Change Order No. 1r' CHANGE ORDER NO. 1 ' Project Title: Revovati on of First Floor Job No. 04-017.10 Courthouse Annex Building, Key West, Florida Contractor: Hewett -Kier Construction, Inc. Contract Date: April 19, 1988 Notice To Proceed: May 25, 1988 Hewett -Kier Construction, Inc. To: 1888 N.W. 23rd. Avenue Pompano Beach, Florida 33069 You are directed to make the changes noted below in the subject contract: Attest: By: �� >•�.j �/ Chairm , Monr ounty Date:4&-"VEb //_/- g Board of County Commissioners Approve o Correctness and Form Approved By: By: Lxl_� Project Director Attorney for Monroe County Nature of the Change: (See Attachment "A") 3 z o � Z_ r— rn C) n`1 .1 �- � ." C7 The changes result in the following adjustment of Contract Price and Time: Contract Price Prior to this Change Order: $301 , 783.00 Net (Increase) ( mmit) Resulting from this Change Order: 8,933.63 Current Contract Price Including this Change Order: $310,71'6.63 Contract Time Prior to this Change Order: 200 Days Net (Increase) (fie) Resulting from this Change Order: -25 Days Current Contract Time Including this Change Order: 225 Days Current Contract Completion Date: January 17,� 1989 Prepared by: C. Robert Rogers, Jr. Post, Buckley, Schuh & Jernigan, Inc. as Monroe County Consulting Engineers Date: _November 2, 1988 C. Robert R Qers. Jr. Proiect Manaaer The Above Changes /are �Accepted: Attest: ontractor's Representative � GC/#76 11/14/83/REVISED 3/5/87 President ' Attachment A Renovation of First Floor of Courthouse Annex Building at Jackson Square Key West, Florida. PROPOSED ITEMS FOR CHANGE ORDER NO. 1 TO EXISTING MASTER CONSTRUCTION CONTRACT BETWEEN MONROE COUNTY AND HEWETT-KIER CONSTRUCTION, INC., DATED APRIL 19, 1988 FOR RENOVATION OF FIRST FLOOR COURTHOUSE ANNEX BUILDING KEY WEST, FLORIDA. The changes are the results of users requests after commencement of construction and modifications due to existing conditions. The following items were approved by the Monroe County Board of County Commissioners at their regular meeting November 1, 1988. Description Amount 1. Double Fur Walls, remove two existing windows block in $ 569.69 openings and stucco exterior area. 2. Relocate existing fire line for hose cabinet to clear A/C $ 176.55 duct for courtroom. 3. Delete six (6) round recessed light fixtures for Jury $ (425.00) deliberation room. 4. Furnish and Install two Acme Wrap -around lamp fixtures $ 373.45 (surface mount) for Jury Deliberation Room. 5. Furnish and Install two additonal Exit lights in lobby $ 400.00 area. 6. Add drop for A/C in holding room and ceiling grill for $ 458.79 existing exhaust for clerk's bathroom. 7. Reroute existing additional PVC Floor drain discharge $ 2,087.60 piping (not shown on original plans) 8. Demolition and Renovation for bathroom for clerk's area $ 5,779.70 including new plumbing. 9. Credit for existing acorn jail commode/lavatory combination $ (1,200.00) 10. Additional cost of selected hardware for Booking area as per $ 712.85 Section 08711 Security doors finish hardware (Allowance) Addendum No. 1 of the Project Manual. TOTAL AMOUNT PROPOSED CHANGE ORDER NO. 1 $ 85933.63 A twenty-five (25) calendar day time extension is proposed for this project based on the additional work required and time delay encountered in obtaining City permits. The present completion date is December 23, 1988. The additional 25 day time extension would change the final completion date to January 17, 1989. BR/mmc hm/GC#120