Item O1MEMORANDUM Office of the County Administrator TO: Board of County Commissioners FROM: Debbie Frederick Deputy County Administrator DATE: March 6, 2012 SUBJECT: County Divisions' Monthly Activity Report for February, 2012 MONTHLY ACTIVITY REPORT - FEBRUARY, 2012 KEY WEST AIRPORT • In February, passenger figures for January were compiled. During that month, the six airlines serving Key West International Airport carried a total of 69,307 passengers. This is a 22% increase over January of 2011. • We have been informed by the TSA that a second Check Point lane will be installed in the passenger screening area of the new terminal building. The work will be completed in time for next season and will go a long way towards shortening passenger screening wait time. • On February the Director of Airports gave a presentation to the Aircraft Rescue and Fire Fighting (ARFF) Chiefs Association in St Pete. The topic was "One in a million, two in a week," and discussed the two runway over -runs that occurred here on 10-31-11 and 11-03-11. • Over the course of six nights in February, we repaired the Engineered Material Arresting System (EMAS) bed that was damaged in the November over -run incident mentioned above. MARATHON AIRPORT • Airport Emergency Plan Annual Review with First Responder Agencies was conducted on February 22, 2012, 9:00 a.m., Airport's Departure Lounge. • City of Marathon's Little Venice Waste Water Treatment Plant expansion project located on the southeast end of the airport is reportedly nearing completion. • Wildlife Hazard Assessment: final periodic seasonal observations done in January; report anticipated in March 2012. • Environmental Assessment Project associated with the runway relocation proposal: still awaiting receipt of FAA review comments. • General Aviation (GA) Security Plan update has been completed and submitted to the Aviation Division, Florida Department of Transportation for review and approval. • Special Events: • Wings of Freedom Tour (WWII bomber and fighter aircraft) • Pigeon Key Art Festival • EAA Aviation Day EMPLOYEE SERVICES I. Website Updates (other than normal position vacancy updates, etc.): Benefits: Monthly newsletter — Wellness Human Resources: Revised 1 job description FMLA Form Revisions II. Turnover Numbers To Date: Feb 2012 Turnover: .95% Turnover to date: 2% 2011 TURNOVER: 13% Resignations:4 Terminations: I Retired:0 Deceased:0 Layoffs:0 III. Human Resource IAFF Impasse Hearing One Pre -Determination Hearing held Retraining of middle and upper keys Liaisons Two unemployment claims denied Applications: Referral information: New applications — 54 (TOTAL FOR 2011: 938) Newspaper — 5 (TOTAL FOR 2011: 114) Re -submittals - 24 (TOTAL FOR 2011: 575) Employment Agency — 1 (TOTAL FOR 2011: 18) In -House submittals —2 (TOTAL FOR 2011: 93) Friend — 7 (TOTAL FOR 2011: 153) Total — 80 (TOTAL FOR 2011: 1606) Relative — 3 (TOTAL FOR 2011: 37) Walk-in — 5 (TOTAL FOR 2011: 75) Channel 76 — 0 (TOTAL FOR 2011: 12) Internet — 53 (TOTAL FOR 2011: 939) Other - 6 Total - 80 (TOTAL FOR 2011: 1348) Risk None Benefits (Group/Workers Comp) Meeting with GBS on Plan Document revisions Sr. Administrator performed Wkrs Comp audit with TPA Safety Obtained quotes for Fire Extinguisher servicing — Changing vendors to Keys Fire Revised NEO presentation BUDGET & FINANCE Budget Analysts: • Prepared, Reviewed and Posted Budget transfers -138 • Prepared and Posted Resolutions — 91 • Reviewed Contract Summaries: 18 2 • Processed invoices & sent to Finance: 4 • Signed off PAF's: 24 • Incoming mail - 44 • Outgoing mail — 36 • Prepared and compiled March 2012 agenda packet. • Processed and submitted to Finance Dept., MCSO's 911 Wireless/Wireline Octl l revenue collection. • Processed and submitted to Finance Key Largo EMS & Ambulance Jan12 salary reimbursement. • Reviewed Jan12 Pcard back-up sufficiency. • Routed Timesheets for signature and submitted to Payroll Dept. • Updated and completed l st Quarter Revenue/Expense report • Performed an Employee Database review. Verified that the GovMax employee database is the same as the database from HR. Items reviewed: position number, employee name, salary and position title. • Create the FY13 budget timetable with Tina. This item will be on the March BOCC agenda. Reserved rooms and confirmed dates with Commissioners, County Admin. and Deputy County Admin. • Cost Allocation Plan: BOCC approved KPMG's Task Order at their last meeting. I have received a list of the reports KPMG needs and we will be using FYI l data. I have contacted those people who will be responsible in supplying KPMG with information. KPMG will be here April 2-5th to do their field work and would like to receive as many as the reports as they can during that week. The last time we completed a Cost Allocation report was two years ago. Grants: • HSAB 2013: Prepped and facilitated FY 2013 cycle kick off meeting February 22 d. • HSAB 2013 Funding announcement and application: Application cycle is open until April 25, 2012. Notice of Funding Availability was advertised and distributed by email to all contacts. Application/Attachments and Instructions have been made available and were distributed by email to all contacts. • Legislative affairs: Monitoring various pending legislation with potential impacts for County (wastewater, permitting, Medicaid, DOH, military coordination, etc.) Ongoing discussions/emails with FAC staff; emails to Floridian partners; attend FAC's weekly County lobbyist conference calls. • Keys Days: prepared materials and attended meetings/events in