11/21/2000 Agreement
S~ction 00500
CLERK'S ORIGINAL
Standard Form of Agreement
Between Owner and Contractor
where the basis of payment is a STIPULATED SUM
AGREEMENT
~"t .
made as of the ~
(In Words, indicate day, month and year.) ~
day of P1~
in the year of ;. (J ,) 0
BETWEEN the Owner:
(Name and address)
Monroe County Board of County Commissioners
500 Whitehead Street
Key West, Florida 33040
and the Contractor:
(Name and address)
Synagro Southeast, Inc.
6630 Front Street, Stock Island
Key West, Florida 33040
For the following Project:
(Include detailed description o/project, location, address and scope)
Storm Sewer Cleaning IT
Key West to Key largo, Monroe County, Florida
The Construction Manager is:
(Name and address)
Monroe County Engineer
The Architect is:
(Name and Address)
Monroe County Engineer
:r
<:) 0 <::)
:t: ::c. - ...,..,
::Q (j :l" :-rt r=
<:) r- ;:r= f"P'i rry
,.....,~_.\~ ex; 0
Q' r- , ~
"-'t::"). \0 ./
c.:-:;:;- __ 0
~~ 2 -0 ::.0
::-< <.'") r- ::::.:- ::0
... ..- <I::r: rr,
,,:.' ~.. ~ <"")
/'" f:i..r ~ <:::I
::0
.c- 0
The Owner and Contractor agree as set forth below.
10/23/00
Standard Form of Agreement Between Owner and Contractor
00500-1
ARTICLE 1
The Contract Documents
The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other
Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other docwnents listed in this
Agreement and Modifications issued after execution of this Agreement: these form the Contract, and are as fully a part of
the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated
agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or
oral. An enwneration of the Contract Documents, other than Modifications, appears in Article 9.
ARTICLE 2
The Work of this Contract
The Contractor shall execute the entire Work described in the Contract Docwnents, except to the extent specifically
indicated in the Contract Documents to be the responsibility of others, or as follows:
Scope of Work as specified in the Project Manual for this project, Section 00300.
ARTICLE 3
Date of Commencement and Substantial Completion
3.1 The date of commencement is the date from which the Contract Time of Paragraph 3.2 is measured, and shall be
the date of this Agreement, as first written above, unless a different date is stated below or provision is made for the date
to be fixed in a notice to proceed issued by the Owner.
Ten (10) calendar days from Notice to Proceed unless otherwise agreed in writing by Contractor and
Construction Manager.
Unless the date of commencement is established by a notice to proceed issued by the Owner, the Contractor shall notify
the Owner, through the Construction Manager, in writing not less than five days before commencing the Work.
3.2 The Contractor shall achieve Substantial Completion of the entire Work not later than
(Insen the calendor dole or number of calendar days after the dole of commencement. Also insen any requirements for earlier Substanlial Completion of
cenain ponions of the Work. if not stated elsewhere in the Contract Documents.)
One Hundred Twenty (120) calendar days from date of Commencement.
subject to adjustments of the Contract Time as provided by the Contract Document
(Insen provisions if any for liquidoled damages relating to failure to complete on time>)
Liquidated damages will be assessed at the rate of $250.00 per normal working day following
anticipated Substantial Completion date described above until such time as Substantial Completion is
achieved.
ARTICLE 4
Contract Sum
4.1 The owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract
Swn of Two Hundred thirty thousand three hundred thirteen and 12/100 Dollars ($230,313.12), subject to additions and
deductions as provided in the Contract Docwnents.
4.2 The Contract Swn is based upon the following alternates, if any, which are described in the Contract Docwnents
and are hereby accepted by the Owner:
(State the numbers or other identification of accepted alternates. If decisions on other alternates are to be made IJy the Owner subsequent to the
execution of this Agreement. Anach a schedule of such other alternates showing the amount for each and the dole until which tlult amount is valid.)
10/23/00
Standard Form of Agreement Between Owner and Contractor
00500-2
4.3 Unit prices, if any, are as follows:
Unit prices as specified on Bid Form for this project from Section 00110 of Project Manual for this
project, as submitted by Contractor and accepted for award of contract by Monroe County Board of
County Commissioners.
ARTICLE 5
Progress Payments
5.1 Based upon Applications for Payment submitted by the Contractor to the Construction Manager, and upon Project
Applications and Certificates for Payment issued by the Construction Manager and Architect, the Owner shall make
progress payments on account of the Contract Sum to the contractor as provided below and elsewhere in the Contract
Documents.
5.2 The period covered by each Application for payment shall be one calendar month ending on the last day of the
month, or as follows:
Thirty days (30) after commencement of the work and every thirty days thereafter until completion of
the project.
5.3 Provided an Application for Payment is submitted to the Construction Manager not later than the First day of a
month, the Owner shall make payment to the Contractor not later than the Twentieth day of the Same month. If an
Application for Payment is received by the Construction Manager after the application date fixed above, payment shall be
made by the Owner not later than Twenty days after the Construction Manager receives the Application for Payment.
5.4 Each Application for Payment shall be based upon the Schedule of Values submitted by the Contractor in
accordance with the Contract Documents. The Schedule of Values shall allocate the entire Contract Sum among the
various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the
Construction Manager or Architect may require. This schedule, unless objected to by the Construction Manager or
Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment.
