Loading...
05/19/2010 Contract DANNY L. KOLHAGE CLERK OF THE CIRCUIT COURT DA TE: May 20,2010 TO: Jerry Barnett, Director Project Management A TTN: FROM: Ann Riger Contracts Administrator Pamela G. Hanc~. At the May 19, 2010, Board of County Commissioner's meeting the Board granted approval and authorized execution of the following: Contract between Monroe County and Pedro Falcon Electrical Contractors, Inc. for construction of new exterior stairs at the East Martello Towers. Contract for Professional Services between Monroe County and Bender & Associates Architects, P.A. for the Design through Contract Administration for the replacement of the perimeter fencing at the West Martello Towers. Contract for Professional Services between Monroe County and Bender & Associates Architects, P.A. for the repair and stabilization of Brick and Mortar at the East Martello Towers. Contract for Professional Services between Monroe County and Bender & Associates Architects, P.A. for the repair and stabilization of Brick and Mortar at the West Martello Towers. Contract between Monroe County and Bender & Associates Architects for Construction Administration Services for the East Martello Tower Restroom Project. Consent to Assignment of the Contract for Maintenance and Annual Reporting of the Environmental Wetland Mitigation at the Medical Examiner's Facility from BAT Constuction to Terramar Environmental Services, Inc. (enclosed is a copy). Enclosed is a duplicate original of each of the above-mentioned for your handling. Should you have any questions please do not hesitate to contact this office. cc: County Attorney Finance File -! . CONTRACT FOR PROFESSIONAL SERVICES BETWEEN OWNER AND ARCHITECTIENGINEER For REPLACEMENT OF PERIMETER FENCING At WEST MARTELLO TOWERS, KEY WEST FLORIDA THIS CONTRACT made as of the 19th day of May, 2010, FOR PROFESSIONAL SERVICES BETWEEN OWNER AND ARCHITECT (the "Contract" or "Agreement") is made and entered into by MONROE COUNTY, BOARD OF COUNTY COMMISSIONERS (the "Owner" or "County"), a political subdivision of the State of Florida, whose address is 1100 Simonton Street, Key West, Florida 33040, its successors and assigns through the Monroe County Board of County Commissioners ("BOCC"), and BENDER & ASSOCIATES ARCHITECTS, P.A. (the "Architect") ,whose address is 410 Angela Street, Key West, Florida 33040, its successors and assigns. NOW, THEREFORE, in consideration of the mutual promises, covenants and agreements stated herein, and for other good and valuable consideration, the sufficiency of which hereby acknowledged, the Owner and the Architect/Engineer agree: 1. This contract shall be effective on the date of execution by the last party signatory to the contract. 2. This contract is in accordance to the Continuing Contract as approved by the BOCC on January 20, 2010 where professional services are to be rendered for projects in which the estimated construction costs of each individual project under contract does not exceed Two Million Dollars ($2,000,000.00). All terms and conditions of the continuing contract approved by the BOCC shall apply to this contract. Modifications to the existing contract consist of the following: 3. The Architect shall not disclose, publish. or authorize others to disclose or publish, design data, drawings, specifications, reports, or other information pertaining to the services performed by Architect or other information to which the Architect has had access during the Term of the Continuing Contract without the prior written approval of the County, during the Term of the Continuing Contract and for a period of two years after the termination of the Continuing Contract. Nevertheless, the parties agree the Architect may use and publish the County's name and give a general description of the work provided by the Architect for the pwpose of informing other clients and potential clients of the Architect's work experience and qualifications. 4. Should the County receive a request for documents pursuant to Chapter 119, Florida Statutes, Architect shall cooperate with the County to facilitate the County's compliance with Chapter 119, Florida Statutes. Should the Architect assert any exemptions to the requirements of Chapter 119 and related statutes, the burden of establishing such exemption, by way of uyunctive or other relief as provided by law, shall be upon the Architect. Failure by the Architect to cooperate with the County in connection with a Public Records request shall be grounds for immediate unilateral cancellation of the Continuing Contract by the County. - ~ . I OJ 5. Scope of Work: Replacement of the perimeter fencing, much of which is deteriorated to a point of being unsafe. Replacement of the fence shall be in the same location as the original fence unless the location must be changed due to statute, ordinance, or role. Design the posts, pickets, and rails to be similar to the existing. Provide all attachment designs and obtain approvals from all Historic Agencies. Issues which must be addressed include: Archaeological protection of the resource, research alternatives for anchorage to the resource, details developed in compliance with the Secretary of the Interior's Standards and full coordination with the Florida Department of State, Division of Historic Resources (DHR). Individual tasks along with required time scheduled is attached hereto as Exhibit "A". 