Change Order No. 38GC 4PPi(pV" 11-i-vt CHANGE ORDER NO. 3 Project Title: Completion of Interior Job No- 04-017.00 finishing for Third Floor of the Jail Addition (at Jackson Square) Key West, Florida Contractor: Gomez Construction Company Contract Date: January 5, 1988 Notice To Proceed: February 5, 1988 Gomez Construction Company TO: 1560 Cadiz Avenue Coral. Gabl Qs , Fl gi ja 33134 You are dire d to ma e the changes noted below in the s ject contact: Attest: �� By: -. Chairman, Ylonr ounty Date: / • Board of County Commissioners Approv A T Correctness and Form " Approved By: By: Project,I,X qt ,,, . Attorney for Monroe County (See Attachment "A") The changes result in the following adjustment of Contract Price and Time: Contract Price Prior to this Change Order: 1566 , 330.00 Net (Increase) (I11(99=0 Resulting from this Change Order: 23,003.50 Current Contract Price Including this Change Order: $589.333.50 Contract Time Prior to this Change Order: 187 Days Net (Increase) (1J1(i(X%WW Resulting from this Change Order: 66 Days Current Contract Time Including this Change Order: 253 nays Current Contract Completion Date: October 15; 1988 Prepared by: C . Robert Rogers. Jr. Post, Buckley, Schuh do Jernigan,. Ine- as Monroe County Consulting Engineers Date: November 2, 1988 The Above Changes are Accepted: Attest: Date: // / elks Con ctor' epresentative Title: 7- GC/#76 11/14/83/REVISED 3/5/87 ATTACHMENT "A" Completion of Interior Finishing for Third Floor of the Jail Addition (at Jackson Square) PROPOSED ITEMS FOR CHANGE ORDER NO. 3 TO EXISTING MASTER CONSTRUCTION CONTRACT BETWEEN MONROE COUNTY AND GOMEZ CONSTRUCTION, DATED JANUARY 59 1988 TO COMPLETE THE INTERIOR FINISHING FOR THIRD FLOOR OF THE JAIL ADDITION (AT JACKSON SQUARE) KEY WEST, FLORIDA. The changes are the results of requirements/requests by County Fire Marshal and User request after commencement of construction, modifications due to existing conditions and costs incurred by the Contractor due to Court/Commission ordered work stoppages. The following items were approved by the Monroe County Board of County Commissioners at their regular meeting held November 1, 1988. DESCRIPTION AMOUNT 1. Furnish and install monitor light for each dormitory and test buttom for each isolation cell tying fire alarm system into console. $ 4,341.25 2. Furnish and install three (3) additional Exit lights including conduit and conductors. $ 1,035.00 3. Furnish and install ten (10) additional fire sprinkler heads including piping (6 for isolation cells and 4 for corridor 320). $ 3,074.25 4. Deletion of 32 flush mounted sprinkler heads as called for by contract. $ (490.20) 5. Furnish 40 institutional type sprinkler heads (32 installed per contract and 8 for spares). $ 814.20 6. Furnish 50 institutional type sprinkler heads for install- ation by County Staff $ 324.00 (32 heads as replacement for existing heads painted by contractor - N/C). 7. Repair defective existing drain pan for A/C fan coil Unit #2. $ 195.00 8. Furnish and install six (6) three speed control fan relays for A/C fan coil units including conduit, conductors and hook-up existing fan motors. $ 4,816.20 9. Furnish and install (approx. 200 ft.) of conduit for speaker in dormitory 306; smoke detector for dormitory 304 and lights for corridor 302 (existing conduit blocked up and not useable). $ 759.00 hm/GC#120 Page 1 • ATTACHMENT "A" (CONTINUED) Completion of Interior Finishing for Third Floor of the Jail Addition (at Jackson Square) DESCRIPTION AMOUNT 10. Furnish and install conduit and conductors to supply current from first floor to existing electrical receptacles in hallway on second floor. $ 1,150.00 11. Furnish and install custom designed metal chase around exposed conduit in dormitories 304 and 306. $ 295.00 12. Cost incurred due to Court ordered work stoppage during installation of door on second floor. (includes equipment rental and labor losses). $ 3,072.00 13. Cost incurred due to Commission ordered work stoppage during installation of Fresh Air Vent on second floor (includes equipment rental and labor losses). $ 562.80 14. Additional cost of selected hardware per Section 08711 Finish Hardware (allowance) of the Project Manual. $ 2,675.00 15. Caulk around all light fixtures. N/C 16. Furnish and install removable 1/4" thick steel cover plates over opening around fire cabinets in hallway. $ 380.00 TOTAL AMOUNT DUE THIS CHANGE ORDER NO. 3 $ 23,003.50 hm/GC#120 Page 2