Change Order 06/09/1999
CHAN~E
ORDER
o
o
o
o
o
Rrrr";,', r")
r--' -,
. MAY I .,. !
.
AlA DOCUMENT G701
OWNER
ARCHITECT
CONTRACTOR
FIELD
OTHER
I
I
I
i
...
PROJECT: Construction of ARFF bldg.
(rume. address) including access and parking
and electrical vau1E.Keywest
TO CONTRACTOR:
(nune, address) Rove1 Construction
7380 S.W. 48th Street
Miami Fl. 33155
CHANGE ORDER NUMI ER: 1 b. .' JTS
ill.".....1\
DATE: 4/29/99
Fl.
ARCHITECTS PROJECT NO: C500003623. 24
CONTRACT DATE: February 15, 1999
CONTRACT FOR: $ 1,488,000.00
.,
The ContC2.ct Is dunged 2S (ollows:
.\~:;~-';~'
Y~';.
"-' !f'..
f \.,":"11::_'- .:.,~. :
'\.w: .
~ SEE-~TACH CHANGE ORDER No. 1
.~
.~iP"tl \ .
.' f;~~:tl: DANNY L. KOLHAGE, aERlC
BOARD OF COUNTY COMMISSIONERS
OF MONROE COUNTY, FLORIDA
~.. ~._~
By ~ tI -.\Jl. "...:-...~~ _~
Mayor
. No.t.valid until sIgned by the Owner, Architect and Contractor.
. .
Thcocigim1(ConU'2.CtSum)(~~)wa.s................... o....s
Net dunge by prc,'lously 2.udloci%.ed Cll2nge.OcdelS . . . . . . . . . . . . . . . 0 . . . . . . . . . . . . . . . S
TllC (Concnct Swn)(~~~ pciorto dtisOutlgeOrdcr wz. . . . . . 0 . 0 0 $
TllC (Contact Sum) (~~ ~ wiI1 be ('UlCrCISCd) ~l
~~~bythisCh2t18~Ocdcrlnthc2l1lOUOto( ............................s
Thc ncw (Contact Sum) (~lnduding this Clungc Ocder~'i11 be .. S
1,488,000.00
0.00
1,488,000.00
17,163.30
1,505,163.30
The Contact Tlmc wut beflt\aOSCd)(~by
TllC chtc oCSubsc:ultbl Completion 2S OCdlC chtc oCdlis Ol2ngC Order therefore is DECEMBER 17, 1999
(36 )d:l~~.
NOTE:
Thl<< IUml1\:K}' doc:s ntK n:(Ica cNnec:s In me: Qwr.>Ct Sum. Qwr.>Ct Time u(' GU2n(\IC<:d "l:I:dmum l'ric<: ,,1tlch tu,'c h<."Ct\ :Iu(huri7~"l.l hr
QK\.~CUCtkan Oun(te Diccak'e.
U 12.5 --GREilVlSt.. TZOVE:L CON~rfl./lC.1"IOlYr.:f#C.,
Aftbllft:C'I" iC.N~\ N~~ .. CONTRACTOR
5-~~'S NW (,.-t- ~ ~ 3<10 7~?O t5/....J 'f 'j~T
^......~ fl- . ",Il.{; ~;"~"$S~
- ~~~-- . _W~ _
::T; ~:P~~ :TE . ~/~o/~. .
K6'j ~5 T' ,'t.JT'l. A.~f.fOi.+
OWICR
SIOO l..ollec:.€ ~~o
Ad<J(e:<.<
4.., <.4)e)~ . Ft. 33040
~~A.. C-
6.... . - ~
4'30-"
DATE
:::;':<=1
_ ~ 4_'.. _.
-. . .... - .
.: ::;:.J .ic:- :.. ::" ~:.-:::.
. ._ ..::::);:: '/hjc~ :,:13 -his ;:.u:ic.~ .... ..:',.- ..