Tallahassee. • HSAB internal audit: Drafted HSAB audit responses for County Administrator review. • 2012 HSAB and BOCC line items contracts: Regular monitoring, collecting required documents, processing certifications; addressed compliance requirements with several entities. • HSAB website information: Working with Tech Services to establish links on Grants page to applications, submissions, funding amounts, etc. • Federal Lobbyists Monitoring on -going UASI federal funding lobbying activities with Miami group and Chidlow; conference call on wastewater with staff and Chidlow, updated him on State/DOE status. • Strategic Plan: Discussed with County Administrator, Deputy County Administrator, HR Director, the draft SP, Action Plan templates, and coordination with performance plans and staff evaluations. Completed Strategic Plan Appendix (analysis of feedback from meetings and surveys.) Attended training on GovMax related to Strategic Planning and inputting of SP priorities, core services, performance measures and indicators. • 2012 State FDLE JAG County grants: Regular monitoring; quarterly reporting • 2012 RSAT County Grant: Regular monitoring; quarterly reporting • 2011 Federal JAG Drug Court grant: Regular monitoring; quarterly reporting • 2011-2012 Federal JAG Sheriffs Office grants: monitored activity; reviewed invoices; completed drawdown requests. • State DCF Criminal Justice Mental Health Substance Abuse Implementation Grant (Sheriffs Office): Continued monitoring of grant and match expenditures; review match spreadsheets from partners; reviewed/approved invoices; attended monthly council meeting. • eCivis Grants Management Software: Processed execution of contract; attended first training. Purchasing Department: Estimated Totals for the month of February 2012 are as follows: • Total purchase orders processed: 330 • Total orders placed for departments: 62 • Total orders entered for departments: 65 • Office Depot orders processed: 56 • Staples Orders processed: 3 • We opened 4 bids and processed another 6 which was average from the previous months. Addendums entered 7, contracts reviewed 14, and bills paid 4, and voided 18 purchase orders. We also processed 838 pieces of mail which was average from previous months. COMMUNITY SUPPORT SERVICES In -Home And Nutrition Services (1HNS) OAA, Older Americans Act Programs: Nutrition (Information in this section is for the period 1/21/12-2/20/12): • C-1 Congregate Meals totaled 1417 units this period, 242 units over goal but typical for the season. C-2 Home Delivered Meals totaled 2631 units, slightly under the monthly goal of 2752 units. New clients have already been signed up to reduce the underachievement. In -Home Services (Information in this section is for the period 1/1/12-1/20/12 beginning of the contract year): • III-E In -Home Respite: 108 units this period, 108 units year-to-date, 12.96% year -to - date -achieved, 4.63% overachieved. III-E Facility Respite: 289.5 units this period, 289.5 units year to date, 2% underachieved. We will be asking the Alliance for Aging for a re -allocation of funds in the III-E program to provide services where they are most needed. 4 Non-OAA Programs: CCDA (Community Care for Disabled Adults) for January 2012: • Case Management: 25 units for the month were produced; 95.75 units year-to- date. • Homemaking: 135 units for the month were produced; 1004.75 units year -to date. • Home -Delivered Meals: 85 meals for the month were provided; 730 meals year- to-date. • Personal Care: 55.5 units for the monthly were produced; 351 units year-to-date. Overall Program Achievement was 48.42%, 1.58% underachieved year-to-date. CCE (Community Care for the Elderly) for the period 12/21/11-1/20/12: • Case Management: 35 units for the period and 226.75 units year-to-date. 31% achieved year-to-date. There are 188 clients on the waiting list. • Intake: No units achieved and 14 units year-to-date. 39% achieved year-to-date. • Chore: 0 units achieved and 0 units year-to-date. • Homemaking: 488 units for the period and 3327.5 units year-to-date. 67.94% achieved year-to-date. There are 152 clients on the waiting list. • Personal Care: 296 units for the period and 2305.25 units year-to-date. 78% achieved year-to-date. There are 70 clients on the waiting list. • Respite: 44.5 units for the period and 239.5 units year-to-date. 59% achieved year to date. There are 27 clients on the waiting list. CCE overall is at 65.85% achievement, 7.51% over the target achievement level, due primarily to two emergency cases we had during the month. We will continue trying to reduce the overachievement by attrition. Wait lists are increasing due to lack of funds. ADI (Alzheimer's Disease Initiative) for the period 12/21/11—1/20/12: 140.75 units were produced in the period and 1339 units year to date. 57% year-to-date achieved, 1.34% underachieved. There are three clients on the waiting list, one of whom will be activated to reduce the underachievement. HCE (Home Care for the Elderly Program) for the period 1/16/12—2/15/12: 16.75 billable units this period, 104.25 billable units year-to-date. 47.61% year-to-date achieved, 19.03% underachieved. We have requested additional clients from the Aging Resource Center. Monroe County Transit • One-way trips provided: 1856 • Unduplicated clients served: 244 • Special Needs Clients registered: 499 Deposited Revenue: $2,340.00 Expenditures: $65,359.23 Percentage Spent Fiscal YTD: 48.3% Incoming calls, provision of information and referrals 1,192 Unduplicated Welfare client households that received service 56 New Welfare