Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
07/08-05
DANNY L. KOLHAGE CLERK OF THE CIRCUIT COURT DATE: December 18, 2007 TO: Dave Koppel, County Engineer Engineering Division FROM: Pamela G. Hancq k' Deputy Clerk �' At the November 14, 2007, Board of County Commissioner's meeting the Board granted approval of Purchase Service Order No. 07/08-05 between Monroe County and URS for Value Engineering Design Fees at the McCoy Terminal Complex at the Key West International Airport. Enclosed is a copy of the above -mentioned for your handling. Should you have any questions please do not hesitate to contact this office. cc: County Attorney Finance File PURCHASE / SERVICE ORDER FOR MONROE COUNTY To: URS Re: PSA Agreement, Dated: 1-1-02 Project Name: EYW- Terminal Description of Services: Purchase Service Order No. 07/08-05 Resolution redesign Services © =-_ Cn CO 3 — c? 0 (SEE ATTACHED SCOPE OF SERVICES) r w Multiple of Direct Salaries Lump Sum X Reimbursable Expense Days to Complete 365 Fee this Service Order $299,000.00 Payment for Services shall be in their entirety as per PSO. Prepare yrr: Recom n e by: f�Q Milfor A. Reisert iiiii Date: 10/29 /�0 7 Accepted by: Carlos Garcia Date: Oo. RECEWD D OCT a o Date: Approved by: my Board of County Charles "Sonny" McCoy Date: -�2!:/6- ' _ ___ MONROE COUNTYATTOBNEY IRPO �• ���c: r lt. ASSISTANT Date �° > U SCOPE OF SERVICES URS Corporation Key West International Airport - New Terminal Facility Scope of Services - Value Engineering Redesign Services October 19, 2007 1. Background MGI has provided Monroe County with a list of Value Engineering items intended to reduce the Project Budget to match the Guaranteed Maximum Price Proposal prepared by MGI. This redesign effort is excluded from the present Scope Of Services that forms a part of URS' contractual obligations for design of the new Terminal Facility Refer to Item 6 of the URS Scope of Services revised 6.24.06). At the County's request URS has prepared several alternate proposals to perform this work in different times during the course of the construction effort. This proposal combines two previous proposals that addressed the new and existing building components of the work separately. When we last met in Key West on October 10, 2007, URS presented a draft fee to perform full AE services required to completely revise the Contract Documents to incorporate these VE changes. That fee was determined to be higher than could be funded by the County at the present time. The County requested that URS look for ways to reduce the scope of services to a set fee amount that was within the County's budget for the work. The reduced scope must: 1. Provide adequate documentation to control the quality of the Project work performed in the field; 2. Provide MGI with sufficient information to understand the design intent of the changes; 3. Provide revisions to the Contract Documents that address the following specific items of work: a. Items 9, 11, 14, 15, 16, 23, 24, 26, 27, 28, 29, 30, 32, 34, 37, 39, 40, 50, 52, 53, 57, 59, 60, 70, 72, 74, 75, 79, 81, 85 as described in the MGI GMP Document. These tasks are related to changes in the new structure currently under construction. b. Revisions to the existing building as described in revised floor plans and elevations presented to the County Engineer and MGI on 10/11/07. 4. Provide documentation of the revised concept plans for the existing building reviewed with the County and MGI on October 11, 2007. As a result, we discussed several assumptions that could be used by URS in revising that fee proposal. 2. Assumptions Morganti Group, Inc is presently under contract to provide CM at Risk services required to construct the new terminal facility. With that in mind, it was determined that the level of detail necessary to prepare new documents for competitive bid would not be required. The revisions will adequately describe the scope and quality of the revised work. This will allow the County to monitor (with CA assistance from URS as described in our current Construction Phase Services PSO) the quality of the work to be performed. If MGI requires supplemental information, an RFI will be prepared by MGI requesting clarification. URS will respond to the RFI providing the requested information. As discussed with the Mr. Koppel, no additional fees are requested at this time to cover additional direct expenses associated with this PSO Scope of Work. It is anticipated that additional field trips and reproduction costs can be covered with the remaining expense budget included in URS's active PSOs. 3. PSO Fee a. Item 3 a above (New Building Revisions) $ 60,000 b. Item 3.b above (Revisions to the Existing Building) $ 239,000 c. Total $ 299,000 Key West International Airport REVISION 1 Construction Phase Value Engineering Re -design New Building Only Add Service Request The Value Engineering tasks described below are related to the new building portion of the work, and as defined by MGI we critical path issues. The Items listed below are numbered as they are in the MGI VE list submitted with the GMP. Only these specific tasks are included in the proposal at this time.Following a detailed discussion of the remaining tasks associated with the existing building to be performed, a separate Note proposal will be provided for that work. Item No. VE Redesign 11 14 Change Granite Counter Tops to Plastic Laminate Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 1 $196 Senior Architect $132 0 $0 Project Architect $78 2 $157 Architectural CADD $63 4 $252 Technical Support $42 1 $42 Subtotal 8 1 $647 Delete All Work associated with the beach front dining Revise Plan AI 11.2, Elevations 1,2,3/A705; A112.2, A113, A113.2, A131, A131.2, A132, Al32.2, A151, A151.2, A201, A705 with associated engineering changes Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 2 $392 Paging $123 2 $246 Paging CADD $54 1 $54 Security $123 4 $492 Senior Architect $132 2 $263 Project Architect $78 8 $627 Architectural CADD $63 8 $504 Plumbing Engineer $78 2 $157 Plumbing CADD $63 2 $126 Senior Low Voltage Electrical Engineer $140 2 $280 Low Voltage Electrical CADD $84 1 $84 Fire Protection CADD $63 0 $0 Senior Electrical Engineer $106 2 $213 Electrical Engineer $84 6 $504 Electrical CADD $63 6 $378 Specifications 1 $140 0 $0 Technical Support $42 1 $42 Subtotal 49 $4,362 fflae, Delete terrazzo in hold room and baggage. Re ,let Revise Finish plans, Finish Schedule, revise/coordinate with additional details covering floor depressions, door sills, escalator access panels, etc. Classification Rate Hours Fee Project Manager $196 2 $392 Paging $123 2 $246 Paging CADD $54 1 $54 Senior Architect $132 1 $132 Project Architect $78 12 $941 Architectural CADD $63 16 $1,008 URS Corporation 10/21/2007 Hours Drawings.new.2 -Key West International Airport REVISION 1 URS Corporation Construction Phase Value Engineering Re -design 10/21/2007 New Building Only Add Service Request I1.7 16 23 24 Senior Structural Engineer $1011 01 0 Structural Engineer $84 1 $84 Structural CADD $63 2 $126 Specifications $140 0 $0 Technical Support $42 1 $42 Subtotal 38 $3,024 Delete Elevator #4 at baggage make up Area (keep shaft - delete equipment out ) Revise plans Classification Rate lHours Fee Principal $168 0 $0 Project Manager $196 1 $196 Paging $123 2 $246 Paging CADD $54 1 $54 Senior Architect $132 0 $0 Project Architect $78 1 $78 Architectural CADD $63 1 $63 Security $123 2 $246 Senior Electrical Engineer $106 3 $319 Electrical Engineer $84 0 $0 Electrical CADD $63 2 $126 Specifications $140 0 $0 Technical Support $42 1 $42 Subtotal 14 $1,371 Delete Elevator #1 at the passenger bridge (keep shaft - delete equipment only) Revise plans Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 1 $196 Paging $123 2 $246 Paging CADD $54 1 $54 Senior Architect $132 0 $0 Project Architect $78 1 $78 Architectural CADD $63 1 $63 Security $123 2 $246 Senior Electrical Engineer $106 3 $319 Electrical Engineer $84 0 $0 Electrical CADD $63 2 $126 S ecifications $140 0 $0 Technical Support $42 1 $42 Subtotal 14 $1,371 Delete E type Windows at Dormers from three to two (See Item 67 below) Classification Rate lHours Fee Principal $168 0 $0 Project Manager $196 0 $0 Senior Architect $132 0 $0 Project Architect $78 0 $0 Architectural CADD $63 0 $0 Specifications $140 