Item P2BOARD OF COUNTY COMMISSIONERS
AGENDA ITEM SUMMARY
Meeting Date: Marchl8, 2015 Division: County Administrator
Bulk Item: Yes No X Staff Contact Person/Phone #: Lisa Tennyson x4444
AGENDA ITEM WORDING: Discussion and direction regarding the potential acquisition of the
"Gulf Seafood" property on Stock Island in order to preserve commercial fishing.
ITEM BACKGROUND:
History: In November 2008, the County applied for a grant through the Florida Communities Trust
(FCT) Stan Mayfield Working Waterfront Program to purchase the "Gulf Seafood" property, located at
6021 Peninsula Avenue in Stock Island, in order to preserve the 8-acre parcel (5 acres upland, 3 acres
private bay bottom) in perpetuity for commercial fishing. At the time of that original application, the
project cost (for acquisition) was estimated to be $11M. The County committed $3.5M toward the
purchase. The request to FCT was $7.5M. The County's project did not rank high enough to be
considered for funding.
Current: FCT recently notified the County that there is $2M remaining in that grant program that can
be directed to our project should we still wish to proceed with the Gulf Seafood acquisition.
The current cost estimate for the acquisition is $7M. The State/FCT contribution is $2M. The County
contribution required will be $5M. These are preliminary numbers, subject to appraisal and negotiation.
The State/FCT will conduct the appraisal, negotiation and sale.
FCT has given us until the end of March to let them know if we are interested in moving forward with
this project; otherwise the funds will revert back to the program. If the County is interested in
proceeding, we will need to provide them with a renewed commitment letter (original commitment
letter is attached for reference) including confirmation of the County's contribution toward the
acquisition cost.
Additional information is in the backup.
PREVIOUS RELEVANT BOCC ACTION:
November 2008: Approval of grant application submission to FCT to purchase Gulf Seafood, including
County cash commitment of $3.5M.
December 2006: The Marine Port Advisory Committee recommended to the BOCC the purchase of
this parcel for preservation of working waterfront. The recommendation was further supported by the
Advisory Board for the Florida Keys National Marine Sanctuary with requested that the BOCC
"urgently consider the purchase of the Gulf Seafood site for the preservation of the commercial fishing
industry and associated traditional way of life in Key West and Lower Florida Keys."
CONTRACT/AGREEMENT CHANGES: NA
STAFF RECOMMENDATIONS:
TOTAL COST: $5M INDIRECT COST: BUDGETED: Yes No
COST TO COUNTY: $5M SOURCE OF FUNDS: I Cent Infrastructure Sales Tax
REVENUE PRODUCING: Yes No AMOUNT PER MONTH Year
APPROVED BY: County Atty OMB/Purchasing Risk Management
DOCUMENTATION: Included XX Not Required
DISPOSITION: AGENDA ITEM #
Back -Up Documentation:
1. Project Overview (Powerpoint)
2. County Commitment Letter (Draft, template
provided by FCT)
3. Willing Owner Statement (Template provided
by FCT)
4. Original 2008 Grant Submission to FCT
5. Legal Property Description
6. Property Zoning and FLUM Information
I�mw
ow
El
IA tt
CD
is M ® c•P �jCD
C � w C
9 m p
�. ® o ® CD � �.
®CD
r+
Cl, CDCD
�-
CD
�• CD W
CD
CD UQ
CDD � CD
® �
CD
0 CD
CTL CD CD
C . CD
W 0.
CD
CD CD
CD
n CD �71 �•�
® BCD ® �•
CD CD CD CD
r-L A�
CD CD
CD CD
RA
CD
r-LCD
CD
CL
CD
CD
{rQ
CD
44
CD
r
CD r
0
e--1-
n
CD
CD
CD
CL
CD co
�.►
CD O
CD
�--f P
aq
CD
cn
CD
s
d�
3
r;
w
SM
a
CD
CA
CD
uq
a
R-1
cn
It
CD
9
CL
CD
CL
CD
CD
cn
w
CD
cn
cs'
0
0
�,
AT
CD
co
1-0
CL
rKA
c
cn
CD
CD
r-+ .
CD
`.J
CD
C/]
0
y
CD
M.
7109-
•
•
�
r
Fes..
dip
dw
d
b
db
r
•
40
•
40
IL
t
�
IL
db
7
%o
01
rz
91
0
w
0
CD
CD CD
O
CD
CD CD
d n CD
En +` n ® .
