2nd Change Order 06/15/2011 DANNY L. KOLHAGE
CLERK OF THE CIRCUIT COURT
DATE: August 23, 2011
TO: Peter Horton, Director
of Airports
April Pearson - via e-mail
FROM: Pamela G. Hance4i.C.
At the June 15, 2011, Board of County Commissioners meeting, the Board granted
approval and authorized execution of Item C35 Change Order #2 from Quality Enterprises USA
for the Runway Safety Area project at the Key West International Airport.
Although the time stamp indicates July 20th, this document was not sent out until today
due to the lack of current insurance. Should you have any questions, please feel free to contact
our office.
cc: County Attorney via e -mail
April Pearson via e-mail
Finance
File
CHANGE
ORDER
ALA DOCUMENT G701
OWER
❑
ARCHITECT
❑
CONTRACTOR
❑
FIELD
❑
OTHER
❑
PROJECT: Runway Safety Area
(name, address) Improvements.
3491 South Roosevelt Blvd
Key West, Florida 33040
CHANGE ORDER NUMBER: 2
DATE: May 26, 2011
ARCHITECT'S PROJECT NO: 12639185.00000
CONTRACT DATE:
TO CONTRACTOR: Quality Enterprises USA, Inc.
(name, address) 3894 Mannix Dr. Suite 216 CONTRACT FOR:
Naples, Florida 34114
The Contract is changed as follows: Modifications requested by the owner.
Item
Description
Unit
Quantity
Unit Price
Subtotal
1
Credit for Runway Pavement Grooving
s
-473
$ 18.00
$ 8 514.0
2
Credit for Chain -Link Fence
If
-427.5
$ 25.00
$ (110,688.0
3
Credit for Unsuitable Excavation
c
-12545
$ 4.00
$ 50 180.00
4
Credit for Rehandling Material
c
-12545
$ 4.00
$ 50 180.00
5
Credit for Final Markin
sf
-31043
$ 2.00
$ 62 086.00
6
Credit for Outline Black Paint
sf
-15684
$ 1.50
$ 23 526.00
7
Credit for Staked Silt Fence
If
-3000
1.00
(3,000.00
8
Additional Floatinn Turbidity Barrier
If
3000
$ 9.00
$ 27
9
Additional Rubber Removal
Is
1
$ 24 570.00
$ 24,570. -
10
Additional Unclassified Excavation
c
5391.6
8.60
46 367.67'
Total
,
Not valid until signed by the Owner, Architect, and Contractor.
10 -21 -2009
$ 2,296,711.98
The original (Contract Sum) (Guaranteed Maximum Price) was ......................... ..............................$ 2,296,711.98
Net change by previously authorized Change Orders ............................................. .............................. 187,544.00
The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was .................... $ 2,484,255.98 -
The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased)
(unchanged) by this Change Order in the amount of .............................................. .............................. (110 236.33)
The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be ... S 2,374,019.6
The Contract Time will be (increased) (unchanged) by Fifty One (51) days `
The date of Substantial Completion as of the date of this Change Order therefore is May 12, 2011.
NO This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximb*: s ..
authorized by Construction Change Directive until the cost and the time have been agreed upon lid "`
cor ractor on which case a change order is executed to supersede the construction change direc ve.
K4 �n
ENGI 'EER NTR-�CTOR OWNE
URS orporation Quality Enterprises USA, Inc. Monro C n BOCC
Address Address Addr s
7650 Corporate Center Drive 3894 Mannix Dr. Suite 216 1100 Simonton Street
Suite 400 Naples, Florida 34114 Key West FL 33040
Miami, F133126 -1220
BY Andres Gutierrez, PE BY • V BY
I�OJZs
DINE May 26, 2011 DATE o DATE
a=nill sign an original AIA current that has this caution
t
r not be obscured as may occur when documents are
AIA AMERICA14 I ^I TSTITti"1tAW:1$CI&TP7( 1,11 3R VF;� AVE. NW,•WASHI \G 01
N D.C. 20006
and
Mayor Heather Carruthe
06/15/2011
printed in red. An original
- eproduced.
G701 -1987
pocuryents and Settings\horton- peter \Local Settings \Temporary Internet Files \Content.Outlook \TOQ2Y3QO \Change Order # 2rev (526- 11).doc
I, 3311
c—
M
r
0
0
r"
••
C)
M
tV
'a
The original (Contract Sum) (Guaranteed Maximum Price) was ......................... ..............................$ 2,296,711.98
Net change by previously authorized Change Orders ............................................. .............................. 187,544.00
The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was .................... $ 2,484,255.98 -
The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased)
(unchanged) by this Change Order in the amount of .............................................. .............................. (110 236.33)
The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be ... S 2,374,019.6
The Contract Time will be (increased) (unchanged) by Fifty One (51) days `
The date of Substantial Completion as of the date of this Change Order therefore is May 12, 2011.
NO This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximb*: s ..
authorized by Construction Change Directive until the cost and the time have been agreed upon lid "`
cor ractor on which case a change order is executed to supersede the construction change direc ve.
K4 �n
ENGI 'EER NTR-�CTOR OWNE
URS orporation Quality Enterprises USA, Inc. Monro C n BOCC
Address Address Addr s
7650 Corporate Center Drive 3894 Mannix Dr. Suite 216 1100 Simonton Street
Suite 400 Naples, Florida 34114 Key West FL 33040
Miami, F133126 -1220
BY Andres Gutierrez, PE BY • V BY
I�OJZs
DINE May 26, 2011 DATE o DATE
a=nill sign an original AIA current that has this caution
t
r not be obscured as may occur when documents are
AIA AMERICA14 I ^I TSTITti"1tAW:1$CI&TP7( 1,11 3R VF;� AVE. NW,•WASHI \G 01
N D.C. 20006
and
Mayor Heather Carruthe
06/15/2011
printed in red. An original
- eproduced.
G701 -1987
pocuryents and Settings\horton- peter \Local Settings \Temporary Internet Files \Content.Outlook \TOQ2Y3QO \Change Order # 2rev (526- 11).doc
I, 3311