12/10/2014 AgreementAqreement
Between Owner and Contractor
Where the basis of payment is a STIPULATED SUM
AGREEMENT
Made as of the Tenth Day of December, Two Thousand and Fourteen
BETWEEN the Owner: Monroe County Board of County Commissioners
500 Whitehead Street
Key West, Florida 33040
And the Contractor: Greentech Group Solutions, LLC
88005 overseas Highway#10 -165
Tavernier, FL 33070
For the following Project: Marathon Courthouse Sanitary Sewer
Improvements
Scope of the Work
The Scope of Work consists of: the installation of a new sanitary sewer collection
system to serve the courthouse and adjacent substation, Clerk of Courts office and
nearby library. There are a total of four buildings. The collection system consists of four
sanitary sewer manholes, with approximately 380 linear feet of 8 inch sewer main,
approximately 100 linear feet of 4 inch sewer laterals, cleanout, backwater valves, a
vacuum pit, air intake, and all appurtenances for a complete system. The project also
includes asphalt trench restoration, restriping of the parking lot and septic tank / drain
field abandonment. Testing of the collection system is required.
Project Management:
The Architect is:
C. Michael Nalepa
1100 Simonton Street
Second Floor -Room 2 -216
Key West, Florida, 33040
K2M Design
1001 Whitehead Street
Key West, Florida 33040
November 19, 2014 AGREEMENT Pagel of 44
The Owner and Contractor agree as set forth below.
ARTICLE 1
The Contract Documents:
The Contract Documents consist of this Agreement, Conditions of the Contract (General,
Supplementary and other Conditions), Drawings, Specifications, Proposal Documents, Addenda
issued prior to execution of this Agreement, together with the response to RFP and all required
insurance documentation, and Modifications issued after execution of this Agreement. The
Contract represents the entire and integrated agreement between the parties hereto and
supersedes prior negotiations, representations or agreements, either written or oral. An
enumeration of the Contract Documents, other than Modifications, appears in Article 9.
ARTICLE 2
The Work of this Contract:
The Contractor shall execute the entire Work described in the Contract Documents, except to
the extent specifically indicated in the Contract Documents to be the responsibility of others.
ARTICLE 3
Date of Commencement and Substantial Completion:
3.1 The date of commencement is the date to be fixed in a notice to proceed issued by the
Owner.
The Contractor shall achieve Substantial Completion of the entire Work not later than SIXTY
(60) calendar days after the date of commencement or issuance of a Notice to Proceed. The
time or times stipulated in the contract for completion of the work of the contract or of specified
phases of the contract shall be the calendar date or dates listed in the milestone schedule.
Liquidated damages will be based on the Substantial Completion Date for all work, modified by
all approved extensions in time as set forth by the Director of Project Management's signature
of approval on the Certificate of Substantial Completion. The liquidated damages table below
shall be utilized to determine the amount of liquidated damages.
FIRST SECOND 31ST DAY &
CONTRACT AMOUNT 15 DAYS 15 DAYS THEREAFTER
Under $50,000.00 $50.00 /Day $100.00 /Day $250.00 /Day
$50,000.00- 99,999.00 100.00 /Day 200.00 /Day 750.00 /Day
$100,000.00 - 499,999.00 200.00 /Day 500.00 /Day 2,000.00 /Day
$500,000.00 and Up 500.00 /Day 1,000.00 /Day 3,500.00 /Day
The Contractor's recovery of damages and sole remedy for any delay c aused by the
Owner shall be an extension of time on the Contract.
ARTICLE 4
November 19, 2014 AGREEMENT Page 2 of 44
Contract Sum:
4.1 The owner shall pay the Contractor in current funds for the Contractor's performance of
the Contract the Contract Sum of Sixty -Nine Thousand Five Hundred Dollars and 00/100
Dollars ($69,500.00), subject to additions and deductions as provided in the Contract
Documents.
4.2 The Contract Sum is based upon the following alternates, if any, which are described in
the Contract Documents and are hereby accepted by the Owner:
Alternate # 1: No Alternates Specified
4.3 Unit prices, if any, are as follows: N/A
ARTICLE 5
Progress Payments
5.1 Based upon Applications for Payment submitted by the Contractor to the Director of
Project Management, and upon approval for payment issued by the Director of Project
Management and Architect, the Owner shall make progress payments on account of the
Contract Sum to the contractor as provided below and elsewhere in the Contract Documents.
5.2 The period covered by each Application for payment shall be one calendar month ending
on the last day of the month.
5.3 Payment will be made by the Owner in accordance with the Florida Local Government
Prompt Payment Act, section 218.735, Florida Statutes.
5.4 Each Application for Payment shall be based upon the Schedule of Values submitted by
the Contractor in accordance with the Contract Documents. The Schedule of Values shall
allocate the entire Contract Sum among the various portions of the Work and be prepared in
such form and supported by such data to substantiate its accuracy as the Director of Project
Management may require. This schedule, unless objected to by the Director of Project
Management, shall be used as a basis for reviewing the Contractor's Applications for Payment.
5.5 Applications for Payment shall indicate the percentage of completion of each portion of
the Work as of the end of the period covered by the Application for Payment.
5.6 Subject to the provisions of the Contract Documents, the amount of each progress
payment shall be computed as follows:
5.6.1 Take that portion of the Contract Sum properly allocable to completed Work as
determined by multiplying the percentage completion of each portion of the Work by the share
of the total Contract Sum allocated to that portion of the Work in the Schedule of Values, less
retainage of Ten Percent 10 %. Pending final determination of cost to the owner of changes in
the Work, amounts not in dispute may be included in Applications for Payment. The amount of
credit to be allowed by the Contractor to the Owner for a deletion or change which results in a
net decrease in the Contract Sum shall be the net cost to the Owner, less Overhead, Profit and
Documented Costs incurred prior to the change Request, as indicated in the corresponding line
November 19, 2014 AGREEMENT Page 3 of 44
item in the Approved Schedule of Values for that line item as confirmed by the Director of
Project Management. When both additions and credits covering related Work or substitutions
are involved in a change the allowance for overhead and profit shall be figured on the basis of
net increase, if any, with respect to that change.
5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment
delivered and suitably stored at the site for subsequent incorporation in the completed
construction (or, if approved in advance by the Owner, suitably stored off the site at a location
agreed upon in writing), less retainage;
5.6.3 Subtract the aggregate of previous payments made by the Owner; and
5.6.4 Subtract amounts, if any, for which the Director of Project Management has withheld or
nullified a Certificate for Payment as provided in Paragraph 9.5 of the General Conditions.
5.7 Retainage of 10% will be withheld in accordance with section 218.735 (8(b), Florida
Statutes.
5.8 Reduction or limitation of retainage, if any, shall be as follows:
Monroe County is exempt from and not subject to Florida Statutes 255.078, "Public Construction
Retainage". Reduction or limitation of retainage, if any, shall be reduced incrementally at the
discretion of and upon the approval of the Director of Project Management.
ARTICLE 6
Final Payment
Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the
Owner to the Contractor when (1) the Contract has been fully performed by the Contractor
except for the Contractor's responsibility to correct nonconforming Work as provided in
Subparagraph 12.2.2 of the General Conditions and to satisfy other requirements, if any, which
necessarily survive final payment, and (2) a final approval for payment has been issued by the
Director of Project Management. Such final payment shall be made by the Owner not more
than 20 days after the issuance of the final approval for payment. The following documents
(samples in section 1027) are required for Final Payment:
(1) Application and Certificate for Payment
(2) Continuation Sheet
(3) Certificate of Substantial Completion
(4) Contractor's Affidavit of Debts and Claims
(5) Contractor's Affidavit of Release of Liens
(6) Final Release of Lien
(7) Contractor shall provide two (2) hard copies in tabulated divided binders and
one (1) indexed electronic copy on CD of all the following but not limited to:
A. Project Record Documents (As Built Documents).
B. Operating and maintenance data, instructions to the Owner's personnel.
C. Warranties, bond and guarantees.
D. Keys and keying schedule.
E. Spare parts and maintenance materials.
November 19, 2014 AGREEMENT Page 4 of 44
F. Evidence of payment and final release of liens and consent of surety to final
release (includes final release from all utilities and utility companies).
ARTICLE 7
Miscellaneous Provisions
7.1 Where reference is made in this Agreement to a provision of the General Conditions or
another Contract Document, the reference refers to that provision as amended or supplemented
by other provisions of the Contract Documents.
7.2 Payment shall be made according to the Florida Local Government Prompt Payment Act
and Monroe County Code.
7.3 Temporary facilities and services: As described in Article 34 of the General Conditions
7.4 Monroe County's performance and obligation to pay under this contract is contingent
upon an annual appropriation by the Board of County Commissioners.
7.5 A person or affiliate who has been placed on the convicted vendor list following a
conviction for public entity crime may not submit a bid on a contract to provide any goods or
services to a public entity, may not submit a proposal on a contract with a public entity for the
construction or repair of a public building or public work, may not submit proposals on leases of
real property to public entity, may not be awarded or perform work as contractor, supplier,
subcontractor, or consultant under a contract with any public entity, and may not transact
business with any public entity in excess of the threshold amount provided in Section 287.017,
for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted
vendor list.
7.6 The following items are included in this contract:
a) Contractor shall maintain all books, records, and documents directly pertinent to
performance under this Agreement in accordance with generally accepted accounting principles
consistently applied. Each party to this Agreement or their authorized representatives shall
have reasonable and timely access to such records of each other party to this Agreement for
public records purposes during the term of the Agreement and for four years following the
termination of this Agreement. If an auditor employed by the County or Clerk determines that
monies paid to Contractor pursuant to this Agreement were spent for purposes not authorized
by this Agreement, the Contractor shall repay the monies together with interest calculated
pursuant to Sec. 55.03, FS, running from the date the monies were paid to Contractor.
b) Governing Law, Venue, Interpretation, Costs, and Fees: This Agreement shall be
governed by and construed in accordance with the laws of the State of Florida applicable to
contracts made and to be performed entirely in the State. In the event that any cause of action
or administrative proceeding is instituted for the enforcement or interpretation of this Agreement,
the County and Contractor agree that venue shall lie in the appropriate court or before the
appropriate administrative body in Monroe County, Florida. The Parties waive their rights to trial
by jury. The County and Contractor agree that, in the event of conflicting interpretations of the
terms or a term of this Agreement by or between any of them the issue shall be submitted to
mediation prior to the institution of any other administrative or legal proceeding, pursuant to
Section XVI of this agreement.
November 19, 2014 AGREEMENT Page 5 of 44
c) Severability. If any term, covenant, condition or provision of this Agreement (or the
application thereof to any circumstance or person) shall be declared invalid or unenforceable to
any extent by a court of competent jurisdiction, the remaining terms, covenants, conditions and
provisions of this Agreement, shall not be affected thereby; and each remaining term, covenant,
condition and provision of this Agreement shall be valid and shall be enforceable to the fullest
extent permitted by law unless the enforcement of the remaining terms, covenants, conditions
and provisions of this Agreement would prevent the accomplishment of the original intent of this
Agreement. The County and Contractor agree to reform the Agreement to replace any stricken
provision with a valid provision that comes as close as possible to the intent of the stricken
provision.
d) Attorney's Fees and Costs. The County and Contractor agree that in the event any
cause of action or administrative proceeding is initiated or defended by any party relative to the
enforcement or interpretation of this Agreement, the prevailing party shall be entitled to
reasonable attorney's fees and court costs as an award against the non - prevailing party, and
shall include attorney's fees and courts costs in appellate proceedings.
e) Binding Effect. The terms, covenants, conditions, and provisions of this Agreement
shall bind and inure to the benefit of the County and Contractor and their respective legal
representatives, successors, and assigns.
f) Authority. Each party represents and warrants to the other that the execution,
delivery and performance of this Agreement have been duly authorized by all necessary County
and corporate action, as required by law. Each party agrees that it has had ample opportunity to
submit this Contract to legal counsel of its choice and enters into this agreement freely,
voluntarily and with advice of counsel.
g) Claims for Federal or State Aid. Contractor and County agree that each shall be, and
is, empowered to apply for, seek, and obtain federal and state funds to further the purpose of
this Agreement; provided that all applications, requests, grant proposals, and funding
solicitations shall be approved by each party prior to submission.
h) Adjudication of Disputes or Disagreements. County and Contractor agree that all
disputes and disagreements shall be attempted to be resolved by meet and confer sessions
between representatives of each of the parties. If the issue or issues are still not resolved to the
satisfaction of the parties, then any party shall have the right to seek such relief or remedy as
may be provided by this Agreement or by Florida law. This Agreement is not subject to
arbitration.
i) Cooperation. In the event any administrative or legal proceeding is instituted against
either party relating to the formation, execution, performance, or breach of this Agreement,
County and Contractor agree to participate, to the extent required by the other party, in all
proceedings, hearings, processes, meetings, and other activities related to the substance of this
Agreement or provision of the services under this Agreement. County and Contractor
specifically agree that no party to this Agreement shall be required to enter into any arbitration
proceedings related to this Agreement.
j) Nondiscrimination. County and Contractor agree that there will be no discrimination
against any person, and it is expressly understood that upon a determination by a court of
competent jurisdiction that discrimination has occurred, this Agreement automatically terminates
without any further action on the part of any party, effective the date of the court order. County
November 19, 2014 AGREEMENT Page 6 of 44
or Contractor agree to comply with all Federal and Florida statutes, and all local ordinances, as
applicable, relating to nondiscrimination. These include but are not limited to: 1) Title VI of the
Civil Rights Act of 1964 (PL 88 -352) which prohibits discrimination on the basis of race, color or
national origin; 2) Title IX of the Education Amendment of 1972, as amended (20 USC ss. 1681-
1683, and 1685 - 1686), which prohibits discrimination on the basis of sex; 3) Section 504 of the
Rehabilitation Act of 1973, as amended (20 USC s. 794), which prohibits discrimination on the
basis of handicaps; 4) The Age Discrimination Act of 1975, as amended (42 USC ss. 6101-
6107) which prohibits discrimination on the basis of age; 5) The Drug Abuse Office and
Treatment Act of 1972 (PL 92 -255), as amended, relating to nondiscrimination on the basis of
drug abuse; 6) The Comprehensive Alcohol Abuse and Alcoholism Prevention, Treatment and
Rehabilitation Act of 1970 (PL 91 -616), as amended, relating to nondiscrimination on the basis
of alcohol abuse or alcoholism; 7) The Public Health Service Act of 1912, ss. 523 and 527 (42
USC ss. 690dd -3 and 290ee -3), as amended, relating to confidentiality of alcohol and drug
abuse patient records; 8) Title VIII of the Civil Rights Act of 1968 (42 USC s. et seq.), as
amended, relating to nondiscrimination in the sale, rental or financing of housing; 9) The
Americans with Disabilities Act of 1990 (42 USC s. 1201 Note), as maybe amended from time to
time, relating to nondiscrimination on the basis of disability; 10) Any other nondiscrimination
provisions in any Federal or state statutes which may apply to the parties to, or the subject
matter of, this Agreement.
k) Covenant of No Interest. County and Contractor covenant that neither presently has
any interest, and shall not acquire any interest, which would conflict in any manner or degree
with its performance under this Agreement, and that only interest of each is to perform and
receive benefits as recited in this Agreement.
1) Code of Ethics. County agrees that officers and employees of the County recognize
and will be required to comply with the standards of conduct for public officers and employees
as delineated in Section 112.313, Florida Statutes, regarding, but not limited to, solicitation or
acceptance of gifts; doing business with one's agency; unauthorized compensation; misuse of
public position, conflicting employment or contractual relationship; and disclosure or use of
certain information.
m) No Solicitation /Payment. The County and Contractor warrant that, in respect to
itself, it has neither employed nor retained any company or person, other than a bona fide
employee working solely for it, to solicit or secure this Agreement and that it has not paid or
agreed to pay any person, company, corporation, individual, or firm, other than a bona fide
employee working solely for it, any fee, commission, percentage, gift, or other consideration
contingent upon or resulting from the award or making of this Agreement. For the breach or
violation of the provision, the Contractor agrees that the County shall have the right to terminate
this Agreement without liability and, at its discretion, to offset from monies owed, or otherwise
recover, the full amount of such fee, commission, percentage, gift, or consideration.
n) Public Access. The County and Contractor shall allow and permit reasonable access
to, and inspection of, all documents, papers, letters or other materials in its possession or under
its control subject to the provisions of Chapter 119, Florida Statutes, and made or received by
the County and Contractor in conjunction with this Agreement; and the County shall have the
right to unilaterally cancel this Agreement upon violation of this provision by Contractor.
Contractor is required to:
(1) Keep and maintain public records that ordinarily and necessarily would be required
by the public agency in order to perform the service.
November 19, 2014 AGREEMENT Page 7 of 44
(2) Provide the public with access to public records on the same terms and conditions
that the public agency would provide the records and at a cost that does not exceed the
cost provided in this chapter or as otherwise provided by law.
(3) Ensure that public records that are exempt or confidential and exempt from public
records disclosure requirements are not disclosed except as authorized by law.
(4) Meet all requirements for retaining public records and transfer, at no cost, to the
public agency all public records in possession of the contractor upon termination of the
contract and destroy any duplicate public records that are exempt or confidential and
exempt from public records disclosure requirements. All records stored electronically
must be provided to the public agency in a format that is compatible with the information
technology systems of the public agency.
o) Non - Waiver of Immunity. Notwithstanding the provisions of Sec. 768.28, Florida
Statutes, the participation of the Contractor and the County in this Agreement and the
acquisition of any commercial liability insurance coverage, self- insurance coverage, or local
government liability insurance pool coverage shall not be deemed a waiver of immunity to the
extent of liability coverage, nor shall any contract entered into by the County be required to
contain any provision for waiver.
p) Privileges and Immunities. All of the privileges and immunities from liability,
exemptions from laws, ordinances, and rules and pensions and relief, disability, workers'
compensation, and other benefits which apply to the activity of officers, agents, or employees of
any public agents or employees of the County, when performing their respective functions under
this Agreement within the territorial limits of the County shall apply to the same degree and
extent to the performance of such functions and duties of such officers, agents, volunteers, or
employees outside the territorial limits of the County.
q) Legal Obligations and Responsibilities: Non - Delegation of Constitutional or Statutory
Duties. This Agreement is not intended to, nor shall it be construed as, relieving any
participating entity from any obligation or responsibility imposed upon the entity by law except to
the extent of actual and timely performance thereof by any participating entity, in which case the
performance may be offered in satisfaction of the obligation or responsibility. Further, this
Agreement is not intended to, nor shall it be construed as, authorizing the delegation of the
constitutional or statutory duties of the County, except to the extent permitted by the Florida
constitution, state statute, and case law.
r) Non - Reliance by Non - Parties. No person or entity shall be entitled to rely upon the
terms, or any of them, of this Agreement to enforce or attempt to enforce any third -party claim or
entitlement to or benefit of any service or program contemplated hereunder, and the County and
the Contractor agree that neither the County nor the Contractor or any agent, officer, or
employee of either shall have the authority to inform, counsel, or otherwise indicate that any
particular individual or group of individuals, entity or entities, have entitlements or benefits under
this Agreement separate and apart, inferior to, or superior to the community in general or for the
purposes contemplated in this Agreement.
s) Attestations. Contractor agrees to execute such documents as the County may
reasonably require, to include a Public Entity Crime Statement, an Ethics Statement, and a
Drug -Free Workplace Statement.
t) No Personal Liability. No covenant or agreement contained herein shall be deemed
to be a covenant or agreement of any member, officer, agent or employee of Monroe County in
November 19, 2014 AGREEMENT Page 8 of 44
his or her individual capacity, and no member, officer, agent or employee of Monroe County
shall be liable personally on this Agreement or be subject to any personal liability or
accountability by reason of the execution of this Agreement.
u) Execution in Counterparts. This Agreement may be executed in any number of
counterparts, each of which shall be regarded as an original, all of which taken together shall
constitute one and the same instrument and any of the parties hereto may execute this
Agreement by signing any such counterpart.
v) Hold Harmless and Indemnification. Notwithstanding any minimum insurance
requirements prescribed elsewhere in this agreement, Contractor shall defend, indemnify and
hold the COUNTY and the COUNTY's elected and appointed officers and employees harmless
from and against (i) any claims, actions or causes of action, (ii) any litigation, administrative
proceedings, appellate proceedings, or other proceedings relating to any type of injury
(including death), loss, damage, fine, penalty or business interruption, and (iii) any costs or
expenses that may be asserted against, initiated with respect to, or sustained by, any
indemnified party by reason of, or in connection with, (A) any activity of Contractor or any of its
employees, agents, contractors or other invitees during the term of this Agreement, (B) the
negligence or willful misconduct of Contractor or any of its employees, agents, sub - contractors
or other invitees, or (C) Contractor's default in respect of any of the obligations that it
undertakes under the terms of this Agreement, except to the extent the claims, actions, causes
of action, litigation, proceedings, costs or expenses arise from the intentional or sole negligent
acts or omissions of the COUNTY or any of its employees, agents, contractors or invitees (other
than Contractor). Insofar as the claims, actions, causes of action, litigation, proceedings, costs
or expenses relate to events or circumstances that occur during the term of this Agreement, this
section will survive the expiration of the term of this Agreement or any earlier termination of this
Agreement.
In the event that the completion of the project (to include the work of others) is delayed or
suspended as a result of the Contractor s failure to purchase or maintain the required insurance,
the Contractor shall indemnify the County from any and all increased expenses resulting from
such delay. Should any claims be asserted against the County by virtue of any deficiency or
ambiguity in the plans and specifications provided by the Contractor, the Contractor agrees and
warrants that the Contractor shall hold the County harmless and shall indemnify it from all
losses occurring thereby and shall further defend any claim or action on the County's behalf.