0 $0 Technical Support $42 0 $0 Subtotal 0 $0 Reduce the number of G windows from three to two at the pilasters Hours Drawings.new.2 Key West International Airport REVISION 1 URS Corporation Construction Phase Value Engineering Re -design 10/21/2007 New Building Only Add Service Request 26 27 Revise Building Elevations Sheet A201. Details will remain unchanged as the new design intent will be conveyed by the plan changes Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 1 $196 Senior Architect $132 1 $132 Project Architect $78 2 $157 Architectural CADD $63 4 $252 Specifications $140 0 $0 Technical Support $42 0 $0 Subtotal 8 $736 Delete hurricane shutters and Provide "insulated impact glass Revise all second floor plans, At 12 series, Revise Reflected Ceiling Plans and building sections will remain unchanged as the design intent will be conveyed by the plan changes. Shutter pockets (A132 series) will be deleted by notes. The building elevations will not be revised as the design intent will be conveyed by the changes revised notes and plans. Revise wall sections A400, A401, A403, A404, A411, A412, Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 1 $196 Senior Architect $132 8 $1,053 Project Architect $78 16 $1,254 Architectural CADD $63 16 $1,008 Senior Structural Engineer $101 4 $403 Structural Engineer $84 4 $336 Structural CADD $631 4 $252 Specifications $140 0 $0 Technical Support $42 1 $42 Subtotal 54 $4,544 Delete linear metal ceilings at sofrts and replace with stucco Revise second floor RCP, A132, AA132.3, A132.4, A132.5, Wall sections A400, A401, A402, A404, A412 will not be revised as the design intent will be conveyed by the plan changes.Revise light fixtures, fire Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 2 $392 Senior Architect $132 2 $263 Project Architect $78 8 $627 Architectural CADD $63 20 $1,260 Senior Structural Engineer $101 0 $0 Structural Engineer $84 0 $0 Structural CADD $45 0 $0 Senior Mechanical Engineer $101 2 $202 Mechanical Engineer $84 4 $336 Mechanical CADD $45 4 $179 Paging $123 2 $246 Paging CADD $54 1 $54 Senior Fire Protection Engineer $123 2 $246 Fire Protection Engineer $84 2 $168 Fire Protection CADD $63 2 $126 Senior Electrical Engineer 1 $106 2 $2l3 Electrical Engineer $84 4 $336 Electrical CADD $63 6 $378 Specifications 1 $1401 0 $0 Technical Support 1 $42 1 $42 Hours Drawings.new.2 Key West International Airport REVISION 1 URS Corporation Construction Phase Value Engineering Re -design 10/21/2007 New Building Only Add Service Request 28 29 30 32 Subtotal 64 $5,068 Change granite and solid surface countertops to plastic laminate and use 304-4b regular stainless steel for forms and surfaces metal #2 for loekicks and reveals Classification Rate lHours Fee Principal $168 0 $0 Project Manager $196 0 $0 Senior Architect $132 2 $263 Project Architect $78 2 $157 Architectural CADD $63 2 $126 S ecifications $140 2 $280 Technical Suport $42 1 $42 Subtotal ol $868 Change Window Type A from three bay to two bay at north elevation of the terminal Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 2 $392 Senior Architect $132 2 $263 Project Architect $78 4 $314 Architectural CADD $63 4 $252 S ecifications $140 0 $0 Technical Su ort $42 1 $42 Subtotal 13 $1,263 Change stainless steel handrails to clear anodized aluminum with no glass. Change to be handled b s Classification Principal $168 0 $0 Project Manager $196 1 $196 Senior Architect $132 2 $263 Project Architect $78 4 $314 Architectural CADD $63 4 $252 Specifications $140 1 $140 Technical Support $42 1 $42 Subtotal 13 $1,207 Delete metal ceiling a space 234 and S101 and replace with 2x2 acoustical ceiling Revise reflected ceiling plans A131.1, 132.1, revise finish schedules, wall sections A407. revise light fixtures, fire protection devices, paging, hvac devices accordingly Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 2 $392 Senior Architect $132 0 $0 Project Architect $78 2 $157 Architectural CADD $63 2 $126 Senior Mechanical Engineer $101 1 $101 Mechanical Engineer $84 2 $168 Mechanical CADD $63 2 $126 Paging $123 2 $246 Paging CADD $54 1 $54 Senior Fire Protection Engineer $123 0 $0 Fire Protection Engineer $84 1 $84 Fire Protection CADD $63 1 $63 Senior Electrical Engineer $106 2 $213 Electrical Engineer $84 2 $168 Hours Drawings.new.2 Key West International Airport REVISION 1 URS Corporation Construction Phase Value Engineering Re -design 10/21/2007 New Building Only Add Service Request 34 37 39 40 Electrical CADD 1 $631 2 $126 S ecifications $140 0 $0 Technical Su22ort 1 $421 1 $42 Subtotal1 1 23 $2,065 Provide alternate electricals stem manufacturers Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 1 $196 Electrical Engineer $84 24 $2,016 Electrical CADD $63 8 $504 Specifications $140 8 $1,120 Technical Support $42 2 $84 Subtotal1 1 43 $3,920 Provide alternative light fixture manufacturers Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 1 $196 Senior Architect $132 4 $526 Project Architect $78 16 $1,254 Architectural CADD $63 4 $252 Fire Protection Engineer $84 0 $0 Fire Protection CADD $63 0 $0 Senior Electrical Engineer $1,702 Electrical Engineer $672 Electrical CADD U$144 $0 Specifications $560 Technical Su ort $84 Subtotal $5,247 Schedule 80 PVC for domestic water piping in lieu of copper. Change to be handled by a substitution request initiated by MGI and reviewed by URS Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 1 $196 Senior Civil Engineer $106 0 $0 Civil Engineer $84 2 $168 Civil CADD $50 0 $0 Plumbing Engineer $78 2 $157 Plumbin CADD $63 0 $0 Specifications $140 0 $0 Technical Support $42 1 $42 Subtotal 1 1 6 $563 Delete cast iron piping and replace with schedule 40 PVC. Change to be handled by a substitution request initiated by MGI and reviewed by URS Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 1 $196 Plumbing Engineer $78 0 $0 Plumbing CADD $63 2 $126 Specifications $140 2 $286 Technical Support $42 1 $42 Subtotal 6 $644 Hours Drawings.new.2 Key West International Airport REVISION 1 URS Corporation Construction Phase Value Engineering Re -design 10/21/2007 New Building Only Add Service Request 50 52 53 57 59 Change solid surface toilet partitions to phenolic Classification Rate 111ours Fee Principal $168 0 $0 Project Manager $196 1 $196 Senior Architect $132 1 $132 Project Architect $78 0 $0 Architectural CADD $63 2 $126 Specifications $140 2 $280 Technical Support $42 1 $42 Subtotal 7 $776 Change site lighting conduit from PVC coated rigid to PVC conduit. Change to be handled by a substitution request initiated by MGI and reviewed by URS Classification Rate Illours Fee Principal $168 0 $0 Project Manager $196 1 $196 Senior Electrical Engineer $106 0 $0 Electrical Engineer $84 2 $168 Electrical CADD $63 0 $0 Specifications $140 2 $280 Technical Support $42 1 $42 Subtotal 6 $686 Provide glass balustrade panels on the interior side of the escalator unit in lieu of stainles steel. Change to be handled by a substitution request initiated by MGI and reviewed by URS Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 1 $196 Senior Architect $132 2 $263 Project Architect $78 4 $314 Architectural CADD $63 4 $252 Specifications $140 1 $140 Technical Support $42 1 $42 Subtotal 1 1 13 $1,207 Use plenum rated cable in lieu of conduit for HVAC controls. Change to be handled by a substitution request initiated by MGI and reviewed by URS Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 1 $196 Senior Electrical Engineer $106 0 $0 Electrical Engineer $84 1 $84 Electrical CADD $63 1 $63 S ecificalion $140 1 $140 Technical So,,port $42 1 $42 Subtotal 1 1 5 $525 Delete MUFIDS (Reduce scope of MUFIDS) delete multiple FIDS displays at ticket lifts and ticket counters. Keep two public displays (one in new terminal, one in the existing) Revise Floor plans to delete references A111 series, A112, series, revise interior elevations 6/A704, 4/A705, revise telecom and power sheets as required. Classification Rate Hours 1 Fee Principal 1 $168 0 $0 Project Manager 1 $196 1 $196 Hours Drawings.new.2 Key West International Airport REVISION 1 URS Corporation Construction Phase Value Engineering Re -design 10/21/2007 New Building Only Add Service Request 60 67 69 Senior Architect $132 I $132 Project Architect $78 4 $314 Architectural CADD $63 12 $756 Senior Low Voltage Electrical Engineer $140 6 $840 Electrical Engineer $84 0 $0 Electrical CADD $63 3 $189 Specifications $140 0 $0 Technical Su ort $42 1 $42 Subtotal1 1 28 $2,468 Delete all spare conduits. Change to be implemented by issuance of a Proposal Request by URS in text form. No drawing revisions included. Classification Rate Hours Fee Principal $1681 1 $168 Project Manager $196 0 $0 Senior Low Voltage Electrical Engineer $140 2 $280 Low Voltage Electrical CADD $63 1 $63 Senior Electrical Engineer $106 2 $213 Electrical Engineer $84 2 $168 Electrical CADD $63 0 $0 Specifications $140 0 $0 Technical Support $42 I $42 Subtotal 9 $934 Delete Dormers This Item of V E work has been eliminated by Monroe County. Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 0 $0 Senior Architect $132 0 $0 Project Architect $78 0 $0 Architectural CADD $63 0 $0 Senior Structural Engineer $101 0 $0 Structural Engineer $84 0 $0 Structural CADD $63 0 $0 Specifications $140 0 $0 Technical Support $42 0 $0 Subtotal1 0 $0 Reduce windows on east elevation to one bay. Revise elevation only. The design intent is conveyed by the elevation change. Any other required coordination is to be performed by MGI Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 1 $196 Senior Architect $132 1 $132 Project Architect $78 4 $314 Architectural CADD $63 6 $378 S ecifications $140 0 $0 Technical Support $42 1 $42 Subtotal 13 $1,0 11 Hours Drawings.new.2 Key West International Airport REVISION 1 URS Corporation Construction Phase Value Engineering Re -design 10/21/2007 New Building Only Add Service Request 70 72 74 w1i 79 81 Reduce windows on west elevation to one bay. Revise elevation only. The design intent is conveyed by the elevation change. Any other required coordination is to be performed by MGI Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 1 $196 Senior Architect $132 1 $132 Project Architect $78 4 $314 Architectural CADD $63 6 $378 S ecifications $140 0 $0 Technical Support $42 1 $42 Subtotal 13 $1,061 Reduce seating allowance to $200,000 Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 1 $196 Specifications $140 0 $0 Technical Support $42 1 $42 Subtotal 2 $238 Change elevator ceiling from laminate to stainless steel Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 1 $196 Senior Architect $132 0 $0 Project Architect $78 1 $78 Architectural CADD $63 0 $0 S ecifications $140 0 $0 Technical Su ort $42 1 $42 Subtotal 3 $316 Change elevator hall lanterns, position indicators, and stainless steel reveals Classification Rate lHours Fee Principal $168 0 $0 Project Manager $196 1 $196 Senior Architect $132 1 $132 Project Architect $78 2 $157 Architectural CADD $63 1 $63 Specifications $140 4 $560 Technical Support $42 1 142 Subtotal 10 $1,149 Delete painting of exleror of existing terminal added in Bulletin 2. Change to be implemented by issuance of a Proposal Request by URS in text form. No drawing revisions included. Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 1 $196 Senior Architect $132 1 $132 Project Architect $78 1 $78 Architectural CADD $63 0 $0 Specifications $140 0 $0 Technical Support $42 1 $42 Subtotal 1 1 4 $448 Change linear metal ceiling in new terminal to alternates stem Hours Drawings.new.2 Key West International Airport REVISION 1 URS Corporation Construction Phase Value Engineering Re -design 10/21/2007 New Building Only Add Service Request 85 Revise RCP sheets A 112 series. No revisions to A400 series wall sections as design intent is conveyed by RCP changes. Revise light fixtures, fire protection devices, paging, hvac devices accordingly Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 1 $196 Senior Architect $132 4 $526 Project Architect $78 8 $627 Architectural CADD $63 16 $1,008 Senior Mechanical Engineer $101 1 $101 Mechanical Engineer $84 4 $336 Mechanical CADD $63 8 $504 Senior Fire Protection Engineer $123 1 $123 Fire Protection Engineer $84 4 $336 Fire Protection CADD $63 8 $504 Senior Electrical Engineer $106 1 $106 Electrical Engineer $84 4 $336 Electrical CADD 1 $63 8 $504 Specifications 1 $1401 4 $560 Technical Support i $42 1 $42 Subtotal 73 $5,810 Change integral gutter to outside gutter at curb overhang As the dormers have not been eliminated per Monroe County and as described in Item 67 above. effort required to revise the wall sections to show these changes in revising building elevations I/A201, A205, building section A301, wall sections A400, and associated structural revisions. Classification Rate Hours Fee Principal $168 0 $0 Project Manager $196 2 $392 Senior Architect $132 12 $1,579 Project Architect $78 16 $1,254 Architectural CADD $63 24 $1,512 Senior Structural Engineer $101 8 $806 StmcturalEngineer $84 16 $1,344 Structural CADD i $63 12 $756 Specifications $140 0 $0 Technical Support $421 1 $42 Subtotal 1 91 $7,686 Additional Direct Expenses ESTIMATE No additional direct costs or reimbursable expenses are included in this estimate. Per discussions with Monroe County, trips for VE purposes are to be combined with CA trips and direct expenses can be charged to the reimbursable exoense budget defined for the Construction Phase Support PSO Item Unit Cost Qt Subtotal Airfare Columbus/Tampa/Key West $800 $0 Hotel $190 $0 Per Diem $30 $0 Airfare Tampa/Key West $400 $0 Parking/Misc. $45 $0 Rental car $80 $0 Overnight Deliveries $50 $0 Re roduction $2,500 $0 Misc. $250 $0 Subtotal $0 Hours Drawings.new.2 Key West International Airport REVISION 1 URS Corporation Construction Phase Value Engineering Re -design 10/21/2007 New Building Only Add Service Request Total Additional Service Amount 685 $60,332 Hours Drawings.new.2 10 KWIA VE Existing Building Attachment A URS Corporation Key West Florida Drawing/Task List Hours Project Management A/E Civil Architectural Structural Mechanical Electrical Baggage Systems Low Voltage/Comm/Security System: Subtotal 189 42 1038 398 257 188 92 75 2280 Estimated Direct Expenses Total Base Fee (including Direct Costs and Permitting Fees) Fee $30,030 $3,806 $99,942 $35,913 $27,570 $21,791 $12,004 $8,001 $239,056 $0 $239,056 10/21/2007 Hours Drawings.exist.2 URS Corporation PROJECT MANAGEMENT A/E FACILITIES HOURS ESTIMATE & TRACKING FORM PAGE: 1 Project: KWIA Existing Building VE Changes Job #: ih,! BY: JPS DATE: 1 1-Oct-07 TASK TASK DESCRIPTION Packa a PM AE Clerical TOTALS % HOURS SD DD CD NO. COMPLETE REMAINING 1 CODE SEARCH / CODE ISSUES ----------- 2 ----------------------------------------------------------------------- FEE PROPOSAL PREP ----- ----- ----- X ------------- 140 ---------------- ---------- 40 ----------- 180 ------------- ------------------ 180 3 REVIEW EXISTING DRAWINGS 4 _ CONCEPT_ DEVELOPMENT & REVIEW_ ----- ------- --- ------ --- ------------ ------------------ 5— -- - -- — INTERIORS/COLOR BOARDS— — ---- ---- ---- --- -------- ------------- ----------- ----- ------- -------------------_..--------------------.__ ---- ---------- ------------ ----------- --------- --------- -------------- -6-- 7 ----- ---------- ----------- ----------- ----------- ----------- --------------- ---------- 8_— -------------------------------------------------- DRAWINGS see drawing list_paj 2� ---- ---- ----- ----- ---- --- -- ------ -------- — --- — ------------- ------- --- --------- ------------ 9_— _ --- REVIEW MEETINGS W/ CLIENT ---- ----- ---- ----- ------------- ----------- -------------- ----------- --- ---- 10 -------------------------------- COORDINATION/TEAM MEETINGS— _ _ -- - _ -- ----- ----- ----- —--- — ----------- --- —--- — --- --- -------------- ------------- --- ------- Ti— -- SPECIFICATIONS (ON DRAWINGS) - -��--_------ �--- � �--�--- 12 STUDIES ---- ---- ----- -- ---- --- --- —-------- --- ---------- --- ----- --- ---- ----------------- -------3- 1_ -CON---T S------RUCTION COST ------------------------------------- ESTIMATES 14 PLAN -IN -HAND CHECK ----------- ----------- ------------ -------------- ------------ ----------------- ------- 15 -----UAL---------------------------------------------- QITY ASSURANCE /CONTROL --- -- ---- — — — _ — — -------- --- ------------ 16 — — _— — -- — — — — --_ — — OBTAIN BUILDING & ZONING PERMITS __ -- — — — — ----------- ------------------------------------------------------------------- Continuous PM Operations ----- ----- ----- ------------- ---------------- -------------- -------------- ------------- ---------------- DESIGN SUBTOTALS 140 40 180 180 17 BIDDING SERVICES ------------ ---------------- -------------- -------------- -------------- ---------------- ---------- 18 ---------------------------------------------------------------------------------- CONSTRUCTION ADMINISTRATION — — — —————— — — _ I SHOP DRAWINGS _ — — — — — — — — -- — -- --- _ — — — ----- — — — — — — — — REQUESTS FOR INFORMATION — — — ---------- — -------------- ----------- ------------ _ --------- ------------------------------------------------------------------- SITE VISITS & PUNCHLISTS ---------- ---__------ -------- ------------- ------------ ------------------ --------- ------------ -----__.