CD
CID
CD CD CD v� ®� CD
CD I:L � CD CD CD
a �' ►3° .,
CD CD CD CD
p N , - P+ $=A r�-r. � CD CD
CD
p' CD
keAIn ,� • �'
CL CD
CD
Is +CD
• 0�
C1U "-° • CD
� a a ® CD
CD
n CL CD CD cn
CD
� tz ®CD 0
O
1+ R� '� CD CD r.� CD
1:1 b
CD® p
VZ p
O C �' ® On
C n' z z
p:+s
V C-M
o �P' CL 0 b dV
� vnP CD
CD
n
0
CD
a..e .
CD
a
O•
CD
O
CD
r-
CD
0
CD
CD
r�
14 �
b
0
Z4
,�, ,.,,� • �, M t�Jl�»ii 1i11ffaii Il�ll ' - � � � ♦ 1 ..,
Nr Lr r :.0
_q
`Ovh xra7t �. +4•,a w,Y�
Y1i-k
ca 6;RIP
' 1
Pr:."
7/ -JT
,
• � +.�._. 1 t".�, - � ;a:� y'�� Mo , tiff - —.^$ ,�
its p�
h
�y� �r �ti `�•�'�.rk'}� �;- i
ti�A* a.w
� WM" ��
.C*n�"0Zc'
CD�....
,..f
�,w
N
O
O
O
m
�
UQ
x
O
�n M
0-
�.
r+ CD
iA
OCD
W
o
p.
ar
CL
<
CD CD
Co
CL
14
u
o �.
�•°��
w
�..,
o
w
o
CD
a.
°�
.
w
CD
aoa
CD
�o�
c��°w
ww�
,....
�
wotj
CD
ID
CDUQ
0
�,
CD
o
CCL D�
o
o
�
�
a
�
Z
P7
x
O
���
oC
���
��
.
o
v,
G
i
�74
r
En
°_o
or
p
CD
CD
0
3
CD
C
N
O
W
i�
•
IN
CD
n•
Cl�
R
rO
CL
rr��V
V1
t.
C
CD
■
D ) 0
CD r ID
1•
CD CD CD CD CD CD
r • - r
•
1
CD
• 1* 1
D -
•
a
1� 9 an1•
1•
• • • �
CD
1• 61
D • CD CD
• * ► •
• 1Q •
•CD CD 1.
•CD
IwCL CD
1•
CD ICD
CD l
1 •
D • r-L cD
CD 0a
• ,
1+ Ir En a , 1•
I i a
• 1 •
CD CD
• r
• CD
•CL
CD
CD
L CD CD
CD w
•
w
1 !
1�
•D
C + D
CD CD CD
• w ! D
•
CD CD CD CD
D •cr
D ..D
1
•
D •*
1CD r-t-
r
1. • 1
cr
CD
CD 1•
P�
County Commitment Letter
(Draft)
OMNIMarorprors, ^90
Monroe County Board of County Commissioners
Office of the County Administrator
The Historic Gato Cigar Factory
1100 Simonton Street, Suite 205
Key West, Florida 33040
(305)2924441
March 18,2015
Linda Reeves
OMC Manager
Department of Environmental Protection
Land and Recreation Grants Section
Florida Communities Trust
3800 Commonwealth Boulevard
Tallahassee, Florida 32399-3000
MS 103, Mail Code 7550
Dear Ms. Reeves,
BOARD OF COUNTY COMMISSIONERS
Mayor Danny L. Kolhage, District I
Mayor Pro Tcm Heather Carruthers, District 3
George Neugent, District 2
00 David Rice, District 4
Sylvia J. Murphy, District 5
On behalf of the County of Monroe, I am pleased to submit the enclosed grant application (one original and two
copies) to Florida Communities Trust's Working Waterfronts Program. This application is for acquisition of the
former Gulf Seafood commercial fishing facility on Stock Island, currently known as "Fishman's Seafood."
If the project site is selected for funding, Monroe County is committed to fulfilling the commitments made in the
grant application. However, we would like to clarify that since the time of the original grant submission some
changes have occurred:
• The property owner has changed.
• Several, significant improvements have been made, including a new 6,000 square foot processing facility
("fish house") and repaired seawalls.
• Estimated project costs are lower than those reflected in the original application; and,
• Based on the level of FCT grant funding now available to this project, the County's potential match,
should the acquisition move forward, would be higher.
We have received an opinion from the local government planning staff determining that the proposed use of the
project site is consistent with the local comprehensive plan.
We also certify that condemnation or the threat of condemnation has not been used and will not be used to acquire
any portion of the project site.
I hereby authorize Lisa Tennyson, Director of Legislative Affairs and Grants Acquisition to act as the Key Contact
for the project. I understand that all correspondence concerning the grant application will be directed to this
person. You may reach her at (305) 2924444 or tennyson-lisa@monroecounty-fl.gov or by mail at Monroe
County Office of Management and Budget, 1100 Simonton Street, Key West Florida 33040.
