Loading...
08/17/2013 Task AssignmentAMY REAVIIIN, CPA CLERK OF CIRCUIT COURT &COMPTROLLER NbMROE COUNTY, FLORIDA DATE: October 7, 2013 TO: Christine Hurley, Director Growth Management Division ATTN. Mayra Tezanos Executive Assistant FROM: Vitia Fernandez, D. C. At the August 21, 2013, Board of County Commissioner's meeting the Board granted approval and authorized execution Item G5 Amendment No. 2 to Contract between Dot Palm Landscaping, Inc. to and Monroe County, extending contract to May 16,2014 at an additional cost of $65,000. Item G6 , Task assignment in the amount of $79,659.30 for URS Corporation Southern to conduct a Capacity Improvement Feasibility Analysis to evaluate potential improvements for Level of Service (LOS) on US 1. Item G7 First amendment to Contract for Professional Services between Monroe County and Maximus Consulting Services, Inc. to conduct development approval fee analysis to include a comparison of other jurisdiction's fees. Enclosed is a certified copy of each of the above - mentioned for your handling. Should you have any questions, please feel free to contact our office. cc: County Attorney Finance File 500 Whitehead Street Suite 101, PO Box 1980, Key West, FL 33040 Phone: 305- 295 -3130 Fax: 305 -295 -3663 3117 Overseas Highway, Marathon, FL 33050 Phone: 305 -289 -6027 Fax: 305 - 289 -6025 88820 Overseas Highway, Plantation Key, FL 33070 Phone: 852 -7145 Fax: 305 - 852 -7146 uRs SCOPE OF SERVICES FOR MONROE COUNTY - US 1 CAPACITY IMPROVEMENTS FESABILITY STUDY URS Corporation Southern proposes to provide the services identified below for the task entitled "Monroe County - US 1 Capacity Improvements Feasibility Study ", pursuant to its Professional Service Agreement with Monroe County for 'Transportation Planning', dated March 16, 2011. PURPOSE In Monroe County, the LOS on individual segments of US 1 is measured by comparing the travel speeds to the weighted average posted speeds. The difference between the LOS C speed and the travel speed is referred to as 'reserve speed'. If the reserve speed is equal to or less than 3 mph, then the area where that particular segment is located is considered 'Area of Concern'. Following the 2013 Travel Time Delay Study (TTDS), 8 of the 24 segments were categorized as within 'Areas of Concern,'- the 8 segments and the respective reserve speeds are listed below: - Saddle Bunch (MM 10.5 to MM 16.5) - 2.1 mph - Grassy (MM 54.0 to MM 60.5) - 2.5 mph - Duck (MM 60.5 to MM 63.0 - ( -) 2.7 mph - Long Key Br. (MM 63.0 to MM 73.0 - 2.3 mph - L Matecumbe (MM 73.0 to MM 77.5) - ( -) 0.6 mph - Tea Table (MM 77.5 to MM 79.5) - ( -) 3.5 mph - U. Matecumbe (MM 79.5 to MM 84.0) - ( -) 1.7 mph - Windley (MM 84.0 to MM 86.0) - 0.7 mph Of the 8 segments categorized as 'Area of Concern', 3 segments are located within unincorporated Monroe County, 4 segments are within the Village of Islamorada, and 1 segment is within the city limits of Marathon. All 3 segments in the unincorporated areas of the Monroe County have had a historical trend of being categorized as 'Area of Concern' (see Figure 1). The 3 segments identified in the 2013 TTDS and 2 other segments (Big Coppitt and Big Pine Key) that had historically shown a trend of being within the area of concern are included in this study (a total length of 17.5 miles). The CONSULTANT will perform planning and engineering services required to identify appropriate improvements to address the capacity deficiencies and evaluate the feasibility, including the environmental impacts associated with the potential improvements for these 5 segments. These segment limits may be extended to develop segments with rational limits for analysis purposes. The final product of this task will be a Feasibility Study