Loading...
Supplement No. 2 (1/1/72) SUPPLEMENTAL AGREEMENT NO.2 SUPPLEMENTAL AGREEMENT -- AIRPORT ENGINEERING MONROE COUNTY, FLORIDA AND CONNELL ASSOCIATES, INC. This Letter of Authorization dated ~ r::L '7 , , 1972 wi 11 cons t i tute a. Supp 1 ementa 1 Agreement to that "Agreement" entered i,nto by and between CONNELL ASSOCIATES, INC., Consulting Engineers, and the COUNTY OF MONROE, a political subdivision of the State of Florida, acting by and through the Board of County Commissioners of Monroe County~ under date of January 1, 1972. The work to be covered by this project, the services to be furnished, and the methods of compensation shall be as follows: 1. Airport development description: Improvements to Marathon Airport. Develop a 401 wide parallel taxiway and connecting taxiway to the NE/SW Runway. 2. The Engineer agrees to furnish the following services or prepare the following documentation: a. Ai rport layout Pl an (Revi sed). b. Paving design (Form FAA-5100-1). . c. Construction plans and specifications. d. Bid Tabulation - contract award recommendation. e. General supervision of construction. f. Change Orders - Supplemental Agreements. ' g. Payment Applications h. Final inspectio~ - acceptance. i. As-constructed plans (S-sets prints). j. Twenty copies of drawings, specifications and contract documents to be furnished without extra charge. Extra copies at cost. (Plans oat $.03/sq. ft. c?:1d specs at $.10/per sheet). k. Original drawings are property of the Engineer. County will be furnished rcproducibles. 1. Resident supervision of construction shall be accomplished by the County. Testing shall be accomplished by an independent testing laboratory and reimbursement shall be made directly by the County. m. All field surveys in connection with the project shall be furnished by the Engineer with payment therefor in accordance with Section 1. (g) of the Agreement or shall be accomplished by an independent surveyor paid directly by the County, but directed by the Engineer. 3. Standards: All work performed under this Agreement shall in all cases: a. Conform to professional standards. b. Conform to project requirements. c. Conform to FAA requirements. 4. Time Schedule: a. Preliminary planning will start as of the date of execution of this Letter of Authorization by the County. b. Final Pesign will be started upon receipt of approval of the .. preliminary plans by the County and the Florida DOT. Final plans and specifications will be completed within thirty (30) days from the date of approval of the preliminary layout. 5. Method of Compensation: a. Compensation for services furnished under paragraph 2. a. through k. hereof shall be in accordance with Section 1. (9) of the Agreement. The percent fee for this project will be 15.0% based upon the median curve of the current edition (March 1972) of the .Minimum Schedule of Fees recommended by the Florida Engineering Society (as per Sec. 1. (g) of the Agreement). The construction cost will be the total construction costs. b. All field surveys required for the project furnished under the provisions of Section 2, para. m. will be paid for in accordance with Section 1. (9) of the Agreement if performed by the Engineer's personnel or at actual cost if independent surveyors are retained. 2. f c. Extra or additional copies of plans and specifications will be furnished at the Engineer's cost of $.a8/sq. ft. for plans and $.10 per sheet for specifications. 6. Method of Payment: Upon presentation of cert-ified invoices by the Engineer, the County will reimburse the Engineer for services performed as follows: a. Upon completion of the preliminary design phase and approval of layout plans by the County and the pertinent Governmental Agencies, twenty percent (20%) of the total fee based upon the applicable percentage and the estimated cost of construction. b. Upon completion of final plans and specifications, and acceptance by the County an additional fee increment amounting to sixty percent (60%) of the total fee based upon the applicable per- centage and the estimated cost of construction. c. After bids have been received the total fee due based upon the actual low bid or bid as awarded will be determined and the unpaid portion of the total fee (adjusted on the basis of the a~tual bid as awarded) will be paid monthly based upon the portion of the construction work accomplished during that month as that cost relates to the total construction cost. IN PRESENCE OF: COUNTY OF MONROE, A POLITICAL SUBDIVISION OF THE STATE OF FLORIDA, ACTING BY AND THROUGH THE BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY :112 ~Yf::fZ /? ATTEST: k~ ~ Earl R. Adams, Clerk By: )/~L~~( Harry Har IS: Mayor ~~ .)J~~ /,'1' ~ (_ttLuA(~' a/&17a~ CONNELL ~SSOCIATES, INC. ,~ ...-..../, /?/ '~~'k ," /'.///, / ...-/~ .' By: </ /M4b;:;?:-/:.:dK ~Harold A. Wilde, Vice President I N PRESENCE OF: 3.