lo oloio of of of ml m mo O O O O O O OIO sO� O OIO OOO OOO m O 0 i 0 O O I U1 I N m O O N m I C I I m I c I I W' l h I EI d N Q U' UI 9 # I c d omm cac3i v' rnm O m mi c m Y Evl °1 m OJT I - I a a dIQ 221m mil U o �I .- g gig of I 811olLLlo 2IL LI O`I.O oI�I m m J �I U ci m mi a.mlm 0001 m a1'fmi v mlmlm m EI.. of U .n rl �I d' m> o m o>1 mlc alm coo:o of QI N m. iT i i $ m a m' m v,oio a m yNm'a �'CI I U IQ Q ZOIKm Umm pIOOO� m'i m o '.o of o'ol'o �0 O m olo'm�olof??�mlm m E MOm I'O mmiv m E,' lam- B 0 O��O N.�` O O O O O O O'O O O ��\ I` �� llOpp O�O {{OppOO O �Op IO �p O ttpp O��p O O O O�O O O�O 0 0 0 0 O O O�O15 O O. 0 m 0 ttOpp 0 0 N O^ N N O M fD O O NIN n' m tp N Oi Op N .- N I aD n0 T m T N O O O N .- �V O O O a j N ��b III ICI I mj IQI i I I I I al i �WI� of 4 j 21 c m' Q O'l EU mI alai �� w a c � d ! � I aia I W'lall cc m c of al m-'ai oll�+ RIB d ! m a (D p) I IW f 1 anvil mUjt o Njo w 0 ym o.y EE ,'9 EI E o c> Zo o hl0 O.Y COIN N '(p, eOl Olh u']� IT O�N O '12 O N.N�.M MININ N o: o a: o 0 0 0 0 0 M'MI MI MIM h nl0,ro 0' 0 0' 0 0 M M Mi Mi MI, M MGM w j do III I it I ` I ali U � Ip m' io rc. c �E�I to III I w . < ml 101 c Q� I Oil ° �v� mJ E�� I m wlol O U R 'O l yl Q if m a� a U N I N m a.c o IQ rn c ml c'',c m!rn N N y 10 C w0 IOI O OI OO N, tp VI of W OIN hM;M M M M M M MIM M.M C sa lti 'I 5 o'mlo Q v o�mlml�o n ao i � E''I rn rn o'ol0 3 m OII Oi O O ONI aa T, mm�0 OI10 OIc.i EI Uf ' N.Ofo E E, E' SIC m N r N, aia ' .. C = O a 6 aml C Q C O' a a ac n �'" °. m d E I a m m E m m E E L E y E t. y l J o .- J 2.2 W (1 U(nd 00 to LL' g .4 3a L] 'C � Q CL o to o\IoioJoo to 0 0 0 � oo�o� 2o M.m N�� O O O`er N O N O�OrO N N C L 0 0 ooi000 � o o�� o go S Solon 000 ilk o� o 0 00 0 oo�oi rn C I i I O O O O O O O O O O O O O O O O O O O O O O O O OO O NiM SIN Ni NI ON N. Ni Nary ul O N OiO ' O}I —O}b Yl N O O.'O �.tODi NM N N Np N NNN N mO NO Or N O O' N N O Oi0 OIL p p r I' ji I I� I jiiil I I I I I l �I I I iIii l I I I U I I I I I I it I I I I IEI I �I I� i I Ili - !P I ml N y j t OIL. m m" Q ICI 3I nl tai of Im of m m s' r cl a �, mI mlaal`o i.dl aj mlal ml oil �� KoEa .1 IEcmI ao,If.1 WICmm ommgo of y Wm am O'c Im aNI =r0 Lm - y= c `�;u10I II rTyl °�d�Cmmnom 5 Nim o I 0m � Eaa M,lc�c ml °lT>l NmQIE m-0:aiL �lI'.l 6Hw�rnCNyo ll, aorncWmmPlillL0000��Q tl�ooOQrn�n llI'm�o_oQo lIImN000g l l ¢ ,il mwtn'iioU 75 It_—�ny,lI II i I I W. mJ o,o,00 M., m O O -IV (OOI NI N� N o0']'VO'l0 (OO�b NN rlO bIN� T OI WIoO,)l0 ON O OOIO O .m. Nl.m.. m El E N N N'N N MININ M N N: NN M MM u> M,� pOjl cO'J Mlyr O Imla N C al M M�MM MIMIM M Mr Min M M M M M M MIM M!M M M M nr r n nr�r rr r n n n n r r r �'nln n m m m m m rn m �3 r 0 0 0 0 010 0 0 0 0 0 Ob b.N O Ob NO NCO O O O ib Nbb I I I i IN O N N O I I U N y o c, UOni III td m o'. ml rn' c ml m,'w'I c. I�,E'c� m�M,i''°c'�� Ica31�o 0 �I ola of a, mj m clfni9 xl m of v� d W E oI ,. 3 m b a ° E E ��N. y.H NI t, mlm :°IN 3' w o' m' U NIN LLI-2 i i wlr o'>Ir- W wliil ` -i-'z c • O'Oit°1O O O OHO O 0�, ��'O. L1 NIO N O bIm Nly V O NV O pVp. pNpIM pM <'O f/J i WV vlAT010 d'; O, a i c a o n n m c o ao. m E E Em E L =.. ° c o = ° c wa`U�na`Ucn2.s t- nI r'r n'nln r r INN0 00 0 0 0 n r nlr'n r r rin 0 0 0 o 0 0 0 0� II N N N m I O N N,N O NI NI�b � I U I y i N o pi G 'U; NSW L N OI C ?'