Change Order No. 32-001-001 •
C H A N G E O R D E R
Project: FIRE FACILITY ROOF REPAIRS Change Order Number: 32- 001 -001
To Contractor: PAGE BUILDING SYSTEM Change Order Date: 12/09/93
P.O. BOX 106
KEY LARGO, FL Architect's Project #:
33037
Contract For: FIRE FACILITY ROOF REPAIRS
Contract Date: 10/20/93
You are directed to make the following changes in this contract; all other provisions of the contract shall, except as
specifically changed herein, remain in full force and effect.
Issue: 001 - MARATHON 1 /KEY LARGO AMBULANCE ROOF
In accordance with the attached scopes of work and sketches, perform the described roof repairs at
the Marathon Fire Station No. 1 and Key Largo Ambulance Corps.
1Ct n
rn
.c:.
-N : :j
Contractor agrees to accept this LUMP SUM CHANGE ORDER as FINAL SETTLEMENT for this extra work and all related impacts
due to this contract change for the LUMP SUM AMOUNT of $ 35,915.00 and 28 days.
The Original Contract Amount was S 61,479.00
Net Change by Previously Authorized Change Orders S 0.00
The Contract Amount prior to this Change was S 61,479.00
The Value of this Change Order is S 35,915.00
The New Contract Amount including this Change Order will be S 97,394.00
The Contract Time will change by 28 days
The Date of Substantial Completion as of the Date of this Change Order is 01/28/94
Recommended by Construction Manager: Approved by Architect:
Morrison - Knudsen /Gerrits
5090 College Road
Key West, Fl= 33040
dllklbt— —usher s ligh.
D- e By Date
Agreed to by Contractor: Authorized by Owner:
PAGE BUILDING SYSTEM Monroe Co ,ty Board of County Commissioners
P.O. BOX 106 500 Whi - ad Street
KEY LARGO, FL Key W- la 330,-
_! i
• 49 Nory/ ice- -3
= 111111" Date By - /Chairman Date
Approved As To Form And al f iciency: A Jr Da ny L. Kolhage, Clerk
rOr AP BY i' �/_ Lo ,:d,L By Cala C. 460"00:0
County A Office Deputy C k
Date 7 I / 93 Date I Z 2 Z' 1 3
Not valid unless signed by the Owner, the Architect, and the Construction Manager. Signature of the Contractor
indicates agreement herewith, including any and all adjustments in Contract Sum and /or Contract Time.
•
Marathon Fire Station No. 1
General Scope of Work
1) Remove and properly dispose of all existing roofing materials
from roof deck and all parapets
2) Remove all pitch pans, abandoned conduit stubs, anchor stubs
and insulated anchor from roof deck and parapet. Patch in a
manner which is acceptable to the Owner's Representative.
3) Remove curb with plywood cover and properly frame -in and patch
opening in a manner which is acceptable to the Owner's
Representative.
4) Install appropriate base sheets and a 3/4" buffer /insulation
sheet to the roof deck per the roofing system Manufacturer's
printed instructions.
5) Install all cant strips (min. of all horizontal to vertical
surfaces), flashings for full height of all parapets, new lead
flashing for vent stack, new approved metal cap flashing
( "Colorclad or equal - User to chose color) for atop all
parapets and new approved metal drip edge at southern edge of
roof.
6) Install approved modified bitumen roofing system per the
Manufacturer's printed instructions, providing for all
necessary detailing and caulking.
•
• .
T
I
T ‘� t O i 18 = r r N 1 � �p �L
u. ii a
c
P. 1y
. 1 " -
.r ' K Z
all t
.4 1. „
0 t Z.O� ` C
ilc. V1 • ` t ~
k
kk
z i a . ��
•
w M .4 •
V �‘ s
w
s a
4 V qt �a qt
Key Largo Ambulance Corps
General Scope of Work
1) Remove and properly dispose of all asphalt shingles, base
sheet and metal drip edge.
2) Dry -in roof deck utilizing a 30# felt.
3) Scrape existing facia and paint all facia with one undercoat
and two finish coats. Color to be selected by User.
4) Install new aluminum drip edge.
5) Install new approved three tab asphalt shingles over base
sheet per shingle Manufacturer's printed instructions with a
minimum of six nails per shingle.
6) Provide proper detailing for roof ventilators and
penetrations.
7) Provide new lead flashings for vent stacks.
•