Loading...
1st Supplemental 01/20/2010 DANNY L. KOLHAGE CLERK OF THE CIRCUIT COURT DATE: February 3, 2010 TO: Judy Clarke, Engineering VI Public Works Division of Isabel C. DeSantis, D. C. 7 FROM: At the January 20, 2010, Board of County Commissioner's meeting, the Board granted approval and authorized execution of the following: Supplemental Local Agency Program (LAP) Agreement between Monroe County and Florida Department of Transportation (FDOT) to amend the transportation stimulus funding for the Palm Drive (Baypoint) Bridge Repair Project. Attached hereto are four (4) duplicate originals of the above document for your handling. Please be sure that the sets marked Monroe County Clerk's Office Original and Monroe County Finance Department's Original are returned to my attention. Should you have any questions please do not hesitate to contact this office. cc: County Attorney Finance File/' 525 - 010-32 PRODUCTION SUPPORT 02/09 Page 11 or s SUPPLEMENTAL NO. STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FPN 1 LOCAL AGENCY PROGRAM 426182- 1 -58 -01 DUNS NO. SUPPLEMENTAL CONTRACT NO. AGREEMENT APL 06 The Monroe County desires to supplement the original Agreement entered into and executed on July 16.2009 as identified above. All provisions in the original Agreement and supplements, if any, remain in effect except as expressly modified by this supplement. The changes to the Agreement and supplements, if any, are described as follows: PROJECT DESCRIPTION Name Palm Drive (Baypoint) Bridge Repair Project Length 21 feet Termini Description of Work: The Palm Drive (Baypoint) Bridge Repair Project scope of work includes, but is not limited to, demolition of the existing bridge deck and railings, construction of a new reinforced concrete bridge deck and railings, replacement of guardrails, required environmental protection and maintenance of traffic including installation of a temporary bridge and all other work outlined in the project drawings and project manual. Reason for Supplement: The project construction budget is being reduced from $269,620 to $130,543 and the project Construction Engineering and Inspection (CEI) budget is being reduced from $27,000 to $5,510 as shown on following page. Remaining funds are to be moved to FM426355 -1 Phase 58. FM 426182 -1 Original LAP Ph 58 Fund Ph 68 Fund Total $269,620.00 FSSL $27,000.00 FSSL $296,620.00 FSSL $0.00 Local $0.00 Loca 1 $0.00 Loca I Supplemental $130,543.00 FSSL $5,510.00 FSSL $136,053.00 FSSL $0.00 Local $0.00 Local $0.00 Local Remaining Balance $160,567.00 FSSL Move to FM426355 -1 Phase 58 525 -010-32 PRODUCTION SUPPORT 02/09 Page 2 of 3 SUPPLEMENTAL NO. 1 DUNS NO. STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION LOCAL AGENCY PROGRAM SUPPLEMENTAL AGREEMENT FPN 426182- 1 -58 -01 CONTRACT NO. APL 06 TYPE OF WORK By Fiscal Year FUNDING PREVIOUS TOTAL PROJECT FUNDS (2) ADDITIONAL PROJECT FUNDS (3) CURRENT TOTAL PROJECT FUNDS (4) TOTAL AGENCY FUNDS (5) TOTAL STATE & FEDERAL FUNDS Planning 2007 -2008 2008 -2009 2009 -2010 2010 -2011 Total Planning Cost $0.00 $0.00 $0.00 $0.00 $0.00 Project Development & Environment (PD &E) 2007 -2008 2008 -2009 2009 -2010 2010 -2011 Total PD &E Cost $0.00 $0.00 $0.00 $0.00 $0.00 Design 2007 -2008 2008 -2009 2009 -2010 2010 -2011 Total Design Cost $0.00 $0.00 $0.00 $0.00 $0.00 Right -of -Way 2007 -2008 2008 -2009 2009 -2010 2010 -2011 Total Right -of -Way Cost $0.00 $130.543.00 $130,543.00 $5,510.00 $5,510.00 $0.00 $0.00 $0.00 $0.00 Construction 2007 -2008 2008 -2009 2009 -2010 2010 -2011 Total Construction Cost $269,620.00 ($139, 077.00) $130,543.00 $269,620.00 $139,077.00 $130,543.00 $0.00 Construction Engineering and Inspection (CEI) 2007 -2008 2008 -2009 2009 -2010 2010 -2011 Total CEI Cost Total Construction & CEI Costs $27.000.00 ($21,490.00) $5,510.00 $27,000.00 $21,490.00 $5,510.00 $0.00 $296,620.00 $160,567.00 $136,053.00 $0.00 $0.00 $136,053.00 $136,053.00 TOTAL COST OF THE PROJECT $296 ($160 $136,053.00 525-010-32 PRODUCTION SUPPORT 02/09 SUPPLEMENTAL NO. j STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FPN LOCAL AGENCY PROGRAM SUPPLEMENTAL 426182-1-58-01 DUNS NO. AGREEMENT CONTRACT NO. I API-06 IN WITNESS WHEREOF, the parties have caused these presents to be executed the da and y ear first above written. AGENCY Mpfir4e Count �Ndfm $ ,47 U Titl V7 / V irrr� Attest: C Name: /fv /Li 4 Title: 112, 9 / IC I Date: �,��j�� As to form: � r Attorne As to form: District Attorne See attached Encumbrance Form for date of fundin approval b Comptroller. MONROE COUNTY ATTORNEY PPROVED AS TO FORM: # i & ", 1 �l CHRISTINE M. LINIBERT-BARROWS ASSISTANT COUNTY ATTORNEY Date 3 r �� --- Page of -� STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION B Name: Title: Attest:. ic; Name: V Title: Vw Date: N-3 -TI r NO cn C=) rri C) G CD STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525- 010-40 LOCAL AGENCY PROGRAM AGREEMENT PRODUCTION SUPPORT 08/06 Page EXHIBIT "B" SCHEDULE OF FUNDING Monroe County FPN: 4261821- 1 -58 -01 c/o Engineering Department 1100 Simonton Street Key West, Florida 33040 PROJECT DESCRIPTION Name: Palm Drive (Baypoint) Bridge Repair Project; bridge #904140, Termini: Length: 21 ft TYPE OF WORK By Fiscal Year FUNDING TOTAL PROJECT FUNDS ( AGENCY FUNDS ( STATE & FEDERAL FUNDS Planning 2006 -2007 2007 -2008 2008 -2009 Total Planning Cost Project Development & Environment (PD &E) 2006 -2007 2007 -2008 2008 -2009 Total PD &E Cost Design 2006 -2007 2007 -2008 2008 -2009 Total Design Cost Right -of -Way 2006 -2007 2007 -2008 2008 -2009 Total Right-of-Way Cost Construction 2006 -2007 2007 -2008 2009 -2010 2009 -2010 Total Construction Cost _$269,620 $269,620 ($139,077) ($139,077) $130,543 $ 130,543 Construction Engineering and Inspection (CEI) 2008 -2009 2009 -2010 2009 -2010 Total CEI Cost 1 Total Construction and CEI Costs $27,000 $27,000 ($21,490) ($21,490) $5,510 1 $5,510 $136,053 $136,053 $136,053 TOTAL COST OF THE PROJECT $136,053 The Department's fiscal year begins on July 1. For this project, funds are not projected to be available until after the 1st of July of each fiscal year. The Department will notify the Agency, in writing, when funds are available.