Loading...
02/16/2011 Task OrderDANNY L. KOLHAGE CLERK OF THE CIRCUIT COURT DATE: February 24, 2011 TO: Jerry Barnett, Director Project Management ATTN.• Ann Riger Contracts Administrator FROM: Pamela G. Hanc k, I C. At the February 16, 2011, Board of County Commissioner's meeting the Board granted approval and authorized execution of Item C13 Task Order (TO) with Bermello Ajamil & Partners, Inc. for engineering services to provide cost estimates and design of changes to Bernstein Park to raise the elevation to eliminate flooding and add a soccer field to the park (sharing space with softball). Attached is the electronic copy of the TO for your handling. Should you have any questions please do not hesitate to contact this office. cc: County Attorney Finance File TASK ORDER FOR ON CALL PROFESSIONAL ENGINEERING SERVICES BETWEEN MONROE COUNTY AND BERMELLO AJAMIL & PARTNERS, INC. FOR BERNSTEIN PARK ELEVATION & SOCCER FIELD This Task Order made on the 16 day of February 2011, in accordance with the Continuing Contract for On Call Professional Engineering Services made and entered on the 16 day of December 2009, and Amended on the 17 day of February 2010, between Monroe County hereinafter referred to as the "County" and Bermello Ajamil & Partners, Inc., hereinafter referred to as "Consultant" where construction costs do not exceed $2,000,000.00. All terms and conditions of the referenced Contract for On Call Professional Engineering Services apply to this Task Order, unless the Task Order modifies an Article of the Agreement of which will be specifically referenced in this Task Order and the modification shall be precisely described. The Scope of Work is divided into two parts: 1. Provide an initial cost estimate for raising the elevation of the northern part of Bernstein Park on Stock Island approximately 1 foot. The estimate should include the cost of fill, drainage as needed (a disposal well is part of the existing system), irrigation (if necessary), sod, replacement of the softball infield, backstops, and any other required ancillary facilities (lights may /may not have to be relocated). The initial feasibility review estimates the cost of the work as something less than $200,000.00. The object of the cost estimate is to confirm that the project costs are in a range that is within available finances before embarking on a detailed design. 2. Provide all design drawings and bid support services for the scope of work identified in the first phase. Background: Bernstein Park is a County owned facility located on Stock Island. It contains a softball field, a playground, walking track, and other facilities. It is subject to flooding both from heavy rain events and when tides are very high. This limits it use. The grant establishing the park requires that its use for softball be retained. The County has been approached by the Youth Soccer League in Key West and the City of Key West to make the park available for youth soccer because they have recently lost the use of some School District fields due to construction at the school which normally hosts the league. The flooding makes the park unreliable as an alternate. In the opinion of local officials and the County's Public Works Department, raising the level of the playing area by one foot would be adequate to eliminate the flooding problems. Compensation shall be as follows: • Civil Engineering Drawings Design through Bidding Phase $18,300.00 • Reimbursables Not to Exceed Total Fee 1,500.00 $19,800.00 Monthly invoices shall be submitted based on the percentage of completion. Civil Engineering Services will include: • Preparation of drawings and technical specifications for inclusion of bidding documents, which will include cover sheet, general notes, existing drainage conditions, proposed elevations and drainage improvements, and specifications for proposed surfaces. • Preparation of drawings required for submission to Department of Environment Resource Management (DERM) to obtain required permit. If additional deep well is proposed, preparation of drawings required for separate permit. • Preparation of drainage report documenting the existing field conditions, storage requirements for a 5 -year, 10- minute storm, and the backup documentation supporting proposed drainage. ESS WHEREOF, each party caused the Task Order to be executed by its duly authorized Itative. (SEAL) A NY L. KOLHAGE, CLERK f s r Deputy Clerk Date: 2. /14. Zo j I PR4 Name: ��-e ��-e✓ Title: Ulm - �tS� �T Date: 2 . 7 And B / Title: l O' ke /)c- C xyd t"lally Date: 07 f l BOARD OF COUNTY 0MMISSIONERS OF MONROE COUNTY, RI BY: r - 4 M or /C ai an rn :u CONTRACTOR Bermello jamil & Partners, Inc. 0 C N By: Print Name: 4v« k3AM )L Title: 1 g U r 2/07/2011 MONROE COUNTY ATTORNEY AP ROVED AS TO F �CJ1� �ilA�� / NATILEENE W. CASSEL ASSISTANT COUNTY ATTORNEY Date - :I 3 // .*z1`v� "Q ei /0 f 'VZ7.0 ,.. 56- O 12 >i - `t r- Tt ZD 0 O CD