Report. The report will identify specific locations of US 1 (within the 5 segments) in unincorporated Monroe County requiring capacity improvements to sustain anticipated future growth (20 year horizon) in traffic. The report will also document the feasibility of implementing the potential improvements, including the environmental impacts and the cost. The potential improvements will be presented on concept sketches. It will be the CONSULTANT'S responsibility to utilize the standard engineering judgment, practices and principles possible during the prosecution of the work commissioned under this task. URS Corporation Southern The Congress Centre 7800 Congress Avenue, Suite 200 Boca Raton, Fl 33487 -1350 Tel: 561.994.6500 Fax: 561.994.6524 EXHIBIT A Scope of Services: US 1 / Overseas Highway Capacity Improvements Feasibility Study August 14, 2013 Page 2 of 5 i ne UUNSULI ANT will demonstrate good project management practices while working on this task. These include communication with the COUNTY and others as necessary; management of time and resources, and documentation. The CONSULTANT should make every effort to make use of all past studies and information gathered, and not repeat tasks that have been completed through other studies. The County will provide contract administration, management services, and technical reviews of all work associated with the development of this Feasibility Study and the concept plans. The County will provide job specific information and /or functions as outlined in this agreement. 1. BACKGROUND RESEARCH The CONSULTANT will investigate and compile existing relevant data, studies and roadway plans, including as -built plans related to the 5 study segments. The existing studies include planning, engineering, and environmental resource permits and any ancillary documentation which is readily attainable. 2. COLLECT NEW DATA Two types of new data will be collected to perform this study: i. Field Data - Field observations and roadway geometric data to perform the engineering analysis, and a cursory desktop review of the potential environmental constraints; such as protected species and regulated habitats within each of the 5 segments. ii. Traffic Data - Directional vehicle speed and volume data will be collected, as a minimum for a period of 24 hrs. for all 5 segments. Additional data will be collected if there are speed limit changes and potential volume changes are anticipated within each segment. 3. PERFORM TRAFFIC OPERATIONAL ANALYSIS The CONSULTANT will develop a methodology to project future LOS anticipated along the 5 study segments. The beginning year for the analysis will be 2013 and the horizon year will be 2023. Because a nontraditional methodology is used to measure the LOS along US 1, the proposed LOS projection methodology will be a collaborative effort between the CONSULTANT, COUNTY, FDOT, and other agencies the COUNTY deem necessary to be part of the process. The Synchro /SimTraffic traffic operational analysis tool will be utilized to perform the analysis. The field observations, geometric data, and traffic data collected in tasks 1 and 2 will be utilized to simulate the existing speeds and to develop speed projections to determine the future LOS. 4. PERFORM TRAFFIC SAFETY ANALYSIS The CONSULTANT will gather most recent 3 years of crash data from FDOT for the 5 study segments of US 1. The crash data will be used to prepare collision diagrams and perform the safety analysis to identify and support potential roadway improvements. 