cases receiving service 20 Low Income Home Energy Assistance Grant Program cases- 59 $ 14,200.00 Low Income Crisis Assistance cases — 38 $ 6,459.46 Home and field visits 42 Office visits 333 s Bayshore Manor (BSM) Bayshore Manor's current census is 16 residents. The current census is six private pay and 10 subsidized . BSM provided 395.75 hrs of OA3E respite care and 0 hours of Medicaid Waiver this month. Bayshore Manor has five OA3E clients. There is one client on the waiting list. Revenue for February 2012 $36,530.88 Expenditures for the same period $45,381.45 Percentage of the budget spent year to date 36.96% T TRRARV • Library usage figures continue to reflect the seasonal increase in traffic and visitors throughout the Keys: • January circulation reached 38,227 items, 7% higher than last year's total for the same month • 40,250 Library customers made use of our onsite services, 22% more than in the previous month • E-visits to the Library's website, catalog and archives continue to be a major focus of our patrons, strongly demonstrating the importance of our online presence; 50% more e-visits were logged than January of the previous year • 419 new Library cards were issued in the month, bringing the total of Monroe County Library cardholders to 52,839 • At least 9,534 PC and Wi-Fi sessions were provided to the public in January, which was an increase of 32% over the previous month; an estimated 1,674 of them involved our wireless network, but it is probable that the actual number of wireless users was well above that figure, as many users access our "hot spots" from outside the Library buildings, especially at times when the Libraries are closed. More accurate figures from software used by the Technical Services Department are anticipated to be available shortly • The restoration of Monday hours at all Library branches began January 23, and in just the first two weeks a significant impact was seen on Library services: on the first Monday, 1,678 onsite visitors came in to enjoy our added hours; the following Monday Library staff welcomed 1,986 visitors • Our fiscal year is well underway, and Library spending is on pace with the year; the State Aid to Libraries Grant for this year has been approved, and the Monroe County share of the funds for FY 2012 will be S 59,385.00. It is expected that the major portion of these funds will be used to enhance the Library's collection of print and electronic materials at all five branches. EXTENSION SERVICES • Number of services provided: 452 phone calls, 40 office visits, 13 visits to clients, 27 group teachings with 416 participants, 7 media submissions, and 543 publications distributed. Total Budget for FY 11/12: $189,306.00; Year to Date Expenditures and Encumbrances: $137,294.72; Remaining Balance: $52,011.28; Percentage of budget spent and/or encumbered year-to-date: 72%. The Extension Director accomplished the following activities: 6 • Assisted the Monroe County Sustainability Coordinator with an on -site meeting of Big Pine Key homeowners, Habitat for Humanity, and contractor Solar Development Inc., regarding the installation of solar water heaters in Habitat homes funded by the Florida Energy Grant. • Organized and assisted with the Monroe County Climate Change Advisory Committee meeting. • Participated in the Florida Keys Commercial Fishermen's Association Board meeting to discuss mackerel and lobster regulatory issues. • Participated in a NOAA SE & Caribbean Climate Change Extension and Outreach Community of Practice conference call to organize the June 2012 Workshop. The Environmental Horticulture Agent accomplished the following activities: • Held two Rugose Spiraling Whitefly workshops; one in Marathon and one in Key West. A total of thirty people were in attendance. • Presented a Rugose Spiraling Whitefly workshop to the Buttonwood Bay Condominium Association. Ten people attended. • Spoke to the Islamorada Chamber of Commerce about the Rugose Spiraling Whitefly. Eighty-five people were in attendance. • Held five regional plant clinics with 15 Master Gardeners assisting 25 clientele. • Set up a horticulture educational booth at five different events with help from the Master Gardeners: Layton Garden Club Yard & Plant Sale; 2nd Annual Middle School Go Green! Science Fair at the Key West Tropical Forest & Botanical Garden; Native Plant Giveaway at the Key West Tropical Forest & Botanical Garden; GardenFest at the Key West Tropical Forest & Botanical Garden; and the Sugarloaf Volunteer Firehouse Fish Fry/Yard & Plant Sale. In all, 268 residents were accommodated. • Held four Master Gardener Training Classes. Twenty interns will attend the class every Friday for the next 4 weeks, ending on March 23. • Made four site visits: Stock Island - Aerial vine identification; Cudjoe Key - Everglades, Queen, and Traveler's Palm problems, and Rugose Spiraling Whitefly; Marathon - Rugose Spiraling Whitefly on Gumbo Limbo tree on Sombrero Beach Road. The Family & Community Development Agent accomplished the following activities: • Presented a timeline and developed an action plan for completion of the 2011/2012 High School Financial Literacy Program with staff at two high schools. • Worked with the Monroe County Climate Change Advisory Committee (CCAC) to develop climate -related recommendations for consideration in the Monroe County Comprehensive Plan update. Also worked with the CCAC to rank action items in the Community Climate Action Plan including rewriting the document according to the group's recommendations. • Worked on the Energy Efficiency