HomeMy WebLinkAboutSupplement No. 5SUPPLEMENTAL AGREEMENT NO. 5
TO CONSULTANT AGREEMENT
This Supplemental Agreement, made and entered into this 12th
day of August 1980, by and between:
THE BOARD OF COUNTY COMMISSIONERS
OF MONROE COUNTY, FLORIDA
(hereinafter referred to as "County")
and
M. VINCENT PROTHEROE, P.E.
Consulting Engineer
123 N. W. 23rd Street
Gainesville, Florida 32607
(hereinafter referred to as "Consultant")
WITNESSETH:
In accordance with the Consultant Agreement dated the 3rd
day of June, 1980, by and between the Board of County Commis-
sioners of Monroe County, Florida, (County), and M. Vincent
Protheroe, P.E. (Consultant), under Article 1. - Scope of Service,
Consultant hereby presents a scope of engineering services for
an Alignment Study to define the horizontal geometrics of the
road which is proposed to follow the existing 30 foot easement
South of 5th Avenue on Stock Island, known as Shrimp Road.
A. SERVICES
This study will require the consideration of a design vehicle
and a design speed, with geometrics suitable to provide a safe
roadway therefor. While the proposed alignment will follow the
30 foot easement insofar as possible, the study will identify and
describe portions of private land ownership which must he acquired
to accommodate the alignment selected. The descriptions so obtained
will be used by the County Legal Staff in ascertaining ownership
and determining the cost of right-of-way acquisitions. This cost
information can then be combined with a construction cost estimate
(the next step recommended in the development of this project ) when
requested by the County Commission.
The results of this alignment study will be summarized in a
letter engineering report which will fully describe the alignment
selected, relate the selected alignment to private property owner-
ship, and provide descriptions of land which must be acquired. It
Page 1 of 3 Pages
will be illustrated by drawings detailing intersections and
other significant features.
While this study is an important first step in developing
a construction cost estimate, it must be supplemented by soil
investigations and borings to determine subsurface conditions
before such an estimate can be prepared.
B. SCHEDULE
1. This alignment study is to be completed within sixty
(60) days from the date hereof.
2. Prepare fifteen (15) copies of the report and a personal
presentation of the study findings to the County representative(s)
designated.
C. COMPENSATION
Based on the use of Method II as described in our Consultant
Agreement, i.e. Direct Personnel Expense times a Multiplier, the
fee for the alignment shall not exceed Two Thousand Seven Hundred
and No/100 Dollars ($2,700.00), without further specific authori-
zation.
Additionally, the County will reimburse the Consultant for
sll out-of-pocket expenses as provided in Article 8 of the Basic
Agreement.
D. TERMINATION
This Supplemental Agreement may be terminated by either party
giving thirty (30) days notice in writing to the other party. In
the event of notice of termination, the Consultant shall do no
further work, and he shall be paid for all work then in progress
up to the date of termination.
IN WITNESS WHEREOF, the parties have caused these presents
to be executed the day and year first above written.
Signed, Sealed, and Delivered
in the Presence Of:
BOARD OF COUNTY COMMISSIONERS
OF MONROE NTY O+RIDA
By
airman
(Seal)
Attest-:
Cler
Page 2 of 3 Pages
Signed, Sealed, and Delivered
in the Presenc"f:
M. VINCENT PROTHEROE, P.E.
Consulting Engineer
r
M. Vincent Pro eroe, P.E.
Page 3 of 3 Pages