Loading...
Supplement No. 3(1).--NT MA'; 2 5 1998 VIE: Engineers • Architects • Planners DAVID V8&QASSOCIATES, INC. March 23, 1998 3 ace nr rn CD Director of Community Services, Monroe Countyac- 5100 Junior College Road Public Service Building, Wing IV, Stock Island CDC") r*.N CD Key West, Florida 33040-4399 ,(305) 292-4510, FAX: (305) 292-4401 MLA-, a -4 t-- _.,n rn n ATTN: PETER HORTON °D Ca C3 RE: KEY WEST INTERNATIONAL AIRPORT TERMINAL RENOVATION PROJECT Volkert Job. No. 001703.16 TERMINAL BUILDING SCOPE CHANGE Peter: It is our understanding the Monroe County Board of County Commissioners must approve the additional services connected with the Change in the Scope of Work to the existing Terminal Renovation portion of the above referenced project. The services are detailed in the attached Man -Hour Estimate. The Changes are the result of new Airline, Rental Car, and Airport Security operational requirements and are and described as follows: 1. Delete the built-in Casework at each of the Airline Ticket Counters and redesign the Ticket Counter layouts to accommodate Airline -furnished "plug-in" Modular Equipment. Revised Ticket Counter layouts will be designed to allow future relocation of the various Airline Tenant operations. 2. Delete the built-in Casework at each of the Rental Car Counters and redesign the Rental Car Tenant layouts to accommodate Rental Car Company -furnished "plug-in" Modular Equipment. Revised Rental Car Tenant layouts will be designed to allow future relocation of the various Rental Car Tenant operations. 3. Increase the size of the Airport Security work room and reconfigure the layout to provide "one- way" observation windows and to provide an exterior access door. As the Agreement between Volkert and Monroe County, identified as Supplemental Agreement Number Three, dated October 18, 1995, has provisions for Contingent Additional Services (Article 3.5) we propose to include this Letter of Confirmation as an amendment attached to the Contract intended to authorize Volkert to provide additional services required by the Scope of Work as described above. The remainder of the referenced Agreement will remain in full effect with no modification. Should the County Commission approve the above Scope Change description and Contingent Additional SeD e s Supplemental A reement Number Three, your signature, below will indicate acknowledgment. APPROVED AS TO FORM P er Horton BY AND AL -Z S IC C Director of Community Services R ERT N. DATE �� g' Date Upon execution, please return one original signed copy for our 44es.-- Thanks... d. --- —� _--�`-. James L. Roberts Coun Aaninistrator J 19 Edwa A. (BudValdwell, AIA, NCARB Datifa cc: Art Skelly, Mil Reisert, File, Project Diary 350 Egyn Parkway, N.E. • Fort Walton Beach, FL 32547 • (904) 864-1199 • Fax (904) 864-2946 • AAC000476 Birmingham, AL Gulf Shores, AL Mobile, AL Metropolitan Washington, D.C. Miami, FL Tampa, FL Dalton, GA New Orleans, LA Chattanooga, TN MAN HOUR ESTIMATE KEY WEST INTERNATIONAL AIRPORT TERMINAL RENOVATION Revise Airline & Rental Car Millwork DAVID VOLKERT & ASSOCIATES, INC. AAC000476 (850) 864-1199 Services required to implement proposed revisions ITEM DESCRIPTION Proj. Mgr. Architect Civil Eng. Mech. Eng. Elec. Eng.; ADD Tech Clerical Totals 1 Document User Requirements 4 1 5 2 Prepare Schematic Plans 1 8 4 13 3 Prepare Schematic Elevations 1 4 8 13 4 Coordinate User Approvals of Layout 4 2 1 7 5 Prepare Final Plans 8 8 16 6 Prepare Final Elevations 6 4 10 7 Modify Existing Assembly Details 4 4 8 8 Prepare & Issue Proposal Request 2 2 1 5 9 Quality Assurance Review 1 10 Evaluate Contractor's Proposal 1 2 3 11 Recommend / Issue Change Order 1 1 2 12 Verify / Review Shop Drawings 1 4 5 Total Estimated Hours 16 40 0 0 0 28 4 87 Hourly Rates per ARTICLE IX $114.40 $61.42 $75.09 $51.97 $68.84 $48.04 $28.59 Total Estimated Cost $1,830 $2,457 $0 $0 $0 $1,345 $114 $5,747 MH Ticket Counter.XLS Page 1 3/23/98 MAN HOUR ESTIMATE KEY WEST INTERNATIONAL AIRPORT TERMINAL RENOVATION Revise Security Room No. I I I DAVID VOLKERT & ASSOCIATES, INC. AAC000476 (850) 864-1199 Services required to implement proposed revisions ITEM DESCRIPTION Proi_ Mnr_ Architect Civil Fnn Marh Fnn Flar Fnn -.Ann Tarh C larical Tnfal¢ 1 Document User Requirements 1 1 2 Prepare Schematic Plan 2 2 2 Coordinate User Approvals of Layout 1 1 2 5 Prepare Final Plan 1 1 2 8 Prepare Final Reflected Ceiling Plan 1 1 2 7 Modify Door, Hardware, Finish Sch's. 2 2 8 Prepare & Issue Proposal Request 1 1 2 9 Quality Assurance Review 1 io Evaluate Contractor's Proposal 1 1 2 11 Recommend / Issue Change Order 1 1 2 Total Estimated Hours 5 6 0 0 0 4 3 17 Hourly Rates per ARTICLE IX $114.40 $61.42 $75.09 $51.97 $68.84 $48.04 1 $28.59 Total Estimated Cost $572 $369 $0 $0 $0 $192 1 $86 $1,218 MH Security Room.XLS Page 1 3/23/98