5.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of
the period covered by the Application for Payment.
5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as
follows:
5.6.1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the
percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the
Work in the Schedule of Values, less retainage of Ten percent (10%). Pending final determination of cost to the Owner
of changes in the Work, amounts not in dispute may be included in applications for Payment. The amount of credit to be
allowed by the Contractor to the Owner for a deletion or change which results in a net decrease in the Contract Sum shall
be actual net cost as confirmed by the Construction Manager. When both additions and credits covering related Work or
substitutions are involved in a change the allowance for overhead and profit shall be figured on the basis of net increase, if
any, with respect to that change.
5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored
at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably
stored off the site at a location agreed upon in writing), less retainage of Ten percent (10 % ):
10/23/00
Standard Form of Agreement Between Owner and Contractor
00500-3
"5.6.3 Subtract the aggregate of previous payments made by the Owner; and
5.6.4 Subtract amounts, if any, for which the Construction Manager or Architect has withheld or nullified a Certificate
for Payment as provided in Paragraph 9.5 of the General conditions.
5.7 The progress payment amount determined in accordance with Paragraph 5.6 shall be further modified under the
following circumstances:
5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to Ninety percent
(90%) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines for
incomplete Work and unsettled claims: and
5.7.2 Add, if fmal completion of the Work is thereafter materially delayed through no fault of the Contractor, any
additional amounts payable in accordance with Subparagraph 9.10.3 of the General Conditions.
5.8 Reduction or limitation of retainage, if any, shall be as follows:
(If it is intended. prior to Substantial completion of the entire Work, to reduce or limit the retainage resulting from the percentages inserted in
Subparagraphs 5.6.1 and 5.6.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or
limitations)
ARTICLE 6
Final Payment
Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor
when (I) the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct
nonconforming Work as provided in Subparagraph 12.2.2 of the General Conditions and to satisfy other requirements, if
any, which necessarily survive final payment: and (2) a fina1 Project Certificate for Payment haws been issued by the
Construction Manager and Architect: such fina1 payment shall be made by the Owner not more than 20 days after the
issuance of the fina1 Project Certificate for Payment, or as follows:
ARTICLE 7
Miscellaneous Provisions
7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract
Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract
Documents.
7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated
below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located.
(Insert rate of interest agreed upon, if any)
Zero Percent (0 % )
(Usury laws and requirements under the Federal TTUlh in Lending Act, similar state and local consumer credit laws and other regulations at the Owner's
and Contractor's principal places of business. the location of the Project and elsewhere may affect the validity of this provision. Legal advice should be
obtained with respect to deletions or modifications, and also regarding requirements such as written disclosures or waivers.)
7.3 Temporary facilities and services:
(Here insert temporary facilities and services which are different from or in addition to those included elsewhere in the Contract Documents.)
7.4 Other Provisions:
(Here list any special provisions affecting the Contract.)
10/23/00
Standard Form of Agreement Between Owner and Contractor
00500-4
'Special Conditions, if any are detailed in Section 01000 of the Project Manual for this Project
ARTICLE 8
Termination or Suspension
8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General
Conditions.
8.2 The Work may be suspended by the Owner as provided in Article 14 of the General Conditions.
Article 9
Enumeration of Contract Documents
9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as
follows:
9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor.
9.1.2 The General Conditions are the General Conditions of the Contract for Construction.
9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated June
2000, and are as follows:
Document
Title
Pages
As listed in Table of Contents, Section 00001 of the Project Manual for this project.
9.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 9.1.3, and are as follows:
(Either list the Specifications here or refer to an exhibit attached to this Agreement.)
Section
Title
Pages
As listed in Table of Contents, Section 00001 of the Project Manual for this project.
9.1.5 The Drawings are as follows, and are dated on each individual drawing unless a different date is shown below:
(Either list lhe Drawings here or refer to an exhibit attached 10 this Agreement.)
Number
Title
Date
As listed in Table of Contents, Section 00001 of the Project Manual for this project.
9.1.6 The Addenda, if any, are as follows:
Number
Date
Pages
Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding
requirements are also enumerated in this Article 9.
9,1.7 Other documents, if any, forming part of the contract Documents are as follows:
10/23/00 Standard Form of Agreement Between Owner and Contractor
00500-5
, .
(List he';e any additional documents which are intended to form pan of the Contract Documents. The General Conditions provide that bidding
requirements such as advenisement or invitation to bid. Instructions to Bidders, sample forms and the Contractor's bid are not pan of the contract
Documents unless enumerated in this Agreement. They should be listed here only Ifintended to be pan of the Contract Documents.)
eement is entered into as of the day and year first written above and is executed in at least
copies of which one is to be delivered to the Contractor, one each to the Construction
rchitect for use in the administration of the Contract, and the remainder to the Owner.
BOARD OF COUNTY COMMISSIONERS
~ONROE COUNTY, FLORIDA
~l~ -e ~:s-d
Mayor/Chairman
Date
~ ~~ .2.0<>(.)
(SEAL)
:~test:Qu ~
Title: /Sv 8 (J ':1.'/ 've As, .5~4
By:
Title:
,.....,~,.....,,.....,.........,,.....,,.....,,.....,,.....,
END OF SECTION 00500
11/2/00
Standard Form of Agreement Between Owner and Contractor
00500-6
SECTION 00110
BID PROPOSAL
The Bid Proposal shall be submitted on the forms included in this section of the Bidding
Documents as previously instructed herein.