5. IDENTIFY AND DEVELOP POTENTIAL GEOMETRIC IMPROVEMENTS The CONSULTANT will identify and evaluate potential geometric improvements to mitigate the operational deficiencies. Potential improvements may include change in speed limits, access management /shared access, roadway widening, including bridge widening, addition of turn lanes, intersection improvements, etc. A meeting will be held with the County staff to review the potential improvements and solicit feed -back necessary to move forward with the selected improvements for the 5 segments. EXHIBIT A Scope of Services: US 1 / Overseas Highway Capacity Improvements Feasibility Study August 14, 2013 Page 3 of 5 6. DEVELOP CONCEPT SKETCHES The CONSULTANT will develop concept sketches for the proposed roadway improvements consistent with FDOT Plans Preparation Manual (PPM). The sketches will be at a 1 " =100' scale and is not intended to be design plans. When necessary, blow -up of specific improvements will be provided at 1 " =20' scale to present the details. The concept sketches will include approximate right of way and above ground utility information. The below ground utilities will have to be addressed during the design phase. 7. PERFORM ENVIRONMENTAL ANALYSIS OF PRPOSED IMPROVEMENTS The CONSULTANT is very familiar with the habitats, resources and environmental constraints within Monroe County and The Florida Keys through our 12 years of work as the Florida Department of Transportation, District VI Districtwide Environmental Permits Consultant. The CONSULTANT will conduct a cursory desktop analysis to identify potential impacts to regulated resources and habitats within the study areas. The CONSULTANT will document the findings and prepare an impact matrix for submittal to the COUNTY as part of the reporting documentation. In addition, the CONSULTANT will prepare a preliminary list of the anticipated environmental resource permits -that will likely be required for the proposed improvements. 8. ATTEND AND PRESENT THE PLANS The COUNTY will schedule, invite the appropriate agencies, and conduct a meeting to review the proposed conceptual improvements. The CONSULTANT will provide large scale sketches of the proposed improvements and present the findings at the meeting. 9. DOCUMENTATION The CONSULTANT will document the findings in a report. The report will be submitted to the COUNTY, initially in a DRAFT format to solicit input prior to submitting the FINAL report. The report will also include a probable cost estimation of proposed improvements. The report will identify potential constraints - engineering, environmental, and policy, and potential mitigation measures. Deliverables: Three (3) deliverables are anticipated to accomplish this project. They are: 1. Preliminary identification of potential improvements by location. 2. DRAFT Report. 3. FINAL Report. Each submittal to the COUNTY will include ten (10) sets of 11 "x17" plans and /or 8 1 /2"xI 1 "written documents for review and circulation. The final submittal will include six signed and sealed reports, along with six copies of calculations report, if any, signed and sealed. Project Schedule: Within seven (7) days after the Notice -To- Proceed, the CONSULTANT will provide a schedule of calendar deadlines. The schedule will be prepared in a format prescribed by the COUNTY. See attached for a tentative.project schedule. EXHIBIT A Scope of Services: US 1 / Overseas Highway Capacity Improvements Feasibility Study August 14, 2013 Page 4 of 5 Meetings and Presentations: Three (3) meetings are anticipated during the course of this study: i. A meeting to review preliminary improvements and locations identified by the CONSULTANT. ii. A meeting to present and solicit input to the proposed conceptual improvements; and iii. An additional meeting as necessary. Quality Control: The CONSULTANT will be responsible for the professional quality, technical accuracy and coordination of all submittals and other services furnished