� Of of Ul �I villa ov°�ilolol u' rnIW ail c A`y � c ulm' >'. (j''QI VNJ N' O I_O N TI T E m, I y C t ry N I J V ! O N O � mma0 Q ' oo.o l,00 V% Q_QI, aj U'a QI `m -ram I =a o a a a N N E O O. tr0 E E L c WyyyYYYjdUU)a UU)vl ii' t$ td ��NIm n OO OV O Ol OiO O O O N N N'NO NI p N O'O NN �M O b A NIA I�Ih O O O` V O aOa a d aOa O W o N N OIOHO Oy O OI N NI(OIfO O O O OO O OEM N'N� N pled- N M NN N 1p O O Kl Oh O.NN b000 ofOl - ,I rI N I M I N I N i N I N I Mi" a 1�2 l� � s ICI �2 I N I- l blO �� III III IIII II I I I — lei I I I I C 0.1 - r 8 c0 l3 olim lDN al om am �rn 0el pp Mr ' .M I r l OU E oO l E 01 yu IIN'�oml �o1yomcoIA,Ia cl AlI aN a c N > °p c o E'0 p v!-o: I01 c U � PE rn^ MI 0-,- = pl S2 m U.��m in ao'o�'m`� u'E p"u E�Ib ml3 �Im�c iyU nlam v x x R St o � w,w w.w o: w 5 co'Si,a iLyw. m'a 01 O:�cl� o N �n'o 0 00 0l0 O'0l0 0. 010'0 oloio o, of O'o Olo � O O O O y N NAM (p h D7 SIN Mi d'. Yl '.O oJ�lp h.�OA,N O M y.,pl� M yy O.N ; ol�I'ol0l UI c o'er I �c'mlo olo,o � 'E y I III a E, .Ell olr la alc �I. _'iN Ni C'dl 9CIry miry � '' O IIL'�jd"la I E p o n no c S c o a o n o a m d wn Z'w nz'm d— E 'E E T r� E E L E 2 Z e m w(LcSmaciwwLL 0 �a cQ a� � c 0 0 C9 �' r L C d 0) c 00 i+ i Y If m,2 'o �Imao Q it I - 'o�olold E.., 000lo� v �i mi2.E E 'Ei ,z Ira Lla a'I i0 o5 ❑. GMP DRAWING & SPECIFICATION LIST The following list of documents was utilized as a starting point to solicit proposals from potential subcontractors. The GMP is based on certain modifications (reference section 3, item 35) to be incorporated into the documents at a future date to limit the cost of the project to a close proximity of the Owner's budget. ARCHITECT'S AND ENGINEERS PLANS — VOLUME I SET Drawing No. Description Date GENERAL G001.0 VOL. 1- COVER SHEET 06126106 G001.1 VOL. 1- ARCHITECTURAL INDEX AND LEGEND 06/26/06 G001.2 PROJECT COMPLIANCE SHEET 08/04/06 G002.0 VOLUME /l COVER SHEET 06/26/06 G002.1 VOLUME /I INDEX, LEGEND & NOTES 08/04/06 A7460-1 ROOF PLAN AND PART 77 DIAGRAM 7460.1 06/26/06 A7460-2 BUILDING ELEVATION AND PART 77 DIAGRAM 7460.2 06/26/06 CIVIL C111.1 PROJECT LAYOUT PLAN 03/30/06 C111.2 EXISTING TOPO 03/30/06 C 111.3 STORMWATER POLLUTION PREVENTION PLAN 03/30/06 C111.4 UT/LITYAND PAVEMENT DEMOLITION PLAN 03/30/06 C111.5 PAVEMENT SECTIONS 03/30/06 C 111.6 GEOMETRY PLAN 03/30/06 C111.7 DRA/NAGEAND GRADING PLAN 03/30/06 C 111.8 DRAINAGE STRUCTURES 03/30/06 C 111.9 WATER AND SANITARY PLAN 03/30/06 C111.10 WATER AND SANITARY DETAILS 03/30/06 C 111.11 GROUND LEVEL - SIGNING AND PAVEMENT MARKING 03/30/06 C 111.12 SECOND LEVEL - SIGNING AND PAVEMENT MARKING 03/30/06 LANDSCAPE LD-01 LANDSCAPE PLAN 06/05/06 LD-02 LANDSCAPE DETAILS 06/05/06 LD-03 LANDSCAPE DETAILS, NOTES, AND SCHEDULES 06/05/06 ARCHITECTURAL A001.0 FIRST & SECOND FLOOR LIFE SAFETY PLAN 06/26/06 A002.0 SITE DEVELOPMENT PLAN 06/26/06 A 101.0 FIRST FLOOR DEMOLITION PLAN 06/26/06 A 101.1 FIRST FLOOR DEMOLITION PLAN - AREA 1 06/26/06 A 101.2 FIRST FLOOR DEMOLITION PLAN - AREA 2 08/04/06 A 102.1 EXTERIOR DETAILS 08/04/06 A102.2 SECOND FLOOR DEMOLITION PLAN 08/04/06 A111.0 OVERALL FIRST FLOOR PLAN 06/26/06 A111.1 FIRST FLOOR PLAN -AREA 1 08/04/06 A 111.2 FIRST FLOOR PLAN - AREA 2 08/04/06 A111.3 FIRST FLOOR PLAN -AREA 3 06/26/06 A111.4 FIRST FLOOR PLAN - AREA 4 08/04/06 A111.5 FIRST FLOOR PLAN - AREA 5 08/04/06 A111.6 FIRST FLOOR PLAN - AREA 6 06/26/06 A111.7 FIRST FLOOR PLAN - AREA 7 06/26/06 A111.8 FIRST FLOOR PLAN -AREA 8 06/26/06 A112.0 OVERALL SECOND FLOOR PLAN 06/26/06 A 112.1 SECOND FLOOR PLAN -AREA 1 08/04/06 A 112.2 SECOND FLOOR PLAN - AREA 2 08/04/06 A 112.3 SECOND FLOOR PLAN - AREA 3 08/04/06 A 112.4 SECOND FLOOR PLAN - AREA 4 08/04/06 A112.5 SECOND FLOOR PLAN -AREA 5 08/04/06 A112.6 SECOND FLOOR PLAN - AREA 6 06/26/06 A 112.7 SECOND FLOOR PLAN - AREA 7 06/26/06 A 112.8 SECOND FLOOR PLAN -AREA 8 06/26/06 A 113.0 OVERALL ROOF PLAN 08/04/06 A 