Loading...
10/18/1995ffiAM&EnIunental Geotechnical Construction 6MMsulting • Engineering • Testing County of Monroe Construction Management 5100 College Road Key West, Florida 33040 Attention: Dear Mr. Bibo: MONROE COUNTY CONSTRUCTIOT A9 Received _2 1 ime A Mr. William A. Bibo Construction Manager September 25, 1995 F71 -,, CD CM 77 s F, �o Re: Proposal for, Subsurface Exploration and Foundation Evaluation HRS Building Marathon, Florida Proposal No. P-397-281 Professional Service Industries Inc. (PSI) is pleased to submit this proposal pertaining to geotechnical services for the above -referenced project. Included herein is a estimate of the work effort required to complete the geotechnical portions of the project, based on our understanding of the project. We have also included our anticipated approach. Our services will be provided in accordance with our agreement with Monroe County Board of County Commissioners. INTRODUCTION Project information was provided by Mr. William A. Bibo of the City of Monroe. The project will involve the construction a one-story HRS building with approximate plan dimensions of 90x60 feet. 10ortt ation n) Build On PSI •7950 N.W. 64th Street • Miami, FL 33166 • Phone 305/471-7725 • Fax 305/593-1915 HRS Building Proposal No. P-397-281 Structural information was not provided to us loads for the building area as follows: -2- However, we are assuming that the maximum ONE-STORY STRUCTURE Maximum Column Loads: 30 kips Maximum Wall Loads: 2 to 3 klf Floor Load: 150 psf SCOPE OF WORK Field Exploration Subsurface conditions within the structural footprints will be explored with a total of three (3) soil test borings. The borings will be located at the location indicated by the County of Monroe. The boring will be drilled each to a depth of 25 feet below existing ground surface. We understand that underground utility clearance will not be required to be cleared at the boring locations. The borings will be advanced with a truck mounted machinery using rotary drilling procedures. Samples of the in -place materials will be recovered with a standard split barrel drive with 140- pound hammer falling 30 inches (the Standard Penetration Test after ASTM D1586). Soil samples recovered in the field will be classified and placed in sealed glass containers for transport to our laboratory. There, an engineer will examine all samples and have a few selectively tested for physical properties, if required, including but not necessarily limited to gradation, moisture content and organic content. PSI has not had the opportunity to visit the site to assure that the site is accessible to our drilling equipment, however we are assuming that the site is accessible to our drilling equipment. V i HRS Building Proposal No. P-397-281 -3- Using the results of the field exploration, we will assess the geotechnical engineering impact of the subsurface conditions on the planned construction and provide recommendations for foundation design and related construction. A report of our findings and recommendations will be submitted at the conclusion of the study. The report will specifically contain: Engineering Evaluation and Reporting • A plan of the site showing the locations of the borings • Logs of the exploratory borings which furnish the results of the Standard Penetration Tests. • Identification of the foundation systems which lend themselves to the site conditions and proposed structure. • An evaluation of the alternative foundation systems in terms of their constructibility, and reliability. • A recommendation for a preferred foundation system or systems. • Requirements for foundation preparation • An anticipation of groundwater levels and methods for handling groundwater during construction. • Recommendations for foundation design • A forecast of foundation settlements SCHEDULE Our study can be performed immediately after authorization to proceed. Given the scope described herein, we can complete the field studies within one working day. We will then submit a written engineering report within 7 working days following the field demobilization. Assuming that we will be allowed to perform the study as a fairly continuous effort, we suggest assuming a 2 week period for our work. MV.SE181 HRS Building Proposal No. P-397-281 COMPENSATION 0 Based on our general knowledge of the subsurface conditions of the site and an interpretation of your requirements, we are willing to complete the surface exploration employing one soil boring for a lump sum of $2,185.00. A breakdown of the fee for the Prescribed Program is provided on Attachment 1. PSI appreciates your consideration of firm to undertake this project. To formally authorize us kindly indicate so by signing and returning the Acceptance copy required. We are pleased to be a part of your team for this interesting and important project. If you have any questions, please do not hesitate to contact us. Sincerely, PROFESSIONAL SERVICE INDUSTRIES, INC. Alex R. Montenegro Project Geotechnical Engineer ARM/HES/em Attachment: Attachment 1 - Lump Sum Hugo . Soto, P.E. Branch Manager AGREED TO TIIIS{% DAY OF dctoder 1995 PLEASE PRINT NAME: SHIRLEY FREEMAN, MAYOR/CHAIRMAN ( SEAL) DA"T n lsm FrNm.mrW ATTEST: BY: wki,,mjDEPUTY CLERK AMAM; Alp GAL AS TO FORM GAL FFI B ROBERT N. W F DATE ATTACHMENT I ESTIMATED FEES b.57298 ATTACHMENT 1 FEE BREAKDOWN HRS Building Marathon, Florida Proposal No. P-397-281 Page 1 of 2 I. Field Exploration A. Drill rig mobilization 1 mobilization @ $200.00/each $500.00 B. Rotary drilling with SPT sampling Three borinsg 25 feet deep Total 75 Feet 75' from 0 to 50' @ $10.00/ft. $750.00 C. Boring layout by drilling crew 1 hour @ $50.00/hour $50.00 Subtotal Field $1,300.00 II. Laboratory Testing A. Staff Engineer (soil classification) - Estimate 1.0 hour @ $50.00/hour $50.00 B. Moisture Content Tests - Estimate 1 test @ $5.00/test $5.00 C. Grain Size Distribution Tests - Estimate 1 test @ $45.00/test $45.00 D. Organic Content Tests - Estimate 1 test @ $25.00/test $25.00 Subtotal Laboratory $125.00 Psi ATTACHMENT 1 FEE BREAKDOWN HRS Building Marathon, Florida Proposal No. P-397-281 Page 2 of 2 III. Office Engineering Evaluation and Reaortin 1. Project Engineer, P.E. - Estimate 2 hours @ $95.00/hour 2. Staff Engineer, P.E. - Estimate 10 hours @ $75.00/hour 3 0 Zvi Clerical - Estimate 2 hours @ $30.00/hour Drafting - Estimate 2 hours @ $30.00/hour Subtotal Engineering JOB TOTAL $140.00 $500.00 $60.00 G..1 11 $760.00 $2,185.00