Item Description Pages
1. Proposal Form 2-5
2. Non-Collusion Affidavit 6-7
3. Lobbying and Conflict of Interest Clause 8
4. Drug-Free Workplace Form 9
5. Bid Bond 10
6. Insurance Statement 11
'-
8/11/00
BID PROPOSAL
00 1 1 0- 1
PROPOSAL FORM
BID TO: MONROE COUNTY BOARD OF COUNTY COMMISSIONERS
c/o PURCHASING DEPARTMENT
PUBLIC SERVICE BUILDING, ROOM 002
5100 COLLEGE ROAD, STOCK ISLAND
KEY WEST, FLORIDA 33040
BID FROM: Svnaqro Southeast, Inc.
lBOO Bering Drive, Suite 1000
Houston, Texas 77057
The undersigned. having carefully examined the Work and reference Drawings. Specifications.
Proposal. and Addenda thereto and other Contract Documents for the construction of:
STORM SEWER CLEANING II
Kev West to Kev Lar~o
Monroe County, Florida
and having carefully examined the site where the Work is to be performed. having become familiar with
all local conditions including labor affecting the cost thereof, and having familiarized himself with
material availability, Federal. State. and Local laws. ordinances, rules and regulations affecting
performance of the Work, does hereby propose to furnish all labor, mechanics. superintendents. tools.
material. equipment. transportation services. and all incidentals necessary to perform and complete said
Work and work incidental hereto. in a workman-like manner, in conformance with said Drawings.
Specifications. and other Contract Documents including Addenda issued thereto.
The undersigned further certifies that he has personally inspected the actual location of where the \ V ork i
to be performed, together with the local sources of supply and that he understands the conditions under
which the Work is.to be performed. The successful bidder shall assume the risk of any and all costs and
delays arising from the existence of any subsurface or other latent physical condition which could be
reasonably anticipated by reference to documentary information provided and made available. and from
inspection and examination of the site.
The undersigned shall perform the work at the Unit Price Indicated on the following Bid Form. Further.
is understood that the Bid Form Quantities are estimated for evaluation purposes only and that the final
contract price will be determined from the actual quantities measured for payment in accordance \vith th
Contract Documents.
8/11 /00
BID PROPOSAL
00110-2
(bid form)
~ I' ~ \0 ~ Il'l 0 C 0 ~ 2 N ~ 0 M
U I' r-l Il'l '<3' Il'l I' I' N
..
'C , I . . . ~ . ~ , . .
.. Go ~ 0 I ~ CXl 0 O"l CXl M ~ N ~ O"l M
- M I 0 .~ \0 M Il'l I' CXl r-l
.. N O"l \0 0 CXl .... \J '<3' r-l M
-0 , , , , , ,
I- 0 '<3' '<::I " CXl N ~ N '<::I '<: N .... M 0
r-l r-l M r-l M
r-l N
o I' ~ \0 :: Il'l '<3' ~ Il'l '<3' ~ N ~ O"l
U \01' O"l '<3' \0 r-l '<3' 0 \0
.. 1'0 I . . . . . , .
~ I ~ ,.... r-l N '" \0 @ :: N ~ 0
- g~ I r-l 0 I'
e N -. O"l eX CXl Ui
,
~ 0"l'<3' '" -
ftS
-
~
0 ~ ~ 0 ~ g
00
~~ ~ 0 0 ~
0 0 ,~ 0 ~
O"l "- ~ 0 r-l ~ Lt 0
\01' r-l ......... ~ ......... 1 NO
. I' ~ ......... '<3' Il'l '<3' r-lr-l
! '0 Il'l \0 r-l '<3' "-
1::'0 '0 Ul r-l '<3' 'g 'o0"l
- III I:: I:: ~ '0 '0 '0 ~ 0 1::\0
'i III III I:: '0 '0 I:: III I:: I:: 0 III
~ I:: L Q) I:: I:: III III III r-l '0
Q) >. () III III Ul "- Ul I::
II > ~ Ul ,.. Ul Ul ... N ,.. III
. Q) ,.. ,.. x ,... ,.. ,.. III ,.. ,.. '( 0 III
=
i Ul .,.,j .,.,j .,.,j III III III r-l 10 III r-l Ul
..-.4 .c .c Ul r-l r-l r-l r-l r-l r-l ~ '0 r-l ,..
'0 ~ ~ ....... r-l r-l .g r-l r-l ~ I:: o III
Q) >. 0 0 0 0 0 III '0 r-l
>- ftI ,.. '0 '0 ~ '0 '0 '0 '0 '0 r-l
"C '0 Q) Q) Q) ,.. en Q) 0
- I:: ,.. ,.. I:: Q) '0 ~ ::l X I:: ~ ,.. I:: '0
... ::l '0 '0 .,.,j I:: I:: 0 .,.,j Q) III .,.,j
c:: 0 .c I:: I:: Z 0 0 r... CJ) 8 i:r:l r-t I:: >.
it ::l ::l ';;! '" 1:!
:s ;; Q) '0 t ~
,.. g g
0 - .c ~ ~ Q)
C ~ ~ ~ en
=
a '0 '0 '0 '0 '0
I:: I:: I:: '0 Q) Q)
QJ III III III Q) ,.. ,..