113.1 ROOF PLAN -AREA 1 08/04/06 A 113.2 ROOF PLAN - AREA 2 08/04/06 A 131.0 OVERALL FIRST FLOOR REFLECTED CEILING PLAN 06/26/06 A131.1 FIRST FLOOR -AREA 1 REFLECTED CEILING PLAN 08/04/06 A131.2 FIRST FLOOR - AREA 2 REFLECTED CEILING PLAN 08/04/06 A132.0 OVERALL SECOND FLOOR REFLECTED CEILING PLAN 06/26/06 A132.1 SECOND FLOOR -AREA 1 REFLECTED CEILING PLAN 08/04/06 A132.2 SECOND FLOOR AREA 2 REFLECTED CEILING PLAN 06/26/06 A 132.3 SECOND FLOOR - AREA 3 REFLECTED CEILING PLAN 08/04/06 A 132.4 SECOND FLOOR - AREA 4 REFLECTED CEILING PLAN 08/04/06 A132.5 SECOND FLOOR -AREA 5 REFLECTED CEILING PLAN 08/04/06 A 143 ENLARGED TOILET ROOM PLANS 08/04/06 A 144 ENLARGED TOILET ROOM PLANS 08/04/06 A145 ENLARGED FLOOR PLANS 08/04/06 A151.0 OVERALL FIRST FLOOR FINISH PLAN 08/04/06 A151.1 FIRST FLOOR FINISH PLAN - AREA 1 08/04/06 A151.2 FIRST FLOOR FINISH PLAN - AREA 2 08/04/06 A151.4 FIRST FLOOR FINISH PLAN - AREA 4 08/04/06 A151.5 FIRST FLOOR FINISH PLAN - AREA 5 06/26/06 A152.0 OVERALL SECOND FLOOR FINISH PLAN 08/04/06 A 152.1 SECOND FLOOR FINISH PLAN -AREA 1 08/04/06 A 152.2 SECOND FLOOR FINISH PLAN - AREA 2 08/04/06 A152.4 SECOND FLOOR AREA FINISH PLAN - AREA 4 08/04/06 A152.5 SECOND FLOOR AREA FINISH PLAN - AREA 5 08/04/06 A153 ENLARGED RESTROOM FINISH PLANS 06/26/06 A201 OVERALL BUILDING ELEVATIONS 06/26/06 A202 OVERALL BUILDING ELEVATIONS 06/26/06 A203 PARTIAL BUILDING ELEVATIONS 06/26/06 A204 PARTIAL BUILDING ELEVATIONS 06/26/06 A205 SOUTH BUILDING ELEVATIONS O6/26/06 A206 NORTH BUILDING ELEVATIONS 06/26/06 A207 EAST & WEST BUILDING ELEVATIONS 08/04/06 A301 BUILDING SECTIONS 08/04/06 A302 BUILDING SECTIONS 08/04/06 A303 BUILDING SECTIONS 08/04/06 A304 BUILDING SECTIONS 08/04/06 A305 BUILDING SECTIONS 08/04/06 A306 BUILDING SECTIONS 08/04/06 A307 BUILDING SECTIONS 08/04/06 A400 WALL SECTIONS 08/04/06 A401 WALL SECTIONS 08/04/06 A403 WALL SECTIONS O8/04/06 A404 WALL SECTIONS 08/04/06 A405 WALL SECTIONS 08/04/06 A406 WALL SECTIONS 08/04/06 A407 WALL SECTIONS 08/04/06 A408 WALL SECTIONS 08/04/06 A409 WALL SECTIONS 08/04/06 A410 WALL SECTIONS 08/04/06 A411 WALL SECTIONS 08/04/06 A412 WALL SECTIONS 08/04/06 A413 WALL SECTIONS 08/04/06 A414 WALL SECTIONS 08/04/06 A415 WALL SECTIONS 08/04/06 A416 WALL DETAILS 08/04/06 A500 PCELEVATIONS /DETAILS&MISC. DETAILS 08/04/06 A501 DETAILS 08/04/06 A502 DETAILS 08/04/06 A503 DETAILS 06/26/06 A504 DETAILS 06/26/06 A600 STAIR AND ELEVATOR SECTIONS 08/04/06 A601 STAIR AND ELEVATOR SECTIONS 08/04/06 A602 STAIR AND ELEVATOR PLANS AND SECTIONS 08/04/06 A603 STAIR AND ELEVATOR PLANS AND SECTIONS 08/04/06 A700 INTERIOR ELEVATIONS 08/04/06 A701 INTERIOR ELEVATIONS 08/04/06 A702 INTERIOR ELEVATIONS 08/04/06 A703 INTERIOR ELEVATIONS 08/04/06 A704 TICKETING LOBBY MILLWORK, ELEVATIONS & DETAILS 08/04/06 A705 HOLD ROOM AND BEACHFRONT AREA /NT. ELS 08/04/06 A706 CASEWORK ELEVATIONS AND DETAILS 06/26/06 A800 PARTITION TYPES 08/04/06 A801 INTERIOR AND F/RESTOPP/NG DETAILS 06/26/06 ARCHITECT'S AND ENGINEERS PLANS - VOLUME II SET GENERAL G002.0 VOLUME II COVER SHEET 06/26/06 G002.1 VOLUME II SHEET INDEX LEGEND AND NOTES 06/26/06 STRUCTURAL S000.1 STRUCTURAL GENERAL NOTES AND SPECIFICATIONS 06/26/06 S111.0 OVERALL FOUNDATION PLAN 06/26/06 S 111.1 FOUNDATION PLAN- AREA 1 08/04/06 S 111.2 FOUNDATION PLAN -AREA 2 08/04/06 S 111.3 FOUNDATION PLAN -AREA 3 06/26/06 S111.4 FOUNDATION PLAN - AREA 4 06/26/06 S 111.5 FOUNDATION PLAN -AREA 5 06/26/06 S 111.6 FOUNDATION PLAN -AREA 6 06/26/06 S 111.7 FOUNDATION PLAN - AREA 7 06/26/06 S 111.8 FOUNDATION PLAN -AREA 8 06/26/06 S112.0 OVERALL SECOND FLOOR FRAMING