---------------------------------------------------- RECORD DRAWINGS ------------------------------------------------------------------------------------- ------------- ---------------- ------------- -------------- -------------- ------------------ BID & CA SUBTOTALS 19 CONTINGENCY 5°71 7 2 9 9 TOTAL HOURS ESTIMATE 147 421 189 189 HOURS BREAKDOWN BY PHASE Huurs % SCHEMATIC DESIGN DESIGN DEVELOPMENT CIVIL HOURS ESTIMATE & TRACKING FORM Project: KWIA Existing Building VE Changes Job #: the TASK TASK DESCRIPTION Package Princ. Sr. PE/PS Civil Civil Civil Enginee CADD NO. SD DD CD 1 CODE SEARCH / CODE ISSUES 2 SITE SUR_ VEY /INVESTIGATION ____ _ __ __ X 2 3 REVIEW EXISTING DRAWINGS X 2 4 CONCEPT DEVELOPMENT & REVIEW -----6.___ DESIGN'---------------------------------- --- ----- -._ ___. 7 DESIGN ANALYSIS REPORT __ ._ 8 DRAWINGS (see drawing list, page Z .__—__ —_ X _ _ —_ —6 _ �9_ REVIEW_ MEETINGS W/ CLIENT 10 COORDINATION/TEAM MEETINGS — — 2 11 SPECIFICATIONS 12 STUDIES: stormwate_r + landscaping aft analysis— — 13 CONSTRUCTION COST ESTIMATES 14 PLAN -IN -HAND CHECK__ 15 QUALITY ASSURANCE / CONTROL— _ — 16 OBTAIN BUILDING & ZONING PERMITS — X - — -- - -- -- - E 21 121 1 I DESIGN SUBTOTALS 1 14i 1 611 181 38 17 BIDDING SERVICES - -- ---------------------------------------------------------- --- -- 18 CONSTRUCTION ADMINISTRATION -- -- SHOP DRAWINGS REQUESTS FOR INFORMATION_ _ SITE VISITS & PUNCHLIST—S — RECORD DRAWINGS BID & CA SUBTOTALS 19 CONTINGENCY 10% 1 TOTAL HOURS ESTIMATE 15 7 20 42 HOURS BREAKDOWN BY PHASE Hours % SCHEMATIC DESIGN -------------------------------------------------------- DEVELOPMENT -------------- ----------- _ _ _DESIGN — CONSTRUCTION DOCUMENTS -- -- -- --------- BIDDING ------------------------------------------------------------- CONSTRUCTION ADMINISTRATION -------------- ----------- TOTALS NOTES & QUALIFICATIONS 1. 2. 3. 4. — — — — --------- -------- 5. 6. T:_--- — — —_- 8. -. IPAGE TOTAL 61 21 121 4 ARCHITECTURAL DEPARTMENT HOURS ESTIMATE PROJECT: KWIA Existing Building VE Changes By: PAGE: 1 DATE: 21-Oct-07 TASK NO. TASK DESCRIPTION I PROFINONPROl CADDI TOTALS 1 CODE SEARCH / CODE ISSUES 8 8 2 SITE SURVEY / INVESTIGATION 3 REVIEW EXISTING DRAWINGS 12 8 20 4 CONCEPT DEVELOPMENT & REVIEW 12 12 5 PRELIMINARY CONCEPT PLAN 12 20 32 6 PRELIMINARY CONCEPT ELEVATIONS/SECTIONS 12 20 32 7 PROJECT PLANNING/STATUS UPDATES 8 DRAWINGS (SEE DRAWING LIST) 357 492 849 9 REVIEW MEETINGS W/ CLIENT 10 COORDINATION/TEAM MEETINGS 8 8 11 SPECIFICATIONS ON THE DRAWINGS 12 STUDIES 13 CONSTRUCTION COST ESTIMATES 14 PLAN -IN -HAND CHECK 8 8 16 15 QUALITY ASSURANCE / CONTROL 8 12 16 ARCHITECTURAL DESIGN TOTALS 989 17 BIDDING SERVICES 18 CONSTRUCTION ADMINISTRATION SHOP DRAWING REVIEW REQUESTS FOR INFORMATION SITE VISITS/PUNCH LIST RECORD DRAWINGS ARCHITECTURAL BID & CA TOTALS 19 ICONTINGENCY 5 % 22 28 TOTAL ARCHITECTURAL HOURS ESTIMATE 4591 5801 1038 BREAKDOWN BY PHASES: SCHEMATIC DESIGN: DESIGN DEVELOPMENT: CONSTRUCTION DOCUMENTS 100% BIDDING CONSTRUCTION ADMINISTRATION TOTALS: 100% ARCHITECTURAL DEPARTMENT HOURS ESTIMATE PROJECT; KWIA Existing Building VE Changes DATE: 21-Oct-07 ETC DWG. NO. DRAWING TITLE PROF NONPRO CADD TOTALS AC-1 Cover Sheet I 2 3 G001.1 Drawing Index, Legend Sheet 2 4 G001.2 Notice of Approval Legend 4 4 8 A001.0 Life Safety Plans 4 8 12 A002.0 Site Development Plan 2 4 6 A101.0 Overall First Floor Demolition Plan 2 4 6 A101.1 First Floor Demolition Plan - Area 1 2 8 10 A101.2 First Floor Demolition Plan - Area 2 2 8 10 A102.0 Overall Second Floor Demolition Plan 2 4 6 A102.1 Second Floor Demolition Plan - Area 1 2 4 6 A102.2 Second Floor Demolition Plan - Area 2 2 4 6 A103.0 Demolition - Overall Elevations 4 8 12 A111.0 Overall First Floor Plan 4 4 8 A111.1 First Floor Plan - Area 1 8 8 16 A111.2 First Floor Plan - Area 2 8 8 16 Al 11.3 First Floor Plan - Area 3 ( no revisions) Al 11.4 First Floor Plan - Area 4 (no revisions) Al 11.5 First Floor Plan - Area 5 (no revisions) A111.6 First Floor Plan - Area 6 (no revisions) A 111.7 First Floor Plan - Area 7 (no revisions) A111.8 First Floor Plan - Area 8 (no revisions) A112.0 Overall Second Floor Plan 2 4 6 A112.1 Second Floor Plan - Area 1 8 12 20 A112.2 Second Floor Plan - Area 2 8 12 20 A112.3 Second Floor Plan - Area 3 (no revisions) A112.4 Second Floor Plan - Area 4 (no revisions) A112.5 Second Floor Plan - Area 5 (no revisions) A112.6 Second Floor Plan - Area 6 (no revisions) A112.7 Second Floor Plan - Area 7 (no revisions) A112.8 Second Floor Plan - Area 8 (no revisions) A113.0 Overall Roof Plan 4 4 8 A113.1 Roof Plan - Area 1 4 8 12 A113.2 Roof Plan - Area 2 4 8 12 A131.0 Overall First Floor Reflected Ceiling Plan 4 4 8 A 131.1 First Floor Reflected Ceiling Plan - Area 1 4 8 12 A 131.2 First Floor Reflected Ceiling Plan - Area 2 4 8 12 A132.0 Overall Second Floor Reflected Ceiling Plan 4 4 8 A132.1 Second Floor Reflected Ceiling Plan - Area 1 4 8 12 A132.2 Second Floor Reflected Ceiling Plan - Area 2 4 8 12 A132.3 Second Floor Reflected Ceiling Plan - Area 3 (no revision PAGE TOTAL 103 1 1681 271 ARCHITECTURAL DEPARTMENT HOURS ESTIMATE PROJECT; KWIA Existing Building VE Changes DATE: 21-Oct-07 DWG. NO. DRAWING TITLE 1PROF INONPROICADD ITOTALS A132.4 Second Floor Reflected Ceiling Plan - Area 4 (no revision A132.5 Second Floor Reflected Ceiling Plan - Area 5 (no revision A143 Enlarged Toilet Room Plans 1 ' 16 A144 Enlarged Toilet Room Plans (no revisions) A145 Enlarged Floor Plans (no revisions) A 151.0 Overall First Floor Finish Plan (no revisions) A151.1 First Floor Finish Plan - Area 1 (no revisions) A151.2 First Floor Finish Plan - Area 2 (no revisions) A151.3 First Floor Finish Plan - Area 3 (no revisions) A151.4 First Floor Finish Plan - Area 4 (no revisions) A152.0 Overall Second Floor Finish Plan (no revisions) A152.1 Second Floor Finish Plan - Area 1 (no revisions) A152.2 Second Floor Finish Plan - Area 2 (no revisions) A152.4 Second Floor Finish Plan - Area 4 (no revisions) A152.5 Second Floor Finish Plan - Area 5 (no revisions) A153.0 Enlarged Restroom Finish Plans (no revisions) A201 Overall Building Elevations 8 12 20 A202 Overall Building Elevations 8 12 20 A203 Partial Building Elevations (no revisions) A204 Partial Building Elevations (no revisions) A205 Building "B" - South Elevations (no revisions) A206 Building "B" - North Elevations (no revisions) A207 Building "A" & "B" East & West Elevations 4 8 12 A301 Building Sections I ) 16 28 A302 Building Sections 12 16 28 A303 Building Sections 12 16 28 A304 Building Sections 12 16 28 A305 Building Sections 12 16 28 A306 Building Sections 12 16 28 A307 Building Sections 12 8 20 A308 Building Sections (no revisions) A400 Wall Sections (no revisions) A401 Wall Sections (no revisions) A402 Wall Sections (no revisions) A403 Wall Sections (no revisions) A404 Wall Sections (no revisions) A405 Wall Sections 12 16 28 A406 Wall Sections 12 16 28 A407 Wall Sections 12 16 28 A408 Wall Sections 121 12 24 PAGE TOTAL 1 1641 212 376 ARCHITECTURAL DEPARTMENT HOURS ESTIMATE PAGE PROJECT; KWIA Existing Building VE Changes DATE: 21-Oct-07 DWG. NO. DRAWING TITLE IPROF INONPROICADD ITOTALS A409 Wall Sections 12 12 24 A410 Wall Sections 10 8 18 A411 Wall Sections (no revisions) A412 Wall Sections (no revisions) A413 Wall Sections 8 12 20 A414 Wall Sections 8 12 20 A415 Wall Sections 8 12 20 A416 Wall Sections @ Bridges 8 12 20 A417 Wall Sections 8 12 20 A500 Concrete Details (no revisions) A501 Details (no revisions) A502 Details 4 4 8 A600 Stair & Elevator Plans ,4 44 A601 Stair & Elevator Plans 4 4 8 A602 Stair & Elevator Plans & Sections - Terminal "B" (no revi A603 Stair & Elevator Plans & Sections - Terminal "B" (no revi A700 Interior Elevations (no revisions) A701 Interior Elevations (no revisions) A702 Interior Elevations (no revisions) A703 Interior Elevations (no revisions) A704 Interior Elevations (no revisions) A705 Interior Elevations - Hold Room & BeachFront Area (no revisions) A706 Casework Details (no revisions) A800 Partition Types (no revisions) PAGE TOTAL 1 1121 202 TOTAL DRAWING HOURS (Sheets 1-4) 357 492 849 STRUCTURAL HOURS ESTIMATE & TRACKING FORM PAGE: 1 Project: KWIA Existing Building VE Changes Job #: BY: ALK DATE: 21-Oct-07 TASK TASK DESCRIPTION I Packa a I PE EIT I CADD TOTALS % I HOURS NO. ISDIDDICD I COMPLETI REMAINING _ 3 REVIEW EXISTING DRAWINGS _ 4 CONCEPT DEVELOPMENT & REVIEW ----------------------------------------- --- -- 5 CONSULTATION W/GEOTECHNICAL ENG. _ 8 DRAWINGS (see drawing list_�ac a 2L _-9 REDESIGN OF BRIDGE TRUSSES -------------------------------------------------- --- �10 NEW_EX_CA_L_ATO_R/ELEV FDN DESIGN 11 NEW EXCALATOR/ELEV STEEL FRM'G DESIGN --------------------------------------------------- -- --12 ELEVATOR SHAFT DESIGN 13 NEW ROOF FRAMING DESIGN/PLAN ----------- -- NEW ELEVATOR/ESCALATOR DTLS .