Loading...
1st Amendment 12/20/2012 DANNY L. KOLHA GE CLERK OF THE CIRCUIT COURT DATE: December 20, 2012 TO: Judith S. Clarke, P.E. Director of Engineering ATTN: Tina Losacco FROM: Pamela G. Hanct? At the November 20, 2012, Board of County Commissioners meeting, the Board granted approval and authorized execution of Item F17 Contract with C &W Pipeline, Inc. for the Doctor's Arm Culvert Repairs Project located on Big Pine Key. At the December 12, 2012, meeting the Board granted approval and authorized execution of the following: Item C14 Amendment 1 to the Task Order with AMEC Environment & Infrastructure, Inc. (Amec) for Construction Engineering and Inspection Services for the Tom's Harbor Channel Bridge Project to extend the completion date. ✓ Item C15 Amendment 1 to the Task Order with EAC Consulting, Inc. for design and permitting services for the CR 905 bike lane project to add additional geotechnical engineering services to the scope of services. The additional services result in a fee increase of $13,876.80. Enclosed is are two duplicate originals of each of the above - mentioned for your handling. Should you have any questions, please do not hesitate to contact our office. Cc: County Attorney w/o documents Finance File AMENDMENT ONE TO THE TASK ORDER FOR ON CALL PROFESSIONAL SERVICES BETWEEN MONROE COUNTY AND EAC CONSULTING, INC. FOR CR 905 BIKE LANES PROJECT DESIGN THIS TASK ORDER AMENDMENT IS ENTERED INTO BY Monroe County hereinafter referred to as the "County" and EAC Consulting, Inc., its successors and assigns, hereinafter referred to as "Consultant". The amendment is effective as of this 12"' day of December, 2012. Article II Scope of Basic Services, Paragraph 2.1.1 is amended as follows: The CONSULTANT will perform additional geotechnical engineering and material testing services for the COUNTY as described in Attachment 1 to this amendment. Article VII, Paragraph 7.1 is amended to include the following: The Consultant shall be paid monthly on a time and material basis as described in Attachment 1; the additional not to exceed amount of $13,876.80 will apply for the additional services. All requirements of the original task order and this amendment shall be completed no later than April 30.2013. All other terms and conditions of the Contract For On CaII Professional Engineering Services dated January 20, 2010 and the Task Order dated April 18, 2012 remain in effect. REMAINDER OF PAGE LEFT BLANK CR905 Bike Lanes Amd 1 Task Order. Dec. 12, 2012 Page 1 of 2 IN WITNESS WHEREOF, each party caused the Task Order to be executed by its duly authorized representative. Consultant Witness: EAC Consulting, Inc. << 11-2"1 -12 a / ' //27 -/2 Signature Date ' IT i.• • Date \l tcre 5v1 0,10110(j9 Title (SEAL) BOARD OF COUNTY COMMISSIONERS Attest AMY HEAVILIN, Clerk Ad iini-,,,I., OF MONROE COUNTY, FLORIDA By(.� by: �` �•ua. !. y� Deputy Clerk Mayor /Chairman Date: 1'-I Iz 1 i. g ti o acs 0 c 9 . - f MONROE COUNTY ATTORNEY ` _ APPROVED AS TO FORM: o N C !STINE M. LIM EAT-BARROWS ASSISTANT COUNTY ATTORNEY CD w _ Date 1 I/27 t a t L-7 o f IL N .L CR905 Bike Lanes Amd 1 Task Order. Dec. 12, 2012 Page2of2 ATTACHMENT 1 EAC CONSULTING, INC. E ,.A rm Ar""1111111111111111 EAC Consulting, Inc. REV.01 November 26, 2012 Judith S. Clarke, P.E. Director of Engineering Services Monroe County Engineering 1100 Simonton St, Room 216 Key West, FL 33040 Re: CR 905 Bike Lanes Project - Geotechnical Materials Testing Supplemental Service No. 1 EAC Project No. 09020.SD01 -02 Dear Ms. Clarke; EAC Consulting Inc. (EAC) is pleased to submit this supplemental fee proposal to Monroe County Engineering for civil engineering services on the above referenced project. Further to our comments resolution meeting held on October 18, 2012 it was agreed that Limerock Bearing Ratio (LBR) tests be conducted within the limits of the project to determine if the existing material on -site has sufficient strength to avoid the need for limerock stabilization of the subgrade. In the event that limerock stabilization can be eliminated from this project through testing and analyses as proposed within this scope of works, the County could potentially realize significant cost savings in subgrade stabilization costs, maintenance of traffic costs, and existing asphalt restoration costs. Our services on this project will be supported by the following sub - consultants: • Wingerter Laboratories, Inc. (WL) — Geotechnical Engineering and Material Testing The anticipated scope of work is shown in Attachment 1. EAC will be providing coordination services with WL and will analyze the test results for incorporation within the on -going design of the referenced project. Please feel free to contact me (hhiggins @eacconsult.com) if additional clarifications are necessary. Sincerely, EAC Consulting, Inc Huntley Higgins, P.E. Senior Civil Project Manager cc: File Mike Adeife, P.E. 815 NW 57 