The first ten dollars ($10.00) of remuneration paid to the Contractor is for the indemnification
provided for the above.
w) Section Headings. Section headings have been inserted in this Agreement as a
matter of convenience of reference only, and it is agreed that such section headings are not a
part of this Agreement and will not be used in the interpretation of any provision of this
Agreement.
x) Disadvantaged Business Enterprise (DBE) Policy and Obligation. It is the policy of
the County that DBE's, as defined in C.F.R. Part 26, as amended, shall have the opportunity to
participate in the performance of contracts financed in whole or in part with County funds under
this agreement. The DBE requirements of applicable federal and state laws and regulations
apply to this Agreement. The County and its Contractor agree to ensure that DBE's have the
opportunity to participate in the performance of the Agreement. In this regard, all recipients and
contractors shall take all necessary and reasonable steps in accordance with applicable federal
November 19, 2014 AGREEMENT Page 9 of 44
and state laws and regulations to ensure that DBE's have the opportunity to compete and
perform contracts. The County and Contractor and subcontractors shall not discriminate on the
basis of race, color, national origin or sex in award and performance of contracts, entered
pursuant to this Agreement.
y) Agreements with Subcontractors. In the event that the Contractor subcontracts any or
all of the work in this project to any third party, the Contractor specifically agrees to identify the
COUNTY as an additional insured on all insurance policies required by the County. In addition,
the Contractor specifically agrees that all agreements or contracts of any nature with his
subcontractors shall include the COUNTY as additional insured.
z) Florida Green Building Coalition Standards. Monroe County requires its buildings to
conform to Florida Green Building Coalition standards.
Special Conditions, if any are detailed in Section 00990 of the Project Manual for this Project.
ARTICLE 8
Termination or Suspension:
8.1 The Contract may be terminated by the Owner as provided in Article 14 of the General
Conditions.
ARTICLE 9
Enumeration of Contract Documents:
9.1 The Contract Documents, except for Modifications issued after execution of this
Agreement, are enumerated as follows:
a) Drawings: Construction Drawings: C -1, C -2, C -3, C -4, C -5, C -6
b) Project Manual: September 2014.
9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and
Contractor.
9.1.2 The General Conditions are the General Conditions of the Contract for Construction.
9.1.3 The Supplementary and other Conditions of the Contract are those contained in the
Project Manual dated:
9.1.6 The Addenda, if any, are as follows:
Number
1
Date
October 7, 2014
Pages
3
9.1.7 The Alternates, if any, are as follows: N/A
END ALTERNATES
This Agreement is entered into as of the day and year first written above and is executed in at least four
original copies of which one is to be delivered to the Contractor.
November 19, 2014 AGREEMENT Page 10 of 44
Execution by the Contractor must be by a person with authority to bind the entity.
SIGNATURE OF THE PERSON EXECUTING THE DOCUMENT MUST BE NOTARIZED AND
WITNESSED BY ANOTHER OFFICER OF THE ENTITY.
BOARD OF COUNTY COMMISSIONERS
OF MONROE COUNTY, FLORIDA
Title:
Date:
And
By: _
Print Name
I
CONTRACTOR
GREENTECH GROUP SOLUTIONS, LLC
Title:
Date:
STATE OF FLORIDA
COUNTY OF
By: T - -
'NW-00 rman
MONROE COUNTY ATTORN Y
PROV D AS TO FO
NATILEENE W. CASSEL
AS SISTS T a r TY ATTORNEY _
Dato
On this 76 A day of N• , 20 before me the undersigned notary public, Personally
appeared , known to me to be the Person whose name is
subscribed above or who produced 1 1 L— as identification, and acknowledged
that he /she is the person who executed the above contract with Monroe County for the
Marathon Courthouse Sani ry Sewer Improvements for the purposes therein contained.
Notary Publi
Print Name
My commission expires:
PAMELA Q HAN=
MY COMMISSION A EE 144139
' *I, EXPIRES: Febuary r 7, 2016
�•AF5RIP Banded Thru Notary Public Underwrihn
November 19, 2014
AGREEMENT
Seal
Page 11 of 44
Attest
By:
Print Name: ? k
Date: // ' 49 0- 4
GENERAL CONDITIONS OF THE CONTRACT
1.0 GENERAL PROVISIONS:
1.1 Basic Definitions
1.1.1 The Contract Documents: The Contract Documents consist of the Agreement
between Owner and Contractor, Conditions of the Contract (General, Supplementary and other
Conditions), Drawings, Specifications, addenda issued prior to execution of the Contract,
Owners proposal documents, other documents listed in the Agreement and Modifications issued
after execution of the Contract, and the Contractor's proposal and supporting documentation. A
Modification is (1) a written amendment to the Contract signed by both parties, (2) a Change
Order, (3) a Construction Change Directive or (4) a written order for a minor change in the Work
issued by Project Management.
1.1.2 The Contract: The Contract represents the entire and integrated agreement between
the parties hereto and supersedes prior negotiations, representations or agreements, either
written or oral. The Contract may be amended or modified only by a Modification. The Contract
Documents shall not be construed to create a contractual relationship of any kind (1) between
the Architect and Contractor, (2) between Project Management and Contractor, (3) between the
Architect and Project Management, (4) between the Owner and a Subcontractor or (5) between
any persons or entities other than the Owner and Contractor. The Owner shall, however, be
entitled to enforce the obligations under the Contract intended to facilitate performance of the
duties of Project Management and Architect.
1.1.3 The Work: The term 'Work" means the construction and services required by the
Contract Documents, whether completed or partially completed, and includes all other labor,
materials, equipment and services provided or to be provided by the Contractor to fulfill the
Contractor's obligations. The Work may constitute the whole or a part of the Project.
1. 1.4 The Project: The Project is the total construction of which the Work performed under
the Contract Documents may be the whole or a part and which may include construction by
other Contractors and by the Owner's own forces including persons or entities under separate
contracts not administered by Project Management.
1.1.5 The Drawings: The Drawings are the graphic and pictorial portions of the Contract
Documents, wherever located and whenever issued, showing the design, location and
dimensions of the Work, generally including plans, elevations, sections, details, schedules and
diagrams.
1.1.6 The Specifications: The Specifications are that portion of the Contract Documents
consisting of the written requirements for materials, equipment, construction systems, standards
and workmanship for the Work, and performance of related services.
1.1.7 The Project Manual: The Project Manual is the volume usually assembled for the Work
which may include the proposal requirements, sample forms, Conditions of the Contract and
Specifications.
1.2 Execution, Correlation and Intent
1.2.2 Execution of the Contract by the Contractor is a representation that the Contractor has
visited the site, become familiar with local conditions under which the Work is to be performed
and correlated personal observations with requirements of the Contract Documents.
November 19, 2014 GENERAL CONDITIONS Page 12 of 44
1.2.3 The intent of the Contract Document is to include all items necessary for the proper
execution and completion of the Work by the contractor. The Contract Documents are
complementary, and what is required by one shall be as binding as if required by all;
performance by the Contractor shall be required only to the extent consistent with the Contract
Documents and reasonably inferable from them as being necessary to produce the intended
results.
1.2.4 Organization of the Specifications into divisions, sections and articles, and arrangement
of Drawings shall not control the Contractor in dividing the Work among Subcontractors or in
establishing the extent of Work to be performed by any trade.
1.2.5 Unless otherwise stated in the Contract Documents, words which have well -known
technical or construction industry meanings are used in the Contract Documents in accordance
with such recognized meanings.
1.2.6 Where on any of the drawings a portion of the Work is drawn out and the remainder is
indicated in outline, the parts drawn out shall also apply to all other like portions of the Work.
1.3 Ownership and Use of Architect's Drawings, Specifications and Other Documents
1.3.1 The Drawing, Specifications and other documents prepared by the Architect are
instruments of the Architect's service through which the Work to be executed by the Contractor
is described. The Contractor may retain one contract record set. Neither the Contractor nor
any Subcontractor, Sub - subcontractor or material or equipment supplier shall own or claim a
copyright in the Drawings, Specifications and other documents prepared by the Architect. All
copies of them, except the Contractor's record set, shall be returned or suitably accounted for to
Project Management, on request, upon completion of the Work. The Drawings, Specifications
and other documents prepared by the Architect, and copies thereof furnished to the Contractor,
are for use solely with respect to the Project. They are not to be used by the Contractor or any
Subcontractor, Sub - subcontractor or material or equipment suppliers unless they are granted a
limited license to use and reproduce applicable portions of the Drawings, Specifications and
other documents prepared by the Architect appropriate to and for use in the execution of their
Work under the Contract Documents. All copies made under this license shall bear the
statutory copyright notice, if any, shown on the Drawings, Specifications and other documents
prepared by the Architect. Submittal or distribution to meet official regulatory requirements or
for other purposes in connection with this Project is not to be construed as publication in
derogation of copyright or other reserved rights
1.3.2 Unless otherwise provided in the Contract Documents, the Contractor will be furnished,
two (2) original sealed copies and one (1) electronic copy of Drawings, Specifications and the
Project Manual free of charge for the execution of the Work. Additional copies may be obtained
from Project Management at a fee of $5.00 per page for full size drawings (25 per page for
written specifications or 11 "x 17" drawings).
1.4 Capitalization
1.4.1 Terms capitalized in these General Conditions include those which are (1) specifically
defined, (2) the titles of numbered articles and identified references to Paragraphs,
Subparagraphs and Clauses in the document or (3) the titles of other documents published by
the American Institute of Architects.
1.5 Interpretation
November 19, 2014 GENERAL CONDITIONS Page 13 of 44
1.5.1 In the interest of brevity the Contract Documents frequently omit modifying words such
as "all" and "any" and articles such as "the" and "an," but the fact that a modifier or an article is
absent from one statement and appears in another is not intended to affect the interpretation of
either statement.
2.0 OWNER:
2.1 Definition
2.1.1 The Owner is Monroe County. The term "Owner' means the Owner or the Owner's
authorized representative.
2.2 Information and Services Required of the Owner
2.2.2 The owner shall furnish initial site surveys describing physical characteristics, legal
limitations and utility locations for the site of the Project, and a legal description of the site.
2.2.3 For existing facilities the Owner shall secure and pay for necessary approvals,
easements, assessments and charges, required for construction, use or occupancy of
permanent structures or for permanent changes in existing facilities except for permits and fees
which are the responsibility of the Contractor under the Contract Documents. It is the
Contractor's responsibility to secure and pay for the building permit(s) for the project.
2.2.4 Information or services under the Owner's control shall be furnished by the Owner with
reasonable promptness to avoid delay in orderly progress of the Work.
2.2.5 Unless otherwise provided in the Contract Documents, the Contractor will be furnished
two (2) original sealed copies and one (1) electronic copy of Drawings, Specifications and the
Project Manual free of charge for the execution of the Work as provided in Subparagraph 1.3.2.
2.2.6 The Owner shall forward all communications to the Contractor through Project
Management and may contemporaneously provide the same communications to the Architect.
2.2.7 The foregoing are in addition to other duties and responsibilities of the Owner
enumerated herein and especially those in respect to Article 6 (Construction by Owner or by
Other Contractors), Article 9 (Payments and Completion) and Article 11 (Insurance and Bonds).
2.3 Owner's Right to Stop the Work
2.3.1 If the Contractor fails to correct Work which is not in accordance with the requirements of
the contract Documents as required by Paragraph 12.2 or persistently fails to carry out Work in
accordance with the Contract Documents, the Owner, by written order signed personally or by
an agent specifically so empowered by the Owner, may order the Contractor to stop the Work,
or any portion thereof, until the cause for such order has been eliminated; however, the right of
the Owner to stop the Work shall not give rise to a duty on the part of the Owner to exercise this
right for the benefit of the Contractor or any other person or entity.
2.4 Owner's Right to Carry Out the Work
2.4.1 If the Contractor defaults or neglects to carry out the Work in accordance with the
Contract Documents and fails within a three -day period after receipt of written notice from the
Owner to commence and continue correction of such default or neglect with diligence and
promptness, the Owner may after such three -day period give the Contractor a second written
November 19, 2014 GENERAL CONDITIONS Page 14 of 44
notice to correct such deficiencies within a three -day period. If the Contractor within such
second three -day period after receipt of such second notice fails to commence and continue to
correct any deficiencies, the Owner may, without prejudice to other remedies the Owner may
have, correct such deficiencies. In such case an appropriate Change Order shall be issued
deducting from payments then or thereafter due the Contractor the cost of correcting such
deficiencies, including compensation for another contractor or subcontractor or Project
Management's and Architect's and their respective consultants' additional services and
expenses made necessary by such default, neglect or failure. If payments then, or thereafter,
due the Contractor are not sufficient to cover such amounts, the Contractor shall pay the
difference to the Owner. In the event of clean -up issues, Owner has right to provide a minimum
of 24 hours' notice. In the event of safety issues determined to be of a serious nature, as
determined by Project Management, notice will be given, and contractor is required to rectify
deficiency immediately.
3.0 CONTRACTOR:
3.1 Definition
3.1.1 The Contractor is the person or entity identified as such in the Agreement and is referred
to throughout this Agreement as if singular in number. The term "Contractor' means the
Contractor or the Contractor's authorized representative.
3.1.2 The plural term "Contractors" refers to persons or entities who perform construction
under Conditions of the Contract that are administered by Project Management, and that are
identical or substantially similar to these Conditions.
3.2 Review of Contract Documents and Field Conditions by Contractor
3.2.1 The Contractor shall carefully study and compare the Contract Documents with each
other and with information furnished by the Owner pursuant to Subparagraph 2.2.2 and shall at
once report to Project Management and Architect errors, inconsistencies or omissions
discovered. The Contractor shall not be liable to the Owner, Project Management or Architect
for damage resulting from errors, inconsistencies or omissions in the Contract Documents
unless the Contractor recognized such error, inconsistency or omission and knowingly failed to
report it to Project Management and Architect. If the Contractor performs any construction
activity knowing it involves a recognized error, inconsistency or omission in the Contract
Documents without such notice to Project Management and Architect, the Contractor shall
assume appropriate responsibility for such performance and shall bear an appropriate amount
of the attributable costs for correction.
3.2.2 The Contractor shall take field measurements and verify field conditions and shall
carefully compare such field measurements and conditions and other information known to the
Contractor with the Contract Documents before commencing activities. Errors, inconsistencies
or omissions discovered shall be reported to Project Management and Architect at once.
3.2.3 The Contractor shall perform the Work in accordance with the Contract Documents and
submittals approved pursuant to Paragraph 3.12.
3.3 Supervision and Construction Procedures
3.3.1 The Contractor shall supervise and direct the Work, using the Contractor's best skill and
attention. The Contractor shall be solely responsible for and have control over construction
means, methods, techniques, sequences and procedures and for coordinating all portions of the
November 19, 2014 GENERAL CONDITIONS Page 15 of 44
Work under this Contract, subject to overall coordination of Project Management as provided in
Subparagraphs 4.6.3 and 4.6.5.
3.3.2 The Contractor shall be responsible to the Owner for acts and omissions of the
Contractor's employees, Subcontractors and their agents and employees, and other persons
performing portions of the Work under a contract with the Contractor.
3.3.3 The Contractor shall not be relieved of obligations to perform the Work in accordance
with the Contract Documents either by activities or duties of Project Management in its
administration of the Contract, or by test, inspections or approvals required or performed by
persons other than the Contractor.
3.3.4 The Contractor shall inspect portions of the Project related to the Contractor's Work in
order to determine that such portions are in proper condition to receive subsequent work.
3.3.5 The Contractor shall verify that the Construction Documents being worked with are the
most recent and updated available, including all Addenda information. Also the Contractor will
perform the work strictly in accordance with this contract.
3.4 Labor and Materials
3.4.1 Unless otherwise provided in the Contract Documents, the Contractor shall provide and
pay for labor, materials, equipment, tools, construction equipment and machinery, water, heat,
utilities, transportation, and other facilities and services necessary for proper execution and
completion of the Work, whether temporary or permanent and whether or not incorporated or to
be incorporated in the Work.
3.4.2 The Contractor shall enforce strict discipline and good order among the Contractor's
employees and other persons carrying out the Contract. The Contractor shall not permit
employment of unfit persons or persons not skilled in tasks assigned to them.
3.4.3 The Contractor is responsible for the conduct of his employees at all times. Misconduct,
destruction of property, unsafe practices, or violation of any Federal or State regulations
including abuse of alcohol or drugs, will be cause for permanent dismissal from the project. If
any Contractor's employee is determined to be detrimental to the Project, as deemed by Project
Management, the Contractor will remove and /or replace the employee at the request of Project
Management. Employees dismissed from the project will be transported from the job site at the
Contractor's expense.
3.4.4 The Contractor shall be totally responsible for the security of his work, materials,
equipment, supplies, tools, machinery, and construction equipment.
3.4.5 The Contractor shall be responsible for complete, timely and accurate field
measurements as necessary for proper coordination, fabrication and installation of his materials
and equipment. The Contractor agrees to cooperate with Project Management, if required, to
accommodate any discovered variations or deviations from the Drawings and Specifications so
that the progress of the Work is not adversely affected.
3.5 Warranty
3.5.1 The Contractor warrants to the Owner, Project Management and Architect that materials
and equipment furnished under the Contract will be of good quality and new unless otherwise
required or permitted by the Contract Documents, that the Work will be free from defects not
inherent in the quality required or permitted, and that the Work will conform with the
requirements of the Contract Documents. Work not conforming to these requirements, including
November 19, 2014 GENERAL CONDITIONS Page 16 of 44
substitutions not properly approved and authorized, may be considered defective. The
Contractor's warranty excludes remedy for damage or defect caused by abuse, modifications
not executed by the Contractor, improper or insufficient maintenance, improper operation, or
normal wear and tear under normal usage. If required by Project Management, the Contractor
shall furnish satisfactory evidence as to the kind and quality of materials and equipment.
3.6 Taxes
3.6.1 The Contractor shall pay sales, consumer, use and similar taxes for the Work or portions
thereof provided by the Contractor which are legally enacted when bids are received or
negotiations concluded, whether or not yet effective or merely scheduled to go into effect.
3.7 Permits, Fees and Notices
3.7.1 The Contractor shall secure and pay for all permits, impact fees, governmental fees,
licenses, inspections, testing, surveys and utility fees required by Federal, State, Municipal or
Utility entities having jurisdiction over the project for the proper execution and completion of the
Work which are customarily secured after execution of the Contract and which are legally
required at the time bids are received. The Contractor will be responsible for all building permit
costs or impact fees required for this project. The Contractor shall secure and pay for all
building and specialty permits including plumbing, electrical, HVAC, etc.
3.7.2 The Contractor shall comply with and give notices required by laws, ordinances, rules,
regulations and lawful orders of public authorities bearing on performance of the Work.
3.7.3 It is not the Contractor's responsibility to ascertain that the Contract Documents are in
accordance with applicable laws, statutes, ordinances, building codes, and rules and
regulations. However, if the Contractor observes that portions of the Contract Documents are at
variance therewith, the Contractor shall promptly notify Project Management, Architect and
Owner in writing, and necessary changes shall be accomplished by appropriate Modification.
3.7.4 If the Contractor performs Work knowing it to be contrary to laws, statutes, ordinances,
building codes, and rules and regulations without such notice to Project Management, Architect
and Owner, the Contractor shall assume full responsibility for such Work and shall bear the
attributable costs.
3.9 Superintendent
3.9.1 The Contractor shall employ a competent superintendent and necessary assistants who
shall be in attendance at the Project site during performance of the Work. The superintendent
shall represent the Contractor, and communications given to the superintendent shall be as
binding as if given to the Contractor. Important communications shall be confirmed in writing.
Other communications shall be similarly confirmed on written request in each case. The
superintendent shall be satisfactory to Project Management and shall not be changed except
with the consent of Project Management, unless the superintendent proves to be unsatisfactory
to the Contractor or ceases to be in his employ.
3.10 Contractor's Construction Schedule
3.10.1 The Contractor, promptly after being awarded the Contract, shall prepare and submit for
the Owner's and Architect's information and Project Management's approval a Contractor's
Construction Schedule for the Work. Such schedule shall not exceed time limits current under
the Contract Documents, shall be revised at appropriate intervals as required by the conditions
of the Work and Project, shall be related to the entire Project construction schedule to the extent
required by the Contract Documents, and shall provide for expeditious and practicable
execution of the Work. This schedule, to be submitted within fourteen (14) days after Contract
November 19, 2014 GENERAL CONDITIONS Page 17 of 44
Award, shall indicate the dates for the starting and completion of the various stages of
construction, shall be revised as required by the conditions of the Work, and shall be subject to
Project Management's approval.
3.10.2 The Contractor shall cooperate with Project Management in scheduling and performing
the Contractor's Work to avoid conflict, delay in or interference with the Work of other
Contractors or the construction or operations of the Owner's own forces.
3.10.4 The Contractor shall conform to the most recent schedules.
3.10.5 Project Management will schedule and conduct a project meeting at a minimum of one
meeting per month in each month which the Contractor shall attend. At this meeting, the
parties can discuss jointly such matters as progress, scheduling, and problems.
3.11 Documents and Samples at the Site
3.11.1 The Contractor shall maintain at the site for the Owner one record copy of the Drawings,
Specifications, addenda, Change Orders and other Modifications, in good order and marked
currently to record changes and selections made during construction, and in addition approved
Shop Drawings, Product Data, Samples and similar required submittals. These shall be
available to Project Management and Architect and shall be delivered to Project Management
for submittal to the Owner upon completion of the Work.
3.12 Shop Drawings, Product Data and Samples
3.12.1 Shop Drawings are drawings, diagrams, schedules and other data specially prepared for
the Work by the Contractor or a Subcontractor, Sub - subcontractor, manufacturer, supplier or
distributor to illustrate some portion of the Work.
3.12.2 Product Data are illustrations, standard schedules, performance charts, instructions,
brochures, diagrams and other information furnished by the Contractor to illustrate materials or
equipment for some portion of the Work.
3.12.3 Samples are physical examples which illustrate materials, equipment or workmanship
and establish standards by which the Work will be judged.
3.12.4 Shop Drawings, Product Data, Samples and similar submittals are not Contract
Documents. The purpose of their submittal is to demonstrate for those portions of the Work for
which submittals are required the way the Contractor proposes to conform to the information
given and the design concept expressed in the Contract Documents. Review by Project
Management is subject to the limitations of Subparagraph 4.6.12.
