10/18/1977c
A G R E E M E N T
THIS AGREEMENT, made this 18th day of October
1977, by and between FRANK KEEVAN & SON, INC., a Florida corpora-
tion, of the County of Dade and State of Florida, hereinafter
called the Contractor, and the BOARD OF COUNTY COMMISSIONERS OF
MONROE COUNTY, FLORIDA, of the County of Monroe and State of
Florida, hereinafter called the Owner,
WITNESSETH, that the Contractor and the Owner for the con-
sideration hereinafter named agree as follows:
1. The Contractor shall furnish all the materials and
perform all the work as required by the specifications for the con-
struction of approximately 8.5 miles of Bicycle Path on Knight Key,
Hog Key, Vaca Key and Fat Deer Key, in Monroe County, Florida,
copy of which is attached hereto and made a part hereof.
2. The work to be performed under the contract shall be
commenced within fifteen (15) days and be completed within
calendar days from date of commencement.
3. The Owner shall pay to the Contractor for the per-
formance of the contract in current funds as follows:
$2.48 per linear foot.
Partial payment may be requested by the Contractor to the Owner
after the construction of 15,000 linear feet of path satisfactor-
ily completed and approved less ten percent (10%) retained until
acceptance of the entire path at contract completion.
4. The attached specifications together with this agree-
ment, form the contract and they are as fully a part of this
contract as if herein repeated.
IN WITNESS WHEREOF, the parties hereto have executed this
agreement the day and year first written above.
Attest:
ecretary
F
U.
Page 1 of 2 Pages
Attes t :
Clerk -
BOARD OF COUNTY COMMISSIONERS OF
MONROE COUNTY, FLORIDA
�rm
(Seal)
HEREBY CERTIFY that this document
has been reviewed for legal suffi-
ciency and that the same meets with
my approv
By
Attorney's Office
Page 2 of 2 Pages
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
ORTATION
.. <
PERMIT ram^
DATE March 15, 1977 PERMIT NO.0_,/
SUBJECT: Section 90040. State Road 5 County Monroe
PERMITTEE Boardo County Commissioners, Monroe Count -, Florida
Requesting permission from the State of Florida Department of Transportation, hereinafter
called the Department, to construct, operate and maintain a Bicycle Path 5' wide
from MP Station U.to MP Station 5.0 -
1. Proposed work is within the corporate limits of a municipality. Yes. ) No.(X )
Name of Municipality
2. Applicant declares that prior to submitting this application he has ascertained the
location of all existing utilities, both aerial and underground.
A letter of notification and plan of improvement was mailed on March 15, 1977 to
the following utilities/municipalities.
Florida Keys Aqueduct Authority
on da Keys E ectric Coop,
Southern Be Te one and Telegraph Com an
3. Is Interstate or Toll Road right-of-way involved? Yes ) No. (X
4. It is expressly stipulated that this permit is a license for permissive use only and
that the placing of facilities upon public property pursuant to this permit shall not
operate to create or vest any property right in said holder.
5. Whenever necessary for the construction, repair, improvement, maintenance, safe and
efficient operation, alteration or 'relocation of all, or any portion of said highway
as determined by the Director of the Division of Road Operations, any or all
facilities and appurtenances authorized hereunder, shall be immediately removed from
said highway, reset or relocated thereon as required by the Diriector of the Division.
of Road Operations and at the expense of the permittee.
6. The construction and maintenance of such facility shall not interfere with the
property and rights of'a prior permittee.
7• It is understood and agreed that the rights and privileges herein set out are granted,
only to the extent of the State's right, title and interest in the land to be entered
upon and used by the holder, and the holder will, at all times, assume all risk of
and indemnify, defend, and save harmless the State of Florida and Department from arrc.
against any and all loss, damage, cost or expense arising in any manner on account of
the exercise or attempted exercises by said holder of the aforesaid rights and
privileges. During co,1st1,uc-i;i01i, &11 safety regulations of the Department shall be
observed and the holder must take measures, including placing -and display of safety
devices, and may be necessary in order to safely conduct the public through the
project area in accordance with the Department's Manual on Traffic Controls and Safe
Practices for street and highway construction, maintenance and utility operation.
8. In case of noncompliance with the Department's requirements this permit is void and
the facility will have to be brought into compliance or removed from the R/W at no
cost to the Department..
9• All work shall meet Department standards and be performed under the supervision of
J. W. Jeffries Maintenance or Resident Engineer, located at South Miami
Florida, Tel- No: 5-6933
10. All materials and equipment shall be subject to inspection by the Maintenance or
Resident Engineer.
11. The office of the Maintenance or Resident Engineer named in Paragraph Nine (9) shall
be notified twenty-four (24)- hours in advance before starting work and immediately
upon completion.
12: All Department property shall be restored to its original condition as far as
practical, in keeping with Department specifications, and in a manner satisfactory
to the Department.
13. The attached sketch and special provision covering details of'this installation
shall be made a part of this permit.
14. The permittee shall commence actual construction in good faith within sixty (60) days
from the date of said permit approval and shall be complet'ed'within days.
15. Special conditions: See General Not s tpg
drawing attached,
16. Special instructions:
Submitted by: Board of County_ Commissioners, Place
Monroe Co. Pe it ee Corporate
Sea
i
• Signatu e and Title
Attested
Roadway construction is pro. ed,or ynde way Yes( ) No
Recommended for approval MAY 5 _ 1977
W r�1:V�t� $ }' Date Approved by: Vct *,V ,5 - 1977