by the CONSULTANT under this task in accordance with the standard of care in the industry and based on the circumstances of the work. The CONSULTANT may rely upon and use in the performance of its services information supplied to it by the County or its consultants or agents without independent verification and CONSULTANT will not be responsible for defects in its services attributable to its reliance upon or use of such information. Any cost opinions or estimates provided by CONSULTANT will be on a basis of experience and judgment, but since CONSULTANT has no control over market conditions or bidding procedures, CONSULTANT cannot and does not warrant that bids, ultimate construction cost, or project economics will not vary from such opinions or estimates. Neither the Agreement nor the services provided hereunder will constitute or provide for, and CONSULTANT shall not be considered to have rendered, any legal or financial opinion(s) regarding the feasibility of this project or any other project matter. Compensation for Services The Consultant shall be paid a lump -sum amount of $79,659.30 forsatisfactory performance of work as stated in this scope of services. The staff -hour estimates and the fee are attached. Invoices will be submitted monthly, reflecting the compensation for proportional completion of the task. Acceptance and approval of this Work Order by both parties by signatories below constitute authorization for the Consultant to proceed. ACCEPTED AND APPROVE[ Monroe County qg A N'_ Z. �) �.5 (Signature) N ACCEPTED AND OVED 4 � — , URorpo i S y ern � Y; r 0 z� r-� 0 tbt- L) N G��or >✓ N L C1�1 N Y , Ao T: AMY wA w, C r 4 hn (Name & Title r, C LERK_ (Name & Title) hA - _10 I S (Date) PFHn, G DIED A'S E 0 0RM: (Date) S N Ali. GRIMSL g;STAN T COUNTY ATTORNEY EXHIBIT A Scope of Services:US 1 I Overseas Highway Capacity Improvements Feasibility Study August 14,2013 Page 5 of 5 Preliminary Project Schedule: Notice to Proceed: 27 September 2013 Kick-Off Meeting: 30 September 2013 Preliminary Review Meeting: Week of December 2, 2013 Pre-DRAFT submittal Meeting: Week of January 6, 2014 DRAFT Report Submittal: 10 February 2014 FINAL Submittal: 10 March 2014 Study Tasks and Staff Hours Estimate 3R-5/Overseas Highway-Monroe County Capacity Improvements Feasibility Study TASK Project Mngr. Senior Eng. Eng. Tech. Clerical Total Hours Budget by TASK-1:BACKGROUND RESEARCH Task 1. Collect relavent available data. 2 8 4 2 16 $2,422.92 SUB101AL _ 2 i 8 4 0 2 16 $2,422.92 TASK-2:COLLECT NEW DATA 1. Field Observation for Traffic(5) 2 I 20 20 I 42 _ $5,993.96 2. Collect Traffic Data(5) 2 5 40 40 ; 87 $9,243.61 3. Cursory Environmental Data Review(5) 2 _ 4 12 12 8 38 $3,972 40 SUBTOTAL 6 29 52 72 8 167 $19,209.97 TASK-3:PERFORM TRAFFIC OPERATIONAL ANALYSIS 1. Develop traffic volumefspeed projection methodology _ 8 8 _ 8 1 24 $3.974.24 2. Create SimTraffic models specific to each segment 5 9 (_� 10 20 20 50 $5,776.90 3. Calibrate the Traffic Analysis Models(5) 10 40 50 $5.938.10 4. Perform existing conditions(2013)analysis(5) 2 4 16 22 $2,813.20 5. Perform future conditions(2033)analysis(5) 2 4 16 22 $2,813.20 W SUOIAL 12 36 92 - 28 0 168 621,315.64 TASK-4:PERFORM TRAFFIC SAFETY ANALYSIS 1. Prepare Colloslon Diagrams and Crash Tables(5) 1 1. 