Change Order No. 19A
CHANGE ORDER NO. 1 f
Project Title: Job No. 04-017.00
Completion of Interior Finishing for
Third Floor of the jail Addition (At
Jackson Square) Key, West, Florida
Contractor: Contract Date: January 5, 1988
Gomez Construction Company Notice to Proceed; February 5, 1988
Gomez Construction Co.
To: 1560 Cadiz Avenue
Coral Gables, Florida 33134
You are direc to make the changes noted below in the subject coact:
Attest: By:
ChairmaYi, Monr a ounty
Dater . - Board of ounty Commissioners
Approv s To Correctness an
Form
Approved By: By:
Project Director Attorney for Monroe Co my
Nature of the Change:
See Attachment "A"
The changes result in the following adjustment of Contract Price and Time:
Contract Price Prior to this Change Order: '$500.000.00
Net (Increase) (I>WWe`UU) Resulting from this Change Order: $ 44,300.00
Current Contract Price Including this Change Order: $544 , 300.00
Contract Time Prior to this Change Order: 120 days
Net (Increase) (DM&&MMO Resulting from this Change Order: 67 days
Current Contract Time Including this Change Order: 187 days
Current Contract Completion Date: August 10. 1988
Prepared by: C. Robert Rogers„ Jr. Post, Buckley, Schuh & Jernigan, Inc.
as Monroe County Consulting Engineers
Date: June 8. 1988
BY:
C. Robert Ro rs, . Project Manager
The Above C Accepted:.
Attest:
Contractor Repres ntative
Date: Title:i��S���ll"
GC/#76
11/14/83/REVISED 3/5/87
ATTACHMENT"A"
Completion of Interior Finishing for Third Floor of the Jail Addition
(at Jackson Square)
ITEMS FOR CHANGE ORDER NO. 1 TO EXISTING MASTER
CONSTRUCTION CONTRACT BETWEEN MONROE COUNTY AND
GOMEZ CONSTRUCTION, DATED JANUARY 5, 1988 TO
COMPLETE THE INTERIOR FINISHING FOR THIRD FLOOR OF THE
JAIL ADDITION (AT JACKSON SQUARE) KEY WEST, FLORIDA.
The changes are the results of previous B.O.C.C. action, User requests after
commencement of construction and modifications due to existing conditions. The
following items were approved by the Monroe County Board of County Commissioners
at their regular meeting June 7, 1988.
1.
2.
3.
4.
5.
6.
7.
8.
DESCRIPTION AMOUNT
Provide access doors between old jail and jail $ 20,167
addition at second level (Electric Control and
monitored).
Install roll -up door over entrance to elevator $ 4,945
on roof to weather proof shaft (Electric control
and monitored).
Add conduit and junction boxes for ten (10) $ 1,250
telephone outlets for prisoners access to
telephone.
Delete Spectra Glaze H for masonry block. $ (12,000)
Additional cost of selected hardware per Section $ 1,975
08711 Finish Hardware (Allowance) of the
Project Manual.
Removal of existing masonry column and
relocation of plumbing vent in isolation cell
Room No. 312.
Furnish and Install Upgraded Monitor Console
and Intercom.
Add 12 junction boxes for speakers in
dormitories (existing junction boxes too small).
$ 1,450
$ 20,500
$ 775
Page 1 of 2
DESCRIPTION
AMOUNT
9. Install 8 additonal 3/4" conduits for lighting
$ 1,475
and power circuits on third floor; 1 additional
1 1/2" conduit in first floor electrical room
and 2 additional 3/4" conduits from third floor
control room to first floor control room.
10. Delete 6 ceiling mounted smoke detectors and
$ 3,213
add 6 duct smoke detectors for the isolation cells.
11. Change electric control and monitor for Third
$ 550
Floor Exit Door to Fire Stairs from Second
Floor control room to Third floor control
room.
TOTAL AMOUNT PROPOSED CHANGE ORDER NO. 1 $ 44,300
A 67 calendar day time extension is proposed for this project based on the following:
1. Sixteen (16) calendar days allowed for 82 hours of actual work time delays
due to stop work orders by Judges due to noise interference with court
sessions and time delay caused by Monroe Construction's work to fill voids
in exterior walls.
2. Sixteen (16) calendar days allowed for the additional work required for
completion of the third floor.
3. Thirty (35) calendar days allowed for the installation of the roll -up door for
elevator and providing access between old jail and new jail at second level.
The present completion date is June 7, 1988. The 32 day time extension provided for
by Items 1 and 2 above would change the completion date to July 8, 1988 for the
interior finishing of the third floor of the jail addition. The additional 35 day time
extension provided for by Item 3 above would change the final completion date to
August 10, 1988.
BR/dmh
GC#25
Page 2 of 2