Conservation Block Grant administrative duties including updating budget records and reviewing amendments. • Developed a draft resolution for adoption of the Energy Efficiency Conservation Strategy which was developed with assistance from contractor Cameron -Cole. 7 EMERGENCY SERVICES Fire Rescue • Participated in hearing with special magistrate regarding impasse between Monroe County and IAFF local 3909 contract. • Participated in stakeholder hearings with State Department of Economic Opportunity and other applicable agencies regarding emergency evacuation clearance time study and methodology for Monroe County. • Updated additional MCFR Standard Operating Procedures (SOPs) and Forms. Fire Marshal • Attended contractors meetings for multiple projects in the Upper and Lower Keys. • Reviewed numerous commercial plans for adherence to building and fire codes. • Completed standard operating procedures for pre -fire plans. • Near completion of a new county map book. Training • Started the State Certified 235hr Fire Fighter II Class. • Conducted a State Certified 40hr Ethics Class. • Conducted a Skills Evaluation on three probationary Firefighters. Emergency Management • Participated at a Turkey Point Nuclear Power Plant Task Force meeting to recap 2012 Radiological Emergency Preparedness exercise, and begin scenario planning for the 2013 FEMA evaluated Turkey Point Ingestion Pathway Exercise. • Working with Fire Rescue staff on the creation of a new Emergency Services website. To date, Navigation and Content for the website has been submitted to the Vendor. • Attended a 2-day Traffic Incident Management workshop — conducted by the Florida Department of Transportation. • Met with the Regional Emergency Management Directors and the Army 481h Civil Support Team to discuss the Team's response and assistance to the Region 7 Counties in the event of an emergency. • Disseminated Florida Division of Emergency Management Stakeholder Packet and Worksheets for the FY13-15 Training and Exercise Plan to twenty one Monroe County stakeholders. PUBLIC WORKS • Pollution Control removed 21.79 tons of debris illegally dumped in County rights of way and 12.08 tons for other departments: (7,6601bs. from the Key West Garage; 780 lbs. of tires from the Marathon Garage; 3,5001bs. from the Marathon Airport; 6,7001bs. for Marathon Public Works; 3,8201bs. of brush for the Road Department; and 1,7001bs. of brush for the MCSO) • Haz Mat staff collected 161 gallons of latex, oil, stains, and caulking. Recycled 145.5 gallons to Plantation Facilities and 15.50 to the Key West Pre -School. Also collected: 15 car batteries, 61 S-S LA batteries, 19 power tool batteries, 56 Alkaline, 14 Lithium -ion, 4 button, and 45 Nickel -Cadmium batteries • Fleet Management Mobile Mechanic Norman Haney was selected as Monroe County Employee of the Year for 2011 • Began initial discussions with MC School Board staff regarding combined Fleet Maintenance services • Completed pre -hurricane season generator inspections • Provided secured parking spaces, additional locked gate entry and building entry for Judge Garcia • Replaced missing roof railing on concession stand at Harry Harris Park • Cut brush at fence line and replaced four gates at Harry Harris Park ball field • Spread sand at KL Park playground • Spread mulch at Roth Building • Roof project at Stock Island Detention Center is almost complete • Assisted Keys Energy with install of a new electrical manhole cover that is part of the vault transformer room turnover to MCSO • Assisting with the conversion of the juvenile holding cell at the Stock Island Detention Center • 81.5% of 119 requested work orders at the Stock Island Detention Center were completed within three days • Began installation of new, additional volleyball court at Higgs Beach (funded by Higgs Beach Special Beach Fund) • Safety repairs made to Bernstein Park fence • Recycling Brochure in second print; also having the brochure translated to Creole • RFP for Landfills' Groundwater Testing being published • Developing RFP for Shed Cleaning • Presentation to Middle School Science Fair at Key West Botanical Garden • Presentation at Big Pine Super Sunday at Watson Field; distributed 100 recycling bins • Presentation to Sugarloaf Homeowners Association • Prepared Monroe County residential recycling survey • Prepared/circulated Monroe County ReNews - 4R Recycling newsletter • Prepared survey for Florida Counties/Cities to investigate successful recycling and solid waste programs statewide • Reviewed Monroe County Recycling Action Plan (in-house proposal for all County facilities); began middle keys implementation • Reviewed and commented on Climate Action Plan prepared by the Climate Change Advisory Committee • Prepared background data for tour of transfer stations with South Dade Soil and Water Conservation District to assess composting feasibility • Updated Monroe County recycling brochure for printing/internet • Collaborated on proposed bi-lingual brochures and construction/demolition debris info page • Prepared new Monroe County Recycling Public Service Announcements for radio • Planning for Earth Day events/competitions • Community outreach via email/telephone 9 ENGINEERING Engineering Services • Tom's Harbor Channel — Bid Opening for 2n1 RFP 03/08/12. JPA with FDOT extended to 01-31-13 • No Name Key Bridge Emergency Repairs — NTP issued 02-16-12; contractor mobilized onsite the week of February 131h • No Name Key Bridge Design - Amendment 1 to LAP agreement with FDOT — to remove funds for construction, and engineering/inspection