PLAN 06/26/06 S112.1 SEC OND FLOOR FRAMING PLAN - AREA 1 06/26/06 S 112.2 SECOND FLOOR FRAMING PLAN - AREA 2 06/26/06 S112.3 SECOND FLOOR FRAMING PLAN - AREA 3 06/26/06 S112.4 SECOND FLOOR FRAMING PLAN - AREA 4 06/26/06 S112.5 SECOND FLOOR FRAMING PLAN - AREA 5 06/26/06 S 112.6 SECOND FLOOR FRAMING PLAN - AREA 6 06/26/06 S112.7 SECOND FLOOR FRAMING PLAN - AREA 7 06/26/06 S 112.8 SECOND FLOOR FRAMING PLAN - AREA 8 06/26/06 5113.0 OVERALL ROOF FRAMING PLAN 06/26/06 S 113.1 ROOF FRAMING PLAN -AREA 1 08/04/06 S 113.2 ROOF FRAMING PLAN - AREA 2 08/04/06 S 113.3 ROOF FRAMING PLAN -AREA 3 08/04/06 S113.4 ROOF FRAMING PLAN -AREA 4 08/04/06 S 113.5 ROOF FRAMING PLAN -AREA 5 08/04/06 S301.0 SECTIONS AND DETAILS 06/26/06 S301.1 SECTIONS AND DETAILS 06/26/06 S301.2 SECTIONS AND DETAILS 06/26/06 5301.3 SECTIONS AND DETAILS 06/26/06 S301.4 SECTIONS AND DETAILS O6/26/06 S301.5 SECTIONS AND DETAILS O6/26/06 S301.6 SECTIONS AND DETAILS O6/26/06 S301.7 SECTIONS AND DETAILS 06/26/06 S301.8 SECTIONS AND DETAILS 06/26/06 S301.9 SECTIONS AND DETAILS 06126106 S301.10 SECTIONS AND DETAILS O6126106 S301.11 SECTIONS AND DETAILS 06126106 S301.12 SECTIONS AND DETAILS 06/26/06 S301.13 SECTIONS AND DETAILS 06126106 S301.14 SECTIONS AND DETAILS 06126106 S301.15 SECTIONS AND DETAILS 06126106 S401.0 ENLARGED PLANS AND DETAILS 06126106 S601.0 CONCRETE COLUMN SCHEDULE AND DETAILS 06126106 S601.1 STEEL COLUMN SCHEDULE AND DETAILS 06126106 S601.2 CONCRETE BEAM SCHEDULE AND DETAILS 06126106 S601.3 SLAB,MASONRY WALL AND LINTEL SCHEDULES AND 06126106 DETAILS FIRE PROTECTION F000.1 FIRE PROTECTION LEGEND, SYMBOLS AND NOTES 06/26/06 F000.2 FIRST FLOOR FIRE PROTEC TION HAZARD ZONE PLAN 06/26/06 F000.3 SECOND FLOOR FIRE PROTE CTION HAZARD ZONE PLAN 06/26/06 F111.1 FIRST FLOOR FIRE PROTECTION PLAN AREA 1 06/26/06 F111.2 FIRST FLOOR PROTECTION PLAN AREA 2 06/26/06 F111.3 FIRST FLOOR FIRE PROTECTION PLAN AREA 3 06/26/06 F111.4 FIRST FLOOR FIRE PROTECTION PLAN AREA 4 06/26/06 F111.5 FIRST FLOOR FIRE PROTECTION PLAN AREA 5 06/26/06 F111.6 FIRST FLOOR FIRE PROTECTION PLAN AREA 6 06/26/06 F111.7 FIRST FLOOR FIRE PROTECTION PLAN AREA 7 06/26/06 F111.8 FIRST FLOOR FIRE PROTECTION PLAN AREA 8 06/26/06 F112.0 SECOND FLOOR OVERALL FIRE PROTECTION PLAN 06/26/06 F112.1 SECOND FLOOR FIRE PROTECTION PLAN AREA 1 06/26/06 F112.2 SECOND FLOOR FIRE PROTECTION PLAN AREA 2 06/26/06 F112.3 SECOND FLOOR FIRE PROTECTION PLAN AREA 3 06/26/06 F112.4 SECOND FLOOR FIRE PROTECTION PLAN AREA 4 06/26/06 F112.5 SECOND FLOOR FIRE PROTECTION PLAN AREA 5 06/26/06 F112.6 SECOND FLOOR FIRE PROTECTION PLAN AREA 6 06/26/06 F112.7 SECOND FLOOR FIRE PROTECTION PLAN AREA 7 06/26/06 F112.8 SECOND FLOOR FIRE PROTECTION PLAN AREA 8 06/26/06 F113.0 MEZZANINE FIRE PROTECTION ENLARGED PARTIAL PLAN O6/26/06 F114.1 FIRST FLOOR FIRE PROTECTION ENLARGED PARTIAL PLAN 06/26/06 F114.2 FIRST FLOOR FIRE PROTECTION ENLARGED PARTIAL PLAN 06/26/06 F115.1 SECOND FLR FIRE PROTECTION ENLARGED PARTIAL PLAN 06/26/06 F115.2 SECOND FLR FIRE PROTECTION ENLARGED PARTIAL PLAN 06/26/06 F116.1 SECOND FLR FIRE PROTECTION ENLARGED PARTIAL PLAN 06/26/06 F116.2 SECOND FLR FIRE PROTECTION ENLARGED PARTIAL PLAN 06/26/06 F116.3 FIRE PROTECTION SECTIONS 06/26/06 F116.4 FIRE PROTECTION ENLARGED DETAILS 06/26/06 F117.1 FIRE PROTECTION DETAILS O6/26/06 F117.2 FIRE PROTECTION DETAILS 06/26/06 PLUMBING P000.0 PLUMBING LEGEND, ABBREV, AND GENERAL NOTES O6/26/06 P101.1 FIRST FLOOR PLUMBING DEMOLITION PLAN AREA 1 06/26/06 P101.2 FIRST FLOOR PLUMBING DEMOLITION PLANAREA 2 06/26/06 P111.1 FIRST FLOOR PLUMBING PLAN AREA 1 06/26/06 P111.2 