2 20 23 82,477 20 2. Perform Crash Analysis(5) 15 15 $2,748.15 SUBTOTAL 1 A 17 0 - 20 0 38 65,225.35 TASK-5:IDENTIFY POTENTIAL IMPROVEMENTS&PERFORM TRAFFIC OPERATIONAL ANALYSIS 1. Identify Potential Improvemnts for each segment(5) 2 I 10 4 16 $2680.66 2. Perform existing traffic(2013)operational analysis(5) f— 4 10 14 S1.759.34 3. Perform future traffic(2013)operational analysis(5) 1 4 10 14 $1,759.34 SUBTOTAL 2 t 18 24 0 0 44 6,6,199.34 TASK-6:DEVELOP CONCEPT SKETCHES 1. Develop concept plans and Design Approach(5) _ _2 5 20 40 1 67 $7,190.61 SUBTOTAL 2 5 20 40 ( 0 67 $7,190.61 TASK-7:PERFORM ENVIRONMENTAL ANALYSIS 1. Perform Environmental Analysis of Selected Alternatives(5) 10 20 I 30 $3,885.10 SUBTOTAL 0 10 _ 20 0 0 30 $3,885,10 TASK-8:DOCUMENTATION 1. Develop DRAFT Report 4 16 12 8 8 30 $3,770.58 2. Develop FINAL Report 4 8 6 4 i 8 30 $3,770.58 SUBTOTAL _ 8 24 18 12 16 78 810,001.10 MEETINGS 1. Meetings(3) 15 12 6 33 $4.209.27 SUBTOTAL 0 j 15 0 12 , 6 33 $4,209.27 TOTAL STAFF HOURS 33 j 182 230 184 32 641 641 Contract Hourly Rates $218.98 $183.21 $102.65 $94.59 $54.34 4111si_ TOTAL BUDGET F,$7r,26.34 L$29,880.02 $23,609.50 $17,404.56 ! 61,738.88 $79,659.30 1 $79,659.30 vs>aea2=n s R .acolRNzr CERTIFICATE OF LIABILITY INSURANCE oe z 9"/20 3"' THIS CERTIFICATE 18 ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND Tf ICK IMPORTANT: H the certificats holder Is an NAL Visa) must endorsed. H SUBROGATION IS WAIVED, subject to the terms and conditions of tM polley, certM may require an endorsement. A a on this certificate does not confer rights to the cadfieah holder in lieu of such endorsems PRODUCER 0 - — 9 CONT Marsh Risk and insurance Services t Lw No, EXO: 888- 69 -3873 FAX Ne)c 345 California Street E46AIL Suite ADM"' Sat Francisco, CA 94104 MONROE CO I I AFFORDYNi COVERAOE NAIL 0 RISK .MANAG 101�10!"A° >ov►rx IIMiOM FIRE INS CO OF PITTS 19445 mmLSNIRER s : - ORB Corporation Southern Ann 3318 CO 16535 INSURER C : SEE ATTACHED 1 7650 11r Corporate Center Drive IMSURERD Lloyds of London a British Ccopaniam Suite 400 MMiami, FL 33136 INSURERE: LEXINGTON 3319 CO `19437 COVERAGES CERTIFICATE NUMBER: 35451344 REVISION NUMBER: I I MID IS 1 U czn I m I "A I HE FMICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. M$R TYPE OFN$URANCE AOOLIM1aN POLICY NU POLICYEFr ' POLICY EXP I LWIT$ A dBIIVALLIABILITY GL 5141592 09/01/1 09/01/14 EACH OCCURRENCE S 1,000,000 Z CO_ MAERCULL GENERAL LIABILITY DAMAGE TO READ PREMISE$ (Es 00PAr o) $1,000,000 CLAIMSAIADE , OCCUR MED EXP �^r area Pw>�) $ 10,000 I Z ZCU, BFPD I I , ' PERSONAL 8 ADV INJURY $ 1, 000, 000 i Z Contractual Liability I I GENERAL AGGREGATE $2,000,000 GENL AGGREGATE LIMIT APPLES PER: I 1 j PROOUCrs • coMProP AGO � $ 1, 000, 000 POLICY Z PRO- JPCT LOC $ S I AUTOMOBILE LIABILITY BAP 8511504 1 COME WD LI Z I itl $2.000,000 ANY AUTO ( BODILY INJURY (Pw Pam I S ALL OWNED I SCHEDULED ` I AUTOS AUTOS I BODILY INJURY (Pw HWEDAUTOS NON-OWNED I AUTOS PROPERTY DAMAGE S LPM 4rd w s UMBRlLLA LIAR OCCUR • EACH OCCURRENCE S EXCESS LIAR CLANS -MADE AGGREGATE M _ --_ _ DIED I RETENTION s C ORKESS Y ANDEMPIOYPIJAaLM ES 62111 ATTACHED Ol /Ol /1 01/01/141 OTTN Z 7Q WC RY UNIFT T AT U - i tB YIN ANY ORICERaIEMBER EXClUDE07 � NIA F-L EACH ACCIDENT $ 1, 000, 000 _ _ S iks wndr EL DISEASE - EA EMPLOY S 2, 000, 000 D OE CTI>C ON OF OPERAnONS bNow Retro 11 -17 -38 PP1307135 09101/1 09/01/14 E.L DISEASE - POLICY LIMIT S 1, 000, 000 I C181110110166 E Prof Limb w /Lmtd Contract 015438088 09/01/1 09/01/14 Bach Claim / AOq 1,000,000 DESCRIPTION OP OPERATIONS I LOCATION$ I VEHICLES (MUSA ACORD 101, AddMossl Rsslwks $e WuW. I men spsm N n p*" Ram Professional Services Monroe County is included as Additional insured as respects the General Liability policies, whore required by written contract. % - PR t Rl�, W SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Monroe County Board of County THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Coalmissioners ACCORDANCE WITH THE POLICY PROVISIONS. 1100 Simonton Street AUTHORS REPRESENTATIVE Key Mast, FL 33040 IDEA bla� 0 N.. N O N ® ISaWMU AGt7RU UOKPONATION. AN rights reserved. ACORD 25 101'05) The ACORD name and logo are registered marks of ACORD IffiluckabeeURB 35451344