Loading...
Change Order No. 1 CHANGE ORDER NO. 1 PAVING, GRADING AND DRAINAGE IMPROVEMENTS TO OLD 4A ROAD, LITTLE TORCH KEY 401-002.11 Contractor: The Brewer Company of Florida, Inc. Contract Date: September 22, 1981 To: The Brewer Company of Florida, Inc. You ~~~1 Ji-;'ec~~~t~o S~~i<eet 't~~ .a~cin~~grhi\eJ1MPow in the subject contract: _ . By: Attest: Date: Nature of the Change: THE CONTRACT IS AMENDED TO ADD ITEM lA, ADDITIONAL ROADWAY EXCAVATION . OVER-RUN 1994 CUBIC YARDS AND TO ADD ITEM 2A, FILL MATERIAL OVER-RUN 1256 CUBIC YARDS. AFTER THE CONTRACT LETTING AND DURING CONSTRUCTION IT I~AS DETERMINED THAT A PORTION OF THE UNDERLINING ROADWAY, STATIONS 55 + 60 THROUGH 63 + 00, WAS SCATTERED WITH POCKETS OF PEAT AND MUD, WHICH MUST BE REMOVED IN ORDER TO PROVIDE A SUITABLE AND STABLE BASE FOR THE NEW ROADWA Y . /, The changes result in the following adjustment of Contract Price and Time: Contract Price Prior to this Change Order~ Net Increase Resulting from this Change Order: Current Contract Price Including this Change Order: Contract Time Prior to this Change Order: Net Increase Resulting from this Change Order: Current Contract Time Includin this Chan e Order: $345,099.55 32,386.96 377 ,486.51 120 days 5 days 125 da s Prepared by: Date:~ if( ltt~z.-- By: iY c H. Lee Swanson, Inc. By: Date: t / #fb APPROvtO 6N &. (j..~ -r ~ BOOK .x PAGEJij Walter R. Brewer Title: .~~ ;€