QI en Ul en ,.. '0 '0
0 ~ ::l ::l ::l '0 I:: I::
- o 0 0 I:: ::l ::l
~ .c .c .c ::l .c .c
- :2 ~ .j.l ~ .c
:f . ~ ~
() II Q) ,.. ,.. Q) .g .c
0 ~ I:: 0 I:: ::l ::l I:: 0\
- H 1: .r-l 0 0 .,.,j .,.,j r-l
= Go Z r... r... z i:r:l i:r:l
ftI ... , 1
u ~ ~
- en 0 Q
(J t- III 0
Q) 0 ~
... ~ .c N ...
U .j.l 2 ..
.~ ::l , .. ~ :s
0 ...
- 0 I' S '0 i "U
U CJ) r-l .!l
- ~
CI) IJ ~ 8 c: :s
0 ,.. .2 c: c:
,... Q) c:
e ~ .. ~ 0 0
0\ .Q e c: olIl ! ~ ~~ .~ .~ .~ .t .~ 1 1 ;
III 0 u .. m
~ :s 0
= I:: .j.l u :Q ~ s: s: s: s: s: s: .c:
>t u c: oS oS ~
- c! .. 0 .!! . .
CI) ~ CJ) 0 ~ ~ N 1ft . . b ~ ~ :a ~ ;.. ~
c:;; - .
- - - N .., .., . . N
:= ~ ~ ~ ~ 110 110
c: ~ CIo ~ 110 110 ~ < < <
~ ... ... - ... .. ... lU lU lU
po po po ... \G . ~ ~ - i 8 8 ~ C"I ~
b a: $ -
i.: V\ .. .. ...
0 1ft .. ..,
= .s
'0 u
- .2 t!
u ~
.~ - - & .
3 = - " 0 ~ N .. vi .0 roo; c:i ~ ri "" .,;. vi
ct a ~ ::z .., - ~
.3 Q ... ... ... ... ... ...
E
;...
o
~
"'0
.
r:c
.....
u
~
~
...
...
U
lID
.
Go
c:
o
!
::I
1
Go
lID
Ji
c:
.
u
~
u
oS
lID
oS
"
-a.
&
e
..
.2
I
:I
1
Go
~
=
.
:I
1i
&
-
o
c:
S
j.
i
."
u
:.
..
S
..
o
~
~
c:
a
!
-;
Z"
ll&
.
8/11/00
BID PROPOSAL
001 1 0-3
.
Storm Sewer Cleaning Required Descriptions
.'
Contractor:
Synagro Southeast, Inc.
Date: lO/l7/00
Disposal Sites: 1.
KW Resort Utility
2.
Yellow Brick Road, Inc.
3.
Description of equipment, methods and procedures to be used:
Please refer to the attached.description.
8111/00
BID PROPOSAL
00110-4
Proposal to the Monroe County Board of County Commissioners
Description of equipment, methods and procedures to be used:
A Vactor brand sewer cleaning machine will be used for pipe and catch basin cleaning. It uses
1500 PSI water jet at 80 GPM to clean the pipe and structures with the debris being removed by
an 8-inch vacuum hose. The water/debris slurry is separated in the truck's debris tank with the
water being returned to the storm system. Pneumatic plugs and turbidity screens will be used to
prevent the discharge of turbid water through any outfalls.
Wells will be cleaned using a high pressure jet as described above in combination with a vacuum
pumper truck. The high pressure hose will be lowered into the well, followed by the pumper
truck's 4-inch suction hose. Both will be lowered below the well casing depth where the water jet
will loosen debris to be removed by the suction hose. The pumper truck will continue taking up
water, reversing the flow of water. The water flowing into the well through the porous rock will
remove fine particulate debris from the rock matrix, improving porosity.
Wet debris will be dumped at KW Resort Utility on Stock Island where the debris will drain. The
water will be treated at the FDEP permitted wastewater plant. The dried debris will be hauled
away for disposal by a local transportation contractor.
Submitted by Synagro Southeast, Inc.
I acknowledge receipt of Addenda No.(s) . I have included pages 1
through 10 of the Bid Proposal which entails the Proposal Form~ the Non-Collusion
Affidavit~ the Lobbying and Conflict of Interest Clause~ the Drug-Free Workplace
Form ~ the Bid Bond~ the Bidder's Insurance Statement-L-. Also include a copy of
valid licenses-L.
(Check mark items above, as ~ reminder that thev are included.)
Mailing Address:
Synaqro Southeast, Inc.
1800 Bering Drive, Suite 1000
Houston, Texas 77057
Phone Number:
(713) 369-1700
Date:
October 17, 2000 Signed:
/~jh\j~.
