Loading...
5th Change Order 12/04/2007 .AIA Document G70fM - 2001 Change' Order PROJECT (Name and address): Monroe County, FL - Sheriffs Office Roof Replacement - Marathon, FI, Marathon, Florida TO CONTRAC:TOR (Name and address): D & J Industries, etc. Inc. PO Box 430674 Big Pine Key, FL 33043 CHANGE ORDER NUMBER: 005 DATE:Jl:I]:' 1],~887 ~d./' A'I -;,oOJ"t OWNER: I2J ARCHITECT: I2J CONTRACTOR: I2J FIELD 0 OTHER: 0 ARCHITECT'S PROJECT NUMBER: MK-06065 CONTRACT DATE: May 08, 2007 CONTRACT FOR: General Construction THE CONTRACT IS CHANGED AS FOLLOWS: (Inelude. where applicable, an.v undisputed amOllnt attributable 10 previously executed Construction Change Directives) Due to the Contractor's liability for damage to equipment within the facility during the rain event of 8/15107. and while the contractor still had custody of the rooL the Contract amount is reduced by $4,182.70. Change Order #1 was to not exceed, unit price change order that increased the Contract amount by $12,600.00. The work required and approved under Change Order #1 equates to the dollar amount of $10,920.00. Therefore, the amount for Change Order # I is reduced by $1 ,680.00. Change Order #2 was to not exceed. unit price change order that increased the Contract amount by $ ] 2,000.00. The work required and approved under Chande Order #2 equates tot he dollar amount of $9, I ggAO. Therefore, the amount for Change Order #2 is reduced by $2,811.60 $4,182.70 reduction $1 ,6RO.OO reduction $2,811.60 redlllction $8,674.30 TOTAL REDUCTION The original Contract Sum was The net changl:: by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will he decreased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be increased by Sixty ( 60 ) days. The date of Substantial Completion as of the date of this Change Order therefore is November] 9,2007 $ $ $ $ $ 125,000.00 24,600.00 149,600.00 8/i74.30 140,925.70 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive untillhe cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. AlA Document G701™ - 2001. Copyright @1979, 1987,2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA@ Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA~ Document, or any portion of it, me\,' result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:41 :19 on 11/21/2007 under Order No.10003211 07_1 which expires on 9/13/2008, and is not for resale. User Notes: (1741112149) 1 NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. D & J Industries, etc. Inc. CONTRACTOR (Firm name) ey West, Fl. 33043 Monroe County, l'L OWNER (J."j rm name) 1100 Whitehead Street, Key West, FL 33040 ~d~ A-~ BY (Signature) Robert A. Stone (T.vped name) If /;r.. or Ie 7 DATE I I ~ BY (Signature) David W. Schlapper (TWed name) ~.H(D1 DATE { / ~ '/ " dC)1dc - .' tJ.J L-j ) 01) '" 3: = -., '" CJ = - T." .... l~'~ ~ 7' 0 :-:, '" Q::"::: ,..., :::J P'):_,,-o -< C'") 'I (; c::> ::::J C) ,:; , " .,.", 3 ,'I"") . , '=' ca CO ""'11 :'C' :> ~ '.::J \D AlA Document G~r01TM - 2001. Copyright @1979, 1987,2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA@ Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this A1Ai!I> Document, or any 2 portion of it, may resuh In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:41 :19 on 11/21/2007 under Order NO.1 0003211 07_1 which expires on 9/13/2008, and is not for resale. User Notes: (1741112149) MEMORANDUM DATE: TO: FROM: RE: December 5, 2007 Belle DeSantis, Deputy Clerk ~ Beth Leto, Public Works Division Marathon Sheriff s Substation Roof Replacement Project Enclosed for your information and file, please find a fully-executed original of Change Order No. 5 reducing contract sum by $8,674.30 for the above-referenced project. This change order was executed by Debbie Frederick, Deputy County Administrator, on December 4, 2007, in accordance with Ordinance 026- I 998. Should you have any questions, please feel free to contact me at x4560 or Bob Stone at x6770. bpi cc: Jackie Clynes Bob Stone