Roman Gastesi, Jr.
County Administrator
Willing Owner Statement
Willing Owner Statement
Fee Simple Acquisition
(Exhibit H)
TO: Monroe County
Florida Communities Trust
RE: Gulf Seafood Parcel on 6021 Peninsular Avenue, Stock Island, Monroe County, Florida
TAX PARCEL #s: 00123680, 00125900, 00125910, 00125920, 00125930, 00125940,
00126000, 00126010, 00226020, 00126030, and 00126040, 00126050
I do hereby state that as the property owner(s) of the above -referenced property, I am willing to
entertain a purchase offer from Monroe County and Florida Communities Trust.
UP Development Key West Holdings, LLC
By: i
,,,P4nt Name
1�
Signature of Property Owner
By:
Print Name
Signature of Property Owner
City, State, Zip
Telephone Number
Date Signed by Owner
Owner Address: 1045 Tulloss Rd Franklin TN 37067
Please return this form to:
Lisa Tennyson, Dir. Legislative Affairs and Grants Acquisition
Monroe County
Office of Management and Budget
1100 Simonton Street
Key West, Florida 33040
Original Submission
for
Stan Mayfield Working Waterfront
Grant Program
Florida Communities Trust
Stan Mayfield Working Waterfronts Program
Grant Application
Submitted by:
Office of Management and Budget
Historic Gato Building
1100 Simonton Street
Key West, Florida
33040
Mayfield -Stock Island Maritime Facility
November 21, 2008
Florida Communities Trust Application Form SMWW-1
Stan Mayfield Working Waterfronts Grant Application Form
In Accordance With Rule 9K-9.003(1), F.A.C.
1. PROJECT NAME Mayfield -Stock Island Maritime Facility
(Descriptive project name)
2. APPLICANT NAME Monroe Coun
(Name of Local Government or Nonprofit Working Waterfront Organization)
Nonprofit Working Waterfront Organization, must provide the required information requested in Exhibits J, K and L.
3. PARTNERSHIP APPLICATION
is this a Partnership Application between a Local Government and Nonprofit Working Waterfront Organization?
YES NO X
It yes, provide the name of the Nonprofit Working Waterfront Organization. Also, provide an application transmittal letter
from the partnering agency.
4. KEY CONTACT PERSON
Note: The key contact is required to be an employee of the Local Government or Nonprofit Working Waterfront
Organization. identify only one key contact person.
Key Contact Name Lisa J. Tennyson
First Middle Initial Last
Title Grants Administrator
Department Office of Management and Budget
Mailing Address 1100 Simonton Street
City Key West , FL Zip Code 33040
Phone Number 305 292-4444 Fax Number (305) 292-4515
E-mail Address tennyson-lies a("?monroecounty4gov
Chief Administrator for the Local Government
Name Roman Gastesi, Jr.. County Administrator Phone Number t3051292-4441
Note: if the Applicant's principal office address is a post office box, a delivery address is also required.
Delivery Address
City , FL Zip Code
PROJECT6. .
County Monroe Section 35 Township 67 South Range 25 East
Note:. include all directional designations (Township either North or South —Range either East or West).
Form SMi W-1 (Effective ) Page
6. TOTAL PROJECT ACREAGE
Indicate the approximate acreage of the Project Site.
7. ACQUISITION TYPE
The Applicant must fill out one of the following acquisition types, as appropriate.
8.03 Acres
X Fee Simple
The Project Site will be a joint acquisition with both FCT and the Applicant participating in the Acquisition process.
Less than fee - Working Waterfront Covenants
FCT and the Applicant will acquire a less than fee interest in the site — acquiring the development rights off the property
while still allowing the owner to continue operation of the site as a Working Waterfront.
1 Number of separate ownerships to be acquired within the Project Site.
Note., No Project Site can contain more than 3 ownerships.
8. ESTIMATED PROJECT COSTS
Enter an amount on each line and round to the nearest hundred dollars.
a. Land purchase price (estimated) $ 10.9 m
b. Acquisition costs (estimated)
Cost of certified survey(s), appraisal(s), appraisal review(s), title report(s), $ .1 m
title insurance premium(s) and environmental audit(s).
c. Total Project Costs [Add a. and b.] $ 11.0 m
9. AWARD AMOUNT AND MATCH
Dollar Amount Percentage of Award
a. FCT grant award amount (1) $ 7.5 m 68.18 % (2 decimal places)
b. Match amount (2) $ 3.5 m 31.82 % (2 decimal places)
c. Total Project Costs [Add a. and b.] $ 11.0 m 100 %
(Should equal 8.c above)
(1) The total amount of any Award or combination of Awards applied for by any Local Government(s) or Nonprofit
Working Waterfront Organization(s) under any Application(s) or Partnership Application(s) for any project(s) shall not
exceed funds available during any one cycle.