FIRST FLOOR PLUMBING PLAN AREA 2 06/26/06 P111.3 NOT USED P111.4 FIRST FLOOR PLUMBING PLAN AREA 4 06/26/06 P112.1 SECOND FLOOR PLUMBING PLAN AREA 1 06/26/06 P112.2 SECOND FLOOR PLUMBING PLAN AREA 2 06/26/06 06/26/06 P112.4 SECOND FLOOR PLUMBING PLAN AREA 4 06/26/06 P112.5 SECOND FLOOR PLUMBING PLAN AREA 5 06/26/06 Pl 13.0 MEZZANINE PLUMBING PLAN 06/26/06 P113.2 MEZZANINE ENLARGED PLUMBING PLAN O6/26/06 P401.0 FIRST FLOOR PLUMBING ENLARGEMENT PLANS 06/26/06 P402.0 SECOND FLOOR ENLARGEMENT PLUMBING PLANS 06/26/06 P501.0 PLUMBING DETAILS 06/26/06 P501.1 PLUMBING DETAILS 06/26/06 P601.0 PLUMBING ISOMETRICS - SANITARYAND WATER 06/26/06 P601.1 PLUMBING ISOMETRICS - SANITARYAND WATER 06/26/06 MECHANICAL M000.0 HVAC, LEGEND, ABBREVIATIONS, AND GENERAL NOTES 06/26/06 M101.1 FIRST FLOOR HVAC DEMOLITION PLAN AREA 1 06/26/06 M101.2 FIRST FLOOR HVAC DEMOLITION PLAN AREA 2 06/26/06 M111.1 FIRST FLOOR HVAC PLAN AREA 1 06/26/06 M 111.2 FIRST FLOOR HVAC PLAN AREA 2 06/26/06 M111.4 FIRST FLOOR HVAC PLAN AREA 4 06/26/06 M112.1 SECOND FLOOR HVAC PLAN AREA 1 06/26/06 M112.2 SECOND FLOOR HVAC PLAN AREA 2 06/26/06 M112.4 SECOND FLOOR HVAC PLAN AREA 4 06/26/06 MI 12.5 SECOND FLOOR HVAC PLAN AREA 5 06/26/06 M113.0 MEZZANINE HVAC PLAN 06/26/06 M401.0 MECHANICAL SECTION PLANS 06/26/06 M402.0 MECHANICAL MEZZANINE 300 SECTION PLANS 06/26/06 M501.0 HVAC DETAILS 06/26/06 M502.0 HVAC FLOW DIAGRAMS 06/26/06 M503.0 HVAC CONTROL DIAGRAMS 06/26/06 M504.0 EMERGENC Y GENERATOR PLANS AND DETAILS 06/26/06 M504.1 EMERGENCY GENERATOR DETAILS AND SPECIFIC AT/ONS 06/26/06 M601.0 HVAC SCHEDULES 06/26/06 M601.2 HVAC SCHEDULES 06/26/06 ELECTRICAL E000.1 ELECTRICAL SYMBOLS, LEGENDS, AND NOTES 02/24/06 E100.1 FIRST FLOOR ELECTRICAL DEMOLITION PLAN -AREA 1 02/24/06 E100.2 FIRST FLOOR ELECTRICAL DEMOLITION PLAN -AREA 2 02/24/06 E101.1 FIRST FLOOR - ELECTRICAL SITE POWER PLAN 02/24/06 E101.3 FIRST FLOOR - ELECTRICAL SITE LIGHTING PLAN 02/24/06 E101.4 SECOND FLOOR - ELECTRICAL SITE POWER PLAN 02/24/06 E111.1 FIRST FLOOR LIGHTING PLAN -AREA 1 02/24/06 E111.2 FIRST FLOOR LIGHTING PLAN -AREA 2 02/24/06 E112.1 SECOND FLOOR LIGH/NG PLAN - AREA 1 02/24/06 El 12.3 SECOND FLOOR LIGHTING PLAN - AREA 3 02/24/06 El12.4 SECOND FLOOR LIGHTING PLAN -AREA 4 02/24/06 E112.5 SECOND FLOOR LIGHTING PLAN - AREA 5 02/24/06 E121.1 FIRST FLOOR POWER PLAN - AREA 1 02/24/06 E121.2 FIRST FLOOR POWER PLAN - AREA 2 02/24/06 E122.1 SECOND FLOOR POWER PLAN - AREA 1 02/24/06 E 122.2 SECOND FLOOR POWER PLAN - AREA 2 02/24/06 E122.4 SECOND FLOOR POWER PLAN AREA 4 02/24/06 E122.5 SECOND FLOOR POWER PLAN -AREA 5 02/24/06 E131.1 FIRST FLOOR FIRE ALARM PLAN - AREA 1 02/24/06 E131.2 FIRST FLOOR FIRE ALARM PLAN -AREA 2 02/24/06 E131.3 FIRST FLOOR FIRE ALARM PLAN - AREAS 3 THRU 8 02/24/06 E132.1 SECOND FLOOR FIRE ALARM PLAN - AREA 1 02/24/06 E132.2 SECOND FLOOR FIRE ALARM PLAN -AREA 2 02/24/06 E132.4 SECOND FLOOR FIRE ALARM PLAN - AREA 4 02/24/06 E132.5 SECOND FLOOR FIRE ALARM PLAN -AREA 5 02/24/06 E141.1 LIGHTING PROTECTION PLAN - BLDG A" 02/24/06 E141.2 LIGHTING PROTECTION PLAN - BLDG B" 02/24/06 E151.1 MEZZANINE - LIGHTING, POWER, AND FIRE ALARM PLANS 02/24/06 E211.1 ELECTRICAL ONE -LINE DIAGRAM 02/24/06 E211.2 PANELBOARD SCHEDULES - BLDG "A" 02/24/06 E211.3 PANELBOARD SCHEDULES -BLDG B" 02/24/06 E211.4 PANELBOARD SCHEDULES - BLDG B" 02/24/06 E311.1 LIGHTING FIXTURE SCHEDULE 02/24/06 E361.1 ELECTRICAL DETAILS 02/24/06 E361.2 ELECTRICAL DETAILS 02/24/06 TELECOMMUNICATIONS T000.1 SYMBOL LEGEND, ABBREVIATIONS, AND SHEET INDEX 06/26/06 T100.1 TELECOM DEMO PLAN FIRST FLOOR -AREA 1 06/26/06 T 