phases is on March agenda; funds to be replaced with federal funds under the LAP agreement. • Debris Monitoring — Ranked on Feb. 281h • CR 905 Bike Lanes —Staff is negotiating task order with On Call Engineering Consultant for design services. • Card Sound Bridge - LAP agreement with FDOT for engineering design and permitting services is set for March, 2012 BOCC Agenda; funds will be available in fiscal year beginning on July 1, 2012. • Florida Keys Water Quality Protection Program — staff prepared two task orders under the AMEC Environment & Infrastructure On Call Consulting contract for water quality studies. The second task order, which will be funded with grant money from FDOT is on the March agenda. • Watson Bridge- staff attended/assisted with onsite inspection of bridge approaches on February 131h. Staff reviewed CH2MHILL draft design develop report and provided comments. • Truman Bridge Widening — Staff is reviewing and providing comments on the report from Metric Engineering. PROJECT MANAGEMENT • ADA RFP #1 — All bids rejected - 2nd RFP processed Demand Star 02-24-12 — opens March 28, 2012 • ADA RFP #2 — Bid Opens March 21, 2012 • Conch Key Fire Station — Slab complete, wall construction started • Marathon Courthouse — Mitigation of asbestos containing materials will start mid March. New project completion scheduled 07-26-12. • Stock Island Fire Station Preliminary drawings have been provided by Architect for review. • Stock Island MacDonald Road Abandonment — have legal description; at legal for documentation creation • Crawl Key Fire Training Facility Pre -bid conference — 03-15-12 — Bid opening 04-04-12 • Senior Project Manager Position —Mr. Shane Smith started February 27, 2012 • Senior Engineering Technician position — position vacated and position posted • Customs/Border Patrol at Marathon AP — received revised design & estimate(s) Design 02-21-12. Review planned at March BOCC meeting as Commissioner item (Mayor Rice) 10 • Solar Water Heater Project — Construction complete. Close out in process • Higgs Beach Playground —Purchase and installation by DL Porter approved Feb. BOCC. — TDC additional monies approved Jan. 2012 — Fully funded project. — Permit applied for 02-29-12 • Palm Villa — Bid opening 02-15-12 — NO PROPOSALS RECEIVED. Plan will be revised and rebid. • Thomas St. parking - preliminary revised design — received 02-21-12 — at CAY TDC PROJECTS • W. Martello Fence — Installed 01-26-12 —change order processing - extending some fencing - • E. Martello Brick and Mortar Restoration — Near completion • W. Martello Brick and Mortar Restoration — Near completion • E. Martello Exterior/Interior Doors and Battery Power Backup Lighting — door delivered 01-30-12 - Door installation completed, lighting not yet complete. Processing CO for additional work. • Murray Nelson Theater Dressing Rooms— Bid opening 02-21-12. Contract ready for BOCC approval at March's meeting. TECHNICAL SERVICES We completed 260 work orders, installed additional new computers, removed old computers and other equipment from inventory, worked on Emergency Management website, helped install displays for energy usage at Freeman Justice Building, updated library computers, upgraded our anti -virus software, began buildout of new backup email server, worked on conversion of County Employment to PDF form for web, worked on conversion for Vendor application to PDF as well, added 11 Gigs of data to Alchemy Server, improved web pages for Growth Management, gathered web traffic statistics, and pushed out Microsoft updates. VETERANS AFFAIRS Clients assisted: VA phone calls: 1129 Office visits: 394 New clients: 68 Field visits: 15 Benefits Delivery at Discharge: 10 Transportation program: Transportation calls: 571 Veterans transported: 223 Financial data: The financial data for the month of February totals $242,245.00 and indicates the amount of new revenue brought into Monroe County derived from claims filed by the entire department. The financial data captured monthly will vary due to the Veterans Administration's variable time frame in adjudicating awards. GROWTH MANAGEMENT 12 2009, 2010, 2011 & 2012 GROWTH MANAGEMENT REVENUE vs.EXPENSE REVENUE ENDING JANUARY Total Revenue FY' 09 Total Revenue FY' 10 Total Revenue FY' 11 TotalTotal BUDGETEDYTD Rev 12 e Revenue as of January, 2011 Total Revenue YTD as of January, 2012 Administrative Engineering $44,814 $2,052 $19,866 $0 $11,584 $2,813 Boat ImprovementFund $683,175 $668,103 $699,750 $600,000 $144,323 $142,972 Building Book/Copy/etc. $10,050 $8,867 $10,836 $10,000 $3,216 $2,505 Building -Income fromPermits/Applic $2,537,198 $2,134,998 $2,180,439 $2,000,000 $653,305 $615,417 Certificate of Competency/Contractor $29,782 $160,815 $18,817 $155,000 $8,353 $131,410 Code Compliance $344,640 $348,442 $532,445 $395,000 $184,064 $133,330 Education Fees - Building $30,228 $32,420 $24,677 $0 $7,956 $7,466 Education Fees - Environmental $0 $2,120 $14,254 $0 $4,672 $4,530 Environmental Mitigation $100,231 $133,368 $155,042 $100,000 $23,996 $128,712 Fire Marshal $80,804 $45,571 $15,240 $18,000 $6,502 $4,909 Flood Review (sub -account of Buildi - - - - $22,520 $18,320 Flood Variance $0 $50 $0 $0 $0 $0 Historic Preservation $400 $0 $0 $0 $0 $0 Impact Fees $329,596 $176,996 $163,363 $127,510 $57,782 $56,571 Land Acquisition De osits-Dev. Rev $0 $0 $0 - $0 $0 Marine Resources $0 - $3,079 $3,000 $915 $115 Planning Admin/Research/Copy/etc. $4,078 $1,629 $295 $1,500 $689 $225 Radon/DCA $2,923 $2,459 $26,526 $24,500 $8,302 $7,519 Recovery/DBPR $2,894 $2,459 $26,551 $24,500 $8,302 $7,519 