(2) No match is required. Points are awarded in the criteria (4)(a) 1 and 2 for various levels of match.
10. SOURCE OF MATCH
Check the appropriate response(s) below to indicate eligible source(s) of Match:
X Existing or future cash from the Applicant.
Cash or grant from federal, state, regional, county, municipal, or other agency.
Cash from a private Donation.
Value of real property donated by the landowner in a documented bargain sale or Donation agreement.
Note: If the source of the Match is from a third party, provide documentation indicating source and amount.
Form SMWW--t (Effective ) Page 2
OWNERSHIP AND ACQUISITION PLAN
List all property owners and parcel tax identification numbers for all parcels.
Requirement: Provide a willing owner letter for all parcels listed below (Exhibit H)- included in attachments.
Owner's Name Parcel Tax ID Number(s)
WSG Sand Lake, LP 00123680 00125900 00125910 00125920 00125930
00125940, 00126000, 00126010, 00226020, 00126030,
00126040, and 00126050 (See next page.)
Owner's Mailing Address Phone
400 Arthur Godfrey Blvd., Suite 200, Miami Beach, Florida 33140 305- 673-3707
Owner's Name
Owner's Mailing Address
Owner's Name
Parcel Tax ID Number(s)
Parcel Tax ID Number(s)
Phone
Forth SM -1 (Effective ) Page 3
The purpose of the Stan Mayfield Working Waterfronts Program is to further the
protection and continuation of Working Waterfronts in the State of Florida.
"Working Waterfront" is defined in the Florida Statute as:
(a) A parcel or parcels of land directly used for the purposes of the commercial harvest of
marine organisms or saltwater products by state -licensed commercial fishermen,
aquaculturists, or business entities, including piers, wharves, docks, or other facilities
operated to provide waterfront access to licensed commercial fishermen, aquaculturists, or
business entities; or
(b) A parcel or parcels of land used for exhibitions, demonstrations, educational venues, civic
events, and other purposes that promote and educate the public about economic, cultural, and
historic heritage of Florida's traditional working waterfronts, including the marketing of the
seafood and aquaculture industries.
The project proposed for funding in the grant application must clearly further the
purposes of a Working Waterfront as outlined above.
Form 5M -1 (Effective ) Page 4
A Project Summary is required when a Local Government proposes to acquire fee simple interest in the Project Site solely for a public
use such as a maritime museum, educational venue or civic event area to educate the public about the economic, cultural and historic
heritage of Florida's traditional working waterfronts,: A Business Summary is not required for this type of project.
The Project Summary shall include a discussion of the purpose of the project, existing and future uses, existing and proposed physical
improvements and historic resources. Include the size of any existing or proposed buildings. Indicate if any easements, concessions,
or leases exist or are proposed, The recommended size for a Project Summary is one page.
Business Summary
When the site is to be operated as a Working Waterfront, a Business Summary is required,
Recommended size of a Business Summary is two to five pages but use as many pages as needed.
Address the following items. If an item is not applicable to the project, please state so.
Introduction
1. Provide a brief description of the existing and/or proposed activities on the site.
Z Discuss how the Project Site would further the protection and continuation of a Working Waterfront.
Note: The proposed activities on the site must conform to purposes of the Working Waterfronts Program as defined in 380.5105(a)
and (b)_
3. Discuss how the development and management of the Project Site will provide an economic benefit to the community.
4. Ownership type:
Public (Local Government)
Private — describe the type of ownership including.
Name of organization
Owner(s) or officer(s)
History and background of the business
Business
1. Describe existing or proposed business activities on the site.
Note: The primary activities and revenues collected on site shall conform to the purposes of the Working Waterfront program.
2. Explain the services, benefits and support to the commercial seafood industry.
3. Describe educational activities to be conducted that highlight the historical or current commercial fishing or aquaculture industry.
4. Explain any activities indirectly supporting the commercial seafood industry.
5. Describe the current and future demand for the facilities and activities to be provided, including but not limited to:
Description and size of current market;
Geographic region of customer base;
Describe competition in the area.
Management
1. Description of facility(ies). Identify existing and all proposed improvements:
a. Describe conditions and size of existing structures.
b. Description and approximate size of the proposed improvements.
Note: Any new structure to be located on sovereignty -submerged lands shall comply with the criteria set forth in F.A.C.