100.2 TELECOM DEMO PLAN FIRST FLOOR - AREA 2 06/26/06 T111.0 SITE PLAN - OSP CONDUIT ROUTE 06/26/06 T111.1 TELECOM PLAN FIRST FLOOR - AREA 1 06/26/06 Tl 11.2 TELECOM PLAN FIRST FLOOR - AREA 2 06/26/06 T 112.1 TELECOM PLAN SECOND FLOOR - AREA 1 06/26/06 T 112.2 TELECOM PLAN SECOND FLOOR - AREA 2 06/26/06 T112.4 TELECOM PLAN SECOND FLOOR - AREA 4 06/26/06 T112.5 TELECOM PLAN SECOND FLOOR - AREA 5 06/26/06 T121.1 PAGING PLAN FIRST FLOOR - AREA 1 06/26/06 T 121.2 PAGING PLAN FIRST FLOOR - AREA 2 06/26/06 T122.1 PAGING PLAN SECOND FLOOR -AREA 1 06/26/06 T122.4 PLAGNNG PLAN SECOND FLOOR -AREA 4 06/26/06 T122.5 PAGING PLAN SECOND FLOOR - AREA 5 06/26/06 T161.1 ENLARGED PLAN TELECOMMUNICATIONS ROOM 116 06/26/06 T161.2 ENLARGED PLAN TELECOMMUNICATIONS ROOM 214 06/26/06 T211.1 PWDS ONE - LINE DIAGRAM 06/26/06 T211.2 ACS BLOCK DIAGRAM 06/26/06 T211.3 MUFIDS BLOCK DIAGRAM O6/26/06 T211.4 MAN BLOCK DIAGRAM 06/26/06 T211.5 PAGING BLOCK DIAGRAM 06/26/06 T211.6 PAGING BLOCK DIAGRAM 06/26/06 T211.7 CCTV/DVR BLOCK DIAGRAM 06/26/06 T311.1 ACS/CCTV SCHEDULES O6/26/06 T321.2 PWDS SCHEDULE 06/26/06 T321.3 PWDS SCHEDULE (CONTINUED) 06/26/06 T331.1 PWDS SCHEDULE (CONTINUED) 06/26/06 T341.1 MUFIDS & MTV SCHEDULES 06/26/06 T361.1 TELECOMMUNICATIONS DETAILS 06/26/06 T361.3 SECURITY DOOR DETAILS 06/26/06 T361.4 SECURITY DOOR DETAILS 06/26/06 T361.5 BHS ROUGH -IN INTERFACE DETAILS 06/26/06 T361.6 SECURITY DOOR DETAILS 06/26/06 T361.7 SECURITY DOOR DETAILS 06/26/06 T361.8 CCTV DETAILS 06/26/06 T361.9 CCTV DETAILS O6/26/06 T361.10 PAGING DETAILS 06/26/06 BAGGAGE 6000.0 BAGGAGE HANDLING SYSTEM LEGEND AND NOTES O6126106 B101.0 OVERALL FIRST FLOOR BAGGAGE HANDLING SYSTEM DEMO PLAN 06/26/06 6101.1 FIRST FLOOR BAGGAGE HANDLING SYSTEM DEDMO PLAN - AREA 1 06126106 B101.2 FIRST FLOOR BAGGAGE HANDLIONG SYSTEM DEMO PLAN - AREA 2 06126106 B111.0 OVERALL FIRST FLOOR BAGGAGE HANDLING SYSTEM PLAN 06/26/06 B111.1 FIRST FLOOR BAGGAGE HANDLING SYSTEM PLAN - AREA 1 06/26/06 B111.2 FIRST FLOOR B AGGAGE HANDLING SYSTEM PLAN - AREA 2 06/26/06 B112.0 OVERALL SECOND FLOOR BAGGAGE HANDLING SYSTEM PLAN O6126106 B112.1 SECOND FLOOR B AGGAGE HANDLING SYSTEM PLAN - AREA 1 06/26/06 B112.2 SECOND FLOOR BAGGAGE HANDLING SYSTEM PLAN - AREA 2 06/26/06 B112.4 SECOND FLOOR BAGGAGE HANDLING SYSTEM PLAN- AREA 4 06/26/06 B11Z5 SECOND FLOOR BAGGAGE HANDLING SYSTEM PLAN - AREA 5 06/26/06 B201 SECOND FLOOR BAGGAGE HANDLING SYSTEM ENLARGED PLAN O6126106 B202 MAKEUP UNIT - FIRST FLOOR BAGROOM 06126106 B301 BHS SECTIONS 06126106 B302 BHS SECTIONS 06126106 B401 BHS SECTIONS O6126106 B402 BHS SECTIONS 06126106 6403 BAGGAGE HANDLING SYSTEM E - STOP ZONES 06126106 B404 CONTROLS SHEET 3 06126106 B501 BAGGAGE HANDLING SYSTEM DETAILS 06126106 B502 BAGGAGE HANDLING SYSTEM DETAILS 06126106 B503 BAGGAGE HANDLING SYSTEM DETAILS 06126106 B504 BAGGAGE HANDLING SYSTEM DETAILS 06126106 ARCA403HITECrS SPECIFICATIONS Division - Bidding and Contract Documents Number Date 06126106 SPECIFICATIONS TABLE OF CONTENTS Section 00020 Division 1 - GENERAL REQUIREMENTS Number Date 00340 ENVIRONMENTAL ASSESSMENT INFORMATION 08/04/06 01100 SUMMARY 06/26/06 01230 ALTERNATES 06126106 01250 CONTRACT MODIFICATION PROCEDURES 06126106 01290 PAYMENT PROCEEDURES 06126106 01310 PROJECT MANAGEMENT AND COORDINATION 06126106 01320 CONSTRUCTION PROGRESS DOCUMENTATION 06/26/06 01330 SUBMITTAL PROCEDURES 06126106 01400 QUALITY REQUIREMENTS 06126106 01420 REFERENCES 06126106 01500 TEMPORARY FACILITIES AND CONTROLS 06126106 01570 01600 PRODUCT REQUIREMENTS 06126106 01700 EXECUTION REQUIREMENTS 06126106 01731 CUTTING AND