---a— — -- -- -- -- — — — — --------- — — - 15 QUALITY ASSURANCE / CONTROL 36 1 16 _ 40 16 _ _ 40 16 40 16 — _— 32 32 44 IDESIGN SUBTOTALS 1 1681 1 1941 3621 1 3621 17 ADMINISTRATION SITE VISITS & PUNCHLISTS 19 ICONTINGENCY & DEPT. MGR. TIME 10% HOURS BREAKDOWN BY PHASE Hours % SCHEMATIC DESIGN ---------- -- --------------------------- DESIGN DEVELOPMENT ---- — --- --- ---------- CONSTRUCTION DOCUMENTS ----------- --------- --------------- ------------ ----------- BIDDING ------------ --------- CONSTRUCTION ADMINISTRATION TOTALS INA f1 UPS Corporation STRUCTURAL HOURS ESTIMATE & TRACKING FORM PAGE: 2 Project: KWIA Existing Building VE Changes Job #: BY: ALK DATE: 21-Oct-07 DWG. NO. DRAWING TITLE Packa a PE EIT CADD TOTALS % COMPLET HOURS REMAINING SD DD CD ------------ ................ 5111.1 S 111.2 S112.1 S113.1 ---------------------------------------------------------------------- -- — — — — — — — — — — — -- — _-- - - -- - - - - - - - __ -- ---.---- --- — - -- ---- __ --- --- — _ -- --- --------- --- ................ 8 ................ 8 ................ 8 4 ---------------- .—.--------- ... —....... -------- .. -------------- ---------- -- ............18 18 ................ 18 ..................-- 18 6 ------------ -------- . 26 - - 26 -- 26 26 10 ------------ - - -- -- -------------- 26 26 -- - 26 — — —_ 26 10 URS Corporation MECHANICAL HOURS ESTIMATE & TRACKING FORM PAGE: 1 of 2 Project: KWIA Existing Building VE Changes Job #: TBD BY: MO ORG. DATE: 21-Oct-07 REV. DATE: TASK TASK DESCRIPTION Packa a PE HVAC I PLUMB CADD % TOTAL SDIDDICDI NO. DESIGNI DESIGN Com fete HOURS 1 Code search/ code issues ------ ------ 2___ ---------------------------------------------------------------------- Site Survey /Site Utilitiy Issues ---- ---- ----- ------------- ------------- ------------- -- -------------- -------------- ---- ------------ ------ 3 —_ ------------------ Review Existing Drawin--s____ ---- ---- ----- ------------ ------------ -------- — --- -- -------------- —--- --------- ------- — --- -- 4 --- _--- ----------------- Concept development and review ----------- --------- —----- ------ ----- -------- — --- -- ------------ ------------ ------------- 5 -- ----------------------- ----- HVAC calculations ---- ---- ---- ------------- 2 ----------- 24 -------------- ------------ ------------- ------------- 26 ---------- 6 ------------------------------------------------------------------ Plumbing calculations ---- ---- ----- ------------- ------------- -------------- ------------- ------------- ------------- 7 Life cycle analyses __________________ __ ------------------------- Drawings-------------------------------- —--------- ---- ------------- 22 ------------- --- ----- --- -- -- --- -------- ---------- ------------- ---- -- 214 9 ---------------- — Review Meetings with Client—_____ - -- --- -- - ----- -------- - ------------ ---------32 ------------- ------------45 -------- --------115 _ ------------ ------------ ----------------------------------------- project meetinss_____ ---- ---- ---- -- -------------- ----------------------- ---- -- ----------- 11 ---house __ - - --------------------- Specifications ---- --- ----- ------------ ------------- --- ---- - --- -- -------------- ---- - -------- ---- ---- - --- 12 ------------------------------------------------------------------- IAQ Documentation ---- --- ----- --- ---- --- 1 ----------- 2 ---- --- - --- -- ----------- -- 2 ---- --------- ------- ---- -- 5 ---- ----- 13 ---------------------------------------------------------------------- Cost Estimates ---- --- ---- ------------- ------------ ------------- ------------- ------------- ------------- ----------- 14 --------------------------------------------------------------------- Model Energy Code Submittal ---- ---- ---- ------------ ------------ -------------- -------------- ------------- ------------- 15 - ------------------------- Plan in hand check ---- --- ---- ------------ ------------- -------------- -------------- ------------- ----------------- - --- 16 -------------------------------------------------- ---------------- DCR ---- --- ---- ------------ ------------ -------- - --- -- ----------- -- ---- --------- __ _ ---------- 1 -------------------- ------------------- ---- -------------- ------- IQTR ---- ---- ---- ------------ ------------ ----------- ---- ------------ - -- 18 — --------------------------------- ---- ----------------- ---- ---- ---- ---- ---- ----- ------------ ------------- ------------ ------------- -------- ------ -------------------------- ---------- -- -- -- ------------ --------------- - -- ------------- 19-------------------------------------------------------------------- fTR------ ------------------------------------------------- ---- ---- ----- ------------- ------------- -------- — --- --- -------------- --------------- ---------------- DESIGN SUBTOTALS 25 58 45 117 245 BIDDING SERVICES CA SERVICES .............Shop Drawings — --------------------------------- ------------- ------------- --- --------- -- ----- ------------------------- ---------------- RFIs ------- ---------------------------------------------------------------------------------- Site visits ---------------a--n-d-pch ---u-- -ts--------- ------------------- --------- - --- ------ ----------- ------------- ----------- ------------ -------------- --------- --- -- ----------- -------------- ------------ -------------- -------------- --------- ------- - Record drawin.9s --------------------------------- ------------------------ ------------ ------------ -------------- ------------- ------------ Commissionin2 CA SUBTOTAL 19 Cont. and Department Managers Time F-5-71 1 3 2 6 12 TOTAL HOURS ESTIMATE 1 26 61 47 123 257 NOTES & QUALIFICATIONS 1. ----------- 2. -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ----------- 3. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 4. - --- ----------- ------------------------------------------------- ---- ------------------- -------------- -------------- ------------------- ---- --------------------------- 5: - -----------------------------------------------------------------------------...