Loading...
1st Change Order 02/10/1999 C t -4 . ••C'e COUNTr ; • flannp 1. Rotbage BRANCH OFFICE CLERK OF THE CIRCUIT COURT BRANCH OFFICE 3117 OVERSEAS HIGHWAY MONROE COUNTY 88620 OVERSEAS HIGHWAY MARATHON, FLORIDA 33050 500 WHITEHEAD STREET PLANTATION KEY, FLORIDA 33070 TEL. (305) 289-6027 KEY WEST, FLORIDA 33040 TEL. (305) 852 -7145 FAX (305) 289 -1745 TEL. (305) 292 -3550 FAX (305) 852 -7146 FAX (305) 295 -3660 MEMORANDUM TO: Dent Pierce Director of Public Works FROM: Ruth Ann Jantzen, Deputy Clerk ,.RA/ DATE: March 4, 1999 On February 10, 1999, the Board of County Commissioners granted approval and authorized execution of Change Order No. 1 to D. L. Porter Construction, Inc., for modification to the Crawl Key Fire Training Facility, in the amount of $33,904.00. Enclosed please find a fully executed copy of the above change order for return to D. L. Porter. If you have any questions on the above, please do not hesitate to contact this office. Enclosure cc: County Attorney Finance County Administrator, w/o document File MONROE COUNTY ENGINEERING/CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER �o - n PROJECT TITLE: Crawl Key Fire Training Facility ' .12 (- CHANGE ORDER NO: 1 ' 43 t7 c> rnn Total Previous Change Orders $ 0.00 ?: • r Current Change Order $33.904.00 :< r o Original Purchase Order Amount $54.860.00 r Revised Purchase Order Amount $88.764.00 v rn CD C3 Detailed description of change order and justification: On June 10. 1998. BOCC granted approval to issue a purchase order to D.L. Porter Construction, Inc. in the amount of $54.860.00 for additions and modifications to the Crawl Key Fire Training Facility. The original plans underestimated the length of water line needed and an additional 575' of 6" line is necessary to complete the project. The total cost of the additional water line. meter and backflow preventer assembly. and installation is $33.289.00. Change Order No. 1 also includes extending the concrete slab from 40' to 60'. and adding auger piles as required by the Building Dept. for a total cost (including hardware and electrical disconnect) of $7,162.00. Change Order No. 1 also includes a credit of $6.547.00 for conex boxes that were supplied by Fire Rescue. Change Order No. 1 therefore nets in a total cost of $33.904.00. and increases the project from $54.860.00 to $88.764.00. CONTRACTOR: / / ' / /20 ! D.L. t er C. n • : ion, Inc. Date �► _ ,. Al CONSTRUCTION MANAGER: . A mo k lA4 Stephe Date COUNTY ENGINEER f - I David S. Kp. .el, P. Date DIRECTOR OF PUBLIC WORKS �L /r *mil r' / 25 �9 Dent - fierce A Date BOARD OF COUNTY COMMISSIONERS (S OF MONROE COUNTY, FLORIDA ATT L. KOLHAGE, CLERK BY Mayor /Chairman eputy Jerk APPROVED AS TO FORM AND AL U I CMD007- 11/03/97 4 ORERT N. 7 FE I-2z� nl pa7i1999 16:52 19419299588 I)LPORIER PAGE 81 • • MO J;;GC GOUN.Y 11 i I JAN 0 q ' 19.,9 alLo1 y • Tj '� D.L. PORTER CONSTRUCTION, INC. , C= i ta; _'Y: January 7, 1999 Post -W Fax Note 7871 Date 1,4186 ► j Mr. Steve Piazza , m Monroe County Construction Mgmt. 5100 College Rd. c")eP. W co. • Key West, FL 33040 X10"0 • p"O1° Fax* Fus RE: Crawl Key Fire Training Facility- Water Lin Dear Mr. Piazza: This morning I spoke with Susan Loder with the Florida Keys Aqueduct Authority concerning the size of the water line to the fire hydrant at the above referenced project. As you are aware, there has been much discussion on whether the line is 6" or 8" as shown on their drawings. Apparently FKAA has agreed to approve reduction of the line size to 6 ". Susan will revise their current drawings and discuss the change with D.E.P. She has stated that construction may begin, although the tie-in will not be able to be made until she has received D.E.P.'s blessing. With this in mind, the following is the cost for the additional 575' of 6" line, necessary ductile iron fittings and combined domestic / fire line installation meter assembly and backflow. preventer Additional 575' of 6" line w/ fittings L t' F $ 13,972.00 Meter and backflow preventer assembly (FKAA detail #19) 16,291.00 • Contractors overhead and profit 3,926.00 Total Change S 33,289.00 In order to meet the fire departments schedule we will not only need to start immediately, we will also have to change the contractor we had intended on using, so please let me know as quickly as possible if we should proceed. • In addition to this change we need to process the previous request we prepared and explained in a letter dated November 20,1998, (copy enclosed), for $615.00. Should you have any questions or need any additional information please give me a call. Sincerely, D.L. PORTER CONSTRUCTION, INC. C. Marshall White Vice President CMW /pj Enc. Cc: Bill Fralin 6574 Palmer Park Circle • Sarasota, Florida 34238 • (941) 929 -9400 • Fax (941) 929 - 9500 • 0 'M N 1 C 0 - a o c In io % III N N me c I I I" T � u 0 0. •-,‹ i.. , --1 N r �' m m t "� tl • Q Z p A . -g m r it rri G m y� o � op � � N � rn On rn '' m� a q c, c z i • 1 0 C r r _ 1 ■ - z s �� 14 ma) g `a 1 rn O 5 C • •'� m 1 ir l • rq Z ■ co to ill1.11— n 2) S . • —_ v • C CE j . 6 li 1 Al ', E 0 - 13 , • • °ig a p 0 x 73 @ I: • -i , A g CA .. - -��� 2 N '` i�J N a g b z xi o rill_ OI` �a w ■r■ M -c c - 2 ' £8 39Vd a3LdOd1Q 88566Z61061 Z9 :9Z 6661/L0/1 s 1 01 - 07 {1999 16:52 19419299500 DLPCRIER PAGE 82 Ine en D.L PORTER CONSTRUCTION INC. November 20, 1998 Mr. Steve Zeamer 7 - Monroe County Construction Mgmt. JAN 7 1999 5100 College Rd. VEE Key W FL 33040 ?ECEI ,, RE: Additions and Modifications at the Crawl Key Fire Safety Training Facility Purchase Order #197783 dated 6/13/98 Dear Mr. Zeamer: Based on the information we received at the recent site meeting, the following would be adjusted contract amount: the Original Purchase Order Additional concrete work $54.860.00 (piling, slabs, footers, grade beams) Additional hardware required 6 346 .00 ~ ' Additional electrical disconnect 346.00 }� '"Credit for Owner supplied conex boxes 83.00 u $55,475.00 *Please note that we have included in the credit for the conex boxes, all associated costs including but not limited to the purchase price, shipping, crane to unload and stack, and sleeper with' /." plywood floor on one box. Also at that meeting, the fire department requested pricing for an additional slab with thickened edge footers on the perimeter of 3 sides of the building. We have included epoxy and dowels into the edge of tole existing concrete to stabilize the tie -in. The cost for this on e work is $14,541.00 concrete Should you have any questions or need additional information, please give Inc a call, Sincerely, D.L. PORTER CONSTRUCTION, INC. 0.terlaa-* C. Marshall White Vice President CMW /pj Cc: Bill Fralin 6574 Palmer Park Circle • Sarasota, Florida 34238 • (941) 929 -9400 • Fax (941) 929 -9500