PATCHING 06126106 01732 SELECTIVE DEMOLITION 06126106 01770 CLOSEOUT PROCEDURES 06/26/06 01781 PROJECT RECORD DOCUMENTS 06126106 01782 OPERATION AND MAINTENANCE DATA 06126106 06126106 06126106 Division 2- Site Construction 02050 SITE DEMOLITION AND DISPOSAL 06126106 02220 EXCAVATION, BACKFILL, FILL AND GRADING FOR 06126106 STRUCTURES 02230 CLEARING AND GRUBBING 06126106 02240 DEWATERING 06126106 02370 EROSION AND SEDIMENTATION CONTROL 06126106 02425 JACKING 06126106 02510 WATER MAIN (P - 702) 06126106 02530 SANITARY SEWER SYSTEM (P -704) 06126106 02630 PIPES FOR STORM DRAINAGE AND CULVERTS (D - 701) 06126106 02631 STORM WATER TREATMENT UNTIS 06126106 02632 MANHOLES CATCH BASINS, INLETS AND INSPECTION 06/26/06 HOLES (d - 751) 02710 BASE COURSE 06/26/06 02740 BITUMINOUS CONCRETE PAVEMENT 06/26/06 02750 CEMENT CONCRETE PAVEMENT 06/26/06 02760 PAINTED TRAFFIC LINES AND MARKINGS 06/26/06 02770 CURB AND GUTTERS O6/26/06 02775 CONCRETE SIDEWALK 06/26/06 02820 FENCES AND GATES O6/26/06 02890 TRAFFIC SIGNS AND SIGNALS O6/26/06 02980 MILLING OF EXISTING ASPHALT PAVEMENT 06/26/06 Divison 3 - Concrete 03010 CONCRETE WORK 06126106 03410 PRECAST PRESTRESSED CONCRETE 06126106 Division 4 - Masonry 04220 UNIT MASONRY O6126106 04810 UNIT MASONRY ASSEMBLIES 06126106 04815 GLASS UNIT MASONRYASSEMBLIES 06126106 Division 5 - Metals 05120 STRUCTURAL STEEL 06126106 05210 STEEL JOISTS 06126106 05300 METAL ROOF DECK 06126106 05320 COMPOSITE FLOOR DECK 06126106 05370 METAL DECK WALL SHEATHING 08104106 05400 COLD -FORMED METAL FRAMING O6126106 05500 METAL FABRICATIONS 06126106 05511 METAL STAIRS 06126106 05521 PIPE AND TUBE RAILINGS 06126106 05721 ORNAMENTAL RAILINGS 06126106 05811 EXTERIOR EXPANSION JOINT SYSTEMS 06126106 Division 6 - Wood and Plastics 06105 MISCELLANEOUS CARPENTRY 06126106 06402 INTERIOR ARCHITECTURAL WOODWORK 06126106 06415 STONE COUNTERTOPS O6126106 Division 7 - Thermal and Moisture Protection 07180 TRAFFIC COATINGS 08/04/06 07210 BUILDING INSULATION 06126106 07411 METAL ROOF PANELS 06126106 07415 COMPOSITE WALL PANELS 06126106 07552 SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING 06126106 07620 SHEET METAL FLASHING AND TRIM 06126106 07710 MANUFACTURED ROOF SPECIALTIES 06126106 07716 ROOF EXPANSION ASSEMBLIES O6126106 07841 THROUGH -PENETRATION FIRESTOP SYSTEMS O6126106 07920 JOINT SEALANTS 06126106 Division 8 - Doors and Windows 08110 STEEL DOORS AND FRAME 06126106 08311 ACCESS DOORS AND FRAMES 06126106 08331 OVERHEAD COILING DOORS 06126106 08332 HORIZONTAL SLIDING HURRICANE SHUTTERS 06126106 08356 SECURITY GATES 06126106 08411 ALUMINUM -FRAME ENTRANCES AND STOREFRONTS 06126106 08450 ALL -GLASS ENTRANCES AND STOREFRONTS 06126106 08460 AUTOMATIC ENTRANCE DOORS 06126106 08520 ALUMINUM WINDOWS 06126106 08710 DOOR HARDWARE O6126106 08790 DOOR SCHEDULE 06126106 08791 HARDWARE SCHEDULE 06126106 08800 GLAZING 06126106 08816 DECORATIVE GLASS 06126106 08911 GLAZED ALUMINUM CURTAIN WALLS 06126106 Division 9 - Finishes 09963 HIGH - PERFORMANCE COATINGS FOR EXTERIOR 06126106 CONCRETE 09060 ROOM FINISH SCHEDULE 06126106 09111 NON -LOAD -BEARING STEEL FRAMING 06126106 09220 PORTLAND CEMENT PLASTER 06126106 09250 GYPSUM BOARD O6126106 09265 GYPSUM BOARD SHAFT -WALL ASSEMBLIES 06126106 09310 CERAMIC TILE 06126106 09402 RESINOUS MATRIX TERRAZZO FLOORING 06126106 09511 ACOUSTICAL PANEL CEILINGS 06126106 09514 ACOUSTICAL METAL PAN CEILINGS 06126106 09545 SPECIALTY CEILINGS 08104106 09651 RESILIENT FLOOR TILE 0612&06 09652 RESILIENT SHEET FLOORING 06126106 09653 RESILIENT WALL BASE AND ACCESSORIES 06/2&06 09680 CARPET 