18-21 including but not limited to the requirement that the structure be water dependent
2. Identify existing and/or proposed easements, concessions, or leases.
3. Identify any existing or proposed third party leases including the lessee and purpose of the lease.
4. Identify all short term and long term maintenance requirements.
5. Discuss current and proposed staffing needs.
6. Identify the approximate cost for development and operation of the site including proposed improvements, maintenance,
staffing, etc.
7. Identify funding sources for the development and maintenance of the site.
Appendix
Attach and label backup documentation to provide verification of above items as needed.
Form 5 -1 (Effective ) Page 5
Afqvfidd Grant Application Form SARIV 1
Monroe Comm; November 2008
I. Introduction
1. Brief Description of the existing and/or proposed activities on the site.
Current Parcel name: Gulf Seafood, Incorporated
Owner Name: WSG Sand Lake, L.P.
Location: 6001 Peninsular Avenue, Stock Island; adjacent to Boca Chica Channel, Mile
Marker 5 on the Atlantic side of US Hwy 1. The subject property has the additional addresses
of 8 Peninsula Avenue and 6021 Peninsular Avenue and consists of 12 contiguous parcels,
all owned by WSG Sand Lake, L.P.
Type of facility: Commercial fishing
Zoning: Mixed Use
FLUM Designation: Mixed Use Commercial
Tier Designation: Tier 3
The parcel, a "jewel" that Monroe County Board of County Commissioners by unanimous
vote aspires to purchase and protect, is a unique 8-acre boat basin (4.9 acres of upland and 3.1
acres of bay bottom) located on the southeast side of Stock Island in Monroe County. The
subject parcel is classified as marine working waterfront and lies within a Mixed -Use zoning
district, with a vested right for use as a commercial fishery.
We are proposing to use this parcel for
commercial fishing dockage and trap storage,
the two most important, pressing and threatened
needs of our local commercial fishing fleet. The
property is fully operational for dockage and
trap storage on day one. The subject parcel's
assets for commercial fishing include the
following:
• 8 acre site;
• 5 acres of upland, fenced;
• 3 acres private bay bottom;
2,445 linear feet of seawall;
• Room for 75 vessels;
• Room for 100,000 traps;
Permits in hand for piers, seawall repair
and fuel tanks; and
• Commercial vessel launching facility.
Current Aerial View of subject parcel
Mavfield Grant. application Form SA/IPV 1
Monroe County, November 1008
Although currently unutilized, during storms much of the commercial fleet ties up in
this basin for protection, with the owner's permission. The protection the site offers
vessels from storm winds in hurricanes is yet another of the parcel's assets.
Once the site of Woodsy -Niles Fish house, and more recently Gulf Seafood, this parcel
has operated as a commercial fishery for decades. Below is a photograph of the fishery in
the 1980's.
The property was sold in 2005. It is
currently vacant and cleared of all
structures (not withstanding the seawall
and boat ramp.) A small area of the
seawall is in disrepair and has been
permitted for repair. Planned
improvements by current owners to
construct new piers and install new fuel
tanks have been permitted by DEP, the
Army Corps, and Monroe County.
The property is highly threatened by
current re -development pressures in the
Keys. There is a demonstrated market
for this property to be converted to non -
fisheries uses.
f3k=V''°W= The present owner, WSG Sand Lake,
Gulf Seafood In operation In the 1980's LP, has submitted application and plans
for redevelopment of the parcel to an
upscale marina (their letter of intent and redevelopment plans are included in Exhibit T).
The redevelopment plan is similar to those of Yacht Clubs of America, Kings Point
Marina and Old Island Harbor, which are all recent examples of former Stock Island
working waterfront turned luxury marinas.
The site of the former Gulf Seafood is an ideal parcel for acquisition through the Stan
Mayfield Working Waterfront Grant. It is:
• An historically active working waterfront which is strategically significant to
the local, regional and state fisheries -related economy;
• Currently located and developed to fully support commercial fishing activities;
• Under current and emerging threat by development of conversion to uses
incompatible with commercial fishing activities;
• In a community with a clear desire to maintain and support commercial fishing
enterprises as evidenced by zoning, comprehensive plans, interim development
orders, etc; and
• A critical part of the working waterfront infrastructure.
Mgyfreld Grant Applicaaoir Form sMinv-1
Monroe Canty, November 2008
2. Discuss how the project would further the protection and continuation of a working
waterfront.
