Change Order No. 1[7 CHANGE ORDER NO. 1 Monroe County Justice Building 04-016.90 tractor tractDate: Hewett -Kier Construction, Inc. May 19, 1986 To: Hewett -Kier Construction, Inc. 1888 N.W. 23rd St. Pompano Beach, Fla. 33069 You are directed to make the changes noted below in the subject contract: Attest: Date: Feature of the Change: (See Attachment "A") By: Char es Dent fierce, erector Title: Monroe County Public Works Dept. Approved As To Correctness and Form By: ttorney for Monroe County The changes result in the following a ent of Contract Price and e: Contract Price Prior to this Change Order: Change Order: Net (Increase) (iSt141tK!("q) n6 from this Current Contract Price Including this Chang6 Order: Contract Time Prior to this Change Order: Net (Increase) (I1*11V, XA0 Resulting from this Change Order: Current Contract Time Including this Change Order: Prepared by: Robert Zuccaro, P.E. Date: September 29 1986 The Above Changes are Accepted: Attest: I,r Date: GC/t18 Post, as M4 _ $ 1,620,000.00 79,773.11 270 days 30 days 300 days an, Inc. Engineers ATTACHMENT "A" MONROE COUNTY JUSTICE BUILDING CHANGE ORDER NO. 1 (Items 1-7 are those which were deleted from initial bid) 1. Item # 9, add carpet per original bid. 2. Item #10, omit VAT which was substituted for all carpet areas. 3. Item #19, add white oak doors with applied moldings per original bid. 4. Item #22, add HVAC controls per original bid. 5. Item #29, add original concrete drainage trough 2'-4" deep and 16" wide to collect additional stormwater runoff from existing courthouse parking lot; omit substituted corrugated slot drain. 6. Item #30, add finished hardware per original bid. 7. Item #31, add light fixtures per original bid. 8. Deduct tax fees and permits. 9. Re -design and install A/C to a split unit system per suggestion of Charles McCoy and Associates and outlined in previous correspondence/drawings. 10. Add floors, doors, lights in storage rooms created by utilizing split unit A/C system described in #9 above. 11. Add 8,000 S.F. of hardwood paneling (An allowance of $40 per sheet of paneling purchase). 12. Re-routing of elevator sump drain lines; omit 3" floor drain and 211 dry vent in water heater room 101; add drain pan under water heater. 13. Add concrete fill in interior block wall in 1st floor laboratory, storage room and the 2nd floor armory per request of City of Key West inspector. 14. Additional excavation required due to encountering organic and debris material from the demolition operations beneath the old U.S.O. building in a location where it was not possible to obtain pre -design borings.