3.12.5 The Contractor shall review, approve and submit to Project Management, in accordance
with the schedule and sequence approved by Project Management, Shop Drawings, Product
Data, Samples and similar submittals required by the Contract Documents. The Contractor
shall cooperate with Project Management in the coordination of the Contractor's Shop
Drawings, Product Data, Samples and similar submittals with related documents submitted by
other Contractors. Submittals made by the Contractor which are not required by the Contract
Documents may be returned without action.
3.12.6 The Contractor shall perform no portion of the Work requiring submittal and review of
Shop Drawings, Product Data, Samples or similar submittals until the respective submittal has
been approved by Project Management. Such Work shall be in accordance with approved
submittals.
November 19, 2014 GENERAL CONDITIONS Page 18 of 44
3.12.7 By approving and submitting Shop Drawings, Product Data, Samples and similar
submittals, the Contractor represents that the Contractor has determined and verified materials,
field measurements and field construction criteria related thereto, or will do so, and has checked
and coordinated the information contained within such submittals with the requirements of the
Work and of the Contract Documents.
3.12.8 The Contractor shall not be relieved of responsibility for deviations from requirements of
the Contract Documents by Project Management approval of Shop Drawings, Product Data,
Samples or similar submittals unless the Contractor has specifically informed Project
Management and Architect in writing of such deviation at the time of submittal and Project
Management have given written approval to the specific deviation. The Contractor shall not be
relieved of responsibility for errors or omissions in Shop Drawings, Product Data, Samples or
similar submittals by Project Management's approval thereof.
3.12.9 The Contractor shall direct specific attention, in writing or on resubmitted Shop
Drawings, Product Data, Samples or similar submittals, to revisions other than those requested
by Project Management and Architect on previous submittals.
3.12.10 Informational submittals upon which Project Management are not expected to take
responsive action may be so identified in the Contract Documents.
3.12.11 When professional certification of performance criteria of materials, systems or
equipment is required by the Contract Documents, Project Management and Architect shall be
entitled to rely upon the accuracy and completeness of such calculations and certifications.
3.12.12 If materials specified in the Contract Documents are not available on the present
market, the Contractor may submit data on substitute materials to Project Management for
approval by the Owner.
3.13 Use of Site
3.13.1 The Contractor shall confine operations at the site to areas permitted by law, ordinances,
permits and the Contract Documents and shall not unreasonably encumber the site with
materials or equipment.
3.13.2 The Contractor shall coordinate the Contractor's operations with, and secure the
approval of, Project Management before using any portion of the site.
3.14 Cutting and Patching
3.14.1 The Contractor shall be responsible for cutting, fitting or patching required to complete
the Work or to make its parts fit together properly; He shall also provide protection of existing
work as required.
3.14.2 The Contractor shall not damage or endanger a portion of the Work or fully or partially
completed construction of the Owner's own forces or of other Contractors by cutting, patching,
excavating or otherwise altering such construction. The Contractor shall not cut or otherwise
alter such construction by other Contractors or by the Owner's own forces except with written
consent of Project Management, Owner and such other contractors: such consent shall not be
unreasonably withheld. The Contractor shall not unreasonably withhold from the other
Contractors or the Owner the Contractor's consent to cutting or otherwise altering the Work.
When structural members are involved, the written consent of Project Management shall also be
required. The Contractor shall not unreasonably withhold from Project Management or any
separate contractor his consent to cutting or otherwise altering the Work.
November 19, 2014 GENERAL CONDITIONS Page 19 of 44
3.14.3 The Contractor shall arrange for any blockouts, cutouts, or openings required for the
installation of his materials and equipment and the execution of his work, whether or not shown
or indicated on the Drawings. The Contractor shall be further responsible for sealing and/or
finishing, in an acceptable fashion and meeting any applicable code requirements, and such
block -out, cutout opening, or other hole in any fire- related floor, ceiling, wall, security wall, or
any other finished surface.
3.16 Cleaning Up
3.15.1 The Contractor shall keep the premises and surrounding area free from accumulation of
waste materials or rubbish caused by operations under the Contract. At completion of the Work
the Contractor shall remove from and about the project waste materials rubbish, the
Contractor's tools, construction equipment, machinery and surplus materials. Clean up shall be
performed to the satisfaction of the Owner or Project Management.
3.15.2 If the Contractor fails to clean up as provided in the Contract Documents, Project
Management may do so with the Owner's approval and the cost thereof shall be charged to the
Contractor.
3.16 Access to Work
3.16.1 The Contractor shall provide the Owner, Project Management and Architect access to
the Work in preparation and progress wherever located.
3.17 Royalties and Patents
3.17.1 The Contractor shall pay all royalties and license fees. The Contractor shall defend suits
or claims for infringement of patent rights and shall hold the Owner, Project Management and
Architect harmless from loss on account thereof, but shall not be responsible for such defense
or loss when a particular design, process or product of a particular manufacturer or
manufacturers is required by the Contract Documents. However, if the Contractor has reason to
believe that the required design, process or product is an infringement of a patent, the
Contractor shall be responsible for such loss unless such information is promptly furnished to
the Architect and Project Management.
3.18 Indemnification and Hold Harmless
3.18.1 Notwithstanding any minimum insurance requirements prescribed elsewhere in this
agreement, Contractor shall defend, indemnify and hold the COUNTY and the COUNTY's
elected and appointed officers and employees harmless from and against (i) any claims, actions
or causes of action, (ii) any litigation, administrative proceedings, appellate proceedings, or
other proceedings relating to any type of injury (including death), loss, damage, fine, penalty or
business interruption, and (iii) any costs or expenses that may be asserted against, initiated with
respect to, or sustained by, any indemnified party by reason of, or in connection with, (A) any
activity of Contractor or any of its employees, agents, contractors or other invitees during the
term of this Agreement, (B) the negligence or willful misconduct of Contractor or any of its
employees, agents, sub - contractors or other invitees, or (C) Contractor's default in respect of
any of the obligations that it undertakes under the terms of this Agreement, except to the extent
the claims, actions, causes of action, litigation, proceedings, costs or expenses arise from the
intentional or sole negligent acts or omissions of the COUNTY or any of its employees, agents,
contractors or invitees (other than Contractor). Insofar as the claims, actions, causes of action,
litigation, proceedings, costs or expenses relate to events or circumstances that occur during
the term of this Agreement, this section will survive the expiration of the term of this Agreement
or any earlier termination of this Agreement.
November 19, 2014 GENERAL CONDITIONS Page 20 of 44
In the event that the completion of the project (to include the work of others) is delayed or
suspended as a result of the Contractor's failure to purchase or maintain the required insurance,
the Consultant shall indemnify the County from any and all increased expenses resulting from
such delay. Should any claims be asserted against the County by virtue of any deficiency or
ambiguity in the plans and specifications provided by the Contractor, the Contractor agrees and
warrants that the Contractor shall hold the County harmless and shall indemnify it from all
losses occurring thereby and shall further defend any claim or action on the County's behalf.
The first ten dollars ($10.00) of remuneration paid to the Contractor is for the indemnification
provided for the above.
4.0 ADMINISTRATION OF THE CONTACT:
4.1 Architect/Engineer
4.1.1 The Architect and/or Engineer is the person lawfully licensed to practice
architecture /engineering or any entity lawfully practicing architecture /engineering identified as
such in the Agreement and is referred to throughout the Contract Documents as if singular in
number. The term "Architect" means the Architect or the Architect's authorized representative.
4.2 Project Management
4.2.1 Project Management is the person or entity identified as such in the Agreement and is
referred to throughout the Contract Documents as if singular in number. The term "Project
Management" means Monroe County Project Management Department or Project
Management's authorized representative.
4.3 Duties, responsibilities and limitations of authority of Project Management and Architect
as set forth in the Contract Documents shall not be restricted, modified or extended without
written consent of the Owner, Project Management, Architect and Contractor. Consent shall not
be unreasonably withheld.
4.4 In case of termination of employment of Architect, the Owner shall appoint an Architect
whose status under the Contract Documents shall be that of the former Architect.
4.6 Not Used
4.6 Administration of the Contract
4.6.1 Project Management and Engineer will provide administration of the Contract as
described in the Contract Documents, and will be the Owner's representatives (1) during
construction, (2) until final payment is due and (3) with the Owner's concurrence, from time to
time during the correction period described in Paragraph 12.2. Project Management and
Engineer will advise and consult with the Owner and will have authority to act on behalf of the
Owner only to the extent provided in the Contract Document, unless otherwise modified by
written instrument in accordance with other provision of the Contract.
4.6.2 Project Management and Engineer will determine in general that the Work is being
performed in accordance with the requirements of the Contract Documents, will keep the Owner
informed of the progress of the Work, and will endeavor to guard the Owner against defects and
deficiencies in the Work.
November 19, 2014 GENERAL CONDITIONS Page 21 of 44
4.6.3 Project Management will provide for coordination of the activities of other Contractors
and of the Owner's own forces with the Work of the Contractor, who shall cooperate with them.
The Contractor shall participate with other Contractors and Project Management and Owner in
reviewing their construction schedules when directed to do so. The Contractor shall make any
revisions to the Construction schedule deemed necessary after a joint review and mutual
agreement. The construction schedules shall constitute the schedules to be used by the
Contractor, other Contractors, Project Management and the Owner until subsequently revised.
4.6.4 Not used.
4.6.5 Project Management will visit the site at intervals appropriate to the stage of construction
to become generally familiar with the progress and quality of the completed Work and to
determine in general if the Work is being performed in a manner indicating that the Work, when
completed, will be in accordance with the Contract Documents. However, Project Management
will not be required to make exhaustive or continuous onsite inspections to check quality or
quantity of the Work. On the basis of on -site observations as an architect, Project Management
will keep the Owner informed of progress of the Work, and will endeavor to guard the Owner
against defects and deficiencies in the work.
4.6.6 Project Management will not have control over or charge of and will not be responsible
for construction means, method, techniques, sequences or procedures, or for safety precautions
and programs in connection with the Work, since these are solely the Contractor's responsibility
as provided in Paragraph 3.3, and neither will be responsible for the Contractor's failure to carry
out the Work in accordance with the Contract Documents. Neither Project Management nor the
Architect will have control over, or charge of, or be responsible for acts or omissions of the
Contractor, Subcontractors, or their agents or employees, or of any other persons performing
portions of the Work.
4.6.7 Communications Facilitating Contract Administration. Except as otherwise provided in
the Contract Documents or when direct communications have been specially authorized, the
Owner and Contractor shall communicate through Project Management, and shall
contemporaneously provide the same communications to the Architect. Communications by
and with the Architect's consultants shall be through the Architect. Communications by and with
Subcontractors and material suppliers shall be through the Contractor. Communications by and
with other Contractors shall be through Project Management and shall be contemporaneously
provided to the Architect.
4.6.8 Project Management will review and certify all Applications for Payment by the
Contractor, including final payment. Project Management will assemble each of the
Contractor's Applications for Payment with similar Applications from other Contractor into a
Project Application for Payment. After reviewing and certifying the amounts due the
Contractors, the Project Application for Payment, along with the applicable Contractors'
Applications for Payment, will be processed by Project Management.
4.6.9 Based on Project Management's observations and evaluations of Contractors'
Applications for Payment, Project Management will certify the amounts due the Contractors and
will issue a Project Approval for Payment.
4.6.10 Project Management will have authority to reject Work which does not conform to the
Contract Documents, and to require additional inspection or testing, in accordance with
Subparagraphs 13.5.2 and 13.5.3, whether or not such Work is fabricated, installed or
completed, but will take such action only after notifying Project Management. Subject to review,
November 19, 2014 GENERAL CONDITIONS Page 22 of 44
Project Management will have the authority to reject Work which does not conform to the
Contract Documents. Whenever Project Management considers it necessary or advisable for
implementation of the intent of the Contract Documents, Project Management will have authority
to require additional inspection or testing of the work in accordance with Subparagraphs 13.5.2
and 13.5.3, whether or not such Work is fabricated, installed or completed. The foregoing
authority of Project Management will be subject to the provisions of Subparagraphs 4.6.18
through 4.6.20 inclusive, with respect to interpretations and decisions of the Architect.
However, neither the Architect's nor Project Management's authority to act under this
Subparagraph 4.6.10 nor a decision made by either of them in good faith either to exercise or
not to exercise such authority shall give rise to a duty or responsibility of the Architect or Project
Management to the Contractor, Subcontractors, material and equipment suppliers, their agents
or employees, or other persons performing any of the Work.
4.6.11 Project Management will receive from the Contractor and review and approve all Shop
Drawings, Product Data and Samples, coordinate them with information received from other
Contractors, and review those recommended for approval. Project Management actions will be
taken with such reasonable promptness as to cause no delay in the Work of the Contractor or in
the activities of other Contractors or the Owner.
4.6.12 Project Management will review and approve or take other appropriate action upon the
Contractor's submittals such as Shop Drawings, Product Data and Samples, but only for the
limited purpose of checking for conformance with information given and the design concept
expressed in the Contract Documents. Project Management action will be taken with such
promptness consistent with the constraints of the project schedule so as to cause no delay in
the Work of the Contractor or in the activities of the other Contractors, the Owner, or Project
Management, while allowing sufficient time to permit adequate review. Review of such
submittals is not conducted for the purpose of determining the accuracy and completeness of
other details such as dimensions and quantities, or for substantiating instructions for installation
or performance of equipment or systems, all of which remain the responsibility of the Contractor
as Contractor as required by the Contract Documents. Project Management review of the
Contractor's submittals shall not relieve the Contractor of the obligations under Paragraphs 3.3,
3.5 and 3.12. Project Management's review shall not constitute approval of safety precautions
or, unless otherwise specifically stated by Project Management, of any construction means,
methods, techniques, sequences or procedures. Project Management's approval of a specific
item shall not indicate approval of an assembly of which the item is a component.
4.6.13 Project Management will prepare Change Orders and Construction Change Directives.
4.6.14 Following consultation with the Owner, Project Management will take appropriate action
on Change Orders or Construction Change Directives in accordance with Article 7 and will have
authority to order minor changes in the Work as provided in Paragraph 7.4.
4.6.16 The Contractor will assist Project Management in conducting inspections to determine
the dates of Substantial completion and final completion, and will receive and forward to Project
Management written warranties and related documents required by the Contract and assembled
by the Contractor. Project Management will review and approve a final Project Application for
Payment upon compliance with the requirements of the Contract Documents.
4.6.17 Project Management will provide one or more project representatives to assist in
carrying out his responsibilities at the site. The duties, responsibilities and limitations of
authority of such project representatives shall be as set forth in an exhibit to be incorporated in
the Contract Documents.
November 19, 2014 GENERAL CONDITIONS Page 23 of 44
4.6.18 Project Management will interpret and decide matters concerning performance under
and requirements of the Contract Documents on written request of the Owner or Contractor.
Project Management's response to such requests will be made with reasonable promptness and
within any time limits agreed upon. If no agreement is made concerning the time within which
interpretations required of Project Management shall be furnished in compliance with this
Paragraph 4.6, then delay shall not be recognized on account of failure by Project Management
to furnish such interpretations until 15 days after written request is made for them.
4.6.19 Interpretations and decisions of Project Management will be consistent with the intent of
and reasonably inferable from the Contract Documents and will be in writing or in the form of
drawings. When making such interpretations and decisions, Project Management will endeavor
to secure faithful performance by both Owner and Contractor, will not show partiality to either
and will not be liable for results of interpretations or decisions so rendered in good faith.
4.6.20 Project Management's decisions on matters relating to aesthetic effect will be final if
consistent with the intent expressed in the Contract Documents.
4.7 Claims and Disputes
4.7.1 Definition. A Claim is a demand or assertion by one of the parties seeking, as a matter
of right, adjustment or interpretation of Contract terms, payment of money, extension of time or
other relief with respect to the terms of the Contract. The term "Claim" also includes other
disputes and matters in question between the Owner and Contractor arising out of or relating to
the Contract. Claims must be made by written notice. The responsibility to substantiate Claims
shall rest with the party making the claim.
4.7.2 Meet and Confer. The Contractor and Project Management shall try to resolve the
claim or dispute with meet and confer sessions to be commenced within 15 days of the dispute
or claim. Any claim or dispute that the parties cannot resolve shall be decided by the Circuit
Court, 16 Judicial Circuit, Monroe County, Florida.
4.7.3 Time Limits on Claims. Claims by either party must be made within 21 days after
occurrence of the event giving rise to such Claim or within 21 days after the claimant first
recognizes the condition giving rise to the Claim, whichever is later. Claims must be made by
written notice. An additional Claim made after the initial Claim has been implemented by
Change Order will not be considered unless submitted in a timely manner. This notice is not a
condition precedent to any other legal action or suit.
4.7.4 Continuing Contract Performance. Pending final resolution of a Claim unless
otherwise agreed in writing the Contractor shall proceed diligently with performance of the
Contract and the Owner shall continue to make payments in accordance with the Contract
Documents.
4.7.5 Waiver of Claims: Final Payment. The making of final payment shall constitute a
waiver of Claim by the Owner except those arising from:
.1 liens, Claims, security interests or encumbrances arising out of the Contract and
unsettled;
.2 failure of the Work to comply with the requirements of the Contract Documents; or
3 terms of special warranties required by the Contract Documents.
4.7.6 Claims for Concealed or Unknown Conditions. If conditions are encountered at the
site which are (1) subsurface or otherwise concealed physical conditions which differ materially
November 19, 2014 GENERAL CONDITIONS Page 24 of 44
from those indicated in the Contract Documents or (2) unknown physical conditions of an
unusual nature, which differ materially from those ordinarily found to exist and generally
recognized as inherent in construction activities of the character provided for in the Contract
Documents, then notice by the observing party shall be given to the other party promptly before
conditions are disturbed and in no event later than 21 days after first observance of the
conditions. Project Management will promptly investigate such conditions, and the parties will
follow the procedure in paragraph 4.7.2.
4.7.7 Claims for Additional Cost. If the Contractor wishes to make Claim for an increase in
the Contract Sum, written notice as provided herein shall be given before proceeding to execute
the Work. Prior notice is not required for Claims relating to an emergency endangering life or
property arising under Paragraph 10.3 If the Contractor believes additional cost is involved for
reasons including but not limited to (1) a written interpretation from Project Management, (2) a
written order for a minor change in the Work issued by Project Management, (3) failure of
payment by the Owner, (4) termination of the Contract by the Owner, (5) Owner's suspension or
(6) other reasonable grounds, Claim shall be filed in accordance with the procedure established
herein.
4.7.8 Claims for Additional Time.
4.7.8.1. If the Contractor wishes to make Claim for an increase in the Contract Time, written
notice as provided herein shall be given.
4.7.8.2 If adverse weather conditions are the basis for a Claim for additional time, such Claim
shall be documented by data substantiating that weather conditions were abnormal for the
period of time and could not have been reasonably anticipated, and that weather conditions had
an adverse effect on the scheduled construction.
4.7.9 Injury or Damage to Person or Property. If either party to the Contract suffers injury
or damage to person or property because of an act or omission of the other party, of any of the
other party's employees or agents, or of others for whose acts such party is legally liable, written
notice of such injury or damage, whether or not insured, shall be given to the other party within
a reasonable time not exceeding 21 days after first observance. The notice shall provide
sufficient detail to enable the other party to investigate the matter. If a Claim for additional cost
or time related to this Claim is to be asserted, it shall be filed as provided in Subparagraphs
4.7.7 or 4.7.8.
5.0 SUBCONTRACTORS:
5.1 Definitions
5.1.1 A Subcontractor is a person or entity who has a direct contract with the Contractor to
perform a portion of the Work at the site. The term "Subcontractor" is referred to throughout the
Contract Documents as if singular in number and means a Subcontractor or an authorized
representative of the Subcontractor. The term "Subcontractor" does not include other
Contractors or subcontractors of other Contractors.
5.1.2 A Sub - subcontractor is a person or entity who has a direct or indirect contract with a
Subcontractor to perform a portion of the Work at the site. The term "Sub- subcontractor" is
referred to throughout the Contract Documents as if singular in number and means a Sub -
subcontractor or an authorized representative of the Sub - subcontractor.
5.2 Award of Subcontracts and Other Contracts for Portions of the Work
November 19, 2014 GENERAL CONDITIONS Page 25 of 44
5.2.1 Unless otherwise stated in the Contract Documents or the bidding requirements, the
Contractor, as soon as practicable after award of the Contract, shall furnish in writing to Project
Management for review by the Owner and Project Management the names of persons or
entities (including those who are to furnish materials or equipment fabricated to a special
design) proposed for each principal portion of the Work. Project Management will promptly
reply to the Contractor in writing stating whether or not the Owner or Project Management, after
due investigation, has reasonable objection to any such proposed person or entity. Failure of
Project Management to reply promptly shall constitute notice of no reasonable objection.
5.2.2 The Contractor shall not contract with a proposed person or entity to which the Owner or
Project Management has made reasonable and timely objection. The Contractor shall not be
required to contract with anyone to whom the Owner or Project Management has made
reasonable objection.
5.2.3 If the Owner or Project Management refuses to accept any person or entity on a list
submitted by the Contractor in response to the requirements of the Contract Documents, the
Contractor shall submit an acceptable substitute; however, no increase in the Contract Sum
shall be allowed for any such substitution.
5.2.4 The Contractor shall not change a Subcontractor, person or entity previously selected if
the Owner or Project Management makes reasonable objection to such change.
5.3 Subcontractual Relations
5.3.1 By appropriate written agreement, the Contractor shall require each Subcontractor, to
the extent of the Work to be performed by the Subcontractor, to be bound to the Contractor by
terms of the Contract Documents, and to assume toward the Contractor all the obligations and
responsibilities which the Contractor, by these Documents, assumes toward the Owner or
Project Management. Each subcontract agreement shall preserve and protect the rights of the
Owner or Project Management under the Contract Documents with respect to the Work to be
performed by the Subcontractor so that subcontracting thereof will not prejudice such rights.
