1st Change Order 01/19/2011Item
Description
Unit
Quantity
Unit Price
CHANGE
-
OWER ❑
cy
23443
ORDER
93 772.00
ARCHITECT El
R ndl' Material
cy
23443
4.00
CONTRACTOR ❑
-. Total
ALA DOCUMENT G701
FIELD ❑
W5
OTHER ❑
PROJECT:
Runway Safety Area
CHANGE ORDER NUMBER:
1
(name, address
Improvements.
3491 South Roosevelt Blvd.
DATE:
December 7 2
10
Key West, Florida 33040
ARCHITECT'S PROJECT NO:
CONTRACT DATE:
TO CONTRACTOR:
Quality Enterprises USA, Inc.
(name, address
3894 Mannix Dr. Suite 216
CONTRACT FOR:
$ 2,296,711.98
Naples, Florida 34114
p:
Q
U
The Contract is changed as follows: Modifications requested by the owner to remove additional muck material.
w
sz
Item
Description
Unit
Quantity
Unit Price
Subtotal
1
Unsuitable Excavation
cy
23443
4.001$
93 772.00
20
R ndl' Material
cy
23443
4.00
93 772.00
-. Total
Al
W5
LLJ X:
cc: WX
cD
U_
CC
Not v0d u* sighed J k�ji.the Owner, Architect, and Contractor.
LLJ
_j — < -
The original (Contract Sum) (Guaranteed Maximum Price) was ......................... ..............................$ 2,296,711.98
Net change by previously authorized Change Orders ............................................ ............................... S 0.00
The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was ....................$ 2,296,711.98
The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased)
(unchanged) by this Change Order in the amount of .............................................. .............................. 187 544.00
The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be ... S 2,484,255.98
The Contract Time will be (increased) (unchanged) by Forty-Five (45) days
The date of Substantial Completion as of the date of this Change Order therefore is March 22, 2011.
NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed
authorize onstruction Change Directive until the cost and the ti ;changfc nt ractor case a change order is execute rsede the con
- 7 7, r� �' / h ENGIN R TRA URS Co orati n Quality Enterprises USA, Inc.
00ft CLEPM
a f
rice which have been
both the owner and
Address Address Address �
7650 Corporate Center Drive 3894 Mannix Dr. Suite 216 ��U4 �� ' ,, 'F'1r 0 4"
Suite 400 Naples, Florida 34114 /� �C FL !27,1-/d
Miami, F133126 -1220
X Y Andres Gutierrez, PE BY Louis J. Gaudio, VP BY
DATE December 7, 2010 DATE ► 2/1 + o DATE
M CAUTION: You should sign an original AIA document that has this caution pr nt d in ref. �A
.-assures-that-Changes; will not be obscured as may occur when documents are reproduced. `
AIA DOGU4f1 N" G'6! a
FE - 3 2011
i
CLEAR
7 -ORDER a 1987 EDITION a AIA • 01992 • THE \
CTS, 1735 NEW YORK AVE. NW, WASHINGTON D.C. 20006 f
G701-198 )
JAN i 2011 (� /
A- - v
— IgF:\keywest\ RSA \New RSA (11- 26 -07jtUocuments(511 CO #2(12-07 =10).oc
Mayor H ath r arruthers
Januar 19, 11
QE '
t3UALITY
ENTERPRISES
U 5 A C .
December 7, 2010
SENT VIA E Mail: Andres_Gutierrez @URSCorp.com
Mr. Andres Gutierrez P.E
URS Corporation
7650 Corporate Center Dr, Suite 400
Miami, Florida 33126 -1220
RE: Monroe County
Key West International Airport
Change Order Request for Additional Muck Removal
Dear Mr. Gutierrez:
Quality Enterprises USA, Inc. respectfully request a change order in the amount of One
Hundred Eighty Seven Thousand Five Hundred Forty Four and 00 /100 dollars
($187,544.00) for the removal of addition muck discovered during construction at both
the east and west end of the project limits.
Area #1 located at the east end of the project is a 200ft x 300ft x 6ft deep area which
equates to 11,111 cy. Area #2 and #3 are at the east end of the project and measure 400ft
x 100ft x 6ft deep and 31 Oft x 50ft x 6ft deep, totaling 12,332 cy, for a total combined
volume of 23,443 cy.
Su mmary:
Unsuitable excavation - 23,443cy x $4.00 cy = $93,772.00
Rehandling Material - 23,443cy x $4.00 cy = $93,772.00
Grand Total - $187,544.00
In addition, we would like to request an extension of 45 days for this additional work.
Upon your approval and direction, we will proceed with removal of this muck material.
Please contact me directly should you need any additional information.
Very truly..yours.,...- ._ -...
Louis J. Gaudio
Vice President - Project Management
Cc: Mr. Peter Horton - KWIA Airport Director
208 Tintern Court
3894 Mannix Drive, Suite 216
Chesapeake, VA 23320
Naples, FL 34114 -5406
(757) 548 -8000
(239) 435 -7200
Fax (757) 548 -2600
Fax (239) 435 -7202
Lic# CBCA57231
QE
QUALITY
ENTERPRISES
U s n c .
January 6, 2011
SENT VIA FED EX OVERNIGHT
April Pearson
Senior Administrator - Airport Business
Key West International Airport
3491 South Roosevelt Boulevard
Key West, Florida 33040
305- 809 -5204 direct
RE: Monroe County
Key West International Airport
Change Order Request for Additional Muck Removal
Dear April:
Please find attached Change Order #1 and original change order request letter for the
above referenced project.
Please contact me directly should you need any additional information.
Ver
Louis J. Gaudio
Vice President - Project Management
208 Tintern Court 3894 Mann ix Drive, Suite 216
Chesapeake, VA 23320 Naples, FL 34114 -5406
(757) 548 -8000 (239) 435 -7200
Fax (757) 548 -2600 Fax (239) 435 -7202
Lic# CBCA57231