3rd Change Order 12/11/2013ak AMY REAVILIN, CPA CLERK OF CIRCUIT COURT & COMPTROLLER =� / y��' MONROE COUNTY, FLORIDA �� bo a nofflot DATE: December 23, 2013 TO: Peter Horton, Director of Airports ATTN.- Judy Layne, Senior Coordinator Airport Grants and Finance FROM. Vitia Fernandez, D. At the December 11, 2013, Board of County Commissioners meeting, the Board granted approval and execution of Item C12 Contract Change Order No.3 to D.L. Porter Constructors, Inc., Baggage Claim Hall Renovations, Key West International Airport. Enclosed is a duplicate original of the above - mentioned for your handling. Should you have any questions, please feel free to contact our office. cc: County Attorney (w /o documents) Finance File 500 Whitehead Street Suite 101, PO Box 1980, Key West, FL 33040 Phone: 305-295-3130 Fax: 305-295-3663 3117 Overseas Highway, Marathon, FL 33050 Phone: 305-289-6027 Fax: 305-289-6025 88820 Overseas Highway, Plantation Key, FL 33070 Phone: 852-7145 Fax: 305-852-7146 W . CHANGE Distribution To: ORDER Owner Architect Field Other Contractor PROJECT: Key West International Airport Baggage Claim Renovation 3471 S. Roosevelt Blvd. Key West, FL 33040 TO (CONTRACTOR D.L. PORTER CONSTRUCTORS, INC. 6574 Palmer Park Circle Sarasota, FL 34238 CHANGE ORDER NUMBER: INITIATION DATE: ARCHITECT'S PROJECT NO. CONTRACT FOR: CONTRACT DATE: You are directed to make the following changes in this Contract: Three (3) 9/16/2013 Renovations 1/17/2013 1) Concrete footing revisions pertaining to the replacement canopy (GC reduced). $ 27,753:47: 2) Cost to correct unforeseen floor conditions relating to the terrazzo installation. $ 30,506 -56 3) Four (4) Cornell 120psf rolling grill conveyor doors. $ 11,204.50 4) Furnish & install four (4) additional wall receptacles required within the two bathrooms. $ 920.16 5) Changing rental car area walk path material to "Anti- fatigue" product. $ 2,574.00 6) Customizing Avis area walls and installing added customer supplied products. $ 1,800.00 7) Reroute roof drain along tarmac side wal I. $ 711,20 8) Provide three (3) replacement wall bathroom partition sections. $ 1,716.00 9) I lardwarc - Allowance (balance of unused fiords). $ (3,783.62) 10) Concrete testing - Allowance (balance of unused funds) $ (3,828.50) 11) Granite wall cap deleted from scope (owner installed stainless steel) $ (800.00) 12) Installation of corner guards deleted from GC's scope (installed by owner) $ (250.00) 13) Carpet the for conveyor belt deleted from scope (F & I by owner) $ (1,000.00) Total of COH3 includes GC OH & P / Bond therefore is 9/26/2013 'Relating to this request, we ask that you approve the additional days to contract duration (if requested) and accordingly, should the additional time actually be required, time meaning the contract completion date be extended from the originally intended completion date, D.L. Porter shall have the right to collect a maximum of 3750 /per extra calendar day approved herein, at its discretion, thru the completion of the project. The amount collected by the contractor shall be determined by the extent to which management and related general condition items are required thru the completion of the project. The contractor shall not have the right to collect for amounts exceeding the number of additional days approved within this and collectively all other job related change order(s). This is not to be considered a bonus and shall not be obtainable unless the project exceeds the originally intended duration. Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement h erewith, including any adjustrawW'i ji p ct Sum or Contract Time. The original Contract Sum was Net change by previously authorized Change Ord l The Contract Sum prior to this Change Order wa The Contract Sum will be increased by this Chan t The new Contract Sum including this Change Ord The Contract Time will be increased by The Date of Substantial Completion as of the date Jacobs ARCHITECT 3750 N 87 Ave., Suite 750 ADDRES Miami, HL 33178 D.L. Porter Constructors, Inc CONTRACTOR 6574 Palmer Park Circle ADDRESS Sarasota L 342 BY DATE DATE N 0 0 t C_') a �s 3 I rat C) r C :) .�7 c $ 67,523.77 $ 803,951.00 $ 172,929.55 $ 976,880.55 $ 67,523.77 $ 1,044,404.32 Monroe County Boa rd of Cty Commissioners OWNER 1100 Simonton St. ADDRESS Key West, Flp33040 BY DATE 12 - 23- 20J 1 6 ;MFROE CO ATTORNEY R)pV O FORM