When appropriate, the Contractor shall require each Subcontractor to enter into similar
agreements with Sub - subcontractors. The Contractor shall make available to each proposed
Subcontractor, copies of the Contract Documents which the Subcontractor will be bound, and,
upon written request of the Subcontractor, identify to the Subcontractor terms and conditions of
the proposed subcontract agreement which may be at variance with the Contract Documents.
Subcontractors shall similarly make copies of applicable portions of such documents available
to their respective proposed Sub - subcontractors.
5.4 Contingent Assignment of Subcontracts
5.4.1 Each subcontract agreement for a portion of the Work is assigned by the Contractor to
the Owner provided that:
.1 assignment is effective only after termination of the Contract by the Owner for cause
pursuant to Paragraph 14.2 and only for those subcontract agreements which the Owner
accepts by notifying the Subcontractor in writing; and
.2 assignment is subject to the prior rights of the surety, if any, obligated under public
construction bond covering the Contract.
i. If the work has been suspended for more than 30 days, the
Subcontractor's compensation shall be equitably adjusted.
November 19, 2014 GENERAL CONDITIONS Page 26 of 44
6.0 CONSTRUCTION BY OWNER OR BY OTHER CONTRACTORS:
6.1 Owner's Right to Perform Construction with Own Forces and to Award Other
Contracts
6.1.1 The Owner reserves the right to perform construction or operations released to the
Project with the Owner's own forces, which include persons or entities under separate contracts
not administered by Project Management. The Owner further reserves the right to award other
contracts in connection with other portions of the Project or other construction or operations on
the site under Conditions of the Contract identical or substantially similar to these including
those portions related to insurance and waiver or subrogation.
6.1.2 When the Owner performs construction or operations with the Owner's own forces
including persons or entities under separate contracts not administered by Project Management,
the Owner shall provide for coordination of such forces with the Work of the Contractor who
shall cooperate with them.
6.1.3 It shall be the responsibility of the Contractor to coordinate his work with the work of
other contractors on the site. The Owner and Project Management shall be held harmless for
any and all costs associated with improper coordination.
6.2 Mutual Responsibility
6.2.1 The Contractor shall afford the Owner's own forces, Project Management and other
contractors reasonable opportunity for introduction and storage of their materials and equipment
and performance of their activities, and shall connect and coordinate the Contractor's
construction and operations with theirs as required by the Contract Documents.
6.2.2 If part of the Contractor's Work depends for proper execution or results upon
construction or operations by the Owner's own forces or other contractors, the Contractor shall,
prior to proceeding with that portion of the Work, promptly report to Project Management any
apparent discrepancies or defects in such other construction that would render it unsuitable for
such proper execution and results. Failure of the Contractor so to report shall constitute an
acknowledgment that the Owner's own forces or other contractors' completed or partially
completed construction is fit and proper to receive the Contractor's Work, except as to defects
not then reasonably discoverable.
6.2.3 Costs caused by delays or by improperly timed activities or defective construction shall
be borne by the Contractor. The Contractor's sole remedy as against the Owner for costs
caused by delays or improperly timed activities or defective construction shall be an extension
of time.
6.2.4 The Contractor shall promptly remedy damage wrongfully caused by the Contractor to
completed or partially completed construction or to property of the Owner or other contractors
as provided in Subparagraph 10.2.5.
6.2.5 Claims and other disputes and matters in question between the Contractor and other
contractors shall be subject to the provisions of Paragraph 4.7 provided the other contractors
have reciprocal obligations.
6.2.6 The Owner and other contractors shall have the same responsibilities for cutting and
patching as are described for the Contractor in Paragraph 3.14.
6.2.7 Should the Contractor contend that he is entitled to an extension of time for completion
of any portion or portions of the work, he shall, within (72) hours of the occurrence of the cause
November 19, 2014 GENERAL CONDITIONS Page 27 of 44
of the delay, notify Project Management in writing, of his contention: setting forth (A) the cause
for the delay, (B) a description of the portion or portions of work affected thereby, and (C) all
details pertinent thereto. A subsequent written application for the specific number of days of
extension of time requested shall be made by the Contractor to Project Management within (72)
hours after the delay has ceased to exist.
.1 It is a condition precedent to the consideration or prosecution of any claim for an
extension of time that the foregoing provisions be strictly adhered to in each instance and, if the
Contractor fails to comply, he shall be deemed to have waived the claim.
.2 The Contractor agrees that whether or not any delay, regardless of cause, shall be
the basis for an extension of time he shall have no claim against the Owner or Project
Management for an increase in the Contract price, nor a claim against the Owner or Project
Management for a payment or allowance of any kind for damage, loss or expense resulting from
delays; nor shall the Contractor have any claim for damage, loss or expense resulting from
interruptions to, or suspension of, his work to enable other contractors to perform their work.
The only remedy available to the Contractor shall be an extension of time.
6.3 Owner's Right to Clean Up
6.3.1 If a dispute arises among the Contractor, other contractors and the Owner as to the
responsibility under their respective contracts for maintaining the premises and surrounding
area free from waste materials and rubbish as described in Paragraph 3.15, the Owner may
clean up and allocate the cost among those responsible as Project Management determines to
be just.
7.0 CHANGES IN THE WORK:
7.1 Changes
7.1.1 Changes in the Work maybe accomplished after execution of the Contract, and without
invalidating the Contract, by Change Order, Construction Change Directive or order for a minor
change in the Work, subject to the limitations stated in this Article 7 and elsewhere in the
Contract Documents.
7.1.2 A Change Order shall be based upon agreement among the Owner, Project
Management and Contractor; a Construction Change Directive require agreement by the
Owner, Project Management and may or may not be agreed to by the Contractor; an order for a
minor change in the Work may be issued by Project Management alone.
7.1.3 Changes in the Work shall be performed under applicable provisions of the Contract
Documents, and the Contractor shall proceed promptly, unless otherwise provided in the
Change Order, Construction Change Directive or order for a minor change in the Work.
7.1.4 If unit prices are stated in the Contract Documents or subsequently agreed upon, and if
quantities originally contemplated are so changed in a proposed Change Order or Construction
Change Directive that application of such unit prices to quantities of Work proposed will cause
substantial inequity to the Owner or Contractor, the applicable unit prices shall be equitably
adjusted.
7.2 Change Orders
November 19, 2014 GENERAL CONDITIONS Page 28 of 44
7.2.1 A change Order is a written instrument prepared by Project Management and signed by
the Owner, Project Management and Contractor stating their agreement upon all of the
following:
1 a change in the Work;
2 the amount of the adjustment in the Contract Sum, if any; and
3 the extent of the adjustment in the Contract Time, if any.
7.2.2 The cost or credit to the Owner resulting from a change in the Work shall be determined
in one or more of the following methods:
.1 mutual acceptance of lump sum properly itemized and supported by sufficient
substantiating data to permit evaluation and payment, and approved by the appropriate
authority in writing;
.2 unit prices stated in the Contract Documents or subsequently agreed upon, and
approved by the appropriate authority in writing;
.3 cost to be determined in a manner agreed upon by the parties and a mutually
acceptable fixed or percentage fee;
.4 or by method provided in subparagraph 7.2.3.
7.2.3 If none of the methods set forth in Clauses 7.2.1 or 7.2.2 is agreed upon, the Contractor,
provided a written order signed by the Owner or Project Management is received, shall promptly
proceed with the Work involved. The cost of such Work shall then be determined by daily force
accounts in a form acceptable to the Owner and Project Management. The daily force account
forms shall identify Contractor and /or Subcontractor personnel by name, total hours for each
man, each piece of equipment and total hours for equipment and all material(s) by type for each
extra Work activity claim. Each daily force account form shall be signed by the designated
Project Management representative no later than the close of business on the day the Work is
performed to verify the items and hours listed. Extended pricing of these forms shall be
submitted to Project Management with all supporting documentation required by Project
Management for inclusion into a change order. Unless otherwise provided in the Contract
Documents, cost shall be limited to the following: cost of materials, including sales tax and cost
of delivery; cost of labor, including social security, old age and unemployment insurance, and
fringe benefits required by agreement or custom; works' or workmen's compensation insurance;
and the rental value of equipment and machinery. Markups for overhead and profit will be in
accordance with subparagraph 7.2.4. Pending final determination of cost, payments on account
shall be made as determined by Project Management. The amount of credit to be allowed by
the Contractor for any deletion or change, which results in a net decrease in the Contract Sum,
will be the amount of the actual net cost to the Owner as confirmed by Project Management.
When both additions and credits covering related Work or substitutions are involved in any one
change, the allowance for overhead and profit shall be figured on the basis of the net increase,
if any with respect to that change.
7.2.4 The actual cost of Changes in the Work may include all items of labor or material, power
tools, and equipment actually used, utilities, pro rata charges for foreman, and all payroll
charges such as Public Liability and Workmen's Compensation Insurance. No percentage for
overhead and profit shall be allowed on items of Social Security and Sales Tax. If deductions
are ordered the amount of credit shall be net cost to Owner as defined in section 5.6.1 of the
Contract. Items considered as overhead shall include insurance other than that mentioned
November 19, 2014 GENERAL CONDITIONS Page 29 of 44
above, bond or bonds, superintendent, timekeeper, clerks, watchmen, use of small tools,
miscellaneous supplies, incidental job costs, warranties, and all general home /field office
expenses. The actual cost of Changes in the Work (other than those covered by unit prices set
forth in the Contract Documents) shall be computed as follows:
.1 if the Contractor performs the actual Work, the maximum percentage mark -up for
overhead shall be five percent (5 %) and the maximum percentage for profit shall be five percent
(5 %);
2 if the Subcontractor performs the actual Work, the subcontractor's percentage mark-
up for overhead and profit shall be a maximum addition of ten percent (10 %). If the Contractor
does not perform the Work, the maximum mark -up for managing the Work will be five percent
(5 %);
3. If the Subcontractor performs part of the actual Work, his percentage mark -up for
overhead and profit shall be a maximum addition of ten percent (10 %) on his direct Work only. If
the Contractor performs part of the actual Work, his percentage mark -up for overhead and profit
shall be a maximum addition of ten percent (10 %) on his direct Work only.
7.2.5 The Contractor shall furnish to the Owner through Project Management, an itemized
breakdown of the quantities and prices used in computing the value of any change that might be
ordered. Any additional supporting documentation requested by Project Management such as
certified quotations or invoices shall be provided by the Contractor to Project Management at no
additional cost to the Owner.
7.2.6 If the Contractor claims that any instructions given to him by Project Management, by
drawings or otherwise, involve extra Work not covered by the Contract, he shall give Project
Management written notice thereof within five (5) days after the receipt of such instructions and
before proceeding to execute the work, except in emergencies endangering life or property, in
which case the Contractor shall proceed in accordance with Paragraph 10.3.
.1 The written notice to Project Management for the Extra Work shall include a complete
description of the extra Work, the total cost and a detailed cost breakdown by labor, material
and equipment for each additional activity required to be performed. Mark -ups shall be limited
as specified elsewhere in this Article.
.2 Except as otherwise specifically provided, no claim for additional cost shall be
allowed unless the complete notice specified by this subparagraph is given by the Contractor.
7.2.7 Unless otherwise agreed in writing, the Contractor shall carry on the Work and maintain
its progress during any dispute or claim proceeding, and Owner shall continue to make
payments to the Contractor in accordance with the Contract Documents. Disputes unresolved
shall be settled in accordance with subparagraph 4.7. The Contractor shall maintain completed
daily force account forms in accordance with subparagraph 7.2.3 for any dispute or claim item.
7.3 Authority
7.3.1 Project Management will have authority to order minor changes in the Work not involving
adjustment in the Contract sum or extension of the Contract Time and not inconsistent with the
intent of the Contract Documents. Such changes shall be effected by written order issued
through Project Management and shall be binding on the Owner and Contractor. The Contractor
shall carry out such written order promptly.
8.0 TIME:
November 19, 2014 GENERAL CONDITIONS Page 30 of 44
8.1 Definitions
8.1.1 Unless otherwise provided, Contract Time is the period of time, including authorized
adjustments, allotted in the Contract Documents for Substantial Completion of the Work.
8.1.2 The date of commencement of the Work is the date established in the Agreement. The
date shall not be postponed by the failure to act of the Contractor or of persons or entities for
which the Contractor is responsible.
8.1.3 The date of Substantial Completion is the date certified by Project Management in
accordance with Paragraph 9.8.
8.1.4 The term "day" as used in the Contract Documents shall mean calendar day unless
otherwise specifically defined.
8.1.5 The Owner /Project Management shall be the final judge as to whether Substantial
Completion has been achieved and certifies the date to the Contractor.
8.2 Progress and Completion
8.2.1 Time limits stated in the Contract Documents are of the essence of the Contract. By
executing the Agreement the Contractor confirms that the Contract Time is a reasonable period
for performing the Work.
8.2.2 The Contractor shall not knowingly, except by agreement or instruction of the Owner in
writing, prematurely commence operations on the site or elsewhere prior to the effective date of
insurance required by Article 11 to be furnished by the Contractor. The date of commencement
of the Work shall not be changed by the effective date of such insurance.
8.2.3 The Contractor shall proceed expeditiously with adequate forces and shall achieve
Substantial Completion within the Contract Time.
8.3 Delays and Extensions of Time
8.3.1 If the Contractor is delayed, at any time, in the progress of the Work by any act or
neglect of the Owner, Project Management, or the Architect/Engineer, or by any employee of
either, or by any separate contractor employed by the Owner, or by changes ordered in the
Work, or by fire, unusual delay in transportation, adverse weather conditions not reasonably
anticipatable, unavoidable casualties or any causes beyond the Contractor's control, or by delay
authorized by the Owner, Project Management, or by any other cause which Project
Management determines may justify the delay, then the Contract Time shall be extended by no
cost Change Order for such reasonable time as Project Management may determine, in
accordance with subparagraph 6.2.7.
8.3.2 Any claim for extension of time shall be made in writing to Project Management not more
than Seventy -two (72) hours after the commencement of the delay in accordance with
paragraph 6.2.7; otherwise it shall be waived. Any claim for extension of time shall state the
cause of the delay and the number of days of extension requested. If the cause of the delay is
continuing, only one claim is necessary, but the Contractor shall report the termination of the
cause for the delay within seventy -two (72) hours after such termination in accordance with
paragraph 6.2.7; otherwise, any claim for extension of time based upon that cause shall be
waived.
November 19, 2014 GENERAL CONDITIONS Page 31 of 44
8.3.3 No claim for an increase in the Contract Sum for either acceleration or delay will be
allowed for extensions of time pursuant to this Paragraph 8.3 or for other changes in the
Construction Schedules.
8.3.4 If the Project is delayed as a result of the Contractor's refusal or failure to begin the
Work on the date of commencement as defined in Paragraph 8.1.2, or his refusal or failure to
carry the Work forward expeditiously with adequate forces, the Contractor causing the delay
shall be liable for, but not limited to, delay claims from other Contractors which are affected.
9.0 PAYMENTS AND COMPLETION:
9.1 Contract Sum
9.1.1 The Contract Sum is stated in the Agreement and, including authorized adjustments, is
the total amount payable by the Owner to the Contractor for performance of the Work under the
Contract Documents.
9.2 Schedule of Values
9.2.1 Before submittal of the first Application for Payment, the Contractor shall submit to
Project Management, a schedule of values allocated to various portions of the Work, prepared
in such form and supported by such data to substantiate its accuracy as Project Management
may require. This schedule, unless objected to by Project Management, shall be used as a
basis for reviewing the Contractor's Applications for Payment.
9.3 Applications for Payment
9.3.1 At least fifteen days before the date established for each progress payment, the
Contractor shall submit to Project Management an itemized Application for Payment for Work
completed in accordance with the schedule of values. Such application shall be notarized and
supported by such data substantiating the Contractor's right to payment as the Owner or Project
Management may require, such as copies of requisitions from Subcontractors and material
suppliers, and reflecting retainage if provided for elsewhere in the Contract Documents.
.1 Such applications may include request for payment on account of changes in the
Work which have been properly authorized by Construction Change Directives but not yet
included in Change Orders.
.2 Such applications may not include requests for payment of amounts the Contractor
does not intend to pay to a Subcontractor or material supplier because of a dispute or other
reason.
9.3.2 Unless otherwise provided in the Contract Documents, payments shall be made on
account of materials and equipment delivered and suitably stored at the site for subsequent
incorporation in the Work. If approved in advance by the Owner, payment may similarly be
made for materials and equipment suitably stored off the site at a location agreed upon in
writing. Payment for materials and equipment stored on or off the site shall be conditioned upon
compliance by the Contractor with procedures satisfactory to the Owner to establish the
Owner's title to such materials and equipment or otherwise protect the Owner's interest, and
shall include applicable insurance, storage and transportation to the site for such materials and
equipment stored off the site.
November 19, 2014 GENERAL CONDITIONS Page 32 of 44
9.3.3 The Contractor warrants that title to all Work covered by an Application for Payment will
pass to the Owner no later than the time of payment. The Contractor further warrants that upon
submittal of an Application for Payment all Work for which approval for payment have been
previously issued and payments received from the Owner shall, to the best of the Contractor's
knowledge, information and belief, be free and clear of liens, claims security interests or
encumbrances in favor of the Contractor, Subcontractors, material suppliers, or other persons or
entities making a claim by reason of having provided labor, materials and equipment relating to
the Work. All Subcontractors and Sub - subcontractors shall execute an agreement stating that
title will so pass, upon their receipt of payment from the Contractor. The warranties are for the
administrative convenience of the Owner only and do not create an obligation on the part of the
Owner to pay directly any unpaid subcontractor, laborer or materialmen. Such persons must
seek payment from the Contractor or his public construction bond surety only.
9.4 Approval for Payment
9.4.1 Project Management will assemble a Project Application for Payment by combining the
Contractor's applications with similar applications for progress payments from other Contractors
and certify the amounts due on such applications.
9.4.2 After the Project Management's receipt of the Project Application for Payment, Project
Management will either approve the Application for Payment, with a copy to the Contractor, for
such amount as Project Management determine is properly due, or notify the Contractor in
writing of Project Management's reasons for withholding approval in whole or in part as provided
in Subparagraph 9.5.1.
9.4.3 The issuance of a separate Approval for Payment will constitute representations made
by Project Management to the Owner, based on their individual observations at the site and the
data comprising the Application for Payment submitted by the Contractor, that the Work has
progressed to the point indicated and that, to the best of Project Management's knowledge,
information and belief, quality of the Work is in accordance with the Contract Documents. The
foregoing representations are subject to an evaluation of the Work for conformance with the
Contract Documents upon Substantial Completion, to results of subsequent tests and
inspections, to minor deviations from the Contract Documents correctable prior to completion
and to specific qualifications expressed by Project Management. The issuance of a separate
Approval for Payment will further constitute a representation that the Contractor is entitled to
payment in the amount approved. However, the issuance of a separate Approval for Payment
will not be a representation that Project Management has (1) made exhaustive or continuous
on -site inspections to check the quality or quantity of the Work, (2) reviewed the Contractor's
construction means, methods, techniques, sequences or procedures, (3) reviewed copies of
requisitions received from Subcontractors and material suppliers and other data requested by
the Owner to substantiate the Contractor's right to payment or (4) made examination to
ascertain how or for what purpose the Contractor has used money previously paid on account of
the Contract Sum.
9.5 Decisions to Withhold Approval
9.5.1 Project Management may decline to approve an Application for Payment if, in his
opinion, the application is not adequately supported. If the Contractor and Project Management
cannot agree on a revised amount, Project Management shall process the Application for the
amount it deems appropriate. Project Management may also decline to approve any
Application for Payment because of subsequently discovered evidence or subsequent
November 19, 2014 GENERAL CONDITIONS Page 33 of 44
inspections. It may nullify, in whole or part, any approval previously made to such extent as may
be necessary in its opinion because of: (1) defective Work not remedied; (2) third party claims
filed or reasonable evidence indicating probable filing of such claims; (3) failure of the
Contractor to make payments properly to Subcontractors or for labor, materials, or equipment;
(4) reasonable evidence that the Work cannot be completed for the unpaid balance of the
Contract Sum; (5) damage to Project Management, the Owner, or another contractor working at
the project; (6) reasonable evidence that the Work will not be completed within the contract
time; (7) persistent failure to carry out the Work in accordance with the Contract Documents.
No payment shall be made to the Contractor until certificates of insurance or other evidence of
compliance by the Contractor, with all the requirements of Article 11, have been filed with the
Owner and Project Management.
9.5.2 When the above reasons for withholding approval are removed, approval will be made
for amounts previously withheld.
9.6 Progress Payments
9.6.1 After Project Management has issued an Approval for Payment, the Owner shall make
payment in the manner and within the time provided in the Contract Documents, and shall so
notify Project Management. From the total of the amount determined to be payable on a
progress payment, a retainage in accordance with the Florida Local Government Prompt
Payment Act, Chapter 218, Florida Statutes will be deducted and retained by the Owner until
the final payment is made. The balance of the amount payable, less all previous payments, shall
be approved for payment.
.1 It is understood and agreed that the Contractor shall not be entitled to demand or
receive progress payment based on quantities of Work in excess of those provided in the
proposal or covered by approved change orders, except when such excess quantities have
been determined by Project Management to be a part of the final quantity for the item of Work in
question.
.2 No progress payment shall bind the Owner to the acceptance of any materials or
Work in place, as to quality or quantity. All progress payments are subject to correction at the
time of final payments.
9.6.2 The Contractor shall promptly pay each Subcontractor, upon receipt of payment from the
Owner, out of the amount paid to the Contractor on account of such Subcontractor's portion of
the Work, the amount to which said Subcontractor is entitled, reflecting percentages actually
retained from payments to the Contractor on account of such Subcontractor's portion of the
Work. The Contractor shall, by appropriate agreement with each Subcontractor, require each
Subcontractor to make payments to Sub - subcontractors in similar manner.
9.6.3 Project Management will, on request, furnish to a Subcontractor, if practicable,
information regarding percentages of completion or amounts applied for by the Contractor and
action taken thereon by the Owner and Project Management on account of portions of the Work
done by such Subcontractor.