-
Mark A. Weidman
(Name)
President, Processing Division
(Title)
~J\, A7~~
Witness:
8111 /00
BID PROPOSAL
001 1 0-5
NON-COLLUSION AFFIDAVIT
1, Mark A. Weidman of the city of Millersville, MD according to law on my
oath, and under penalty of perjury, depose and say that;
1. [am President, Processinq Division of the firm of
Synagro Southeast, roc. , the bidder making the Proposal for
the project described in the notice for calling for "bids for:
STORM SEWER CLEANING II
Kev West to Kev Largo
Monroe County, Florida
and that I executed the said proposal with full authority to do 50;
2.) the prices in this bid have been arrived at independently without collusion,
consultation, communication or agreement for the purpose of restricting
competition, as to any matter relating to such process with any other bidder or
with any competitor;
3.) . unless otherwise required by law, the prices which have been quoted in this
bid have not been knowingly disclosed by the bidder and will not knowingl y
be disclosed by the bidder and will not be knowingly disclosed by the bidder
prior to bid opening, directly or indirectly, to any other bidder or to any
competitor; and
4.) no attempt has been made or will be made by the bidder to induce any other
person, partnership or corporation to submit, or not to submit, a bid for the
purpose of restricting competition;
5.) the ~tatements contained in this affidavit are true and correct, and made \\'ith
full knowledge that Monroe County relies upon the truth of the statements
contained in this affidavit in awarding contracts for said project.
8111 /00
BID PROPOSAL
001 1 0-6
/ / .. ~ '...::....(
./ ~ /'_. ..~. /-
- .. (Signature of Bidder)
October 17, 2000
(Date)
STATE OF:
Maryland
COUNTY OF:
Anne Arundel
PERSONALLY APPEARED BEFORE ME, the undersigned authority,
Mark A. Weidman
who, after first being sworn by me,
~
Sue A. Gregory
(name of individual signing) affixed his/her signature
October
My commission expires: 11/01/2000
8/11/00
BID PROPOSAL
00110-7
LOBBYING AND CONFLICT OF INTEREST CLAUSE
SWORN STATEMENT UNDER ORDINANCE NO. 010-1990
MONROE COUNTY, FLORIDA
II
Synagro Southeast, Inc.
(Company)
II
II... warrants that it has not employed, retained or otherwise had act on its behalf any former County
officer or employee subject to the prohibition of Section 2 of Ordinance No. 010-1990 or any County
officer or employee in violation of Section 3 of Ordinance No. 010-1990. For breach or violation of
this provision the County may, in its discretion, terminate this contract without liability and may
also, in its discretion, deduct from the contract or purchase price, or otherwise recover, the full
amount of any fee, commission, percentage, gift, or consideration paid to the former County officer
or employee".
_ ~t.c<zlv)t~
(Signature)
10/l7/2000
(Date)
STATE OF
Marvland
COUNTY OF Anne Arundel
PERSONALLY APPEARED BEFORE ME, the undersigned authority,
Mark A. Weidman
who, after first being sworn by me, affixed his/her
signature
Mark A. Weidman
(name of individual signing)
in the space provided
above on this
I 20 00
~ \\ ~-~
NOTARY PUBLIC
Sue A. Gregory
-
My commission expires: 11/01/2000
8/11 /00
BID PROPOSAL
0011 0-8
DRUG-FREE WORKPLACE FORM
The undersigned Contractor in accordance with Fl. Statute 287.087 hereby certifies that:
Synaqro Southeast. Inc.
(Name of Business)
1. Publish a statement notifying employees that the unlawful manufacture. distribution,
dispensing, possession, or use of a controlled substance is prohibited in the workplace and
specifying the actions that will be taken against employees for violations of such prohibition.
2. Inform such employees about the dangers of drug abuse in the workplace. the business's
policy of maintaining a drug-free workplace. any available drug counseling, rehabilitation.
and employee assistance programs, and the penalties that may be imposed upon employees
for drug abuse violations.
3. Give each employee engaged in providing the commodities or contractual services that are
under bid a copy of the statement specified in subsection (1).
4. In the statement specified in subsection (1), notify the employees that, as a condition of
working on the commodities or contractual services that are under bid, the employees will
abide by the terms of the statement and will notify the employer of any conviction of, or plea
of guilty or nolo contendere to, any violation of Chapter 893 (Florida Statutes) or of any
controlled substance law of the United States or any state, for a violation occurring in the
workplace no later than five (5) days after such conviction.
5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistanc~ or
rehabilitation program if such is available in the employee's community, or any employee
who is so convicted.
6. Make a good faith effort to continue to maintain a drug-free workplace through
implementation of this section.
As a person authorized to sign the statement, I certify that this firm complies fully with the abL'\'~
requirements.
MCP#S Rev. 6/91
~J/~.
,,~ C,4rk.!, .~'-t
Bidder's SilZllature
Mark A. Weidman
ga~5~gfnI"P288assing Division
Date
8/11 /00
BID PROPOSAL
0011 0-9
Bidders's Insurance Statement
The Insurance requirements are set forth in Section 00900 of the project manual as follows:
Insurance Requirement
Required Limits
Worker's Compensation WC2~
$500,000/5500,000/5500,000
General Liability GL2--K-
5250,000 per Person; 5500,000 per
Occurrence; 550,000 Property Damage or
5500,000 Combined Single Limit
GLXCUL
"'Required Endorsement
Underground, Explosion and Collapse
(XCU)
Vehide Liability
VL2 X
. -
5100,000 per Person; $300,000 per
Occurrence; 550,000 Property Damage or
$300,000 Combined Single Limit
I understand the insurance that will be mandatory if awarded the contract and will comply
in full with all these requirements.
Synagro Southeast, Inc.
Name of Business
~ {~.l?JA0J.o~ ~
, ----...'
Signature
10/17/2000
Date
8111 /00
BID PROPOSAL
00 1 1 0- 1 1
END OF SECTION 00110
8111/00
BID PROPOSAL
00110-12
...~
~ 0 0 enz
.... - e e :::t-
In 0 :iZ .