Upland Areas
e
It will also support a diversity of working waterfront activities. Its long seawall will
serve the dockage needs up to one third of the commercial fishing vessels in the Stock
Island area. Its abundant upland space
provides plenty of trap and gear
storage; and boat lift will also allow
for a small boat yard for the
maintenance and repair of commercial
fishing vessels. Its ideal location
offers easy access to deep -water
navigation channels and road
transportation, proximity to support
services and protection against
potentially damaging hurricane winds.
The property provides secure critical
commercial fishing access for fisheries
that cannot or will not be met by other
properties.
Project', Basin and Portion of the 2,S00 LF of Seawall
This acquisition would put this critical part of the working waterfront in the public
domain. The Gulf Seafood facility on Stock Island represents one of the last opportunities
Afield Grant Application Form SAIRIV-1
Monroe Counts; A'o" m&r 2008
for maintaining working waterfront access, and preserving the historic, economic and
cultural importance of the commercial fishing industry in Key West and Monroe County.
The Project Mitigates the Threat of Redevelopment to Commercial Fishing in Stock
Island
It's hard to imagine Stock Island without a working waterfront, but that is a possibility.
Currently the subject parcel is part of a pattern of working waterfront that is in
redevelopment transition, slowly displacing the commercial vessels it once housed. Due
to market pressure and zoning changes, the future of commercial fishing is at risk. In
recent years, most of the commercial fishing docks have been converted into commercial
marinas (Sunset Marina), luxury
condominium marinas (Yacht Clubs
of America), and an upscale mixed -
used residence and marina (King's
Point). Safe Harbor is now under
similar redevelopment.
Stock Island Lobster Company represents the only other fish house in Stock Island, and
this facility is near capacity in terms of dockage and trap storage space. If the leased
property of La Curva's dockage is sold or redeveloped, Stock Island Lobster Company
could not accommodate those vessels. The Gulf Seafood site represents a singularly
valuable opportunity to secure the future of commercial fishing in Stock Island.
If we don't act to protect commercial fishing now, the costs to the region could be
immense. Loss of the commercial fishing industry and associated fish houses could lead
El
i(avfield Grant Application Form SAfil'IV--1
Monroe County, ,November 2008
to a reduction in the gross county production of approximately of $108 million for the
Florida Keys in just the next 6 years.'
The Keys' fishing industry has been trending downward in the number of commercial
1�
,f� r fishing licenses and pounds of landings.= While
there is no doubt that additional federal and state
1 regulations, increased operating costs, and
weather have contributed to the downward trend,
the industry's the most significant threat is
k, decreased access to working waterfront. "Future
fishery management actions may lead to further
industry consolidation in both numbers and
vessels and fish dealers, but nothing threatens the
ultimate survival of Keys historical and
culturally -relevant commercial fishing industry
y` as much as does the potential loss of commercial
fishing waterfront access to residential and
recreational marina redevelopment," states Doug
' Gregory, Sea Grant Marine Agent with
University of Florida's Extension Services.
7-LO
bster Buoys at the former site of
Gulf Seafood The South Florida Regional Planning Council
has also sounded the alarm. Its Monroe County
Working Waterfront Report states, "If nothing is done to control this redevelopment, the
concern is that future losses of waterfront facilities will negatively affect the economy and
bring an end to critical marine service industries (e.g., boatyards), commercial marinas
which are available to the public, and traditional trades associated with the community
character (e.g., commercial fishing.) The commercial fishing industry is once again
particularly vulnerable due to their dependence on waterfront land and increasing
operating costs." 3
The Project Has Community -wide Support
There is wide community support for the acquisition of the Gulf Seafood parcel for the
use and preservation of commercial fishing. In 2006, the Monroe County Board of County
Commissioners' Marine and Port Advisory Committee (MPAC) unanimously
' Monroe County Marine Management Strategic Plan, Appendix 4, Demographic and Economic Analysis of Monroe County
and the Marine Industry, prepared by the South Florida Regional Planning Council with Center for Urban and
Environmental Solutions at Florida Atlantic University, December 2005
However, those that remain in business are becoming more efficient based on landings per trip; and, in terms of poundage,
the last 7 years have been more productive that the 80's and only slightly less productive that the 90's. It's also important to
note that Monroe County has had the largest commercial fishing fleet in the Southeastern United Stales, so some
consolidation is inevitable.
3 Monroe County Marine Management Strategic Plan, Appendix 2, Working Waterfronts Report, prepared by the South
Florida Regional Planning Council with Center for Urban and Environmental Solutions at Florida Atlantic University,
December 2005.
Mavfield Gran! Application Form SMiVIV-1
Monroe County. November 1008
recommended the purchase this parcel after reviewing a variety of working waterfront sites
for possible acquisition.