Wastewater $0 $0 $0 $0 $0 $4,500 Zonin ROGO/Environmental $521,583 $443,278 $471,401 $400,000 $172,857 $121,305 Total $4,722,396 $4,163,627 $4,362,5811 $3,859,010 $1,319,3361 $1,390,140 EXPENSES ENDING JANUARY Total Actual Expense FY09 Total Actual Expense FY10 Total Actual Expense FYII Total BUDGETED Expense FY12 Total Expense YTD as of January, 2011 Total Expense YTD as of January, 2012 Boating Improvement - County $ $7,651 $13,784 $106,379 $502,881 $27,101 $8,212 Boating Improvement - State $ $313,085 $292,524 $364,167 $250,000 $74,177 $48,977 Building Dept. $2,236,331 $2,144,364 $2,351,380 $2,340,029 $687,374 $657,093 Code Compliance $1,049,348 $1,157,050 $995,330 $1,292,751 $333,926 $299,694 Comprehensive Plan $46,045 $380,765 $240,249 $252,000 $21,999 $10,419 Environmental Resources $269,072 $280,108 $295,142 $368,729 $91,696 $91,260 Environmental Restoration $128,739 $153,611 $158,229 $171,162 $30,862 $27,847 Geographic Info. (GIS) $232,759 $209,676 $168,827 $196,657 $60,551 $56,635 Growth M t. Admin. $458,496 $464,890 $909,891 $762,593 $175,299 $116,615 Planning $899,234 $990,168 $1,052,377 $1,189,798 $289,813 $342,678 Planning Commission $84,698 $80,563 $81,844 $84,191 $23,409 $24,688 Total $5,725,458 $6,167,503 $6,723,815 $7,410,791 $1,816,207 $1,684,118 Difference (Revenue vs. Expense) I - I.,00; .,062 - 2.t1I13,876i 2,361.234, -9,56I.781 - 496.,871 - 293.,978 NOTE: FY'09,'10,'11 Revenue, Total Budgeted Revenue FY'12 &Expenses (all) from Finance *FY'09,'10, &'11 Building Expenses updated 2/7/12 per reports from NIL; Revenue YTD FY' 11, FY' 12 from Comn-Plus. Account No. & Fee ID for Flood Review. IFormatting decimal place 11011. 13 $20,929 $119,275 $234,925 * Does not include "Boat Improvement Fund" income -receipts only $1,400,000.00 $1.200.000.00 $1,000,000.00 $800,000.00 $600,000.00 $400,000.00 $200,000.00 MONROE COUNTY 3ROWTH MANAGEMENT REVENUE IANUARY, 2012 Ile,, * Does not include "Boat Improvement Fund" income - receipts only ■ Upper Keys ■ Middle Keys ■ Lower Keys MONROE COUT GROWTH MANAGEMENT REVENUE JANUARY, 2012 ■ Upper Keys ■ Middle Keys Lower Keys ■ TOTAL 14 $400,000 $350,040jF cz� $300,000 $25 0,000 $200,000 Monroe County Growth $15 0,000 Management Revenue $100,000 January, 2012 $50,000 $fl Upper Keys Middle Keys Lower Keys Total *Does not include 'Boat Improvement Fund" income - receipts only Channel Marker Program: 30 25 20 15 10 5 0 Feb March 2011 MARINE RESOURCES OFFICE 15 February 2011 Marker/BuoyMonth Channel $0.00 March $0.00 April $848.00 May $22,186.75 June $15,121.70 July $0.00 August $4,978.00 September $15,082.00 October $0.00 November $0.00 December $0.00 January 2012 $5,000.00 Total $63,216.45 Derelict Vessel Program: Derelict Vessels Removed 20 16 T t 12 14 12 8 8 7 4 6 5 5 3 fl Feb March April May June July _due Sept Oct Nov Dec ?an _." 11 101, 16 Month IMF February 2011 =erefi7tVessel Removal Costs $9,175.98 March $11,781.00 April $3,000.00 May $67,303.00 June $500.00 July $45,728.00 August $19,422.22 September $10,945.00 October $300.00 November $12,700.00 December $6,550.00 January 2012 $32,850.00 Total $220,255.20 Vessel Pumpout Program: 90 80 70 60 50 40 30 20 10 0 Number of Pumpouts. 80 72 71 60 54 45 23 15 0 0 0 0 Feb March April May June July Aug Sept Oct Nov Dec Jan 2011 2012 17 Sewage Removed (gal.) 4000 3500 3000 2500 2000 1500 1000 500 0 Feb March April May June July Aug Sept Oct Nov. Dec Jan 2011 2012 72011 $270 $360 $4,255 April $355 May $300 June $400 July $225 Aug $75 $3,459 Sept $0 Oct $0 Nov $0 $1,267 Dec $0 Jan 2012 $115 Total: $2,100 $8,981 BUILDING DEPARTMENT IN PERMITS INSPECTIONS PLAN REVIEW Upper Keys 232 1,228 769 Middle Keys 200 626 919 Lower Keys 64 - 435 TOTAL 4961 1,8541 2,123 2,500 2,000 1.500 1.000 500 [I] PERMITS INSPECTIONS PLAN REVIEW Inspections, FY 2012 vs. 2011 ■ Upper Keys ■ Middle Keys Lower Keys ■ TOTAL MONROE COUNTY GROWTH MANAGEMENT, BUILDING DEPARTMENT JANUARY, 2012 November, ' 10 November,' l l December, ' 10 December, ' l l January, ' 11 January, ' 12 YTD - FYI I YTD - FY' 12 Building 995 1,013 975 1,083 1,083 1,033 3,947 4,281 Plumb/Mech 915 782 971 735 854 698 3,838 2,945 Electrical 1 281 341 314 438 352 528 1,302 1694 Total 1 2,1911 2,136 2,260 2,2561 2,2891 2,2591 9,0871 8,920 19 Total # Average-20 days Acker, Scott Upper Keys -Building 437 21.85 10,000 9,000 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1,000 0 zr�'1fl bcr.111 bet, bcr,'�� ay,'11 a� �`�'�1 Io�co 'Occe� qcr'z ' Say Safi` `�` ' Monroe County Growth Management Building Department Inspections - January, 2012 ■ Building ■ P1umblMech Electrical ■ Total 20 Albarran, Mike-Lower/Middle Keys -Electrical 128 6.40 Bowden, Mike-Lower/Middle Keys -Building 197 9.85 Kasprzak, Adam -Upper-Elec/Plumb/MechBldg 302 15.10 Kostic, Harry-Lower/Middle Keys -Bldg & Plans Examiner 23 1.15 Phinney, Tucker-Lower/Middle Keys -Building 182 9.10 Sellers, Corey-Upper/Middle/Lower-Plumb/Mech 96 4.80 Sullivan, Steve -Upper Keys-Building/Elec/Plumb/Mech 393 19.65 Tugwell, Paul -Upper Keys-Plumbing/Mechanical 96 4.80 Total # of Inspections - January, 2012 500 450 400 350 300 250 200 150 100 50 0 All All ell Qj o IV CIO ' 10 Novembt2,096 November, ' l l December, ' 10 December, ' l l January, 'I I January, ' 12 YTD - FY' 11 YTD - FY' 12 1,859 2,551 1,746 1,541 2,123 8,4671 7,618 21 9,000 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1,000 0 MONROE COUNTY GROWTH MANAGEMENT BUILDING DEPARTMENT ,ae, roes 4 GIS OFFICE GIS Projects - Data/Map Requests/Technical/Programming - Habitat Map Scanning (on -Going) — Environmental Services - City of Key West