9.6.4 Neither the Owner nor Project Management shall have an obligation to pay, or to see to,
the payment of money to a Subcontractor except as may otherwise be required by law.
9.6.5 Payment to material suppliers shall be treated in a manner similar to that provided in
Subparagraphs 9.6.2, 9.6.3 and 9.6.4.
November 19, 2014 GENERAL CONDITIONS Page 34 of 44
9.6.6 A progress payment, or partial or entire use or occupancy of the Project by the Owner
shall not constitute acceptance of Work not in accordance with the Contract Documents.
9.6.7 All material and work covered by partial payments made shall thereupon become the
sole property of the Owner, and by this provision shall not be construed as relieving the
Contractor from the sole responsibility for the materials and Work upon which payments have
been made or the restoration for any damaged material, or as a waiver of the right of the Owner
or Project Management to require the fulfillment of all the terms of the Contract.
9.6.8 Except in case of bona fide disputes, or where the Contractor has some other justifiable
reason for delay, the Contractor shall pay for all transportation and utility services not later than
the end of the calendar month following that in which services are rendered and for all materials,
tools, and other expendable equipment which are delivered at the site of the Project. The
Contractor shall pay to each of his Subcontractors, not later than the end of the calendar month
in which each payment is made to the Contractor, the representative amount allowed the
Contractor on account of the Work performed by the Subcontractor. The Contractor shall, by an
appropriate agreement with each Subcontractor, also require each Subcontractor to make
payments to his suppliers and Sub - subcontractors in a similar manner.
9.8 Substantial Completion
9.8.1 Substantial Completion is the stage in the progress of the Work when the Work or
designated portion thereof is sufficiently complete in accordance with the Contract Documents
so the Owner can occupy or utilize the Work for its intended use.
9.8.2 When the Contractor considers that the Work, or a portion thereof which the Owner
agrees to accept separately, is substantially complete, the Contractor and Project Management
shall jointly prepare a comprehensive list of items to be completed or corrected. The Contractor
shall proceed promptly to complete and correct items on the list. Failure to include an item on
such list does not alter the responsibility of the Contractor to complete all Work in accordance
with the Contract Documents. Upon receipt of the list, Project Management will make an
inspection to determine whether the Work or designated portion thereof is substantially
complete. If the inspection discloses any item, whether or not included on the list, which is not
in accordance with the requirements of the Contract Documents, the Contractor shall, before
issuance of the Certificate of Substantial Completion, complete or correct such item upon
notification by Project Management. The Contractor shall then submit a request for another
inspection by Project Management, to determine Substantial Completion. When the Work or
designated portion thereof is substantially complete, Project Management will prepare a
Certificate of Substantial Completion, shall establish responsibilities of the Owner and
Contractor for security, maintenance, heat, utilities, damage to the Work and insurance, and
shall fix the time within which the Contractor shall finish all items on the list accompanying the
Certificate. Warranties required by the Contract Documents shall commence on the date of
Substantial Completion of the Work or designated portion thereof unless otherwise provided in
the Certificate of Substantial Completion. The Certificate of Substantial Completion shall be
submitted to the Owner and Contractor for their written acceptance of responsibilities assigned
to them in such Certificate.
9.8.3 Upon Substantial Completion of the Work or designated portion thereof and upon
application by the Contractor and certification by Project Management, the Owner shall make
payment, reflecting adjustment in retainage, if any, for such Work or portion thereof as provided
in the Contract Documents.
November 19, 2014 GENERAL CONDITIONS Page 35 of 44
9.9 Partial Occupancy or Use
9.9.1 The Owner may occupy or use any completed or partially completed portion of the Work
at any stage when such portion is designated by separate agreement with the Contractor,
provided such occupancy or use is consented to by the insurer as required under Subparagraph
11.3.1 and authorized by public authorities having jurisdiction over the Work. Such partial
occupancy or use may commence whether or not the portion is substantially complete, provided
the Owner and Contractor have accepted in writing the responsibilities assigned to each of them
for payments, retainage if any, security, maintenance, heat, utilities, damage to the Work and
insurance, and have agreed in writing concerning the period for correction of the Work and
commencement of warranties required by the Contract Documents. When the Contractor
considers a portion substantially complete, the Contractor and Project Management shall jointly
prepare a list as provided under Subparagraph 9.8.2. Consent of the Contractor to partial
occupancy or use shall not be unreasonably withheld. The stage of the progress of the Work
shall be determined by written agreement between the Owner and Contractor or, if no
agreement is reached, by decision of Project Management.
9.9.2 Immediately prior to such partial occupancy or use, the Owner, Project Management and
Contractor shall jointly inspect the area to be occupied or portion of the Work to be used in order
to determine and record the condition of the Work.
9.9.3 Unless otherwise agreed upon, partial occupancy or use of a portion or portions of the
Work shall not constitute acceptance of Work not complying with the requirements of the
Contract Documents.
9.10 Final Completion and Final Payment
9.10.1 Upon completion of the Work, the Contractor shall forward to Project Management a
written Notice that the Work is ready for final inspection and acceptance and shall also forward
to Project Management a final Contractor's Application for Payment. Upon receipt, Project
Management will promptly make such inspection. When Project Management, finds the Work
acceptable under the Contract Documents and the Contract fully performed, Project
Management will promptly issue a final Approval for Payment stating that to the best of their
knowledge, information and belief, and on the basis of their observations and inspections, the
Work has been completed in accordance with terms and conditions of the Contract Documents
and that the entire balance found to be due the Contractor and noted in said final Approval is
due and payable. Project Management's final Approval for Payment will constitute a further
representation that conditions listed in Subparagraph 9.10.2 as precedent to the Contractor's
being entitled to final payment have been fulfilled.
9.10.2 Neither final payment nor any remaining retained percentage shall become due until the
Contractor submits to Project Management (1) an affidavit that payrolls, bills for materials and
equipment, and other indebtedness connected with the Work for which the Owner or the
Owner's property might be responsible or encumbered (less amounts withheld by Owner) have
been paid or otherwise satisfied, (2) a certificate evidencing that insurance required by the
Contract Documents to remain in force after final payment is made, is currently in effect and will
not be canceled or allowed to expire until at least 30 days' prior written notice has been given to
the Owner, (3) a written statement that the Contractor knows of no substantial reason that the
insurance will not be renewable to cover the period required by the Contract Documents, (4)
consent of surety, if any, to final payment and (5), if required by the Owner, other data
establishing payment or satisfaction of obligations, such as receipts, releases and waivers of
November 19, 2014 GENERAL CONDITIONS Page 36 of 44
liens, claims, security interests or encumbrances arising out of the Contract. The following
documents (samples included in section 1027 of Project Manual) are required for Final
Payment:
(1) Application and Certificate for Payment
(2) Continuation Sheet
(3) Certificate of Substantial Completion
(4) Contractor's Affidavit of Debts and Claims
(5) Contractor's Affidavit of Release of Liens
(6) Final Release of Lien
(7) Contractor shall provide two (2) hard copies in tabulated divided binders and
one (1) saved electronically tabbed and indexed in Adobe Acrobat file (.PDF)
format delivered on a downloadable CD /DVD of all the following but not limited
to:
A. Project Record Documents (As Built Documents).
B. Operating and maintenance data, instructions to the Owner's personnel.
C. Warranties, bond and guarantees.
D. Keys and keying schedule.
E. Spare parts and maintenance materials.
F. Evidence of payment and final release of liens and consent of surety to final release
(includes final release from all utilities and utility companies).
9.10.3 Acceptance of final payment by the Contractor, a Subcontractor or material supplier shall
constitute a waiver of claims by that payee except those previously made in writing and
identified by that payee as unsettled at the time of final Application for Payment. Such waivers
shall be in addition to the waiver described Subparagraph 4.7.5.
9.11 Payment of Subcontractors
9.11.1 Any requirement of this Article 9 that the Contractor furnish proof to the Owner or Project
Management that the subcontractors and material men have been paid is for the protection and
convenience of the Owner only. Unpaid subcontractors and material men may only seek
payment from the Contractor and the surety that provided the Contractor's Public Construction
Bond. The Contractor must insert this paragraph 9.11 in all its contracts with
subcontractors and material men.
10.0 PROTECTION OF PERSONS AND PROPERTY:
10.1 Safety Precautions and Programs
10.1.1 The Contractor shall be responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the performance of the Contract. The Contractor
shall submit the Contractor's safety program to Project Management for review and coordination
with the safety programs of other Contractors.
November 19, 2014 GENERAL CONDITIONS Page 37 of 44
10.1.2 In the event the Contractor encounters on the site material reasonably believed to be
asbestos or polychlorinated biphenyl (PCB) which has not been rendered harmless, the
Contractor shall immediately stop Work in the area affected and report the condition to the
Owner and Project Management in writing. The Work in the affected area shall not thereafter
be resumed except by written agreement of the Owner and Contractor if in fact the material is
asbestos or polychlorinated biphenyl (PCB) and has not been rendered harmless. The Work in
the affected area shall be resumed in the absence of asbestos or polychlorinated biphenyl
(PCB), or when it has been rendered harmless, by written agreement of the Owner and
Contractor.
10. 1.3 The Contractor shall not be required pursuant to Article 7 to perform without consent any
Work relating to asbestos or polychlorinated biphenyl (PCB).
10. 1.5 If reasonable precautions will be inadequate to prevent foreseeable bodily injury or death
to persons resulting from a material or substance encountered on the site by the Contractor, the
Contractor shall, upon recognizing the condition, immediately stop Work in the affected area
and report the condition to Project Management in writing. The Owner, Contractor and Project
Management shall then proceed in the same manner described in Subparagraph 10.1.2.
10. 1.6 The Owner shall be responsible for obtaining the services of a licensed laboratory to
verify a presence or absence of the material or substance reported by the Contractor and, in the
event such material or substance is found to be present, to verify that it has been rendered
harmless. Unless otherwise required by the Contract Documents, the Owner shall furnish in
writing to the Contractor and Project Management the names and qualifications of persons or
entities who are to perform tests verifying the presence or absence of such material or
substance or who are to perform the task of removal or safe containment of such material or
substance. The Contractor and Project Management will promptly reply to the Owner in writing
stating whether or not any of them has reasonable objection to the persons or entities proposed
by the Owner. If the Contractor or Project Management has an objection to a person or entity
proposed by the Owner, the Owner shall propose another to whom the Contractor and Project
Management have no reasonable objection.
10.2 Safety of Persons and Property
10.2.1 The Contractor shall take reasonable precautions for safety of, and shall provide
reasonable protection to prevent damage, injury or loss to:
1 employees on the Work and other persons who may be affected thereby;
.2 the Work and materials and equipment to be incorporated therein, whether in storage
on or off the site, under care, custody or control of the Contractor or the Contractor's
Subcontractors or Sub - subcontractors;
.3 other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks,
pavements, roadways, structures and utilities not designated for removal, relocation or
replacement in the course of construction; and
4 construction or operations by the Owner or other Contractors.
10.2.2 The Contractor shall give notices and comply with applicable laws, ordinances, rules,
regulations and lawful orders of public authorities bearing on safety of persons or property or
their protection from damage, injury or loss.
November 19, 2014 GENERAL CONDITIONS Page 38 of 44
10.2.3 The Contractor shall erect and maintain, as required by existing conditions and
performance of the Contract, reasonable safeguards for safety and protection, including posting
danger signs and other warnings against hazards, promulgating safety regulations and notifying
owners and users of adjacent sites and utilities.
10.2.4 When use or storage of explosives or other hazardous materials or equipment or
unusual methods are necessary for execution of the Work, the Contractor shall exercise utmost
care and carry on such activities under supervision of properly qualified personnel.
10.2.5 The Contractor shall promptly remedy damage and loss to property referred to in
Clauses 10.2.1.2, 10.2.1.3, 10.2.1.4 caused in whole or in part by the Contractor, a
Subcontractor, a Sub - subcontractor, or anyone directly or indirectly employed by any of them, or
by anyone for whose acts they may be liable and for which the Contractor is responsible under
Clauses 10.2.1.2, 10.2.1.3 and 10.2.1.4, except damage or loss attributable to acts or omissions
of the Owner, Project Management or Architect or anyone directly or indirectly employed by any
of them, or by anyone for whose acts any of them may be liable, and not attributable to the fault
or negligence of the Contractor. The foregoing obligations of the Contractor are in addition to
the Contractor's obligations under Paragraph 3.18.
10.2.6 The Contractor shall designate a responsible member of the Contractor's organization at
the site whose duty shall be the prevention of accidents. This person shall be the Contractor's
superintendent unless otherwise designated by the Contractor in writing to the Owner or Project
Management.
10.2.7 The Contractor shall not load or permit any part of the construction or site to be loaded
so as to endanger its safety.
10.3 Emergencies
10.3.1 In an emergency affecting safety of persons or property, the Contractor shall act, at the
Contractor's discretion, to prevent threatened damage, injury or loss. Additional compensation
or extension of time claimed by the Contractor on account of an emergency shall be determined
as provided in Paragraph 4.7 and Article 7.
11.0 INSURANCE AND BONDS:
11.1.1 Prior to commencement of Work governed by this contract (including the pre- staging of
personnel and material), the Contractor shall obtain, at its own expense, insurance as specified
in the schedule set forth in Section 00110 Bid Form which are made part of this Agreement.
The Contractor will ensure that the insurance obtained will extend protection to all
subcontractors engaged by the Contractor. As an alternative the Contractor may require all
subcontractors to obtain insurance consistent with the attached schedules.
11. 1.2 The Contractor will not be permitted to commence Work governed by the Agreement
(including pre- staging of personnel and material) until satisfactory evidence of the required
insurance has been furnished to the County as specified below. Delays in the commencement
of Work resulting from the failure of the Contractor to provide satisfactory evidence of the
required insurance shall not extend deadlines specified in this Agreement and any penalties and
failure to perform assessments shall be imposed as if the Work commenced on the specified
date and time, except for the Contractor's failure to provide satisfactory evidence of insurance.
November 19, 2014 GENERAL CONDITIONS Page 39 of 44
11. 1.3 The Contractor shall maintain the required insurance throughout the entire term of this
contract and any extensions specified in any attached schedules. Failure to comply with this
provision may result in the immediate suspension of all Work until the required insurance has
been reinstated or replaced. Delays in the completion of Work resulting from the failure of the
Contractor to maintain the required insurance shall not extend deadlines specified in this
Agreement and any penalties and failure to perform assessments shall be imposed as if the
Work commenced on the specified date and time, except for the Contractor's failure to provide
satisfactory evidence of insurance.
11.1.4 The Contractor shall provide, to the County in care of Project Management as
satisfactory evidence of the required insurance, either:
Certificate of Insurance
Or
A certified copy of the actual insurance policy
11. 1.5 The County, at its sole option, has the right to request a certified copy of any or all
insurance policies required by this Contract.
11. 1.6 All insurance policies must specify that they are not subject to cancellation, nonrenewal,
material change, or reduction in coverage unless a minimum of thirty (30) days prior notification
is given to the County by the insurer.
11.1.7 The acceptance and /or approval of the Contractor's insurance shall not be construed as
relieving the Contractor from any liability or obligation assumed under this contract or imposed
by law.
11. 1.8 The Monroe County Board of County Commissioners, its employees and officials will be
included as "Additional Insured" on all policies, except for Worker's Compensation.
11.1.9 In addition, the County will be named as an additional insured and loss payee on all
policies covering County -owned property.
11.1.10 Any deviations from these General Insurance Requirements must be requested in
writing on the County prepared form entitled "Request for Waiver of Insurance Requirements"
and approved by the Monroe County's Risk Manager.
11.2 Builder's Risk Insurance: Not Required
11.3 Public Construction Bond
11.3.1 A Public Construction Bond in the amount of the cost of construction is a requirement of
this Contract.
12.0 UNCOVERING AND CORRECTION OF WORK:
12.1 Uncovering of Work
12. 1.1 If a portion of the Work is covered contrary to Project Management's request or to
requirements specifically expressed in the Contract Documents, it must, if required in writing by
November 19, 2014 GENERAL CONDITIONS Page 40 of 44
Project Management, be uncovered for their observation and be replaced at the Contractor's
expense without change in the Contract Time.
12.1.2 If a portion of the Work has been covered which Project Management has not
specifically requested to observe prior to its being covered, Project Management may request to
see such Work and it shall be uncovered by the Contractor, if such Work is in accordance with
the Contract Documents, costs of uncovering and replacement shall, by appropriate Change
Order, be charged to the Owner, if such Work is not in accordance with the Contract
Documents, the Contractor shall pay such costs unless the condition was caused by the Owner
or one of the other Contractors in which event the Owner shall be responsible for payment of
such costs.
12.2 Correction of Work
12.2.1 The Contractor shall promptly correct Work rejected by Project Management or failing to
conform to the requirements of the Contract Documents, whether observed before or after
Substantial Completion and whether or not fabricated, installed or completed. The Contractor
shall bear costs of correcting such rejected Work, including additional testing and inspections
and compensation for Project Management's services and expenses made necessary thereby.
12.2.2 If, within one year after the date of Substantial Completion of the Work or designated
portion thereof, or after the date for commencement of warranties established under
Subparagraph 9.9, or by terms of an applicable special warranty required by the Contract
Documents, any of the Work is found to be not in accordance with the requirements of the
Contract Documents, the Contractor shall correct it promptly after receipt of written notice from
the Owner to do so unless the Owner has previously given the Contractor a written acceptance
of such condition. This period of one year shall be extended with respect to portions of Work
first performed after Substantial Completion by the period of time between Substantial
Completion and the actual performance of the Work. This obligation under this Subparagraph
12.2.2 shall survive acceptance of the Work under the Contract and termination of the Contract.
The Owner shall give such notice promptly after discovery of the condition.
12.2.3 The Contractor shall remove from the site portions of the Work which are not in
accordance with the requirements of the Contract Documents and are neither corrected by the
Contractor nor accepted by the Owner.
12.2.4 If the Contractor fails to correct nonconforming Work within a reasonable time, the
Owner may correct it in accordance with Paragraph 2.4. If the Contractor does not proceed with
correction of such nonconforming Work within a reasonable time fixed by written notice from
Project Management, the Owner may remove it and store the salvageable materials or
equipment at the Contractor's expense. If the Contractor does not pay costs of such removal
and storage within ten days after written notice, the Owner may upon ten additional days' written
notice sell such materials and equipment at auction or at private sale and shall account for the
proceeds thereof, after deducting costs and damages that should have been borne by the
Contractor, including compensation for Project Management's services and expenses made
necessary thereby. If such proceeds of sale do not cover costs which the Contractor should
have borne, the Contract Sum shall be reduced by the deficiency. If payments then or
thereafter due the Contractor are not sufficient to cover such amount, the Contractor shall pay
the difference to the Owner.
12.2.5 The Contractor shall bear the cost of correcting destroyed or damaged construction,
whether completed or partially completed, of the Owner or other Contractors caused by the
November 19, 2014 GENERAL CONDITIONS Page 41 of 44
Contractor's correction or removal of Work which is not in accordance with the requirements of
the Contract Documents.
12.2.6 Nothing contained in this Paragraph 12.2 shall be construed to establish a period of
limitation with respect to other obligations which the Contractor might have under the Contract
Documents. Establishment of the time period of one year as described in Subparagraph 12.2.2,
relates only to the specific obligation of the Contractor to correct the Work, and has no
relationship to the time within which the obligation to comply with the Contract Documents may
be sought to be enforced, nor to the time within which proceedings may be commenced to
establish the Contractor's liability with respect to the Contractor's obligations other than
specifically to correct the Work.
12.3 Acceptance of Nonconforming Work
12.3.1 If the Owner prefers to accept Work which is not in accordance with the requirements of
the Contract Documents, the Owner may do so instead of requiring its removal and correction,
in which case the Contract Sum will be reduced as appropriate and equitable. Such adjustment
shall be effected whether or not final payment has been made.
13.0 MISCELLANEOUS PROVISIONS:
13.1 Governing Law
13. 1.1 The contract shall be governed by the laws of the State of Florida. Venue for any claims
or disputes arising under this contract shall be in the Circuit Court of the 16th Judicial Circuit of
the State of Florida.
13.2 Successors and Assigns
13.2.1 The Owner or Project Management (as the case may be) and the Contractor each binds
himself, his partners, successors, assigns, and legal representatives of such other party in
respect to all covenants, agreements, and obligations contained in the Contract Documents.
Neither party to the Contract shall assign the Contract or sublet it as a whole without the written
consent of the other.
13.2.2 The Contractor shall not assign any monies due or to become due under this Contract
without prior written consent of the Owner or Project Management.
13.3 Written Notice
13.3.1 Any written notices or correspondence given pursuant to this contract shall be sent by
United States Mail, certified, return receipt requested, or by courier with proof of delivery. Notice
shall be sent to the following persons:
For Contractor: Greentech Group Solution, LLC
88005 Overseas Highway #10 -165
Tavernier, FL 33070
For Owner: Kevin Wilson, P. E. Roman Gastesi
Director of Project Management County Administrator
November 19, 2014 GENERAL CONDITIONS Page 42 of 44
1100 Simonton St., Room 2 -216 1100 Simonton St.
Key West, Florida 33040 Key West Florida 33040
13.4 Rights and Remedies
13.4.1 Duties and obligations imposed by the Contract Documents and rights and remedies
available thereunder shall be in addition to and not a limitation of duties, obligations, rights and
remedies otherwise imposed or available by law.
13.4.2 No action or failure to act by the Owner, Project Management, Architect or Contractor
shall constitute a waiver of a right or duty afforded them under the contract, nor shall such
action or failure to act constitute approval of or acquiescence in a breach thereunder, except as
may be specifically agreed in writing.
13.5 Tests and Inspections
13.5.1 Tests, inspections and approvals of portions of the Work required by the Contract
Documents or by laws, ordinances, rules, regulations or orders of public authorities having
jurisdiction shall be made at an appropriate time. Unless otherwise provided, the Contractor
shall make arrangements for such tests, inspections and approvals with an independent testing
laboratory or entity acceptable to the Owner, or with the appropriate public authority, and shall
bear all related costs of tests, inspections and approvals. The Contractor shall give Project
Management timely notice of when and where tests and inspections are to be made so Project
Management may observe such procedures. The Owner shall bear costs of test, inspections or
approvals which do not become requirements until after bids are received or negotiations
concluded.