The Advisory Council for the Florida Keys National Marine Sanctuary strongly
supported this recommendation, requesting that the BOCC "urgently consider the purchase
of the Gulf Seafood site for the preservation of the commercial fishing industry and
associated traditional way of life in Key West and the Lower Florida Keys."
In October 2008, The Florida Keys Commercial Fishermen's Association agreed that
there was no more suitable or critical facility for commercial fishing in the lower Keys and
voted unanimously to support the acquisition of this parcel under the Stan Mayfield
Working Waterfront grant program. This was reaffirmed at the organization's November
meeting. (See support letter from FKCFA in Exhibit S.)
On November 19, 2008, the Monroe County Board of County Commissioners voted
unanimously to approve the submission of this application for acquisition of the Gulf
Seafood parcel.
The Project Supports and Furthers Monroe County's Effort to Protect and Preserve
Working Waterfront
Monroe County and the communities of the Florida Keys have historically desired to
maintain and support our commercial fishing industry; this project would further the
numerous efforts on behalf of the County to protect and preserve the commercial working
waterfront.
In efforts to preserve and protect our working waterfronts, the County has carried out
the following protective measures:
• In 2005, Monroe County issued a 9-month emergency moratorium on waterfront
redevelopment.
• Monroe County Board of County Commissioners retained the South Florida Regional
Planning Council (SFRPC) and the Center for Urban and Environmental Solutions of
Florida Atlantic University (CUES) to develop the Monroe County Working Waterfronts
Master Plan to provide a comprehensive strategy for protecting and preserving the working
waterfronts of Monroe County. This report presented a coordinated implementation
strategy recommending numerous modifications to our current land development
regulations and comprehensive plan policies to strengthen efforts to preserving the
working waterfront.
Monroe County continued to control redevelopment by following up on this action with
an Interim Development Order in 2006, which was then extended to July 2008, to allow us
time to do develop appropriate and protective development guidelines in our LDR's and
Comprehensive Plan.
2
Mayfield Cram Applicurion Form sAnviv-!
Monroe Counrv, November 1008
The County has put in place a number of land use zones specifically designated for or
protective of commercial fishing, such as the mixed -use district, commercial fishing village
district, commercial fishing special district, maritime industries district. Our proposed
project parcel lies within a mixed -use district:
• As per the Monroe County Code 9.5-219, "the purpose of the Mixed -Use district is to
establish or conserve areas of mixed -uses, including commercial fishing, resorts, residential,
institutional and commercial uses, and preserve these as areas representative of the character,
economy and cultural history of the Florida Keys."
• Section 9.5-248 discusses allowable uses within mixed -use districts; commercial fishing is
listed as an as -of -right use. (See Exhibit R.)
e The Monroe County Code defines commercial fishing as follows: (C-12) commercial
fishing means the catching, landing, processing or packaging of seafood for commercial
purposes, including the mooring and docking of boats and/or the storage of traps and other
fishing equipment and charter boat uses and spot diving uses.
Contained within the County's Year 2010 Comprehensive Plan are the following
provisions specific to the Stock Island's working waterfront (these excerpts are in Exhibit I):
. Goal 212 states that Monroe County shall prioritize shoreline land uses and establish
criteria for shoreline development in order to preserve and enhance coastal resources and to
ensure the continued economic viability of the county.
Policy 212.1.3 states that Monroe County shall maintain existing commercial fishing
operations as conforming uses.
• Objective 502.1 states that Monroe County shall promote the preservation and
enhancement of the existing ports and port -related activities.
• Policy 502.1.1 states that Monroe County shall permit only port and port related land uses
within the Safe Harbor/Peninsular port area of Stock Island.
Policy 502.1.2 states that Monroe County shall permit land use supportive, complementary
or otherwise port -related nearby and adjacent to the Safe Harbor/Peninsular port area of
Stock Island.
Section 3.20.2 of the Comprehensive Plan Technical Document discusses the threat to
commercial fishing posed by redevelopment pressures and the need to address this.
. Policy 101.4.5: Amended language (underlined) to our Comprehensive Plan, recently
approved by DCA and to be adopted at the December 2008 BOCC meeting, enhances
protections for commercial fishing:
N
Xlavfield Grant Application Form SHIM-1
Monroe County, November 2008
The principal purpose of the Mixed Use/ Commercial land use category is to provide for
the establishment of commercial zoning districts where various types of commercial retail
and office may be permitted at intensities which are consistent with the community character,
the natural environment and orderly and balanced growth. Employee housing and
commercial apartments are also permitted, along with other permanent residential
development compatible with the mix of uses allowed.
The maintenance and enhancement of economically viable commercial fishing. and other
traditional water dependent and water related uses such as retail storage and repair and
maintenance shall be encouraged within this land use cate o(pursuant to Goal 219 of this
Plan .