06126106 09911 EXTERIOR PAINTING O6126106 09912 INTERIOR PAINTING 09940 DECORATIVE FINISHES 09960 HIGH PERFORMANCE COATINGS 09981 CEMENTITIOUS COATINGS Division 10 — Specialties 10155 TOILET COMPARTMENTS 10350 FLAGPOLES 10522 FIRE EXTINGUISHER CABINETS 10523 FIRE EXTINGUISHERS 10801 TOILET AND BATH ACCESSORIES Division 11 - Equipment 11150 PARKING CONTROL EQUIPMENT Division 12 — Furnishings (Not Used) Division 13 — Special Construction 13129 PREFABRICATED CONTROL BOOTHS 13286 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBS AND MERCURY Division 14 — Conveying Systems 14240 HYDRAULIC ELEVATORS 14310 14540 14550 Division 15010 15140 15170 15190 15245 15260 15280 15290 15330 15365 15410 15430 15440 15450 15510 ESCALATORS BAGGAGE HANDLING SYSTEMS (BHS) MATERIAL LIFT 15 — Mechanical BASIC MECHANICAL REQUIREMENTS SUPPORTS AND ANCHORS MOTORS MECHANICAL IDENTIFICATION VIBRATION ISOLATION PIPING INSULATION EQUIPMENT INSULATION DUCTWORK INSULATION AUTOMATIC SPRINKLER AND STANDPIPE SYSTEM FIRE PUMPS — DIESEL DRIVEN PLUMBING PIPING PLUMBING SPECIALITIES PLUMBING FIXTURES PLUMBING EQUIPMENT HYDRONIC PIPING 06126106 06126106 08104106 06126106 06126106 O6126106 06126106 O6126106 06126106 06126106 06126106 06126106 06126106 06126106 O6126106 06126106 06126106 O6126106 06126106 06126106 06126106 O6126106 06126106 06126106 06126106 06126106 O6126106 06126106 06126106 15515 HYDRONIC SPECIALITIES 06126106 15530 PACKAGED AIR-COOLED CHILLERS 06126106 15535 REFRIGERANT PIPING AND SPECIALITIES 06126106 15540 HVAC PUMPS 06126106 15545 CHEMICAL WATER TREATMENT 06126106 15738 SPLIT SYSTEM AIR-CONDITIONING UNITS 06126106 15850 VARIABLE FREQUENCY DRIVES 06126106 15857 FAN -COIL UNITS 06126106 15860 FANS 06126106 15875 WALL LOUVERS 06126106 15890 DUCTWORK 06126106 15910 DUCTWORK ACCESSORIES 06126106 15930 AIR TERMINAL UNITS 06126106 15940 AIR OUTLETS AND INLETS 06126106 15951 DIRECT DIGITAL CONTROL FOR HVAC 06126106 15980 INSTRUMENTATION 06126106 15990 TESTING, ADJUSTING, AND BALANCING 06126106 Division 16 — Electrical 16010 BASIC ELECTRICAL REQUIREMENTS 02124106 16020 INSTALLATION OF UNDERGROUND ELECTRICAL DUCT 02124106 BANKS, CONDUIT, MANHOLES, AND HANDHOLES 16060 GROUNDING AND BONDING 02124106 16075 ELECTRICAL IDENTIFICATION 02124106 16123 600 VOLT OR LESS CABLE 02124106 16130 RACEWAYS 02124106 16135 OUTLET BOXES AND FITTINGS 02124106 16140 WIRING DEVICES 02124106 16142 ELECTRICAL CONNECTIONS FOR EQUIPMENT 02124106 16145 LIGHTING CONTROL DEVICES 02124106 16160 CABINETS AND ENCLOSURES 02124106 16190 SUPPORTING DEVICES 02124106 16231 GENERATOR SET 02124106 16290 POWER MONITORING AND CONTROL 02124106 16410 ENCLOSED DISCONNECT SWITCHES AND CIRCUIT 02124106 BREAKERS 16411 ELEVATOR SHUNT -TRIP FUSED DISCONNECT SWITCHES 02124106 16415 EXTERNALLY MOUNTED TRANSIENT VOLTAGE 02124106 SUPPRESSOR 16416 AUTOMATIC TRANSFER SWITCH 02124106 16421 UTILITY SERVICE ENTRANCE 02124106 16441 SWITCHBOARDS 02124106 16442 PANELBOARDS 02124106 16444 ENCLOSED MOTOR CONTROLLERS 02124106 16461 DRY -TYPE TRANSFORMERS 02124106 16485 CONTACTORS 02124106 16491 FUSES 02124106 16501 LAMPS 02124106 16511 INTERIOR LIGHTING 02124106 16521 EXTERIOR LIGHTING 16601 LIGHTNING PROTECTION SYSTEM 16721 ADDRESSABLE FIRE ALARM SYSTEM 16740 VOICE PAGING SYSTEM 16741 PREMISE WIRING DISTRIBUTION SYSTEM (PWDS) 16780 CCTV/DVR SYSTEM 16781 MULTI-USER FLIGHT INFORMATION DISPLAY SYSTEM (MUFIDS) 16850 MASTER ANTENNA TELEVISION SYSTEM (MA TV) 16900 ACCESS CONTROL SYSTEM 16950 ACCEPTANCE TESTING 02124106 02124106 02124106 02124106 02124106 02124106 02124106 02124106 02124106 02124106