13.5.2 If Project Management, Owner or public authorities having jurisdiction determine that
portions of the Work require additional testing, inspection or approval not included under
Subparagraph 13.5.1, Project Management will, upon written authorization from the Owner,
instruct the Contractor to make arrangements for such additional testing, inspection or approval
by an entity acceptable to the Owner, and the Contractor shall give timely notice to Project
Management of when and where tests and inspections are to be made so Project Management
may observe such procedures. The Owner shall bear such costs except as provided in
Subparagraph 13.5.3.
13.5.3 If such procedures for testing, inspection or approval under Subparagraphs 13.5.1 and
13.5.2 reveal failure of the portions of the Work to comply with requirements established by the
Contract Documents, the Contractor shall bear all costs made necessary by such failure
including those of repeated procedures and compensation for Project Management's services
and expenses.
13.5.4 Required certificates of testing, inspection or approval shall, unless otherwise required
by the Contract Documents, be secured by the Contractor and promptly delivered to Project
Management.
13.5.5 If Project Management is to observe tests, inspections or approvals required by the
Contract Documents, Project Management will do so promptly and, where practicable, at the
normal place of testing.
13.5.6 Test or inspections conducted pursuant to the Contract Documents shall be made
promptly to avoid unreasonable delay in the Work.
November 19, 2014 GENERAL CONDITIONS Page 43 of 44
13.7 Commencement of Statutory Limitation Period
13.7.1 The statute of limitations applicable to this contact are as provided in Section 95.11 (3)
(C), Florida Statutes.
14.0 TERMINATION OR SUSPENSION OF THE CONTRACT:
14.1 Termination by the Owner for Cause
14.1.1 The Owner may terminate the Contract if the Contractor:
.1 persistently or repeatedly refuses or fails to supply enough properly skilled workers or
proper materials;
.2 fails to make payment to Subcontractors for materials or labor in accordance with the
respective agreements between the Contractor and the Subcontractors;
.3 persistently disregards laws, ordinances, or rules, regulations or orders of a public
authority having jurisdiction;
.or
.4 Otherwise is guilty of substantial breach of a provision of the Contract Documents
14.1.2 When any of the above reasons exist, the Owner, after consultation with Project
Management, and upon certification by Project Management that sufficient cause exists to
justify such action, may without prejudice to any other rights or remedies of the Owner and after
giving the Contractor and the Contractor's surety, if any, 72 hours written notice, terminate
employment of the Contractor and may, subject to any prior rights of the surety:
.1 take possession of the site and of all materials, equipment, tools, and construction
equipment and machinery thereon owned by the Contractor;
2 accept assignment of subcontracts pursuant to Paragraph 5.4; and
3 finish the Work by whatever reasonable method the Owner may deem expedient.
14.1.3 When the Owner terminates the Contract for one of the reasons stated in Subparagraph
14.1.1, the Contractor shall not be entitled to receive further payment until the Work is finished.
14.2 Suspension or Termination by the Owner for Convenience
14.2.1 The Owner may, without cause, order the Contractor in writing to terminate, suspend,
delay or interrupt the Work in whole or in part for such period of time as the Owner may
determine.
14.2.2 In the event of Termination the Owner shall pay for work completed to date of
Termination
November 19, 2014 GENERAL CONDITIONS Page 44 of 44
10 r i `A �
MONROE COUNTY
BOARD OF COUNTY COMMISSIONERS
REQUEST FOR PROPOSALS
FOR
MARATHON COURTHOUSE SEWER
IMPROVEMENTS
MANDATORY Pre Bid Conference at the Marathon Courthouse 3117 Overseas Hwy
Marathon, FL on Thursday, September 2e, 2014 at 10:00 AM. Any proposal received from
a Contractor not present will result in a non - responsive proposal.
BOARD OF COUNTY COMMISSIONERS
Mayor, Sylvia Murphy, District 5,
Mayor Pro Tern Danny Kolhage, District 1
George Neugent, District 2
Heather Carruthers, District 3
David Rice, District 4
COUNTY ADMINISTRATOR
Roman Gastesi
Clerk of the Circuit Court Dir. of Public Works / Eng. Division
Amy Heavilin Kevin G. Wilson P. E.
Sepember 2014
PREPARED BY:
Monroe County Project Management Department
MARATHON COURTHOUSE SEWER IMPROVEMENTS
SECTION 00110
PROPOSAL FORM
The Proposal shall be submitted on the forms included in this section of the Proposal
Documents as previously instructed herein.
Item
Description
Pages
1.
Proposal Form
18 -19
2.
Bid Bond (Proposal Security)
20
3.
Non - Collusion Affidavit
21
4.
Lobbying and Conflict of Interest Clause
22
5.
Drug -Free Workplace Form
23
6.
Local Preference Form
24
7.
Subcontractor Listing Form
25
8.
Insurance Checklist
26
9.
Workers Compensation and Employers' Liability
30
10,
General Liability
31
11.
General liability, Underground, Explosion, and Collapse
32
12.
Vehicle Liability
33
13.
Proposer's Insurance and Indemnification Statement
34
14.
Insurance Agent's Statements
36
15.
Contractor License
Current Copy to Be Submitted with Proposal
Subcontractor Licenses to Be Submitted Prior to
Award of Notice to Proceed
16. In order to determine if the persons or entity submitting proposals are responsible, all
Proposals for contracts to be awarded under this section must contain the following
information:
A. A list of the entity's shareholders with five (5) percent or more of the stock or, if a
general partnership, a list of the general partners; or, if a limited liability company, a
list of its members; if a solely owned proprietorship, names(s) of owner(s). A copy of
documentation demonstrating that the entity is a legally viable entity shall be
attached.
PROPOSAL FORM 00110 -Page 15 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
B. A list of the officers and directors of the entity;
C. Relevant Experience: The number of years the person or entity has been operating
and, if different, the number of years it has been providing the service, goods, or
construction services called for in the proposal specifications (include a list of similar
projects);
D. The number of years the person or entity has operated under its present name and
any prior names;
E. Answers to the following questions regarding claims and suits:
a. Has the person or entity ever failed to complete work or provide the goods for
which it has contracted? (If yes, provide details of the job, including where the
job was located and the name of the owner.)
b. Are there any judgments, claims, arbitration proceeding or suits pending or
outstanding against the person, principal of the entity, or entity, or its officers,
directors, or general partners (this specifically includes any present or prior
entities in which the person, principal, entity, officer, director or general
partner of the proposing entity has been involved as a person, principal, entity,
officer, director or general partner in the last five (5) years)? (If yes, provide
details, include enough information about the judgment, claim, arbitration or
suit so that the Owner will able to obtain a copy of the judgment or claim or
locate the suit by location and case number.)
Has the person, principal of the entity, entity, or its officers, major
shareholders or directors within the last five (5) years, been a party to any law
suits or arbitrations with regard to a contract for services, goods or
construction services similar to those requested in the specifications with
private or public entities? This specifically includes any present or prior
entities in which the person, principal, entity, officer, director or general
partner of the proposing entity has been involved as a person, principal, entity,
officer, director or general partner in the last five (5) years. (If yes, provide
details, include enough information about the judgment, claim, arbitration or
suit so that the Owner will able to obtain a copy of the judgment or claim or
locate the suit by location and case number.)
d. Has the person, principal of the entity, or its officers, owners, partners, major
shareholders or directors, ever initiated litigation against the County or been
sued by the County in connection with a contract to provide services, goods or
construction services? This specifically includes any present or prior entities in
which the person, principal, entity, officer, director or general partner of the
proposing entity has been involved as a person, principal, entity, officer,
director or general partner in the last five (5) years. (If yes, provide details,
include enough information about the judgment, claim, arbitration or suit so
that the Owner will able to obtain a copy of the judgment or claim or locate the
suit by location and case number.)
e. Whether, within the last five (5) years, the Owner, an officer, general partner,
controlling shareholder or major creditor of the person or entity was an officer,
general partner, controlling shareholder or major creditor of any other entity
PROPOSAL FORM 00110 -Page 16 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
that failed to perform services or furnish goods similar to those sought in the
request for bids;
Customer references (minimum of three), including name, current address
and current telephone number;
Credit References (minimum of three), including name, current address
and current telephone number;
g. Financial statements for the prior three years. Please provide in a separate
sealed envelope for the Contractor's confidentiality, and clearly label the
envelope "CONFIDENTIAL" one (1) original copy.
( "Any financial statement that an agency requires a prospective bidder to
submit in order to prequalify for bidding or for responding to a bid for a road or
any other public works project is exempt from s. 119.07(1) and s.24(a), Art. 1
of the State Constitution. ")
PROPOSAL FORM 00110 -Page 17 of 204
Section 00110
Proposal Form.
Questionnaire Item 16.
A. Owner: Juan C Perez 100%
B. Officers: Juan C Perez
C. Greentech Group Solutions, LLC 4 Years of Experience
Juan C Perez: 12 Years of Experience
D. Greentech Group Solutions, LLC has operated for 3.75 Years.
E. a. No
b. No
c. No
d. No
e. No
f. - Monroe County School District — Jeff Barrow (Assistant Director) 305 853 1930
241 Trumbo Road, Key West, FL 33040
City of Marathon — Carlos Solis (Utilities) 305 743 0033
City of Marathon City Hall
DD Schmitt — Coldwell Banker (Owner) 305 393 0055
11100 Overseas Highway, Marathon FL 33050
CREDIT REFERENCES
Bank of America — 3057431000 — Marathon Branch
Ferguson Enterprises — 305 716 0086 — Miami — Eureka Branch
Slazar Construction — 786 299 2612
g. ATTACHED
MARATHON COURTHOUSE SEWER IMPROVEMENTS
SECTION 00110
PROPOSAL FORM
PROPOSAL TO: MONROE COUNTY BOARD OF COUNTY COMMISSIONERS
c/o PURCHASING DEPARTMENT
1100 SIMONTON STREET
ROOM 1 -213
KEY WEST, FLORIDA 33040
PROPOSAL FROM: �� '4C
900-1 J5 0 - 6"
✓ 33U
The undersigned, having carefully examined the Work and reference Drawings, Specifications,
Proposal, and Addenda thereto and other Contract Documents for the construction of:
MARATHON COURTHOUSE SEWER IMPROVEMENTS
and having carefully examined the site where the Work is to be performed, having become
familiar with all local conditions including labor affecting the cost thereof, and having familiarized
himself with material availability, Federal, State, and Local laws, ordinances, rules and
regulations affecting performance of the Work, does hereby propose to furnish all labor,
mechanics, superintendents, tools, material, equipment, transportation services, and all
incidentals necessary to perform and complete said Work and work incidental hereto, in a
workman -like manner, in conformance with said Drawings, Specifications, and other Contract
Documents including Addenda issued thereto.
The undersigned further certifies that he has personally inspected the actual location of where
the Work is to be performed, together with the local sources of supply and that he understands
the conditions under which the Work is to be performed. The successful proposer shall assume
the risk of any and all costs and delays arising from the existence of any subsurface or other
latent physical condition which could be reasonably anticipated by reference to documentary
information provided and made available, and from inspection and examination of the site.
The Base Proposal shall be furnished below in words and numbers. If there is an
inconsistency between the two the Proposal in words shall control.
(Total E
?Vm . / �s�
0
1 �2 u. �n cla'o� r 'cv �0
Proposal- words)
$ ro �- �Gb ^ (NO GSM (s4
(Total Base Proposal — numbers)
I acknowledge Alternates as follows:
I acknowledge receipt of Addenda No.(s)
No. 1 Dated
No. Dated
No. Dated
PROPOSAL FORM 00110 -Page 18 of 204
MARATHON COURTHOUSE SANITARY SEWER IMPROVEMENTS
MARATHON, FLORIDA
ADDENDUM NO.1
October 7, 2014
The information contained in this Addendum modifies supplements or replaces information
contained in the RFP and is hereby made a part of the Contract Documents.
A mandatory pre - proposal conference was held on Thursday September 25, 2014 on site.
Below were items of discussion:
• Only bids from companies with representatives at the pre-bid meeting will be accepted.
• Last day to get questions in for addendum is 10/06/14. Only questions asked in writing will be
answered, and will be answered by addendum.
• Contractor might want to consider working on weekends. There may be bond hearings at the
Courthouse on Saturdays.
• The Building permits are ready to be picked up by the contractor from the Marathon Building
Department. There are 5 signed and sealed sets of drawings at the building department,
contractor is to provide one signed and sealed drawing set back to Monroe County Project
Management.
• Court schedules vary. Contractor to check daily the working court schedule.
• For the trench details, 8" pipes are needed and 24" trench depth.
• There are two water lines through the parking lot by the handicap parking spot that are not on
the drawings.
• The a -mail for the City of Marathon Code of Ordinances is
httus: /Ilibrary.municode .corn/index.asax ?clientlD =13811
All Construction is to comply with City of Marathon Ordinances.
• Three different inspectors will be on the job: Engineer from Perez Engineering, MikeNalepa
from Monroe County Project Management, and the City of Marathon.
• The current septic system will have to be abandoned by the contractor, or removed. Refer to
drawings /specifications.
• It is unknown if the library septic system has a drain field or an injection well.
• Contract to call 811 before digging to Identify underground lines.
All other items remain as called for in the documents.
End of Addendum No. I -rte
Mike alepa
�`'—RFoj Manager
MARATHON SEWER HOOK UP
PRE-31D MANDATORY MEETING ON SITE
DATE: SEPTEMBER 25TH,2014
ATTENDEES:
•
. • ,
..\
r p: A r t
/1-1 P_
." .1- 3 u d -lc7 /'.
C 2292
• _ "
ahn
• ,
•
'• 47." r • .1%....I,-Ci", e .
•
•
• ' • . •• • • r e ' •
I • •
i
,
irr.le It j.
• ",• •v.
• 11
. . _ • ;7. "Nrii 4
•
."7 .e; 3os: scf 09 q.
- Guan z
_ ,et@ re/44.d;,
MARATHON SEWER HOOK UP
PRE -BID MANDATORY MEETING ON SITE
DATE: SEPTEMBER 25TH, 2014
ATTENDEES:
REPRESENTATIVE's NAME
CO MPANY
PHONE/EMAIL
John Hoover
Perez Engineering
305 - 522 -3430
Patrick Ortega
Charley Toppino & Sons
305- 296 -5606
Ann Riger
MCPM
305 - 292 -4439
Michael Nalepa
MCPM
305 - 2924468
Johnnie Yongue
MCPM
305- 2924429
Chis Haack
Mike Haack Excavating
305 - 504 -3323
Dan Massaro
3` Generation Plumbing
305- 743 -4245
"Jay" Massaro
3 rd Generation Plumbing
305 - 7434245
Dan Massaro
3` Generation Plumbing
305 -743 -4245
Bob Stone
MCPW
305 - 289 -6077
Tammy L. Marciel
Clerk of Courts
305 -289 -6347
Cristy Danford
MCPL
Danford- cristv(a monroecounty-
fl. oV
Juan C. Perez
Green Tech. Group
305- 289 -0949
MARATHON COURTHOUSE SEWER IMPROVEMENTS
Proposer, states by his check mark in the blank beside the form and by his signature that he
has provided the following forms (located in Section 00110):
a. Proposal Form
b. Proposal Security (Bid Bo9d)
C. Non - Collusion Affidavit 'ACC ,
d. Lobbying and Conflict of Interes Clause 4-1" ,
e. Drug -Free Workplace Form
f. Subcontractor Listing Form! ,
g. Proposer's Insurance and Indemnification Statement l ,
h. Insurance Agents Statement (signed by agent), and
i. Local Preference Form and requirements (if applicable),
In addition, Proposer states that he has included a certified copy of Contractor's License and
Monroe County Occupational License. (Check mark items above, as a reminder that they
are include .1
Mailing Address: �J Fox 5 04. 22
F 33615 d
Phone Number: 305. 207 47 4-
Date: Signed:
(Name) ; J
Witness:
(Title)
Seal)
PROPOSAL FORM 00110 -Page 19 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
BID (PROPOSAL) BOND
KNOW ALL MEN BY THESE PRESENTS, that we
(Here insert name and address or legal title of Contractor)
as Principal, hereinafter called the Principal, and
(Here insert full name and address or legal title of Surety)
a corporation duly organized under the laws of the State of as Surety, hereinafter called the
Surety, are held and firmly bound unto
(Here insert full name and address or legal title of Owner)
as Obligee, hereinafter called the Obligee, in the sum of Dollars ($), for the payment of which
sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs,
executors, administrators, successors and assigns, jointly and severally, firmly by these
presents.
WHEREAS, the Principal has submitted a bid for
(Here insert full name, address and description of project)
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal shall enter into a
Contract with the Obligee in accordance with the terms of such bid, and give such bond or
bonds as may be specified in the bidding or Contract Documents with good and sufficient surety
for the faithful performance of such Contract and for the prompt payment of labor and material
furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such
Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not
to exceed the penalty hereof between the amount specified in said bid and such larger amount
for which the Obligee may in good faith contact with another party to perform the Work covered
by said bid, then this obligation shall be null and void, otherwise to remain in full force and
effect. Any action instituted by a claimant under this bond must be in accordance with the
notice and time limitations provisions in Section 255.05(2), Florida Statutes.
(Principal) (Seal)
(Witness)
(Title)
(Surety) (Seal)
(Witness)
(Title
PROPOSAL FORM 00110 -Page 20 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
SECTION 00110
NON - COLLUSION AFFIDAVIT
I, z "V of the city
according to law on my oath a nder penalty of perjury, depose and say that:
1. I am ? i
of the firm of GA ttJA° Get, , LC
the proposer making the Proposal for the pr ect described in the notice for calling for proposals
for:
°L �cy&L T �,v✓eTn4 s
and that I executed the said proposal with full authority to do so;
2. The prices in this proposal have been arrived at independently without collusion, consultation,
communication or agreement for the purpose of restricting competition, as to any matter relating to
such prices with any other proposer or with any competitor;
3. Unless otherwise required by law, the prices which have been quoted in this proposal have not
been knowingly disclosed by the proposer and will not knowingly be disclosed by the proposer prior
to proposal opening, directly or indirectly, to any other proposer or to any competitor; and
4. No attempt has been made or will be made by the proposer to induce any other person, partnership
or corporation to submit, or not to submit, a proposal for the purpose of restricting competition; and
5. The statements contained in this affidavit are true and correct, and made with full knowledge that
said project.
-5 )O F" W-4.0 �
(Signature of Proposer (Date)
STATE OF:
COUNTY OF: /)o (3, ro -je
PERSONALLY APPEARED BEFORE ME, the undersigned authority, 0 ,
P_I Z
who, after first being sworn by me, (name of indddiividual signing) affixed his /her signature in the space provided above
on this f day of '" 1 20/ 4
TARY PU
My commission expires:
A •
MAUREEN L. GRIFFIN
Notary Public, State of Florida
Commission i EE 833515
My comm. expires Sept. 9, 2018
PROPOSAL FORM 00110 -Page 21 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
LOBBYING AND CONFLICT OF INTEREST CLAUSE
SWORN STATEMENT UNDER ORDINANCE NO. 010 -1990
MONROE COUNTY, FLORIDA
ETHICS CLAUSE
0
4C C.
warrants that he /it has not employed, retained or otherwise had act on his /its behalf any former County
officer or employee in violation of Section 2 of Ordinance No. 010 -1990 or any County officer or employee in violation
of Section 3 of Ordinance No. 010 -1990. For breach or violation of this provision the County may, in its discretion,
terminate this contract without liability and may also, in its discretion, deduct from the contract or purchase price, or
otherwise recover, the full amount of any fee, commission, percentage, gift, or consideration paid to the former
County officer or employee ".
(Signature)
Date:
STATE OF: 7 C) x �—
COUNTY OF: r / 1(�. ✓C� '� �1/
Subscribed and sworn to (or affirmed) before me on C. A l -E' /-e Z (date)
by (name of affiant). He /She is personally known to me
or has produced nc irionfifirnfinn /Tuna of
identification)
My commission expires:
MAUREEN L GRIFM
Notary Public, State of Florida
Commission s EE 833515
My comm. expires Sept. 9, 2018
PROPOSAL FORM 00110 -Page 22 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
DRUG -FREE WORKPLACE FORM
The undersigned vendor in accordance with Florida Statute 287.087 hereby certifies that:
(Name of Busi
1. Publishes a statement notifying employees that the unlawful manufacture, distribution,
dispensing, possession, or use of a controlled substance is prohibited in the workplace and
specifying the actions that will be taken against employees for violations of such prohibition.
2. Informs employees about the dangers of drug abuse in the workplace, the business's
policy of maintaining a drug -free workplace, any available drug counseling, rehabilitation, and
employee assistance programs, and the penalties that may be imposed upon employees for
drug abuse violations.
3. Gives each employee engaged in providing the commodities or contractual services that
are under proposal a copy of the statement specified in subsection (1).
4. In the statement specified in subsection (1), notifies the employees that, as a condition
of working on the commodities or contractual services that are under proposal, the employee
will abide by the terms of the statement and will notify the employer of any conviction of, or plea
of guilty or nolo contendere to, any violation of Chapter 893 (Florida Statutes) or of any
controlled substance law of the United States or any state, for a violation occurring in the
workplace no later than five (5) days after such conviction.
5. Imposes a sanction on, or require the satisfactory participation in a drug abuse
assistance or rehabilitation program if such is available in the employee's community, or any
employee who is so convicted.
6. Makes a good faith effort to continue to maintain a drug -free workplace through
implementation of this section.
As the person authorized to sign the statement, I certify that this firm complies fully with the
above requirements. l
r
Proposer's Signature
/0.21. t"
Date
PROPOSAL FORM 00110 -Page 23 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
LOCAL PREFERENCE FORM
A. Vendors claiming a local preference according to Ordinance 02 -349 must complete this form.
Name of Proposer /Responder �+u '�iP f' bate: 0.241$1-
1. Does the vendor have a valid receipt for the business tax paid to the Monroe County Tax Collector
dated at least one year prior to the notice or request for bid or proposal? YES (Please furnish
copy.)
