Change Order No. 32-001-001 • C H A N G E O R D E R Project: FIRE FACILITY ROOF REPAIRS Change Order Number: 32- 001 -001 To Contractor: PAGE BUILDING SYSTEM Change Order Date: 12/09/93 P.O. BOX 106 KEY LARGO, FL Architect's Project #: 33037 Contract For: FIRE FACILITY ROOF REPAIRS Contract Date: 10/20/93 You are directed to make the following changes in this contract; all other provisions of the contract shall, except as specifically changed herein, remain in full force and effect. Issue: 001 - MARATHON 1 /KEY LARGO AMBULANCE ROOF In accordance with the attached scopes of work and sketches, perform the described roof repairs at the Marathon Fire Station No. 1 and Key Largo Ambulance Corps. 1Ct n rn .c:. -N : :j Contractor agrees to accept this LUMP SUM CHANGE ORDER as FINAL SETTLEMENT for this extra work and all related impacts due to this contract change for the LUMP SUM AMOUNT of $ 35,915.00 and 28 days. The Original Contract Amount was S 61,479.00 Net Change by Previously Authorized Change Orders S 0.00 The Contract Amount prior to this Change was S 61,479.00 The Value of this Change Order is S 35,915.00 The New Contract Amount including this Change Order will be S 97,394.00 The Contract Time will change by 28 days The Date of Substantial Completion as of the Date of this Change Order is 01/28/94 Recommended by Construction Manager: Approved by Architect: Morrison - Knudsen /Gerrits 5090 College Road Key West, Fl= 33040 dllklbt— —usher s ligh. D- e By Date Agreed to by Contractor: Authorized by Owner: PAGE BUILDING SYSTEM Monroe Co ,ty Board of County Commissioners P.O. BOX 106 500 Whi - ad Street KEY LARGO, FL Key W- la 330,- _! i • 49 Nory/ ice- -3 = 111111" Date By - /Chairman Date Approved As To Form And al f iciency: A Jr Da ny L. Kolhage, Clerk rOr AP BY i' �/_ Lo ,:d,L By Cala C. 460"00:0 County A Office Deputy C k Date 7 I / 93 Date I Z 2 Z' 1 3 Not valid unless signed by the Owner, the Architect, and the Construction Manager. Signature of the Contractor indicates agreement herewith, including any and all adjustments in Contract Sum and /or Contract Time. • Marathon Fire Station No. 1 General Scope of Work 1) Remove and properly dispose of all existing roofing materials from roof deck and all parapets 2) Remove all pitch pans, abandoned conduit stubs, anchor stubs and insulated anchor from roof deck and parapet. Patch in a manner which is acceptable to the Owner's Representative. 3) Remove curb with plywood cover and properly frame -in and patch opening in a manner which is acceptable to the Owner's Representative. 4) Install appropriate base sheets and a 3/4" buffer /insulation sheet to the roof deck per the roofing system Manufacturer's printed instructions. 5) Install all cant strips (min. of all horizontal to vertical surfaces), flashings for full height of all parapets, new lead flashing for vent stack, new approved metal cap flashing ( "Colorclad or equal - User to chose color) for atop all parapets and new approved metal drip edge at southern edge of roof. 6) Install approved modified bitumen roofing system per the Manufacturer's printed instructions, providing for all necessary detailing and caulking. • • . T I T ‘� t O i 18 = r r N 1 � �p �L u. ii a c P. 1y . 1 " - .r ' K Z all t .4 1. „ 0 t Z.O� ` C ilc. V1 • ` t ~ k kk z i a . �� • w M .4 • V �‘ s w s a 4 V qt �a qt Key Largo Ambulance Corps General Scope of Work 1) Remove and properly dispose of all asphalt shingles, base sheet and metal drip edge. 2) Dry -in roof deck utilizing a 30# felt. 3) Scrape existing facia and paint all facia with one undercoat and two finish coats. Color to be selected by User. 4) Install new aluminum drip edge. 5) Install new approved three tab asphalt shingles over base sheet per shingle Manufacturer's printed instructions with a minimum of six nails per shingle. 6) Provide proper detailing for roof ventilators and penetrations. 7) Provide new lead flashings for vent stacks. • N 0 v '•a ❑ a r wit % r ❑ 0 r►` _ CC r V W " a VI X Q �