----------------------------------------------------------------------------- ----------------------------- ----------------------------- ---- ------------------------ ---- -------------------------------------------- -- ---------- 6. --------------------- ---- -------------- ----------- 8- ---------------------- ---- ------------------------------------------------- ---- ------------------- -------------- ---- ---- ---- ---- -------------- ------------------------ - --- -- CAsinaeltarv\ursa\kev wesAAddServices\TotaI.VE.Hiah\ URS Corporation MECHANICAL HOURS ESTIMATE & TRACKING FORM PAGE: 2 OF 2 Project: KWIA Existing Building VE Changes Job #: TBD BY: MO ORG. DATE: 21-Oct-07 REV. DATE: DWG. DRAWING TITLE Packa a PE HVAC PLUMB CADD % HOURS SIDIDDICID1 NO. DESIGN DESIGN Com fete REMAINING M000.0 HVAC Legend, Abbr. and Gen Notes X 1 2 3 M101.1 ---------------------------------------------------------------------- First Floor HVAC Demo Plan- Area 1 ---- ---- ----- X 1 2 --------------- 6 ------------- --------------- 9 M101.2 ---------------------------------------------------------------------- First Floor HVAC Demo Plan -Area 2 ---- ---- ----- X 1 2 --------------- 6 -------------- -------------- 9 M111.1 --------------------------------------------------------------------- First Floor HVAC Plan - Area 1 ---- ---- ---- X 1 6 -------------- 16 ------------- -------------- 23 M111.2 ------------------------------------------------------------------ First Floor HVAC Plan - Area 2 --- --- ---- X 1 4 ------------- 8 ------------ ------------- 13 M111.4 -----t Flo-------------Plan----rea_------------------------------ First Floor HVAC Plan - Area 4 --- --- ---- ------------- -------------- -------------- M112.1 -------------------------------------------------------------------- Second Floor HVAC Plan - Area 1 --- ---- ---- X 1 4 ------------ 8 ------------------- - --- - --- -- 13 M112.2 -------------------------C_Pl------Area-------------------------- Second Floor HVAC Plan -Area 2 ---- ---- ----- X 1 4 ---------------- 8 ------------- ------------- 13 M112.4 ------------------------------lan--Ar----------------------------- Second Floor HVAC Plan - Area 4 --- ---- ---- ------------- ------------- - M112.5 ------------------------------------------------------------------- Second Floor HVAC Plan Area 5 ---- ---- ---- -------- ------- -------------- -------------- M113.0 --------------------------------------------------------------------- Mezzanine HVAC Plan --- ---- ---- ------------- -------------- ------- ---- -- M401.0 ------------------------------------------------------------------ IMechanical Section Plans ---- ---- ----- X 1 2 ------------- 2 ------------- ------------- 5 M402.0 -------------------------------------------------------------------- Mechanical Mezzanine 30- -Sections ---- ---- ---- ------------- ------------- ------------- M403.0 -------------------------------------------------------------------- Kitchen Hood Plans, Details & Sched. ---- ---- ----- ------------- - --- --------- ---- --- ------- M501.0 ---------------------------------------------------------------------- HVAC Details ---- ---- ----- ---------------- ------------ ------------- M502.0 ------------------------ams---------------------------------------- HVAC Flow Diagrams ---- ---- ---- X 1 2 ---------------- 2 --------------- ------------ 5 5 M503.0 ------------------1Dia------------------------------------------- HVAC Control Diagrams ---- ---- ---- X 1 2 -------------- 2 ------------- ------------- 5 M504.0 ---------ency---en Pl--------Detail------------------------- Emergency Gen Plans &Details ---- ---- ---- ------------- ------------- ------------- M504.1 -------------------------------------------------------------------- I Emergency Gen Details and Specs ------- -- ---- ------------- --------------- ------------------------------------------------------------------ Schedules --- ---- ---- X 1 2 --------------- 4 --------------- -------------- 7 ---------------------------------------------------------------------- HVAC Schedules --------------------------------------------------------------------- ---- --- ---- ---- ---- X ---- 1 2 -------------- - 4 -------------- -------------- -------------- 7 ---- - LHVAC ------------------------------------------------------------------- Plumbing Legend and Schedules ---- ---- ---- ------------- 1 ------------- -------- ------- 1 -------------- 2 - --- --------- ------------- 4 -------- First Floor Plumbing Demo Plan - Area 1 --- - _X - - X 1 ----------- 4 4 ------------- ------------- 9 -------- First Floor Plumbing DemoPlan - Area 2 --- ---- ---- X 1 ----------- 4 4 ------------ 9 P111.1 -------- First Floor Plumbing Plan - Area 1 --- - - - X 1 ------------ 4 4 ------------ -------------- 9 P111.2 -------- First Floor Plumbing Plan - Area 2 --- ---- ---- X 1 ----------- 4 4 -------------- -------------- 9 P111.4 -------- First Floor Plumbing Plan - Area 4 ---- ---- ---- ------------- -------------- -------------- P112.1 -------- Second Floor Plumbing Plan - Area 1 ---- ---- ---- X 1 ------------- 6 4 --------------- --------------- 11 P112.2 -------- Second Floor Plumbing Plan - Area 2 ---- ---- ---- X 1 ----------- 2 2 --------------- -------------- 5 P112.4 -------- Second Floor Plumbing Plan - Area 4 ---- ---- ---- ------------ --------------- --------------- P112.5 - --- --- Second Floor Plumbing Plan - Area 5 ---- ---- ---- ----------- -------------- ------------- -- P113.0 -------- Mezzanine Plumbing Plan ---- ---- ----- ----------- - -------- ---- --------------- P113.2 -------- Mezzanine Enlarged Plumbing Plan --- --- ---- ----------- -------------- ------------- P401.0 -------- First Floor Plumbing Enlargement Plans --- - - X 1 ------------ 8 5 ------------- ---------------- 14 P402.0 -------- Second Floor Plumbing Enlargement Plans---------- ---- ---- ---- ------------ --------------- ------ P501.0 -------- Plumbing Details --- .... -- ----... X 1 - ....... -- 2 2 --------------- ----------------- 5 P601.0 -------- Plumbing Isometrics - Sanitary and Water --- - - X 1 ----------- 10 16 -------------- -------------- 27 P601.1 -------- Plumbing Isometrics - Sanitary and Water--- --- ---- ---- --- ----- ---- ------------- ---------- ----------- ----------- ------------------------------------------------------------------------------ ----------- ---------- ----------- ---------- --------------------------------------------------------------------- --- ---------- ------------- ------------------------------------------ ---------------- ---------------------------------------------------- ------------------------------------------------------------------- ------------------------------------------------------------------- ----------------------------------------------------------------- --- ---- ---- ---- ---- ---- ---- --- --- ---- ---- ---- ---- ---- ----- ---- ----- ---- ------------ ----------- ------------ ------------ ------------- ------------- ------------ ------------ ------------- ------------ ------------ ------------ -------------- --------------- -------- ------- --------------- -------------- --------------- -------------- -------------- -------------- -------------- -------------- -------------- --------------- --------------- - -------- ------------- -------------- --------------- --------------- -------------- --------------- -------- ------- ----- -------------- -------------- -------------- ELECTRICAL HOURS ESTIMATE & TRACKING FORM PAGE: 1 Project: KWIA Existing Building VE Changes Job #: thd BY: JEC Building Addition DATE: 11-Oct-07 TASK TASK DESCRIPTION Packa a I PE ENGR DES TOTALS HOURS NO. SDI DD CD COMPLET REMAINING 1 Site Visit 1 trip) 10 10 0 10 ------------- ---- -- ------------------------------- -------------------- 2 Power Co. Coordination 1 1 0 1 ---- 3 Correspondence ------ ---- --- --- 4 -------- --------- -------- 4 ------ 0 — 4 4 Lighting Calculations 8 8 0 8 5 Load Calculations 2 2 0 2 ------- 6 Generator Calculations ------- ---- -- --- 2 ------------- ---------- ------ 2 — 0 — -----2 ------ 7 Voltage Drop Calculations ------ ---- -- --- 1 -------- ------------- ---------- --------- --------- 1 --------- ------- 0 -------- ----1 8 DRAWINGS see drawing list, page 2 ------ ---- --- -- 59 ------------- 0 35 94 ---------- ------ 0 ----94 _ - 9 Short Circuit Calculations ------ ---- --- --- --------- 1 ----------- ----------- 1 0 1 10 Submittals assume 1 ------ ---- --- 8 ------------- 8 -------- 16 0 -------0 -------------- 16 ---11 QA/QC ---- 8 8 16 ------------ ---------- 16 --------------1 — 12 IT_R 8 8 16 - ----- — — — 0 16 — -- 13— _ CONSTRUCTION CO_ST ESTIMATES 0 0 0 14 VE STUDY 0 0 0 —_ 15 QUALITY ASSURANCE / CONTROL _ _ _ — 0 _ _ 0 _ 0 -------------------------------------------------- ENERGY CODE SUBMITTAL HR ASAE 90.1 ---- ---- -- ---- -------- -- ------ _ _0 ---------- _ _ — ------- — 0 __ _16_ _ ----- _ -- ------------- — ---------------- _ -------------- _ 0 ------------- -------------- 0 ----------------- ------------ ----------------------------------------------------------------------- ----- ----- 0 0 0 DESIGN SUBTOTALS 03 171 0 171 17 BIDDING SERVICES 0 0 0 18 — — CONST_RUCTION ADMINISTRAT_ ION ----------- ---------------- ---------- -- ------------ 0 ------------- ---------------- 0 _ SHOP DRAWINGS — —_ _ _ _— _ 0 0 — 0 REQUESTS FOR INFORMATION — _ 0 _ ------ ------------------------------------------------------------ SITE VISITS & PUNCHLISTS _ _ _ _0 0 — 0 -0 0 RECORDDRAWING--- RA � — _ ---------------------------------------- ------------- ---------------- ------------- ------------ C ------------- 0 ---------------- 0 BID & CA SUBTOTALS 0 0 0 0 0 0 19 CONTINGENCY 10% 1 0 ;? TOTAL HOURS ESTIMATE 123 0 65 1881 0 188 HOURS BREAKDOWN BY PHASE Hours % SCHEMATIC DESIGN 0.0% ------------------------------------------------ DESIGN DEVELOPMENT ------ -- 0.0% ----------------------------------------- CONSTRUCTION DOCUMENTS ----------- 0.0% BIDDING 0.0% __ _ _ __ _ - -- - - — - - CONSTRUCTION ADMINISTRATION ---------- ----- 0.0% TOTALS (i la. NOTES & QUALI 1. NO CO: — 2. WORK 3. — El. ELECTRICAL HOURS ESTIMATE & TRACKING FORM PAGE: 2 Project: KWIA Existing Building VE Changes Job #: ihd BY: JEC Building Addition DATE: 21-Oct-07 DWG. DRAWING TITLE Package PE ENGR DES TOTALS % HOURS SD DD CD NO. COMPLETE REMAINING E000.1 Electrical Symbols Legend & Notes 21 0 3 E100.1 First Floor Electrical Demolition Plan - Area 1 0 0 0 0 0 - - E100.2 First Floor Electrical Demolition Plan - Area 2 - — 0 --------------- 0 ................. 