Redistricting - TIME Hurricane Modeling Training - Maritime Industries mapping - Planning - USFWS Focus Areas — Tier III Parcel Analysis - GIS/Engineering Implementation Discussions - Marsh Rabbit Parcel Analysis - Flex Viewer (GIS) development - Vacant Land Analysis — EAR — Planning GIS Addressing - 26 Address Assignments CODE COMPLIANCE 22 1800 1608 1600 1 1400 1223 1 1200 161 1000 839 829 853 800 600 400 200Lil 1 il 1 1254 I 1 1012 1053 1068 860 ti~ ti� tit titi '��' ti1 ti~ '�~ '�~ ti1 ti� ti1 titi S`�, �,�, ���{, ��{,��, S�• Ste~• ����, oG,�. �o�, 4�G.", TOTAL NEW CASES TOTAL INSPECTIONS COMPLETED UPPER KEYS CASES NEW CASES 42 INSPECTIONS COMPLETED 164 SM 9 23 180 160 140 120 100 80 60 40 20 0 15 E P F P P JQQQQ�O�L �O� C.P�O�O �Q�.O�,J O� P� L MIDDLE KEYS CASES TOTAL NEW CASES NEW CASES BYINSPECTORII TOTAL I NSPECTI ON S COMPLETED u INSPECTIONS COMPLETED BY INSPECTOR LA CASES HEARD BEFORE SPECIAL MAGISTRATE NEW CASES 46 INSPECTIONS COMPLETED 529 SM 20 24 600 500 400 300 200 100 N cn 0 Z m Y 0 p r r 0 ci z a' w } w 0 u w m m < 0 H cN V) N p M cN Z w w w Q N p K= w LU� p Z p F Uin O U< J Q O w J Z w >Z_ w m S a w w couZ cn Q >> a u Q in LU U wz° � JpwN r z J m0 /?NcnooinLu O U% V) H U z U U W w m m JQ F Z in U LU 0 <<V) 0V)V) Jon ~w��azwooa�Jwa 0 0Fw ~ u�o w N V) u aHH2O w U Z Z� Z w w N m w aiLU m Z O Z-NNNz000 U'i p cam w a z Z Z 0 vUi —ouzz00 a `) Q Z F v 0 0= moo= O~ a w V) ~ F Q w U cN a u U w cN Z w w 2 w a Q U Z a a — N N N Z_ LU Z Z cN - Q u LOWER KEYS CASES 7 0 NEW CASES BY INSPECTOR LjTOTAL INSPECTIONS COMPLETED GI INSPECTIONS COMPLETED BYINSPECTOR lid CASES HEARD BEFORE SPECIAL MAGISTRATE NCASES HEARD BEFORE NEW CASES 53 INSPECTIONS COMPLETED 461 SM 26 25 500 461 450 400 350 p TOTAL NEW CASES 300 Zbb 250 0 NEW CASES BY INSPECTOR 200 — TOTAL INSPECTIONS 150 COMPLETED 1/ INSPECTIONS COMPLETED 109 100 87M BY INSPECTOR 53 2 50 U CASES HEARD BEFORE SPECIAL MAGISTRATE 4 0 A O �,� R �\0 ,1\1) �k�0 QkC' Qp �P PLANNING & ENVIRONMENTAL RESOURCES CURRENT PLANNING CATEGORY Appeal to Planning Commission, In Progress......................................................................... 1 Appealto DOAH, In Progress................................................................................................. 2 Alcoholic Beverage Permit, Applied....................................................................................... 1 Alcoholic Beverage Permit, In Progress.................................................................................. 2 Conditional Use, Major, Permit, Applied................................................................................ 1 Conditional Use, Major, Permit, Issued................................................................................... 1 Conditional Use, Major, Permit, In Progress........................................................................... 2 Conditional Use Minor Deviation Applied.............................................................................. 2 Conditional Use Minor Deviation Completed......................................................................... 1 Conditional Use Minor Deviation In Progress......................................................................... 1 Conditional Use, Major Deviation In Progress........................................................................ 1 Development Agreement, Completed...................................................................................... 1 26 Development Agreement, In Progress..................................................................................... 1 Home Occupational Permits, Applied..................................................................................... 1 Home Occupational Permits, In Progress................................................................................ 1 HB 7207 Time Extension Completed...................................................................................... 1 HB 7207 Time Extension, in progress..................................................................................... 2 Public Assembly Permits, Applied.......................................................................................... 2 Public Assembly Permits, Issued............................................................................................. 2 RoadAbandonment, In Progress............................................................................................. 3 Setback Waiver, Administrative, Applied............................................................................... 1 Setback Waiver, Administrative, In Progress.......................................................................... 1 Variance, Administrative, In Progress..................................................................................... 2 Variance, Planning Commission, In Progress.......................................................................... 2 PermitReviews....................................................................................................................... 141 VacationRental, Applied......................................................................................................... 4 VacationRental, Issued........................................................................................................... 5 Vacation Rental Mgr. License, Applied.................................................................................. 3 Vacation Rental Mgr. License, Issued..................................................................................... 