2. Does the vendor have a physical business address located within Monroe County from which the
vendor operates or performs business on a day to,yiay basis that is a substantial component of the goods
or services being offered to Monroe County? i
List Address: �3 ! ��e- �N�te[- �Z 3 N /
Telephone Number: .305• 281 0 749
Post Office Boxes are not verifiable and shall not be used for the purpose of establishing a physical
address.
B. Does the vendor /prime contractor intend to subcontract 50% or more of the goods, services or
construction to local businesses meeting the criteria above as to licensing and location? /Vo
If yes, please provide:
1. Copy of Receipt of business tax paid to the Monroe County Tax Collector by the subcontractor dated
at least one year prior to the notice or request for bid or proposal.
2. Subcontractor Address within Monroe County from which the subcontractor operates:
Tel. Number
- -- - Print Name:
Signature and Title of uthorized Signatory for
Proposer /Responder
STATE OF Ew rr
COUNTY OF
�-J
On thtd � - ay of � 20✓ /, before me, the undersigned notary public, personally appeared
- c-^-3 C - Z - known to me to be the person whose name is subscribed above or
who produced c . cA-. / - o-�Ias identification, and acknowledged that he /she is the person
who executefithe above Local Preference Form for the purposes therein contained.
Notary P
Print Name
My commission expires:
Seal
A ,.
it I &
MAUREEN L GRIFFIN
Notary Public, State of Florida
Commission F EE 833515
My Comm, expire Sept. 9, 2016
PROPOSAL FORM 00110 -Page 24 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
SUBCONTRACTOR LISTING FORM
Division Subcontractor Contact Person Ph # w /area Fax: Cell
code
m,
- a,2 scac 0aAL Q- 786. 2q9 2612
I 1
Address
t
Co
fl a. o►rr #'x T C, 3 asp
PROPOSAL FORM 00110 -Page 25 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
Workers' Compensation
MONROE COUNTY, FLORIDA
Insurance Checklist
FOR
Proposer
Workers' Compensation Statutory Limits
WC 1
WC2 X
WC3
WCUSLH
WCJA
Employers Liability
Employers Liability
Employers Liability
US Longshoremen &
Harbor Workers Act
Federal Jones Act
Bodily Injury by
Accident/Bodily
Injury by Disease, policy
limits /Bodily Injury by Disease
each employee
$100,000/$500,000/$l 00, 000
$500,000/$500,000/$500,000
$1,000,000/$1,000,000
/$1,000,000
Same as Employers'
Liability
Same as Employers'
Liability
INSURANCE REQUIREMENTS AND FORMS 00120 -Page 26 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
General Liability
As a minimum, the required general liability coverages will include:
• Premises Operations • Products and Completed Operations
• Blanket Contractual 0 Personal Injury
• Expanded Definition
of Property Damage
Required Limits:
GL1 $200,000 per Person; $300,000 per Occurrence
$200,000 Property Damage
or
$300,000 Combined Single Limit
GL2 X $300,000 per Person; $500,000 per Occurrence
$200,000 Property Damage
or
$500,000 Combined Single Limit
GL3 $500,000 per Person; $1,000,000 per Occurrence
$100,000 Property Damage
or
$1,000,000 Combined Single Limit
GL4 $2,000,000 Combined Single Limit
Required Endorsement:
GLXCU X Underground, Explosion and Collapse (XCU)
GLLIQ Liquor Liability
GLS Security Services
All endorsements are required to have the same limits as the basic policy.
INSURANCE REQUIREMENTS AND FORMS 00120 -Page 27 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
Vehicle Liability
As a minimum, coverage should extend to liability for:
• Owned; Non - owned; and Hired Vehicles
Required Limits:
Builders'
VL1
$50,000 per Person: $100,000 per Occurrence
Risk
$25,000 Property Damage
MVC
or
$100,000 Combined Single Limit
Limits equal to the maximum
(The use of VL1 should be limited to special projects that
Cargo
involve
PRO1
other governmental entities or "Not for Profit" organizations.
$ 300,000 per Occurrence /$
Risk Management must approve the use of this form).
VL2 X
$200,000 per Person; $300,000 per Occurrence
PR02
$200,000 Property Damage
$ 500,000 per Occurrence /$1,000,000
or
$300,000 Combined Single Limit
VL3
$500,000 per Person; $1,000,000 per Occurrence
PR03
$100,000 Property Damage
$1,000,000 per Occurrence /$2,000,000
or
$1,000,000 Combined Single Limit
VL4
$5,000,000 Combined Single Limit
Miscellaneous Coverages
BR1
Builders'
Limits equal to the
Risk
completed project.
MVC
Motor Truck
Limits equal to the maximum
Cargo
value of any one shipment.
PRO1
Professional
$ 300,000 per Occurrence /$
500,000Agg.
PR02
Liability
$ 500,000 per Occurrence /$1,000,000
Agg.
PR03
$1,000,000 per Occurrence /$2,000,000
Agg.
POL1 Pollution $ 500,000 per Occurrence /$1,000,000
Agg.
POL2 Liability $1,000,000 per Occurrence /$2,000,000
Agg.
POL3 $5,000,000 per Occurrence /$10,000,000
Agg.
ED1 Employee $ 10,000
INSURANCE REQUIREMENTS AND FORMS 00120 -Page 28 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
ED2
Dishonesty
$100,000
GK1
Garage
$ 300,000 ($ 25,000 per Veh)
GK2
Keepers
$ 500,000 ($100,000 per Veh)
GK3
$1,000,000 ($250,000 per Veh)
MED1
Medical
$ 300,000/$ 750,000 Agg.
MED2
Professional
$ 500,000/$ 1,000,000 Agg.
MED3
$1,000,000/$ 3,000,000 Agg.
MEN
$5,000,000/$10,000,000 Agg.
IF
Installation
Maximum value of Equipment
Floater
Installed
VLP1
Hazardous
$ 300,000 (Requires MCS -90)
VLP2
Cargo
$ 500,000 (Requires MCS -90)
VLP3
Transporter
$1,000,000 (Requires MCS -90)
BLL
Bailee Liab.
Maximum Value of County Property that
will be in the Bailee's possession.
HKL1
Hangarkeepers
$ 300,000
HKL2
Liability
$ 500,000
HKL3
$ 1,000,000
AIR1
Aircraft
$ 1,000,000
AIR2
Liability
$ 5,000,000
AIR3
$50,000,000
AE01
Architects Errors
$ 300,000 per Occurrence /$ 500,000
AE02
& Omissions
$ 500,000 per Occurrence /$1,000,000
AE03
$ 1,000,000 per Occurrence /$3,000,000
Agg.
E01
Engineers Errors
$ 300,000 per Occurrence /$ 500,000
E02
& Omissions
$ 500,000 per Occurrence /$1,000,000
E03
$ 1,000,000 per Occurrence /$3,000,000
W
INSURANCE REQUIREMENTS AND FORMS 00120 -Page 29 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
WORKERS' COMPENSATION
INSURANCE REQUIREMENTS
FOR
CONTRACT: Marathon Courthouse Sanitary Sewer Improvements,
Marathon FL
BETWEEN
MONROE COUNTY, FLORIDA
AND AA L
L.0
Prior to the commencement of work governed by this contract, the Contractor shall
obtain Workers' Compensation Insurance with limits sufficient to respond to the
applicable state statutes.
In addition, the Contractor shall obtain Employers' Liability Insurance with limits of not
less than:
$500,000 Bodily Injury by Accident
$500,000 Bodily Injury by Disease, policy limits
$500,000 Bodily Injury by Disease, each employee
Coverage shall be maintained throughout the entire term of the contract.
Coverage shall be provided by a company or companies authorized to transact
business in the state of Florida.
If the Contractor has been approved by the Florida's Department of Labor, as an
authorized self- insurer, the County shall recognize and honor the Contractor's status.
The Contractor may be required to submit a Letter of Authorization issued by the
Department of Labor and a Certificate of Insurance, providing details on the Contractor's
Excess Insurance Program.
If the Contractor participates in a self- insurance fund, a Certificate of Insurance will be
required. In addition, the Contractor may be required to submit updated financial
statements from the fund upon request from the County.
WC2
INSURANCE REQUIREMENTS AND FORMS 00120 -Page 30 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
GENERAL LIABILITY
INSURANCE REQUIREMENTS
FOR
CONTRACT Marathon Courthouse Sanitary Sewer Improvements,
Marathon FL
BETWEEN
MONROE COUNTY, FLORIDA
r AD C.
Prior to the commencement of work governed by this contract, the Contractor shall
obtain General Liability Insurance. Coverage shall be maintained throughout the life of
the contract and include, as a minimum:
• Premises Operations
• Products and Completed Operations
• Blanket Contractual Liability
• Personal Injury Liability
• Expanded Definition of Property Damage
The minimum limits acceptable shall be:
$500,000 Combined Single Limit (CSL)
If split limits are provided, the minimum limits acceptable shall be:
$300,000 per Person
$500,000 per Occurrence
$ 200,000 Property Damage
An Occurrence Form policy is preferred. If coverage is provided on a Claims Made
policy, its provisions should include coverage for claims filed on or after the effective
date of this contract. In addition, the period for which claims may be reported should
extend for a minimum of twelve (12) months following the acceptance of work by the
County.
The Monroe County Board of County Commissioners shall be named as Additional
Insured on all policies issued to satisfy the above requirements.
GL2
INSURANCE REQUIREMENTS AND FORMS 00120 -Page 31 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
GENERAL LIABILITY
INSURANCE REQUIREMENTS
FOR
CONTRACT Marathon Courthouse Sanitary Sewer Improvements,
Marathon FL
BETWEEN
C MONROE CO / UUNTY, FLORIDA 4.1
Oc a. �O,so ��►�.
Recognizing that the work governed by this contract involves either underground
exposures, explosive activities, or the possibility of collapse of a structure, the
Contractor's General Liability Policy shall include coverage for the XCU (explosion,
collapse, and underground) exposures with limits of liability equal to those of the
General Liability Insurance policy.
GLXCU
INSURANCE REQUIREMENTS AND FORMS 00120 -Page 32 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
VEHICLE LIABILITY
INSURANCE REQUIREMENTS
FOR
CONTRACT Marathon Courthouse Sanitary Sewer Improvements,
Marathon FL
BETWEEN
MONROE COUNTY, FLORIDA
AND
Recognizing that the work governed by this contract requires the use of vehicles, the
Contractor, prior to the commencement of work, shall obtain Vehicle Liability Insurance.
Coverage shall be maintained throughout the life of the contract and include, as a
minimum, liability coverage for:
• Owned, Non - Owned, and Hired Vehicles
The minimum limits acceptable shall be:
$300,000 Combined Single Limit (CSL)
If split limits are provided, the minimum limits acceptable shall be:
$200,000 per Person
$300,000 per Occurrence
$ 200,000 Property Damage
The Monroe County Board of County Commissioners shall be named as Additional
Insured on all policies issued to satisfy the above requirements.
VL2
INSURANCE REQUIREMENTS AND FORMS 00120 -Page 33 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
PROPOSER'S INSURANCE AND INDEMNIFICATION STATEMENT
INSURANCE REQUIREMENTS
Worker's Compensation
Employers Liability
Statutory Limits
$500,000 Bodily Injury by Accident
$500,000 Bodily Injury by Disease Policy Limits
$500,000 Bodily Injury by Disease, each employee
General Liability, including
Premises Operations
Products and Completed Operations
Blanket Contractual Liability
Personal Injury Liability
Expanded Definition of Property Damage
XCU (explosion, collapse, and underground)
$300,000 per Person
$500,000 per Occurrence
$200,000 Property Damage
or
$500,000 Combined Single Limit
Vehicle Liability (Owned, non - owned, and hired vehicles) $300,000 Combined Single Limit
If split limits are preferred:
$200,000 per Person
$300,000 per Occurrence
$200,000 Property Damage
Hold Harmless and Indemnification. Notwithstanding any minimum insurance requirements
prescribed elsewhere in this agreement, Contractor shall defend, indemnify and hold the
COUNTY and the COUNTY's elected and appointed officers and employees harmless from and
against (i) any claims, actions or causes of action, (ii) any litigation, administrative proceedings,
appellate proceedings, or other proceedings relating to any type of injury (including death), loss,
damage, fine, penalty or business interruption, and (iii) any costs or expenses that may be
asserted against, initiated with respect to, or sustained by, any indemnified party by reason of,
or in connection with, (A) any activity of Contractor or any of its employees, agents, contractors
or other invitees during the term of this Agreement, (B) the negligence or willful misconduct of
Contractor or any of its employees, agents, sub - contractors or other invitees, or (C) Contractor's
default in respect of any of the obligations that it undertakes under the terms of this Agreement,
except to the extent the claims, actions, causes of action, litigation, proceedings, costs or
expenses arise from the intentional or sole negligent acts or omissions of the COUNTY or any
of its employees, agents, contractors or invitees (other than Contractor). Insofar as the claims,
actions, causes of action, litigation, proceedings, costs or expenses relate to events or
circumstances that occur during the term of this Agreement, this section will survive the
expiration of the term of this Agreement or any earlier termination of this Agreement.
In the event that the completion of the project (to include the work of others) is delayed or
suspended as a result of the Contractor s failure to purchase or maintain the required insurance,
the Contractor shall indemnify the County from any and all increased expenses resulting from
such delay. Should any claims be asserted against the County by virtue of any deficiency or
INSURANCE REQUIREMENTS AND FORMS 00120 -Page 34 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
ambiguity in the plans and specifications provided by the Contractor, the Contractor agrees and
warrants that the Contractor shall hold the County harmless and shall indemnify it from all
losses occurring thereby and shall further defend any claim or action on the County's behalf.
The first ten dollars ($10.00) of remuneration paid to the Contractor is for the indemnification
provided for the above.
The extent of liability is in no way limited to, reduced, or lessened by the insurance requirements
contained elsewhere within this AGREEMENT.
PROPOSER'S STATEMENT
I understand the insurance that will be mandatory if awarded the contract and will comply in full
with all the requirements. I fully accept the indemnification and hold harmless as set out on page
� 00110 -12�f this o`al.
PROPOSER J Signature
INSURANCE REQUIREMENTS AND FORMS 00120 -Page 35 of 204
MARATHON COURTHOUSE SEWER IMPROVEMENTS
INSURANCE AGENT'S STATEMENT
I have reviewed the above requirements with the proposer named above. The following
deductibles apply to the corresponding policy.
POLICY
DEDUCTIBLES
Liability policies are Occurrence
Insurance Agency
Signature
Claims Made
INSURANCE REQUIREMENTS AND FORMS 00120 -Page 36 of 204
a DATE (MWDD/YYYY)
AC40R ° CERTIFICATE OF LIABILITY INSURANCE 10/21/2014
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
CONT PRODUCER NAME: CT Linda Regan
Keys Insurance Services PHONE (305) 743 -0494 FAX . ( 305)743 -0582 AC.
5800 Overseas Hwy #43 EMAIL ,lregan @keysinsurance.com
P.O. BOX 500280 INSURERS AFFORDING COVERAGE NAIC#
Marathon FL 33050 -0280 INSURERA:Mid Continent
INSURED INSURERB:Travelers Indemnity Co 25658
Greentech Group Solutions LLC INSURER C :FUBA
7999 Overseas Highway INSURER D:
Suite 2B INSURER E:
Marathon FL 33050 INSURER F:
rf)VFROGFS CERTIFICATE NUMBER:20 -2014 REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR IHL FULiUY rtRIUU
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
I NSR TYPE OF INSURANCE I UBR POLICY NUMBER FIFF MM/ POLICY YYP
LTR
LIMITS
GENERAL LIABILITY
EACH OCCURRENCE
$ 1,000,000
DAMAGE TO
$ 100,000
X COMMERCIAL GENERAL LIABILITY
- PREMISES Ea occurrence)
A CLAIMS -MADE a OCCUR 04GLOO863371 1/23/2013 1/23/2014
MED EXP (Any one person)
$ EXCLUDED
PERSONAL & ADV INJURY
$ 1,000,000
GENERAL AGGREGATE
$ 2,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
PRODUCTS - COMP /OP AGG
$ 2,000,000
X POLICY PRO LOC
$
COMBINED LIMIT
11000,000
AUTOMOBILE LIABILITY
BODILY INJURY (Per person)
$
B
ANY AUTO
BODILY INJURY (Per accident)
$
ALL OWNED X SCHEDULED
AID055328
/2/2014
/2/2015
AUTOS
OWNED
PROPERTY RTY DAMAGE
$
X HIRED AUTOS X NON
Medical pavments
$ 5,000
UMBRELLA LIAB
EACH OCCURRENCE
$
HOCCUR
AGGREGATE
$
EXCESS LIAB
CLAIMS -MADE
DED I I RETENTION
$
C
WORKERS COMPENSATION
STATU-
OR ER
E.L. EACH ACCIDENT
$ 500,000
AND EMPLOYERS' LIABILITY
ANY PROPRIETOR/PARTNER/EXECUTIVE Y / N
E.L. DISEASE - EA EMPLOYE
$ 500,000
OFFICER/MEMBER EXCLUDED?
N/A
0645259
6/3/2014
/3/2015
(Mandatory in NH)
E.L. DISEASE - POLICY LIMIT
$ 500,000
If yes, describe under
DESCRIPTION OF OPERATIONS below
I
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required)
CGC 1518627
CFC 1427909
CUC 1224890
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
Monroe County
1100 Simonton Street
AUTHORIZED REPRESENTATIVE
Key West, FL 33040
Grimi Betancourt /LISA
ACORD 25 (2010/05) V lytftf -'LULU AI.VtSU liVlfrvnA nVr7. rvr nyuw rcacrvWU.
INS025 (201005).01 The ACORD name and logo are registered marks of ACORD
10/20/2014
Detail by Entity Name
Florida Limited Liability Company
GREENTECH GROUP SOLUTIONS, LLC
Filing Infor
Document Number
L09000011996
FEI /EIN Number
205524625
Date Filed
02/05/2009
State
FL
Status
ACTIVE
Effective Date
09/10/2006
Last Event
CONVERSION
Event Date Filed
02/05/2009
Event Effective Date
NONE
Principal Address
143 Sioux St
Tavernier, FL 33070
Changed: 04/30/2014
Mailing Address
P.O. BOX # 504422
MARATHON, FL 33050
Changed: 04/21/2010
� Registered Agent Name & Address
NORTHWEST REGISTERED AGENT, LLC
3030 N. ROCKY POINT DRIVE, STE 150A
TAMPA, FL 33607
Name Changed: 01/26/2011
Address Changed: 05/16/2012
Authorized Person(s) Detail
Name & Address
Title MGRM
PEREZ, JUAN C
Detail by Entity Name
http: / /search.sunbiz.orgAnqui ry /Corporad onSearctVSearchResultD etail /EnttyN ame/fl a1- 109000011996- 86t7460f- 4e50- 4ce7- 99f4 -d38el dcOc4dblgreentech %20gr... 1/2
10/20/2014
143 Sioux St
Tavernier, FL 33070
Annual Reoorts
Report Year Filed Date
2012 01/12/2012
2013 01/03/2013
2014 04/30/2014
Document Images
04/30/2014 -- ANNUAL REPORT
01/03/2013 -- ANNUAL REPORT
01/12/2012 -- ANNUAL REPORT
01/29/2011 --ANNUAL REPORT
01/26/2011 -- Reg. Agent Change
04/21/2010 -- ANNUAL REPORT
02/05/2009 -- Florida Limited Liability
Detail by Entity Name
View image in PDF format
View image in PDF format '
View image in PDF format
View image in PDF format
View image in PDF format
View image in PDF format
View image in PDF format
http: // search. sunbiz. org /Inquiry /Corporate onSearchISearchResultDetail lEnttyN am etfl a1- 10900001199E 86t7460f- 4e50- 4ce7- 99f4 -d38el dcOc4dbtgreentech %20gr... 212
2014 / 2015
MONROE COUNTY BUSINESS TAX RECEIPT
EXPIRES SEPTEMBER 30, 2015
Business Name: GREENTECH GROUP SOLUTIONS LLC
RECEIPT# 30140 - 102496
Owner Name: JUAN C PEREZ JORGE FONTE &
Mailing Address: FERNANDO CAJALE
7999 OVERSEAS HWY STE 2B
MARATHON, FL 33050
Business Location: 7999 OVERSEAS HWY STE 2B
MARATHON, FL 33050
Business Phone: 954 - 214 -1050
Business Type: CONTRACTOR (PLUMBING, UNDERGROUND,
AND EXCAV, AND GENERAL CONTRACTOR)
Employees 2
STATE LICENSE: CFC1427909
Tax Amount
Transfer Fee
Sub -Total
Penalty
Prior Years
Collection Cost
Total Paid
20.00
0.00
20.00
1 0.00
1 0.00
1 0.00
20.00
Paid 000 -13- 00014741 09/30/2014 20.00
THIS BECOMES A TAX RECEIPT Danise D. Henriquez, CFC, Tax Collector THIS IS ONLY A TAX.
WHEN VALIDATED PO Box 1129, Key West, FL 33041 YOU MUST MEET ALL
COUNTY AND /OR
MUNICIPALITY PLANNING
AND ZONING REQUIREMENTS.