0. 0 .. ... zen
.... N '" In :::h(t-
c
Q .. O..JZ
, 0 >~W
- .., . :I
.0 HARRY F. KHIGH)( >- ~
- TAX COlLECTOR C 1-_
... ....
.. ~ I- 2502236.0001 of ~ a
w ... OJ DATE 91'29/00 C 0
< 8
w ; ~ Our nKl W
CI) w a: I- ~ Till 208>0a:
~ ~Ijl~~
I I E ~i~ rG Paid 5~.OO~..Jc"
i 1i:15 ~IU~ 0-,2:
W f~'" Cl)C~
M (J~
-t-N
u.I !!WQ
u :Wz
c
it t-:&C
~ ~
i e
- -
lie ~ I 0. 0
~ .0 eN Q
0- -
!~ a: ...-
@ "" I N
...- ...
"eU ~.. In
~ ~ ~o 0.
0"" ...
u U~ (;)
UI C
... M", -
'< C~ .0
~ l- t- -
; I- ...
Yo! o.M ..
C uw Q
rc Q \1.3 Q
. u ... c.I Q
0 I- Z e ..... (;)
E ; Z - .., P-W
... '" u .., :z::w 0
II: 0 ZIII &D 0
.... - -W ... .. ..
- w - -~ ZOo In
C C ~O t-UJ::a 0 WN Q
Q ex ~E ~Oll: (;) - Q
N to- :z:: c.... "" .- e
I ... WO~ ... (;)
0 &II WO zzc In - (;)
CI CII C ....z"'.... 0. 11-0 (;)
Q C W~ ='-'M&.Io N Clem
"' ~ ::t w... ow_ 0. CIC (;)
loll .. en...",. - CO 0
en w= :.ow .. ZQ. Q
a: >0 000_ Q
0'-' .- Z ..l 0 Q
.0 CDeII-. loll l!! Q
-I cc_w '-' ~~ 0
.... - .2-:.0 . ~~ 0
... 0.0 ~>>-o.c C <> C
caO lIIenca... Q. CltZ C
0 lUlU
:J ~ 0 ~~ CIt ~~
E ~ :!sUI il:3 ~t
l3a:i ~~ I~ W-O:
:1"'0 !t1o
~o ~~ ~i!i :CUI
111< ...a:
0 f-CJ
..., c U)z
..... - c c ::I-
an Q :12 ,
~ C 11\ an zen
..... N N N =C~
C
Q .. o....W
1 Q >A.:!
c ...,
.. Y.'R~oEr.E!'!P~ ~
-
Q ... 2502236.0002 of 5
..., Q. ~
\oJ i ~ OATE 9129/00 C :::J a
In Inn Olt.r nKl 0 W
~ II) r~ T i 11 208> (J a:
w Paid 2S.00...J CJ
a:
8 it I~~ Z..Iz
~ 0....-
u UJc~
<
-
-...N
~ ~WQ
:wz
t-:le(
i to
Q
! - -
~ 1 ~ 0
00 MN 0
~ 0- -
I~ ~ ....-
Q WI ...,
i 111_ ~
U ..J" In
m -0 ~
0,," .....
w." C
0 i 0
~ I&.l .- .C
lD C&&. ..
t; ; III
.... -
.... C
III .... ..,
0 ~ "'..., c
- . 0 ~:a c
. - ... .... '" 0
0 A. Z 0 ~ C
Ie II) Ie - ." ....\101
... :::a \1& W 1ft Z:liC 0
~ L 0 _M &It 0
UI 1& -III - .. 11\
- W >>-z ...~ z~ N
Cl Z :110 ....W3: 0 ~N 0
Q c ZC MOZ 0 - 0
N .... C..J ..., .- 0
I M.... ..,OM ... 0
0 w co :cze V\ tIC 0
Q ... IAI ....:1:111.." ~ ~o 0
Q to- M~ :.....M"- N _CD
N I a.. .... 0111. . ~ . Q
IAI 111- M"'III. - co Q
M =-- =-... .. -a.. 0
a: 00 000- 0
Q w .. Z ..I Q =
... &OeD-a.: w ~ c
- -I c<<_w U < 0
leg
Q - zz-> . ~:i 0
"'" ~c >>-~o.c c <> 1:1
..0 CI'IMtOJ- Q. 07- 0
0 Will
(I) UI I&.~ :a~ ~ ~i
~ ~ ~ti:
~ % o~ Ii .iw 1I)-
. . w_ !;~ 22{l5
~lr!i a.CIl
1&.02 ~i i:~
.AOtI
QI.ertifitate of ~nsuranr.e
TO: Certificate Holder
MONROE COUNTY
5100 COLLEGE ROAD, STOCK ISLAND
KEY WEST, FL 33040
Insured:
SYNAGRO TECHNOLOGIES, INC. INCLUDING
ATTACHED ADDmONAL NAMED INSUREDS
1800 BERING DRIVE, SUITE 1000
HOUSTON, TX 77057
RE:
Aon Risk Services
SEALED BID FOR STORM SEWER CLEANING II KEY
WEST TO KEY LARGO
77Iis u to artilY thtJt the poIicia of innurmctt luted below "aw "- effected fo, '''e InslUt!d named
aboN for the policy period indicated. notwillullllJding a", f'f!I/IIinlntllll. 1_. 01" COIIdidon of any
COIItrIICt or otUr documenl with -(1<<1 to liIIIIich this cenijicDte IIIlJ]1 be Wued 0' lflii}' pertain. 17Ie
iMunurce affOl'lhd by '''e policia dacribed henin u subject to l1li '''e _. ezclruions tmd conditions
of nd poIicia. Limits shawn lflii}' /raw "- redIu:MJ by paid cIlJinu
Policy Number
WC Statutory Umits
E.L. Each Accident
E.L. Disease-Ea Employee
E.L. Disease-Policy Umit
Each Claim
Aggrente
All Risk Building &. Contents
Conlractors Equipment
including Rented &. Leased
Deductible: Various S
Insunnce Com aa es: A Greenwich IIIL Com anv B FIremen's Fund InL Com anv C Indlaa Harbor InL Co. D Reliance Natl. Ind. Co.