0 - - - 0 0 E102.1 Reference Notes - Lighting, Power, & Fire Alarm 2 1 3 0 3 E111.1 First Floor Lighting Plan - Area 1 _ _ _ _ — 6 — — — — 4 ................. _— — 0 —. 10 El 11.2 First Floor Lighting Plan - Area 2 6 —_ _ — _ 4 ............10 10 — — 0 _— 10 ------- El 12.1 Second Floor Lighting Plan - Area 1 ---- --- - -------- 2 ------------ 2 4 ------- - 0 ---------- 4 - - E112.2 Second Floor Lighting Plan - Area 2 - - - --- - 0 - - - 0 ............... 0 —_— 0 - E121.1 First Floor Power Plan - Area 1 6 3 9 -- 0 _ _ _-0 9 --------- E121.2 First Floor Power Plan - Area 2 ---- --- --- — — — 6 — — — — ----- 3 ................. 9 ----- 0 — — — — 9 ------- E122.1 Second Floor Power Plan - Area 1 ---- ---- --- --------- 4 ------------- -------- 2 ----------- 6 --- 0 ---------- 6 ------- E122.2 Second Floor Power Plan - Area 2 -------- ---- ---- ---- --- --- ---- 4 ----- ------ -------- 2 -------- 6 ----- 0 - 6 E131.1 First Floor Fire Alarm Plan - Area 1 ---- 2 ------ ---- 1 --------- 3 --- 0 3 E131.2 First Floor Fire Alarm Plan - Area 2 ------- ---- ---- --- 2 ------ ------------- 1 ---- 3 -------- 0 ------ 3 E132.1 Second Floor Fire Alarm Plan - Area 1 1 1 2 0 2 E132.2 Second Floor Fire Alarm Plan - Area 2 ------- ---- ---- --- 0 --------- ------- 0 0 0 0 E141.1 Lightning Protection Plan - Bldg "A" _ 1 ---- 1 ----- 2 -------------- 0 -- 2 3 _ E211.1 Electrical One -Line Diagram — — — — — _-- — 6 —_ --- — —_ —_— ---- 9 — ----- 0 _ 9 E211.2 Panelboard Scheduels - Existing Terminal BldL____ — 2 _ 2 4 _ 0 4 E311.1 Lighting Fixture Schedule 4 2 6 0 6 E361.1 Electrical Details 2 1 3 0 3 ------ E361.2 Electrical Details -- --- -------- 1 ------------- ----- ----- 1 ---------- 2 ------- 0 ------ 2 0 - 0 ---------------------- ---- ---- ---------------- -- --- --- ----- ------------- ---------- __ 0 ---------- 0 -- — — ---0 --- 0 -- --- 0 -- ------------------------------------ --- --- --- ----- ------------- - 0 — 0 ----------- ----------0 0 ------ 0 - — -- 0 0 0 0_ —---------------------------------------------- — — ---------------------------------------------------- ----- ---- --- ---- --- --- ----------- ----------- ----------- ---------- ---------- --------- - 0 0 ---0 -- — —0 ----- -- 0.--. 0 --------------------------------------------------- ---- ---- --- ------------ -------- 0 0 0 -- ------------ ---------- ----- 0 0 0 ------ - --- - ---_-_ - - -- - -- -- - - - - - - ---- - - - - - --0 0 - - - 0 ----- ---- - ---------------------------- --- -- ------- - - --------- 0 0 - - - 0 --------- 0 -- 0 ---------------- 0 ------------------------------------------------ ------------------------------------------------------------- ---- --- ---- ---- --- --- --- ----- -- --------- ----------- ----------- --------- 0 ------------ 0 -------------- 0 - - ------ -- --- --------------------------------------------- ---- ---- --- --------- ------------- -------- 0 0_ 0 -------------- ------------------------------------- --- ---- --- --------- ------------ -------- 0 - 0 0 ---------- --- - -------------------------------------------------- --- ---- --- --- - - - - 0 --- 0 - 0 __---- - ------------- - --- -- -_ - --- ------ ------- ---- 0 --- -- 0 --- ----------- -------------- --------- - - - - --- - - - - 0 . --- 0 0 . 0 __- - -- - --- -- --- --- - - - - - - - -- - -- - - - 0 . 0 0 ---------------------------------------------------- ---- ---- --- --------- -------- - 0 -- 0 - 0 --_---.-- ------- 0 - 0 --- 0 _ _0 0 0 0 0 0 ------------------------------------------------- -- - --- ---------- ----------- 0 0 0 ----- 0 -- 0 0 PAGE TOTAL 0 ? 9- 94 BAGGAGE SYSTEMS HOURS ESTIMATE & TRACKING FORM PAGE: 1 Project: KWIA Existing Building VE Changes Job #: ihd BY: JEC Building Addition DATE: 11-Oct-07 TASK TASK DESCRIPTION Packa a PE ENGR DES TOTALS % HOURS SDIDDICD1 NO. COMPLET REMAINING 1 CODE SEARCH / CODE ISSUES 0 0 — --- ---- ----- — ---------- — --- --- — — — ------------- 0------------ 0 ----- ------- 0 - --___ _—_— 0 3 -------------------------------------------- PR--OJECT MANAGEMENT_ -- -- - 8 8 _ 0 _ 8 — 4 ---_ _ MISC CALCULATIONS _— _ 0 0 ---------------- 0 5 SHORT CIRCUIT CALCULATIONS 0 ----- 0 0 VOLTAGE DROP CALCULATIONS_ ______0. — 0 _6— 7 LIGHTING CALCULATIONS -- __-0 0 ----- ------ 0 _ 8 --------------------------------------------- DRAWINGS (see drawing list,pa�e 2L --- ---- - _ _ 8 _ 40 _ — — - - - 32 _ 80 0 80 9 _ _ REVIEW MEETINGS W/ CLIENT — 0 0 0 10 COORDINATION/TEAM MEETINGS 0 --- 0 ...__...----- 0 11 _— -- — -- SUBCONSULTANT MEE_TI_NGS 0 0 0 -_ 12 _ _____ ___ - SPECIFICATIONS _ -- --- — ---- — ------------- ---------- ------------ 0 ----------- 0 ----------- ------------ 0 13 _ _ CONSTRUCTION COST ESTIMATES — — _ _ -------------- ---------- ------------- 0 0 --------- 0 _ 14 VE STUDY 0 0 0 ----- --- — 15 --------------------------------------------------------- QUALITY ASSURANCE / CONTROL -- —_ _ _ _ ___ — 0 _ _ 0 _ _ _ _— 0 16 ENERGY CODE SUBMITTAL CASHRAE 90:1� _ _ _ 0 _—_--- 0 — _ __ _ — 0 —61 0 -------- --------� ----- - — DESIGN SUBTOTALS 16 40 321 88 01 88 17 BIDDING SERVICES 0 --0 ------------ 18 --------------------------------------------------------------------- CONSTRUCTION ADMINISTRATION — - _ _ _ _ _ 0 -- -- -- --- _ ________ -----------------------NISTRATI----------------- -- SHOP DRAWINGS _________0 0 REQUESTS FOR INFORMATION ----------- --------------------------------------------------------------- SITE VISITS & PUNCHLISTS ------- ------------- ------------ ------------ ---------- 0 --------------- 0 ----------- -------------------------------------------------------- RECORD DRAWINGS _ _ _ _ _ _ _ _ _ _ _0 0 —__ _ 0 _ _ — ---------- ---------------------------------------------------------------------- ------------- -------------- -------------- ---------- -------------- 0 _ _ 0 _ _ _-0 0 BID & CA SUBTOTALS 0 0 0 0 0 0 =19CONTINGENCY E771 4 TOTAL HOURS ESTIMATE 17 42 34 921 0 92 HOURS BREAKDOWN BY PHASE Hours % SCHEMATIC__D_ESIG_N 0.0 — DEVELOPMENT _ _ 0.0% _DESIGN - CONSTRUCTION DOCUMENTS ----------- 0.0%— 0.0% _BIDDING CONSTRUCTION ADMINISTRATION 0.0% TOTALS 11 s>rF NOTES & QUALIFICATIONS 1. NO COST ESTIMATE INCLUDED 2. WORK IN EXIST BLDG IN SEISMIC BID 3 — — ---- — -- -- — — -- — — — — — — — — — — —-------------------------------------- -- ----- - 8. ELECTRICAL HOURS ESTIMATE & TRACKING FORM PAGE: 2 Project: KWIA Existing Building VE Changes Job #: il,,! BY: JEC Building Addition DATE: 21 -Oct-07 DWG. DRAWING TITLE Packa_qe I PE ENGR DES TOTALS % HOURS SDIDDICDI NO. COMPLETE REMAINING 0 0 ---------- - ------------ ------ ---------------------------------------------------- B000.0 BHS Legend and Notes --- - ----- — - ----- - - - ----- --- - ------------- ------------- ---------------- -- -------------- . ----------------- ................ 0-- ------------------------------------ 0 0 B101.0 Overall First Floor - BHS Demolition Plan 0 0 0 B101.1 First Floor BHS Demolition Plan - Area 1 . 0 ................. 0 0 B111.0 Overall BHS First Floor Plan 4 - -------- 6 0 ................. 0 ................. 0 0 0 0 40 0 JBI111.1 IFirst Floor BHS Plan - Area 1 B111.2 First Floor BHS Plan - Area 2 B 112.0 Overall BHS Second Floor Plan - --- - . . . . . 