1 LUD Map Amendment, In progress........................................................................................ 1 MCC Text Amendment, In progress........................................................................................ 10 ROGOExemptions, Applied................................................................................................... 6 ROGO Exemptions/Denials, Issued......................................................................................... 7 ROGO Exemptions, in progress.............................................................................................. 2 LDRD's in progress................................................................................................................. 2 Pre -Application Conferences, in progress............................................................................... 1 Letters of Understanding, Applied........................................................................................... 2 Administrative Meetings Development Review Committee — 1 meeting, 2 items Planning Commission Meeting — 1 meeting, 6 items COMPREHENSIVE PLANNING CATEGORY Kathy Grasser, Comprehensive Planner 2010 COMPREHENSIVE PLAN Document Update with 3 effective amendments .... COMPREHENSIVE PLAN UPDATE Meeting Attendance: In-house / Keith and Schnars Staff .......................... Document Tracking,: Technical Document Deliverables to Staff, PC, BOCC ............................. DocumentEditing .................................................... Draft Evaluation and Appraisal Report Document .........................................................3 ........................................................ I WA Document Replacement Notebooks......................................................................................10 Contract Management: MeetingManagement............................................................................................................10 Reviewed / Updated current calendar/schedule..................................................................... I TRAINING Staff Excel......................................................................................................................................3 Personal Excel......................................................................................................................................3 COMPREHENSIVE PLANNING - MITCH HARVEY Development Review Committee Meeting............................................................................ I PlanningCommission Meeting..............................................................................................1 Preparation of Administrative Relief LDC Amendment....................................................... I PlanningWebinars.................................................................................................................2 Keith & Schnars Teleconference...........................................................................................I Preparation of Draft Lower Keys LCP AIS for BOCC......................................................... I Preparation and presentation of Draft Lower Keys LCP for PC ........................................... I Responded to E-mails and phone calls.................................................................................10 ENVIRONMENTAL RESOURCES PERFORMANCE REVIEW January 1 — January 31.2011 CATEGORY: CodeEnforcement Referral...................................................................................................18 Letter of Current Site Conditions Applications.....................................................................2 Permit Inspections/Final Bio Inspections..............................................................................52 WetlandDelineation.............................................................................................................. I OTHER: Misc Bio Site Visits [Miscellaneous]...................................................................................................5 WRITTEN CORRESPONDENCE/ BIOLOGICAL ASSESSMENTS Code Enforcement Assessment Memo..................................................................................6 GISMap-Assorted................................................................................................................36 OTHER: Permit Application Review/Assessment-Plan Reviews Completed by Bio ..........................155 MEETINGS ContractorsSummit............................................................................................................... I PlanReview Process..............................................................................................................4 Climate Compact Leadership Summit................................................................................... I MOCO Climate Change Advisory Comm.............................................................................I DRC....................................................................................................................................... I 28 Planning Commission ..... Pre -Application -Assorted OTHER: PumpOut Assistance............................................................................................... PhoneCalls [Estimated]........................................................................................... Front Counter Walk Ins [Estimated]........................................................................ Electronic Logging of Files [ELF] -Digital Map Conversions-1986 Habitat Maps. 29