Description of Operations: Certificate Holder is listed as Additional Insured where required by written conlract under GUAUUMB. The insunace afforded to the
Additional Insured u delCribed la this Certificate of lusunace (COI) for work performed by tbe Named Insured, Is nrlmarv and non-contrlbutorv to any similar
covenle malatalaed by tbe Addltloaal IlIS1IrecI. A Waiver of Subrogation is issued in favor of Certificate Holder where required by written contract under the
GU AUUMB/WC. Certificate Holder is included as a Loss Payee as their interest may appear for Property and Auto Physical Damage coverage.
n. aublc:ribiDl u.nn' oblipIioas lIIIlIer COIIII'IclI of inIaraace 10 which they subscribe U1l seftl'al and _ joint and U1l Iimi1ed solely 10 the ~ of lbeir individuaIlubscriplions. The
lub_ib.. iIlIums U1l - responlible for !be I1IbIc:riplioa of Iny co-subscribinl insum who for any reason does _ satisfy all or pan of its obliplions.
Cancellation: This certificate is issued as a matter of information only and confers no rights upon the certificate holder. This certificate does not amend. extend or alter
the coverage afforded by the policy(ics) shown hereon. Should any of the above described policies be canceled before the expiration date thereof, this agency, on behalf of
the issuing company(ies). will endeavor to mail 30. days written notice to the above named certificate holder, but failure to mail such notice shall impose no obligation or
liability of any kind upon the company(ies) or this agency.
Co Type of Insurance
Policy
A General Uability
I8ICommercial General Uability
DClaims Made I8IOccurrence
D
D
General Agg. Limit lies Per:
Poli Pro'eel Location
A Automobile Uabillty
I8IAny Auto
DAII Owned Autos
DScheduled Autos
I8IHired Autos
I8INon..Qwned Autos
A Excess Uabillty
l8IOccum:ncc OClaims-Made
GEC 0005225
AEC 0005226
(Other Slates)
AEC 0005227
(Texas)
UEC 0005228
D
DDeductible S
Retention $ t 0.000
Worken Compe....don aad
Employen Uablllty
NWAOt5073401
C
Professional'" Pollution
PEC 0005651
B
Commercial Property ladudial
Coatncton Equlpmeat
(lacl'd Reated or Leued Equip.)
COPAJ 10554
.except 10 days notice for nonopayment of premium
Date:
October 11. 2000
By:
Policy
Effective
Policy
Expiration
Policy L1mitslValues
Each Occurrence S 1.000.000
Fire Damage-Anyone Fire S 1,000,000
Med. Exp.-Any one Person S 10,000
Personal & Adv. lnjury S 1,000.000
General Aggregate S 2,000.000
Products-ComplOp Agg. S 2,000.000
Combined Single Umit S 1,000.000
Bodily Injury-per person S
Bodily lnjury-per accident S
Property Damage-per ace. S
Deductible: Collision &. S 1.000
Other than Collision
Each Occurrence S 5.000.000
Aggregate S 5,000,000
ProcIIComp Ops Agg. S 5.000,000
S
S
S
S
S
S
Other
1,000.000
1,000.000
1.000.000
5,000.000
5.000,000
10.000.000
Loss Limit
08-14-00
11-01-00
Aon Risk Services of Texas, Inc.
~
Authorized It""epresentative
lion Risk Services, o[TeJCfJS, Inc.
2000 Bering Drive. Suite 900 Houston, Texas 77057-3790 tel (713)430-6000 fax:(713)430-6570
08-14-00
11-01-00
08-14-00
11-01-00
08-14-00
11-01-00
11-01-99
11-01-00
08-14-00
11-01-00
11-01-99
11-01-00
QLerlifiCate of ~n5urmt.c.e
SYNAGRO TECHNOLOGIES, INC.
J4AMEDINSUREDS
Synagro Technologies, Inc.
ST Interco, Inc.
Organi-Gro, Inc.
Residual Technologies Systems, Inc.
Synagro Midwest, Inc.
A&J Cartage, Inc.
Synagro of Wisconsin
National Resource Recovery, Inc.
Synagro of Michigan, Inc.
Synagro of Illinois
Michigan Organic Resources, Inc.
A&J Southeast, Inc.
Synagro of Florida - A&J Cartage, Inc.
Anti-Pollution Associates, Inc.
0&0 Pumping, Inc.
Synagro of Florida - 0 & 0 Pumping
Jewell's Sewage Service North, Inc.