. . .. :.': ..: 4 ~
:-:"':i ::::::-: ~::.:' _(0 '.:~ :~ :.:~_; :".: :.~ :-:0;.' "C::~;U/,~~~ ,;... :-":.-=-: ~:..::
AJA. OOCUMEKT 0701 . <:IlAtfGE OROER . ''J((7 ED\11OfC . I\!A. . C)(1/tO . TilE
AMEltI(:AI( '~'TIT\'TE UF AKOClTEC'n'. ,~,~ f(1N'" YOAA ^''E.. Xo"'"_ ""1\..<lIIf((;TOl'C. n.(:. ':<UI(,
WAl\HlHG: U"'Ic~.etf pI>o(~ -,(01&(". u.s. eoc>rrl9f\1 laws and Is cublect 10 lc9al p....~lon.
-..
a
G701-1987
IV-42
-.......
:;"0
0,':':
III ~ _.<
~
r-
",
o
""l1
o
;U
::0
fT)
n
o
:::0
o
CHANGE ORDER No.1
ARFF BUILDING
This change order will consist of the following Items
"
Description
1. Relocation of the fire rescue trailer:
The existing fire rescue trailer was located in the construction
site and neeed to be relocated to another area.
2. Unidentified underground utilities:
Relocated existing FAA power ductbank, installed a
windspeed cable, and installation of a new manhole for
the existing airfield lighting. Additional conduit to feed
temporary existing airfield lighting and the demolition of
the existing FAA power ductbank as accomplished.
3. New 4" PVC communication conduit:
A new communication conduit was laid adjacent to the
new water line utilizing the same trench. This will provide
an independent line to the new ARFF building in lieu of
utilizing existing terminal building telephone backboard.
4. Damage to existing 4" Sanitary Forcemain:
Repair of a 4" sanitary forcemain section which was damage
while installing a new 6" water line. The forcemain was not
located by underground detection device due to it being a
non-metalic pipe.
Total Change order No.1
Amount
$ 1,932.00
$11,711.30
$ 1,250.00
$ 2,270.00
$17,163.30
CHANGE ORDER No.1
(ATTACHMENT PER ORDINANCE NO. 004-1999)
A. This Change Order is for the Construction of ARFF Building including Access and Parking
and Electrical Vault Project.
B. This change order consist of the following items:
1, Relocation of the Fire Rescue Trailer
The existing fire rescue trailer was located in the construction site and need to be
relocated to another area.
During the design phase this trailer was not on the construction site therefore was not
part of the original contract documents.
The total amount for this item is $ 1,932.00
2. Unidentified Underground Utilities
Relocated existing FAA power ductbank, installed a windspeed cable, and installation
of a new manhole for the existing airfield lighting. Additional conduit to feed
temporary existing airfield lighting and the demolition of the existing FAA power
ductbank as accomplished.
During the construction the contractor found some unidentified underground utilities
that were not shown on the plans and not identified by any agencies during the review
process therefore where not part of the original contract documents.
The total amount of this item is $ 11,711.30
3. New 4" PVC Communication Conduit
A new communication conduit was laid adjacent to the new water line utilizing the
same trench. This will provide an independent line to the new ARFF building in lieu
of utilizing existing terminal building telephone backboard as recommended by
Bellsouth.
The total amount of this item is $ 1,250.00
N:\DEIDRES\C53623.21\COAM26.WPD
4. Repair existing 4" Sanitary Force Main
Repair ofa 4" sanitary Force main section which was damage while installing a new
6" water line, The Force main was not located by underground detection device due
to it being a non-metallic pipe.
The total amount of this item is $ 2,270.00
C. The total amount ofthis Change Order No. 1 (Items 1 thru 4) is $ 17,163.30
D. The price of Change Order NO.1 expressed as a percentage ofthe original contract price is
$ 17.163.30
$ 1,488,000.00
=
0,0115 -> 1.15%
The price of Change Order NO.1 expressed as a percentage of the contract price after prior
change orders.
$ 17.163,30
$ 1,488,000.00
=
0,0115 -> 1.15%
. The Change Order was not included in the original contract specifications Yes 181 No 0
If yes, explanation: See B (Items 1 thru 4) above.
.
Change Order was included in the original specifications
Yes 0 No 181
.
Change Order exceeds $ 25,000 or 5% of contract price
(which ever is greater)
Yes 0 No 181
.
Project Architect approved the Change Order
Yes 181 No 0
.
Change Order is correcting an error or omission in design
documents
Yes 0 No 181
Should a claim under the applicable professional liability policy be made? Yes 0 No 181
N:\DEIDRES\C53623.2IICOAM26.WPD