MONROE COUNTY BUSINESS TAX RECEIPT
P.O. Box 1129, Key West, FL 33041 -1129
EXPIRES SEPTEMBER 30, 2015
Business Name: GREENTECH GROUP SOLUTIONS LLC RECEIPT# 30140 - 102496
Business Location: 7999 OVERSEAS HWY STE 2B
Owner Name: JUAN C PEREZ JORGE FONTE & FERNANDO MARATHON, FL 33050
Mailing Address: CAJALE Business Phone: 954 - 214 -1050
7999 OVERSEAS HWY STE 2B Business Type: CONTRACTOR (PLUMBING, UNDERGROUND,
MARATHON, FL 33050 AND EXCAV, AND GENERAL CONTRACTOR)
Employees 2
STATE LICENSE: CFC1427909
Tax Amount
Transfer Fee
Sub -Total
Penalty
Prior Years
Collection Cost
Total Paid
20.00
0.00
20.00
1 0.00
0.00
1 0.00
20.00
Paid 000 -13- 00014741 09/30/2014 20.00
STATE OF FLORIDA
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
F
CONSTRUCTION INDUSTRY LICENSING BOARD
1940 NORTH MONROE STREET
TALLAHASSEE FL 32399 -0783
PEREZ, JUAN CARLOS
GREENTECH GROUP SOLUTIONS LLC
143 SIOUXT ST
TAVERNIER FL 33070
Congratulations! With this license you become one of the nearly
one million Floridians licensed by the Department of Business and
Professional Regulation. Our professionals and businesses range
from architects to yacht brokers, from boxers to barbeque restaurants,
and they keep Florida's economy strong.
Every day we work to improve the way we do business in order to
serve you better. For information about our services, please log onto
www.myfloridalicennse.com. There you can find more information
about our divisions and the regulations that impact you, subscribe
to department newsletters and learn more about the Department's
initiatives.
Our mission at the Department is: License Efficiently, Regulate Fairly.
We constantly strive to serve you better so that you can serve your
customers. Thank you for doing business in Florida,
and congratulations on your new license!
DETACH HERE
RICK SCOTT. GOVERNOR
KEN LAWSON, SECRETARY
STATE OF FLORIDA
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
CONSTRUCTION INDUSTRY LICENSING BOARD
LICENSE NUMBER
The PLUMBING CONTRACTOR
Named below IS CERTIFIED
Under the provisions of Chapter 489 FS.
Expiration date: AUG 31, 2016
PEREZ, JUAN CARLOS
GREENTECH GROUP SOLUTIONS LLC
7999 OVERSEAS HIGHWAY
SUITE 26
MARATHON FL 33050
(850) 487 -1395
STATE OF FLORIDA
a DEPARTMENT OF BUSINESS AND
PROFESSIONAL REGULATION
C FC1427909 ISSUED: 09/01/2014
CERTIFIED PLUMBING CONTRACTOR
PEREZ, JUAN CARLOS
GREENTECH GROUP SOLUTIONS LLC
IS CERTIFIED under the provisions of Ch.489 FS.
Exp iat,on dale AUG 31, 2016 1.14030100.".0565
�� r a ❑
..� i
ISSUED: 09/01/2014 DISPLAY AS REQUIRED BY LAW sEa # L1409010000565
E S STATE OF FLORIDA
,- ' :; .± ,• DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
F r
. CONSTRUCTION INDUSTRY LICENSING BOARD
1940 NORTH MONROE STREET
TALLAHASSEE FL 32399 -0783
PEREZ, JUAN CARLOS
GREENTECH GROUP SOLUTIONS LLC
143 SIOUXT ST
TAVERNIER FL 33070
Congratulations! With this license you become one of the nearly
one million Floridians licensed by the Department of Business and
Professional Regulation. Our professionals and businesses range
from architects to y acht brokers, from boxers to barbeque restaurants,
and they keep Florida's economy strong.
Every day we work to improve the way we do business in order to
serve you better. For information about our services, please log onto
www.myfforidalicense.com. There you can find more information
about our divisions and the regulations that impact you, subscribe
to department newsletters and learn more about the Department's
initiatives.
Our mission at the Department is: License Efficiently, Regulate Fairly.
We constantly strive to serve you better so that you can serve your
customers. Thank you for doing business in Florida,
and congratulations on your new license!
DETACH HERE
RICK SCOTT, GOVERNOR
KEN LAWSON, SECRETARY
STATE OF FLORIDA
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
CONSTRUCTION INDUSTRY LICENSING BOARD
LICENSE NUMBER
1 he GENERAL CONTRACTOR
Named below IS CERTIFIED
Under the provisions of Chapter 489 FS.
Expiration date: AUG 31, 2016
PEREZ, JUAN CARLOS
GREENTECH GROUP SOLUTIONS LLC
88005 OVERSEAS HIGHWAY
10 -165
TAVERNIER FL 33070
(850) 487 -1395
o x STATE OF FLORIDA
j DEPARTMENT OF BUSINESS AND
PROFESSIONAL REGULATION
CGC 1518627 ISSUED: 09/01/2014
CERTIFIED GENERAL CONTRACTOR
PEREZ, JUAN CARLOS
GREENTECH GROUP SOLUTIONS LLC
IS CERriFIED under the provisions of Ch.489 FS.
Expiration date AUG 31, 2016 0409010000774
r
❑ •L' 1 ❑'.
fi + r: 1
,, a
ISSUED: 09/01/2014 DISPLAY AS REQUIRED BY LAW SEQ# L1409010000774
STATE OF FLORIDA
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
' . CONSTRUCTION INDUSTRY LICENSING BOARD
1940 NORTH MONROE STREET
TALLAHASSEE FL 32399 -0783
PEREZ, JUAN CARLOS
GREENTECH GROUP SOLUTIONS, LLC
143 SIOUXT ST
TAVERNIER FL 33070
Congratulations! With this license you become one of the nearly
one million Floridians licensed by the Department of Business and
Professional Regulation. Our professionals and businesses range
from architects to yacht brokers, from boxers to barbeque restaurants,
and they keep Florida's economy strong.
Every day we work to improve the way we do business in order to
serve you better. For information about our services, please log onto
www.myfloridalicense.com. There you can find more information
about our divisions and the regulations that impact you, subscribe
to department newsletters and learn more about the Department's
initiatives.
Our mission at the Department is: License Efficiently, Regulate Fairly.
We constantly strive to serve you better so that you can serve your
customers. Thank you for doing business in Florida,
and congratulations on your new license!
DETACH HERE
RICK SCOTT, GOVERNOR
KEN LAWSON, SECRETARY
STATE OF FLORIDA
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
CONSTRUCTION INDUSTRY LICENSING BOARD
LICENSE NUMBER
•,
The UNDERGROUND UTILITY & EXCAVATION CO
Named below IS CERTIFIED
Under the provisions of Chapter 489 FS.
Expiration date: AUG 31, 2016
PEREZ, JUAN CARLOS
GREENTECH GROUP SOLUTIONS, LLC
7999 OVERSEAS HIGHWAY SUITE 2B
MARATHON FL 33050
(850) 487 -1395
�c. STATE OF FLORIDA
DEPARTMENT OF BUSINESS AND
PROFESSIONAL REGULATION
C U C 1224890 ISSUED: 09/01/2014
CERT UNDERGROUND & EXCAV CNTR
PEREZ, JUAN CARLOS
GREENTECH GROUP SOLUTIONS, LLC
IS CERTIFIED under the provisions of Ch.489 FS.
Expiration date . AUG 31, 2016 L1409010000997
� _ r
• � i 'a
� s 4
❑,� E3
i
ISSUED: 09/01/2014 DISPLAY AS REQUIRED BY LAW SEQ # L1409010000997
GREENTECH GROUP SOLUTIONS
Complete Contract List
CFC, CGC & CUC by the State of Florida
Project List
• Seaview Condominium — Replacement of existing sewer drainage system — Work consists on
replacement of the existing sewer system for 6 lower units, restoration will be follow as per original
conditions. Estimated cost of project $110,000.00. Contact Info: Linda Kruszka 305 942 9475
• Sonoma Condominium — Jacksonville FL — Total Rehabilitation of 34 Units from studs. Client
provided a foreclosure building constituted of 34 units, each unit was completed gutted and
restored, construction trades but not limited to: electricity, HAVC, plumbing, paint, carpentry, tile,
etc. Project total cost $290.000.00 — Pacifica LLC — contact Max Combs 702 413 5501
• Gluntz Resort — Exchange of entire sewer system, worked directly with GC, scope of work
consisted on fully furnishing and installation of plumbing drainage and water distribution system
for 48 units, Resort located at Duck Key — Contact Info: Michael Dolan 305 481 4852, total cost of
project $227,000.00
• Marathon — City of Marathon/FKAA installation of FH Work consist on installation of 13 Ea
FH at different locations at Marathon, FL, contracted directly with FKAA, Project scheduled to be
completed before Sep. 30 2013. Cost $112,000. Contact Person: Joe Ivey at FKAA authorities
• Marathon — Duck Key Bridge — Relocation of existing FKAA Force Main worked for FKAA's
Contractor — American Bridge. Work was performed at Thomas Harbor Bridge — Duck Key, it
consisted on remove and relocation of existing Stainless Steel FM under bridge deck. Project was
completed on time and as scheduled by FKAA and Contractor. Cost of the project $17,000.00.
Contact Person: William Campbell, P.M, American Bridge 321 — 229 - 4270
• Marathon — Replacement /maintenance of existing Gate valves for the City of marathon
vacuum Main at Little Venice, Work was performed and directed by the City of Marathon Utility
Department, maintenance /replacement was perform having Central Sewer System at low flow
hours. Project was completed on time and as scheduled. Cost of the Project $35,000.00. Contact
Person: Zully Hemeyer, City Rep 305 743 0033
• Marathon — City's Park Irrigation System connection to reclaim water main. Worked directly
with the City of Marathon Utility Department, Cut in existing 4" Reclaim line, installation of 4"
Gate Valve, Installation of approx. 80LF PVC pipe, Installation of RPZ device, Installation of by-
pass for irrigation booster pump. Cost of Project $18,000.00. Contact Person: Carlos Solis, City
Rep 305 743 0033
• Marathon — Sewer Connection for Key West housing Authorities (41 Street), Installation of an
on -site sewer system, including one buffer tank, approx. 60 LF of gravity line and approx. 300 LF
of vacuum Main, estimated cost $45,000.00
• Marathon — Coconut Kay Resort & Marina Sewer connection to Central Sewer System and
abandonment in place of WWTP and injection Wells, commercial property (Hotel), coordinated
with owner to minimize guest disruptions. Cost of Project $37,000.00, Contact: Mr. James Ryan
(Owner) 305 393 1999
• Miami Fl — Drainage Pump Station re- ventilation system Work was performed directed by city
of Miami Beach Authorities (Utility Department), scope of work included the installation of Special
mechanical Piping to re -vent the drainage wells located at critical locations of Miami beach,
contract amount $70,000.00
• Marathon Sewer Connection for the Hammocks at Marathon, Installation of onsite system
consisting of sewer force main lateral and vacuum main along with AirVac Buffer Tank and gravity
collection sewer manhole, abandoning of existing Waste Water Treatment Plant as per DEP —
Engineer Glen Boe & Associates. Contract Amount $70.000.00
• Marathon Sewer Connection for Cobia Ponte Condominium, Installation of onsite system
consisting of gravity sewer lateral and AirVac Buffer Tank and abandoning of existing Waste
Water Treatment Plant as per DEP — Engineer Glen Boe & Associates
• Marathon Sewer Connection for The Island Club Condominium, Installation of onsite system
consisting of gravity sewer lateral and force main installation along with E -one lift station then
abandoning of existing Waste Water Treatment Plant as per DEP — Engineer Glen Boe &
Associates
• Marathon Sewer Connection for Coco Plum Beach Villas, Installation of HDPE Force Main and
rehabilitation of existing lift Station — Engineer Glen Boe and Associates
• Marathon Sewer Connection for Gulf Pointe 1 & 2 Condominium, Installation of onsite AirVac
vacuum sewer collection system consisting of approx 2500LF of pipe (Gravity and Vacuum Main)
along with the installation of 8Ea Vacuum Pits and AirVac Valves — Engineer Glen Boe and
Associates
• Key Largo Sewer Connection for the Hampton Inn installation of FM using directional bore
method of approx 700 LF, installation of lift station, installation of gravity lines and abandoning of
the Existing WWTP as per DEP (construction in progress) — Engineer Keys Engineer
• Marathon Sewer Connection for The Blackfin Resort, Installation of onsite sewer system
consisting of 2 Concrete Buffer Tanks, gravity pipe installation and vacuum main connecting
central sewer system; scope is combined with the abandoning of the existing WWTP as de DEP
(construction is progress) — Engineer Glen Boe and Associates
• Marathon Sewer Connection for The Reef at Marathon Resort, Installation of onsite sewer
system consisting of 1 Concrete Buffer Tank and 1 Vacuum Pit , gravity pipe installation and
vacuum main connecting central sewer system; scope is combined with the abandoning of the
existing WWTP as de DEP and the rehabilitation of the existing FM and associated piping
(construction is progress)- Engineer Perez Engineering
PRODUCER _ cvnrwcr Angel Yarbrough
Keys Insurance Services (305)743 -0494 FAX :OCS)743 -0583
5800 Overseas Hwy , a arbrough @keysinsurance.com
ADDRF
P.O. BOX 500280 INSURER(S) AFFORDING COVERAGE NAIC0
Marathon FL 33050 INSURERA :International Ins Co of Hanover
INSURED INSURER a :Travelers Indemnity Co 25658
Greentech Group Solutions LLC INSURERCTUBA
7999 Overseas Highway INSURER D:
Suite 28 INSURER E:
FL 33050
CdVERAGES
CERTIFICATE NUMBER:2014 - 2 015
HEVIVOUN Numtith:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
POLI
TR
TYPE OF INSURANCE
POLICY NUMBER
iDDYY OOrrYXYY
LRUTS
GENERAL LIABILITY
EACH OCCURRENCE
S 2,000,000
X COMMERCIAL GENERAL LIABATY
PR N n
S 100,000
MED EXP (AM one person)
S 5,000
A
CLAIMS-MADE ® OCCUR
X
G06CO03762 00
1/23/2014
1/23/2013
PERSONAL 6 AOV INJURY
S 2 ,000,000
GENERAL AGGREGATE
$ 2,000,000
GEN L AGGREGATE LIMIT APPLIES PER
PROOUCTS - COMP/OP AGG
S 2,000,000
$
X I POLICY I I fag LOC
AUTOMOBILE LIABILITY
Cr E LIMIT
11 000,000
BODILY INJURY IPer person)
$
B
ANY A'J'0
AUTO ED X SCHESLXED
NON -OWNED
HIRED AUTOS X AUTOS
I
X
1D055328
/2/2014
/2/2015
EMILY INJURY IPer accfdem)
S
PROPERTY DAMAGE
S
Mack - 1 camerts
S 5 000
UMBRELLA LIAB
or C
EACH OCCURRENCE
S
AGGREGATE
S
EXCESS LIAB
CLAIMS -MADE
DED RETENTION S
S
C
WORKERS COMPENSATION
WC TATU
S• OTH
FR
AND EMPLOYERS' LIABILITY Y r N
ANY PROPRtETOR'PARTNERSXECLTivE
E.L. EACH ACCIDENT
S 500, 000
E.L. DISEASE -EA EMPLOYEES
500.000
� FIdetwyIMBEREXCLUDED7 ❑
(MeIWNMy In NIQ
N A
0645259
/3/2011
/3/2015
E.L. DISEASE - POLICY LIMIT
S 500 000
t yes. dos Nunder
DESCRIPTION OF OPERATIONS �I::w
DESCRIPTION OF OPERATIONS 1 LOCATIONS / VEHICLES (Anech ACORD 101, Addlibnal Rernarke Schedule. It mole apace +s q Wid)
It is understood and agreed that Explosion Hazard, Collapse Hazar d U ound Property Hazard (XCU)
are included coverages to policy NIG06CO037 62 00
V j - ilr - ,
( 305) 295 -4321 Riger- Ann@MonroeCounty -FL.
Monroe County Board of County Commission
1100 Simonton Street Rm 2 -216
Key West, FL 33040
Annon -3s ronin/nci
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED REPRESENTATIVE
G Betancourt /AYARB
Z IOES -2010 ACORD CORPORATION. All riahts reserved.
INS025 (201005).01
The ACORD name and logo are registered marks of ACORD
* OLD REP LBLIC
Old Republic Surety Company
PERFORMANCE AND PAYMENT BOND Bond No OFS- 2145191
KNOW ALL MEN BY THESE PRESENTS:
That Greentech Gro Solutions, LLC as Principal, and
Old Republic Surety Company as Surety, are held and firmly bound unto Monroe CouMy Board of
County as Obligee, in the full and just sum
of Sixty Nine Thousand Frye Hundred and 00 /100"""""""'"""`x"'"'" pa ( S 69,500.00 )
lawful money of the United States, to the payment of which sum, well and truly to be made, the Principal and Surety bind themselves, their
and each of their heirs. executors. adrninishat ors, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, The Principal has entered into a written contract dated Deownber 10th, 2014
MARATHON COURTHOUSE SANITARY SEWER IMPROVEMENTS
with the Obligee for
which contract is hereby referred to and made a part hereof as fly and to the same extent as if copied at length herein
Now, Therefore, The Condition Of This Obligation Is Such, that d the Principal shall faithfully perform said contract according to its
terms, covenants and conditions and shag promptly pay all persons supplying labor or material to the Principal for use in the prosecution
of the work under said contract, then this obligation shag be void; otherwise A shall remain in full force and effect
Subject to the named Obligee's priority, all persons who have supplied labor or material directly to the Principal for use in the prosecution
of the work under said contract shag have a direct right of action under this bond.
The Surety's aggregate liability hereunder shall in no event exceed the amount set forth above.
No claim, suit or action shall be brought hereunder after the expiration of one (1) year following the date of which Principal ceased work
on said contract If this imitation is made void by any law controlling the construction hared, such imitation shag be deemed to be amended
to equal the minimum period of imitation permitted by such law.
Signed, sealed and dated this STH day of J 20
i
() (SeaQ
By
(rte)
Old Rem&lc Sursiv Com
KE" 1rlr hMK VF6kQt " Aorney*n -Fat
ORSC 22112 ( 6-93)
*w.: 0L D` REPUBLIC SURETY COMPANY
** ** POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That OLD REPUBLIC SURETY COMPANY, a Wisconsin stock insurance corporation,
defies make, constitute and appoint:
KEITH MARTIN DRIGGERS, OF TALLAHASSEE, FL
its true and lawful Attomey(s) -in -Fact, with full power and authority, not exceeding $20,000,000, for and on behalf of the company as surety, to execute and deliver
and affix the seal of the company thereto (if a seal is required), bonds, undertakings, recognizances or other written obligations in the nature thereof, (otherthan bail
bands, bankdepository bonds, mortgage deficiency bands, mortgage guaranty bonds, guarantees of installment paper and note guaranty bonds, self- insurance
workers cornpensation bands guaranteeing payment of benefits, asbestos abatement contract bonds, waste management bonds, hazardous waste remediation bonds
or black" bonds), as follows:
ALL WRITTEN INSTRUMENTS'IN AN AMOUNT NOT TO EXCEED AN AGGREGATE ;OF
TWO MILLION DOLLARS ($2,000,000)----------- - - - - -- - - - -- FOR ANY SINGLE
OBLIGATION REGARDLESS:OF THE NUMBER OF INSTRUMENTS ISSUED THE OBLIGATION.
and to bind OL REPUBLIC SURETY COMPANY thereby, and all of the acts of said Attorneys -in -Fact, pursuant to these presents, are
ratified and confirmed. This document is not yalid unless printed on '< colored background and is multi - colored. This appointment is made.,
under and by authority of the board of directors at a special meeting held on February 18, 1982. This Power of Attorney is signed 'and Sealed
by facsimile under and by the authority of the following resolutions adopted by the board' : of directors of the OLD REPUBLIC SURETY
COMPANY on February 18, 1982.
RESOLVED that, the president, any vice - president, or assistant vice president in conjunction with the secretary or any assistant
secretary, may attorneys -in -fact or agents with authority as defined or limited in the instrument evidencing the appointment
in each case, for and on behalf of the company to execute and deliver and affix the seal of the company to bonds, undertakings, recog-
nizances, and suretyship obligations of all kinds; and said officers may remove any such attorney -in -fact or agent and revoke any
Power of Attorney previously granted to such person.
RESOLVED FURTHERthat anybond, undertaking, recognizance, or suretyship obligation shall be valid and binding upon the Company
(i) when signed by the president,' any vice president or assistant vice president,.and attested and sealed ( a seal be required) by any secretaryor assistant
secretary;
or. .
(ii) when signed by the president, any vice president or assistant vice president, secretary or assistant secretary, and countersigned and sealed (if a seal
be required) by a duly authorized attorney -in -fact or agent; or
(iii) when duly executed and sealed (if a seal be required) by one or more attorneys -in -fact or agents pursuant to and within the limits of the authority
evidenced by the Power of Attorney issued by the company to such person or persons.
RESOLVED FURTHER,that the signature of any authorized officer and the seal of the company may be affixed by facsimile to any Power of Attorney or
certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the compaW, and such
signature and seal when so used shall' have the same force and effect as though manually affixed.
IN WITNESS WHEREOF, OLD REPUBLIC SURETY COMPANY has caused these presents to be signed by its proper officer, and its
corporate seal to be affixed this 3RD day of JANUARY, 2012.
OLD REPUBLIC SURETY COMPANY
SURE
QJ C o oav RAr
SEAL
Assistant Secretary.. ;' President
STATE OF WISCONSIN, COUNTY OF WA - SS
On this R��p personally came before me, GERALD C LEACH
and RICK A. JOAROO �me known to be die i€ldivr�uals and officers of the OLD REPUBLIC' SURETY COMPANY who executed the above
instrument, and they each acknowledged the execution of the same, and being by me duly sworn, did severally depose and say;
that they are said officers of the corporation aforesaid, and that the seal affixed to the above instrument is the seal of the corporation,
and that said corporate seal and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority of':
the board of directors of said corporation.
P PON A A
+ N °:ARr Notary Public
N� PUBUG 5
9 0� My commission expires.
1 2/02/2012
CERTIFICATE
1, the undersigned, assistant secretary of the OLD REPUBLIC SURETY COMPANY, a Wisconsin corporation, CERTIFY that the
foregoing and attached Power of' Attorney remains in full force and has not been revoked; and furthermore, that the Resolutions of the board of
directors set forth in the Power of Attorney, are now inforce.