0 ................. ................ ..... 0 .. 0 - ------ B112.1 Second Floor BHS Plan - Area 1 0 0 0 13112.2 Second Floor BHS Plan - Area 2 0- 0 0 B 112.4 Second Floor BHS Plan - Area 4 0 0 0 B 112.5 Second Floor BHS Plan - Area 5 0 0 0 B201 Second Floor BHS Enlarged Plan ___0 ---- 0.- 0 B202 Make-up Unit - First Floor Bagroom 0 _0._ 0 0 B301 BHS Sections B302 BHS Sections 0 0 0 B401 BHS Controls 0 0 B402 BHS Controls 0. 0 B403 BHS E-stop zones 0 - - ------------ 0-- 0 1 6404 lControls Shoot 4 4 20 16 40 0 40 B501 BHS Details 0. 0 B502 BHS Details 0 0 0 0 B503 BHS Details 0 0 - 0 B504 BHS Details 0 - -- - --- - -- 0 ---------------- 0 0... 0 0-- 0... 0 0 0 0 0 0 — — --- - -------- - - - - -- — - - - --- - ------------- - ------- 0 0.— 0 0 0 0 0 ____ __0 A.- 0 — - — -- - - - - ------------------ F 0 0 0 - — - - - ----------------------- - - — - . .... 0 ------ - — - - — -- - --- - ------------- -------- 0 ---------- - --0___0._ 0 ------------- 0 ---------- ° 0 ----- --- - - - -------- - -- - ------------ - --- - --- - -- - ---------0 0.- 0 ------- 0.. 0 0 — - - ------- — -- - -------- - -- --- - --- - -- ----- 0 - -----------0 0 -0 0 0 ------------- . 0 0 0.. 0 0... 0 0 0 0 — - -- — --- - -- — ------------ 0. A... 0 — - - --- - --- - ----------------- 0_0... 0 ---- — --------------- 0 0 0 --0... — 0... 0 - ----------- 0 - ------- 0 0 PAGE TOTAL 401 't?J 801 80 CorporationURS LOW VOLTAGE/COMMUNICATION SYSTEMS HOURS ESTIMATE & TRACKING FORM PAGE: 1 Project: KWIA Existing Building VE Changes Job #: IhJ BY: JEC Building Addition DATE: 11-Oct-07 TASK TASK DESCRIPTION Package SR. SR. SEC SR. CADD TOTALS % HOURS COMM SYST. SPEC. ENG ENG SYSTEM S ENG NO. SD DD CD ICOMPLETE REMAINING 1 CODE /CODE ISSUES u 0 0 _..2... _SEARCH PROJECT M_ANA_ GEMENT-_--_-_-_--_-_—_------------------ -- -- ---- ---- ----------- 8 ------------- ------------- ------------ -------- ---- 8 ----------- 0 ---------------- 8 3 EXISTING INFO REVIEW — — — — — — — — — — — — -------- ---------- 0 — -- 0 — 0 _ 4_ MISC CALCULATIONS — — — 0 0 _ 5 SHORT CIRCUIT CALCULATIONS 0 0 0 6 VOLTA_GE_D_ROP CALCULATIONS _ _ _ _ _ _ 0 — 0 0 ------ GHTING CALCULATIONS ---- - ---------- ------ ------- ------ ---------- 0 -------- 0 --------0 _--_7_LI 8 — --------------------------------------------- DR__A_WINGS1see drawing list-1P a 2�— ---- --- -- --------- 15 ----- 12 -- ----- --------- 11 ------- 23 --------- ------------ - 50 ---------- — �22 ------------- 61 - 9 _ REVIEW MEETINGS W/ CLIENT _ _ -- 0 0 0 —10 COORDI_NATION/TEAM MEETINGS — — — ------- --------- 0 — ....... 0 0 ---------------0 — 11 SUBC_ON_SULTANT MEETINGS-- — — — — — 0 0 �� 12 --- SPECIFICATIONS-�--�-�-----_----------------�- - -- --- ---- ---------- ------------ ------- ------ ------------ 0 ----------- 0 --------------- 0 -- 13 --- --- --_ COST ----FRTT---------- CONSTRUCTION COST ESTIMATES --- -- ----------- ----------- ----- 0 0 0 14 VE STUDY_ --- --- ---- -_ ------ — - 0 0 —_ - - 0 - 15 _ _ -------- QUALITY ASSURANCE % C_ONTROL ---- _ 2 _ - _ — 2 _0 _ 2 _ 16 - ENERGY CODE SUBMITTAL ASHRAE 90.1 —---- ___________ 0 _-_______--_-- 0 0-- --------- ------------------------------------------------------------ ----- --- ---- ------------ ------------ ------------- ---------- ------------- 0 ----------- 0 --— --—------ 0 DESIGN SUBTOTALS 25 12 11 23 711 0 71 17 BIDDING SERVICES 0 0 0 18 _ -- ----- CONSTRUCTION ADMINISTRATION ------------ --- —-- —---- ------------- -— --------- -- — ---— - 0 _ _ _ 0 0 SHOP DRAWINGS 0 -------- ------------------------------------------------- REQUESTS FOR INFORMATION - -- -- _ 0 0 0 ------- --------------------------------------------------------- SITE VISITS & PUNCHLISTS ------ _ — _ -------- --------- --- ---- - - - --- - - --------------------- -- ------ RECORD DRAWINGS — _ ___—_________ _ — -- _ —_0 - 0 —_ __0 0 _—______-0 0 ---------- --------------------------------------------------------------------------------- I ---------- --------------- --------------- 1 ------------- -------- ---- ------------- 0 ------------------ 0 BID & CA SUBTOTALS 0 0 t 01 0 0 0 19 CONTINGENCY 5%I i 3 4 TOTAL HOURS ESTIMATE 26 13 11 24 74 -1 75 NOTES & QUALIFICATIONS 1. NO COST ESTIMATE INCLUDED ----------- 2 --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- WORK IN EXIST BLDG IN SEISMIC BID - _ - -- -- ------------------------------------------------------------------------------------------- 4. ------------- --- -- — -- — - - - - - - - - - - - —_ ----- 5: - — -- ------- 6. - - - -- ----- — - - - -- - - - - - — — - - - - -- --- - -------- - - - - - - ------------------------------------------------------------------------------------------------------------------------------ HOURS BREAKDOWN BY PHASE Hours % SCHEMATIC DESIGN ------------------------------------------------------- DESIGN DEVELOPMENT -------------- ---------- O.OS'o --------------------------------------- CONSTRUCTION DOCUMENTS --------- - O.OYb BIDDING 0.0% --------------------------------------- CONSTRUCTION ADMINISTRATION ----- — Q.09 TOTALS II URS Corporation ELECTRICAL HOURS ESTIMATE & TRACKING FORM PAGE: 2 Project: KWIA Existing Building VE Changes Job #: BY: JEC Building Addition DATE: 21 -Oct-07 DWG. DRAWING TITLE Package SR. SR. SEC SR. CADD TOTALS % HOURS COMM SYST. SPEC. ENG ENG SYSTEM S ENG NO. SD7DD CD COMPLETE REMAINING 0 0 0 Systems per new Floor Plan Layout --- ---------- ----------------------- 2 2 . . 2 . . ... . .... 2 ................. 8 .... 0 8 T111.2 Modify Special Systems per new Floor Plan Layouti iy! 2 2 2 2 .............. ............. 0 8 T1 12.1 Modify Special Systems per new Floor Plan Layout _ --- 2 2 2 2 ............. TI 12.2 Coordinate Redesign of connection between theOldTerminal '.. ar 2 0 0 2 0 T1 12-4 & Delete FIDS Displays - Rough -in Only U. ___. ___ 1 0 0 2 .............. 3 0 3 T121.1 Modify Paging System per new Floor Plan layout 0 0 2 2 ................ . 0 4 TI 21.2 __ Modify Paging System per new Floor Plan LayStut 0 0 2 2 ...........4 .................... 0 4 T1 22.1 Modify Paging System per new Floor Plan Layout.. 0 0 1 1 .... 0 2 T211 Block Diagram Modifications . ... .......... 2 2 0 3 7 0 T211 Block Diagram Modifications 2 2 0 3 7 _2 00 Se r M Schedule Modifications 2 2 0 2 6 ---------__0 0 -- 6 0 0. ___0 0 0 0 0 ---------- ----------------------- 0 ---- — ---- --- — ------------- — ---- --- — -------- --- 0 .0 0 ---- — ---- --- -0 0 ------------ 0 0 0 0 0 0 — ---- --- -------- 0 0 0 0 0 — ---- --- — --- 0 __0 0 0 0 0 0 0 0 0 — --- — ---- --- — -------- — --- — -- 0 0 0— --- — ---- --- — -------- — --- — — — — -- — --- ---- - ----------------- --- — -------- ------------- ----------- 0 0 0 0 0 0 0 0 0 — ------- — --- — --- — --- 0 0 0 0 -0 0 -0 0 0 -0 0. 0 - — — — ---- --- — ------- --------------0 - 0 - 0 ----------0 --- --------- ---------- ------ 0 -0 0 0 0 0 0 0 0 0 -0 --- — -------- — - 0 0 .0 ---------------- 0 — -- — -- — --- -------- — --- -0 ---- — ---------- ----- — --- ---- — --- — ---- --- — --- — --- — -- — --- — ---- ---------0- ..___ 0 — ------------- — --- — ------- 0� — -------------------------------- ---- ---------- ----------- -- — --- — ---- 0 -0 1 ----------------- AGE TOTAL 1 231 "1 f) 611 Hub Swan Island I1u1, Estimated Dueet Costs Travel Item Design Field Cunfinnedon Trips Bid Phase Pe, Rld CenG,rences Construction Si¢ Obmrvatioos Nomees Meetings Punch Lis¢ Subtotal Travel Reproduction C000hnadoNCheek Nnn Copp Review Sets Subtotal - Reproduction Miscellaneous Overnight Shipping Misc Consumablcs Subtotal Misc Expenses ptr is Total Estimated Reimbursable Expenses Permits See Atmchmrnl A Car dat fled lining of p .it fees. Subtotal Subtotal Subtotal Reuel Trips Persannel Days Hotel Hotels Meals Meals Mileage Airfare AiAare Cur Subtotal 0 0 0 $190 $0 $30 $0 $IW SSW $0 $0 V) 0 0 0 $140 $0 $30 $0 $M) $600 $0 $1 $0 0 0 11 $140 $0 $30 $0 $40 $6W $0 $0 $0 0 0 0 $140 $0 $30 $0 $40 $6W S) SO $0 0 0 0 $140 $0 $30 $0 $40 $NM1 $a $0 $0 Item Qty Unit Cost M Sets 0 $90.88 $0 Specs 0 $IOW SO Sets a $70.88 $0 Item Qty m Il 54W 0 $2W $0 $0 $0 $0 URS CoTormlan 875 sf 0.09 $O.79 Avg Sets W drawings Set Cost $90.88 VE ReDesign Fee New Building Hours Fee Subtotal- Labor 685 $60,332 VE Design Existing Building Hours Fee Subtotal 2280 $239 056 Total Fee - Professional Services 2965 $299,389 Estimated Direct Expenses $0 Total PSO Amount $299 Say