Loading...
Change Order 5 BOCC 4-18-95 CHANGE ORDER NO. 5 (Final) Project Title: Marathon Sheriff's/ Job No. N/A Tax Collector's Office Renovation Contract:or: D. L. Porter Construction, Inc. Contract Date: 5-27-94 Nature of the change: The attached six pages are a part of this change l:>rder and address all outstanding issues to date. Included herein are 15 requests for Change Orders from the Contractor for various changes to the plans. The changes result in the following: The contract amount is increased by $2,896.00 to $791,602.00. An additional 22 days is granted so that the revi.sed contract completion date is February 24, 1995. preparedlf}I1d" Ap BY: (~ COUlnty_ ngineer DATE: ,J,';2!l.?> Approved ~~s and Form: By: ) -< Atto,rney for Monroe County BY: ~~ D1V1Si~~,;ctor_ DATE: y ~ ,. -7 Date: l':;; -- ~ -q ~ : -~ r-r, " ::2::. CJ ~ -n ""---.... CXl ~ -'r-' _"t.., -. -.-, ""'e ',~ I , ~ c; A 0 - ~ 1 The above changes are accepted: Attest: ~7Zi:.... ~ Date: '8/;1/QJ By: (' fJXCC j Contract Representative Title: Vf. Approved: BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA Attest: DANNY L. KOLHAGE, Clerk APP. V"DASWo~:: cS~~ Af\/rJ ,r: l Eur::-:r-', .'....... JJno.kJ... Q. ~A~ Clerk ,r Bender & Associates ~~i R. C H J TEe T S p.a. 17 February 1995 Mr. David S. Koppel County Engineering Monroe County 5100 College Road, S.l. Key West, FL 33040 Re: Sheriff's Substation and Tax Collector's Office Marathon, Florida Outstanding Change Order Items Architect's Job No. 9333 Dear Dave: The following describes all of the outstanding change order requests to date. Each of the items listed is my direct response to Shawn Millay concerning his requests for additional compensation. Bold comments following each item are explanations to you as to the reason for the change and a description of any dispute between the parties as to costs allowed. In general, the overall Change Order #5 was computed by me to be an add of $2,896. It is my feeling at this time that the County should not exercise its right to impose its penalty clause. Request for Change Orders DLP-RCO#23 (1/9/95) This was a credit for modification we requested to landscape. Total credit provided $ < 625 > ._~---.., . ,,\ flfl, : iI' I l?1:: ,rrr'rj\. . u ----.-- .Jlll i. 1 . - IJi; In! MAR:3 0 1995 I!! i I ~ ;: i - LJ L:J \.:/. c.: U u -L5b no Caroline Street Key Well, Florida 33040 Tel e p'h 0 n e (305) 296 - 134 7 Facsimile (305) 296-2727 Florida Liunst AA C002022 - - -. - - -... - - - - .. - ... - -- - - - -... Mr. David S. Koppel Page Two 17 February' 1995 Architect's Job No. 9333 DLP-RCO#24 (1/12/95) Install (3) ne:w water service lines that are in conflict within the grading of new parking lot. Subtotal Bond @ 1.2% 10% OH&P Total allowed $ 1,600 20 162 $ 1,782 During grading of the parking lot it was discovered that the existing water lines were at the surface of existing grade, damaged, and not in compliance with Code. New lines were installed and buried to the proper depth, bringing the system into compliance with Code. This condition could not have been anticipated prior to commencing work at the parking lot. DLP-RCO#25 (1/12/95) Keyed cam l.ocks (29) at cabinets in Rooms 104, 105, 113, 116, 135. Subtotal $ 928 Bond @ 1.2% 12 10% OH&P ~ Total allowed $ 1,034 (N ot applicable to this Change Order) -0- To be paid from Sheriff's budget. This item was requested by Sheriff's Office for added security and will be paid directly from Sheriff's Department and will not be a part of this Change Order. DLP-RCO#.26 (1/12/95) Supply and install (2) B3309 Bobrick multi-purpose units for surface mount installation. Mr. David S. Koppel Page Three 17 February' 1995 Architect's Job No. 9333 Subtotal Bond @ 1.2% 10% OH&P Total allowed $ 184 3 --12 $ 206 This change:: is required due to conflict with electrical and plumbing systems inside the wall. Therefore, additional surface mounted trim kits were required. DLP-RCO#27 (1/19/95) Replace approximately 20 LF of 4" sewer line (Courthouse) to new septic tank. ($1,09'2 requested) 20LF @ $15/LF allowed Total allowed $ 300 Sewer lines to this project fall under the 200' allowance @ $15/LF; therefore, the above 20LF of new 4" sewer line is allowed at $300. This sewer line installation is required to correct conflicts with existing underground utilities and allow tie in of the Courthouse to the new septic tank. The existence of underground electric was not known prior to installation of the new septic system. DLP-RCO#28 (1/20/95) Substitute standard grab bars @ Handicapped Bathrooms #102 and #103. Total allowed -0- This RCO was originally generated at $278 to cut and weld existing bars to fit. It was later determined that standard grab bars could be substituted at these locations and at no additional cost. Mr. David S. Koppel Page Five 17 February 1995 Architect's Job No. 9333 DLP-RCO#32 (1/31/95) - Deleted Repair leaking waterline, original line under concrete floor. T etal Cost proposed $4,788 N/A Rejected as Icost prohibitive. DLP-RCO#.33 (Revised) Repair leaking water service line as it enters Building @ Room 138. T etal Cost $1,337 This work replaced DLP-RCO#32 previously rejected and revised the scope for a reduced cost. The work was required to replace an original galvanized waterline under the building slab which broke. This work could not have been anticipated, since the condition of the existing line under the slab was unknown. DLP-RCO#34 (2/3/95) Cut and reweld monitor holder legs in Tax Office Subtotal Bond t@ 1.2% 10% OH&P Total $ 352 5 ~ $ 392 This item was necessary to accommodate the under counter monitors that were positioned at a 450 angle. There were (2) units involved in this work. DLP-RCO#35 Building sign: Substitute one face only in lieu of two face sign as originally called for in Drawings. Total credit $ < 1,655 > Mr. David S. Koppel Page Six 17 February 1995 Architect's Job No. 9333 This credit was generated when D.O.T. would not allow the sign inside their right of way and:it had to be oriented parallel with u.s. Highway 1, allowing the use of a one-sided sign. DLP-RCO#36 Provide and install 36 L.F. sewer line at east sewer tie-in to new septic tank. Total Cost $ 540 This sewer line was part of a contract allowance which had been overlooked previously. We verified that the line was installed an the payment of $540.00 is appropriate and in accordance with the contract. DLP-RCO #37 D.L. Poner requested payment of $957.00 for investigative work associated with the broken water line under the building slab. This request was rejected and D.L. Poner has agreed to absorb the cost. Total cost change for this item is -0-. TOTAL CHANGE ORDER NO.5 + $2,896 ~re~ Ben L. Bendler Architect BLB:bka SHERTAX.C05