Synagro of Florida, Anti-Pollution, Inc.
Rehbein, Inc. .
Synagro Northeast, Inc.
COR Mid-Atlantic
Whiteford, Inc.
Synagro Mid-Atlantic, Inc.
COR Mid-Atlantic - OH
Environmental Protection and Improvement Company, Inc.
Synagro Southeast, Inc.
Environmental Waste RecycJing, Inc.
Synagro of North Carolina - EWR, Inc.
AMSCO, Inc.
Synagro of North Carolina -AMSCO, Inc.
COR
Synagro Southwest, Inc.
COR Environmental, Inc.
Synagro of Texas, Inc. - COR, Inc.
Vital-Cycle, Inc.
Synagro of Texas Vital-Cycle, Inc.
Synagro West, Inc.
Pima Gro Systems, Inc.
Synagro of California, Inc.
Synagro of Arizona, Inc.
Recyc, Inc.
Composting Corporation of America
Synagro Composting Company of California, Inc.
Aon Risk Services. o/Texas, Inc.
2000 Bering Drive, Suite 900 Houston, Texas 77057-3790 tel (713)430-6000 fax:(713)430-6570
Received at: 3:20PM, 10/10/2000
10/10/00 TOE 15:21 FAX 41022!Ol~2
WllEELABRATOR
-... AON INSURANCE
~013
'PH EdIion
INSURANn:: AGENT'SSl"AIEMENT
I ~
I have reviewed the above requirements with the bidder named below. The foDowing deductibles
apply to theanrespanding policy.
POUCY
DEDUCfIBlES
, i
I
I
.
.
, ,
SEE THE ArrACBED CERTIFICATE
Uability policies are _Occuzrence
-~
Signature '
AOH RISK SERVICES OF TEXAS
&t.sur.uu:e Agency
"
BIDDERS 5rATEMENT
I
I understand the insarance that will be mandatory if awarded. the contrzc:t: and will comply in full
with all the nquirements.
Synagro Southeast, Inc.
- ~~~..J, ----==,
Signature
Biddet-
INSCKLSr
,I
I
. i
8/31/00
SUPPLEMENTARY INSURANCE DOCUMENTS
00900-7
'-AON
Synagro Technologies, Inc.
2000- 2001
February 1, 2001
SYNAGRO TECHNOLOGIES, INC.
1800 Bering Drive, Suite 1000
Houston, TX n057
Synagro Technologies, Inc.
ST Interco, Inc.
Organi-Gro, Inc.
Composting Corporation of America
Synagro Midwest, Inc.
A&J Cartage, Inc.
Synagro of Wisconsin, Inc.
National Resource Recovery, Inc.
Synagro of Michigan, Inc.
Michigan Organic Resources, Inc.
Rehbein, Inc.
Synagro of Minnesota - Rehbein, Inc.
Synagro Northeast, Inc.
COR Mid-Atlantic
COR Mid-Atlantic - OH
Residual Technologies, Limited Partnership
Fairhaven Residuals, Limited Partnership
NETCO-Waterbury, Limited Partnership
NETCO-Residuals Management, Limited Partnership
New Haven Residuals, Limited Partnership
New England Treatment Company, Inc.
Fairhaven Residuals Systems, Inc.
NETCO-Connecticut, Inc
NETCO-Residuals Management Systems, Inc.
NETCO-Waterbury, Inc.
NETCO-Waterbury Systems, Inc.
New Haven Residuals Systems, Inc.
Residual Technologies Systems, Inc,
Providence Soils, Limited Liability Company
EPIC, Inc.
Environmental Protection and Improvement Company, Inc.
Synagro Southeast, Inc.
Environmental Waste Recycling, Inc.
Synagro of North Carolina - EWR, Inc.
AMSCO, Inc.
Synagro of North Carolina- AMSCO, Inc.
Synagro of Florida - A&J, Inc.
A&J Cartage Southeast, Inc.
Anti-Pollution Associates, Inc.
0&0 Pumping, Inc.
Jewell's Sewage Service North, Inc.
Synagro of Florida - Anti-Pollution, Inc.
Synagro of Florida - Ecosystems, Inc.
,oAON
Synagro Technologies, Inc.
2000 - 2001
February 1, 2001
Ecosystematics, Inc.
Synagro of Florida-Davis Water, Inc.
Davis Water Analysis, Inc.
AKH Water Management, Inc.
Synagro Mid-Atlantic, Inc.
Whiteford Construction Co., Inc.
Synagro Southwest, Inc.
CDR Environmental, Inc.
Synagro of Texas - CDR, Inc.
Vital-Cycle, Inc.
Synagro of Texas - Vital-Cycle, Inc.
Synagro West, Inc.
Pima Gro Systems, Inc.
Synagro of California, Inc.
Recyc, Inc.
Synagro Composting Company of California, Inc.
Residual Processing, Inc.
Future - Tech Environmental Services, Inc.
Wheelabrator Water Technologies, Inc.
Synagro WWT, Inc.
Enviroland, Incorporated
Soaring Vista Properties, Inc.
NYOFCO Holdings, Inc.
New York Organic Fertilizer Company
Wheelabrator Clean Water New Jersey, Inc.
Synagro - WCWNJ, Inc.
Wheelabrator Water Technologies Baltimore L.L.C.
Synagro - Baltimore L.L.C
JABB II, L.L.C.