Avenue, Suite 402 !Miami, FL 33126 1 Phone' 305 -264 -2557 1 Fax: 305 - 264 -8363 1 www. eacconsult.com 1 CA # 7011 ATTACHMENT 1 SCOPE OF SERVICES Background Monroe County has requested that EAC Consulting, Inc. (EAC)., provide a fee proposal to undertake material testing related to the design of five -foot (5') wide bicycle lanes located within eight -foot (8') wide roadway shoulders along CR 905 from Ocean Reef, south to the intersection with US 1 (approximately 10.5 mi.) in Key Largo, Monroe County, Florida. Accordingly, the following project tasks are required to undertake the requisite professional engineering services for the project are described as follows: TASK 1: GEOTECHNICAL ENGINEERING AND MATERIAL TESTING Task 1.1 — Project Management and Coordination EAC will provide Project Management and Coordination Services that will comprise of contract administration, preparation of invoices, coordination of sub consultant's work, and monitoring the progress of the works associated with this proposal. Task 1.2 — Limerock Bearing Ratio (LBR) Test FM 5 -514: Includes laboratory testing by a certified FDOT /ACI Aggregate Technician, sample preparation, Gradation, Testing, and a typed report with LBR graph and moisture curve. Task 1.3 — Sieve Analysis (Gradation) ASTM C -136, FDOT, FAA F -211 — Includes: Includes laboratory testing by a certified FDOT /ACI Aggregate Technician, sample preparation, sieve analysis testing and a typed report. Task 1.4 — Qualified Sampler & Equipment Provide the services of a CTQP /FDOT Qualified Sampler to obtain aggregate samples for laboratory testing. Logs of sampling hours and activities will be documented in a report. Provide the services of a qualified heavy equipment operator to dig out samples out approximately forty - four locations along a 10.5 mile strip. Task 1.5 — Recommendation Report Provide a report summarizing all test results. Provide specific recommendations on whether the 5 -foot bike path and the 8 -foot shoulder as shown on the typical section can be constructed with or without the need for 12 -inch stabilization and that the material to depth of 20- inches below existing grade meets a minimum of LBR -40 for entire limits of the project. In addition, the recommendations will include any specific subgrade and site preparations that may be required by the contractor, if any. Report will be signed and sealed by a Florida Registered Professional Engineer. Task 1.6 — Incorporation of Test Result in Construction Documents Based on the results of the above, EAC will incorporate the recommendations within the Construction Documents. FEE PROPOSAL ASSUMPTIONS AND EXCLUSIONS The aforementioned scope of services assumes that: 1. No Electrical Engineering Design Services are included in this proposal. 2. No Post Design Services are included in this proposal 3. Fees related to permit applications, permit variances, etc. will be provided by the County. 4. No Right of Way takes are required. 5. The County will provide As- Builts where available for utilities within the project limits that are owned and maintained by the County. 6. Utilities shown on the plans will be limited to those identified through Sunshine State One Call of Florida and those which have been provided via As- Builts from Monroe County. 7. No underground subsurface utility engineering (SUE) exploration services are included in the basic scope of services 8. No Roadway Traffic Signalization is included in scope of work/services. 9. No de- mucking design, plans and specifications is included in the scope of work. 10. Front end documents for the bid package will be the responsibility of Monroe County, however, EAC will review the front end specifications for applicability to the project. 11. No Pavement Design Services are included in scope of work. Bike Lanes will be designed to match existing pavement structure provided there is no damage or failure to the existing pavement. If the need for a pavement design because necessary, EAC will advise Monroe County Engineering accordingly. 12. No Mitigation Plans are included in the base scope of work/services. COMPENSATION Prime Consultant Compensation will be based on a time and materials basis with not to exceed amounts for the tasks. Negotiated rates per staff classification will be utilized for invoices including staff hours for respective staff. Invoices shall include all reimbursable expenses within the invoicing period. Sub Consultant Compensation will be billed as a direct expense on invoices. Basic Services: Task 1.1 - Project Management/Coordination $ 1,740.00 Task 1.2 - Limerock Bearing Ration (LBR) Testing $ 3,575.00 Task 1.3 - Sieve Analysis (Gradation) $ 1,485.00 Task 1.4 - Qualified Sampler & Equipment $ 3,000.00 Task 1.5 - Recommendation Report $ 500.00 Task 1.6 - Incorporation of Test Results in Construction Documents $ 3,076.80 Reimbursables $ 500.00 Basic Scope Total $13,876.80