6. Services shall include, but not be limited to: Preparation and completion of the design program for space requirements and relationship, schematic design, design development, preparation of contract documents for bids, preparation and advertisement for Request for Bids, tabulation and review of bids, recommendation of contract awards, cost estimating during design and document preparation, administration of contract documents, consultation and on-site inspections during construction, review and recommend approval of contractor invoices, preparation and submittal or permit applications, zoning applications, public presentation and presentations to the County Commission. 7. The cost for professional services shall be a lump sum of $11,300.00, billed monthly ending the last day of each month. There shall be no reimbursable expenses associated with this contract. ~~l;:,.other terms and conditions of this Contract shall comply with the Continuing Contract dated - ~. ".ip, which shall be made a part of this contract as if written herein in its entirety. ~. .. REOF, each party caused this Agreement to be executed by its duly authorized day and year first above written. BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA By: ~ M 1 M~or/Chainnan Date: AY 9 lOtC WITNESS TO Architect's Signature: ~ B':= ~~ m~vJM!: 8 ~-;~~ature ~ ~ 5~~ mAVIIJA~ Q: 8f1?~!.;Wltness Name o <:) -": c._~ c:/ ~ C'\I -"j -#::'-~2 7 J 0 ~e: :>_GLtJ · o ~ -H.L.,... ,1 lu a: ~;-tQ: -J ...... 4.....U -"..,. -- ::: <:( .....'.~~ Lt.. ~ Cl ~l Signature of Corporate Agent ~T ,J?fr-N~ . Print Name of Corporate Agent By: Date: 4, z7, /0 '~E COUNTY AT~',f'J~Y ;' ""j n I.':;.) D ", f". ~... ....".,.CVEDA"STO. ""II: --~..~ f\!.' '\- r! ~_ .:~: f;~' ." '-,'~ ;,'.' .' ' 1\8:;: c: T,'"r C.<", '; T T (J,.;,'::: Y o..-- 1/ -bl J' I " ~ , March 11,2010 "Exhibit A" Mr. Jerry Barnett, Director of Project Management Monroe County Construction Mgmt. The Historic Gato Cigar Factory 1100 Simonton Street Key West, FL 33040 p.j~ Re: West Martello Fence, AlE Services Dear Jerry: Thank you for asking us to work with you on the West Martello fence repairs. As discussed, I have researched various sources to detennine what base documents are available that will minimize our time on this effort. We have some historic documents on file, and Bill Horn has provided us with an AutoCAD site plan, which will reduce our field documentation time substantially. I am researching the National Archives for additional historic documents. Our fee proposal reflects that time savings. The scope of services includes replacement of the perimeter fencing, much of which is deteriorated to a point of being unsafe. Issues which must be addressed include: Archaeological protection of the resource, research alternatives for anchorage to the resource, details developed in compliance with the Secretary of the Interior's Standards and full coordination with the Florida Department of State, Division of Historic Resources. Individual tasks along with our estimate of the time required for each follows: Task Description Project Project Intern Admin. ManaKer Architect Architect Assistant Field Doc.to include some excavation, assess brick 4 4 and mortar Existing conditions drawings, sections, details, etc. 2 8 Design dev.of details & anchorage to historic fabric 2 8 Submit and coordinate with DHR 2 1 Revisions and construction documents per DHR Req. 1 8 1 HARC submittals and pennitting assistance 3 2 Bidding support, including prebid meeting. 4 2 Construction phase site visits and reports (4) 8 8 2 Shop drawings and review of submittals 2 2 1 Project close out includes report to DHR 1 1 Total Hours 28 39 10 $/hour $180 $140 $100 $80 Labor cost $5,040 $5,460 $800 Atlantic Engineering Labor Cost N/A HNGS Labor Cost N/A Total B&A Labor Cost $11,300 Based on the above analysis, we propose to provide the required services for a lump sum fee of$II,300. Alternately, we will provide the required services on an hourly basis to a maximum of$12,000. There are no reimbursable expenses associated with this contract. Please call if you have any questions, or if the above does not reflect the required services. Sincerely, e)~-- Bert L. Bender, Architect 4JO Angela Street Kev \\.'est. Florida 33040 Teiephone <.,05) 296-1347 Fa c s j In i Ie ( .-) 0 5) 2 96- 2 72 7 F/oridaLicellse AA CO 02 022 www. BenderArch itects. COlll BLB:swm