Special protective provisions are also included in the Stock Island Liveable Communikeys
Master Plan, which was formally adopted by the County Commission in 2006 as part of our
Comprehensive Plan. These include:
• Goal I is to provide space for a working waterfront and its supporting industries. Further,
Strategy 2 of Goal 1 is to maintain and protect maritime industrial and water -dependent uses
from encroachment and displacement by incompatible or non -water dependent uses.
• Goal 2 is to preserve commercial fishing.
• Strategy 1.3 is to acquire waterfront property, preferably with existing infrastructure to
support commercial fishing. Action Item 1.3.4 is to amend the land development regulations
to eliminate the list of permitted uses that are not consistent with the purpose of the zoning
district.
• Goals 5 and 8 discuss the need to preserve the historic maritime history and community
character of Stock Island through commemorative signage and design guidelines.
Despite these efforts, there has been continued uncertainty about future land uses along
our waterfront. MU zoning which applies to most of the working waterfront in Stock Island,
allows for both commercial and residential uses and does not adequately or inherently protect
commercial working waterfront land from being converted to residential or other non-
commercial fishing uses. Exacerbating this uncertainty, the County is under pressure from
waterfront developers to consider amendments to the Year 2010 Comprehensive Plan to
further ease working waterfront redevelopment restrictions.
This uncertainty and protracted planning process has hurt the industry and made most of
the fishing firms in the Stock Island area fearful for the future viability of their traditional
ability to continue fishing. Such a loss would be irreversible.
Principles for Guiding Development
This project also adheres to the intent and purpose of the Principles for Guiding
Development for areas of critical state concern. Specifically, it complies with the following
development principles:
Alatifield Gram Applicatiaan Form SAMP`lV-!
Monroe Canna; Alavember?00
(b) To protect shoreline and marine resources;
(d) To ensure the maximum well-being of the Florida Keys and its citizens through sound
economic development;
(f) To enhance natural scenic resources, promote the aesthetic benefits of the natural
environment, and to ensure that development is compatible with the unique historic
character of the Florida Keys;
(g) To protect the historical heritage of the Florida Keys;
(I) to limit the adverse impacts of public investments on the environmental resources of
the Florida Keys; and
(1) To protect the public health, safety, and welfare of the citizens of the Florida Keys and
maintain the Florida Keys as a unique Florida resource.
AICUZ Compatibility
This parcel lies in very close proximity to and just across the Boca Chica Channel from
the Naval Air Station Key West; as such it lies in the 75-79 Decibel Noise bevel of the Air
Installation Compatibility Use Zone. The property's proposed and perpetual use of
commercial fishing (in contrast to potential residential use) represents compatible land
development within the AICUZ, safeguards the military mission, and protects the public's
safety, while also promoting economic growth. From a national security perspective, keeping
this land that is adjacent to the Naval Air Station free from commercial development, would
add an invaluable level of security. As such, NAS Key West is very supportive of this
project and is currently investigating the possibility for funding in this current 2009 cycle of
their Encroachment Partnering Program.
3. Discuss how the development and management of the project site will provide an
economic benefit to the community.
The Florida Key's economic vitality
encouraging working waterfronts. Our
working waterfronts provide a workplace for
fisherman and the sectors associated with the
fishing industry. Next to tourism and the
Navy, commercial fishing is the most
valuable sector of our local economy.
Our tourist economy relies in part upon
the iconic image of fisherman plying the
oceans for their living. While the county's
working waterfronts play a large role in the
local and the state's economy, a very small
portion of our waterfront remains as working
waterfront, and these precious few working
waterfront areas are under constant threat.
9
is particularly reliant upon maintaining and
Stock Island Lobster Boat with Traps on Dods
jVlavfield Grant Application Form SAIWW-1
Monroe County, November 2008
The Key's complex marine ecosystem's extensive nursery, feeding and breeding grounds
support a multi -million dollar commercial fishing industry. By just about every measure:
SPLs, federal permits, ex -vessel value of landings, fishing trips, number of traps and number
of vessels, the Keys' commercial fleet, and in particular the Stock Island fleet, is strategically
significant to the local, regional and state fisheries -related economy.
In 2006, Monroe County was ranked the 5`h most valuable port in the nation, with a total
dockside value of $54 million. It is the only port in the State of Florida that annually makes
the list of the nation's top 50 ports.
According to Florida Fish and Wildlife Service, the annual catch of the Florida Keys'
commercial fishermen includes but is not limited to:
• 4 million pounds of spiny lobster -- 90% of the State's entire lobster haul;
• I million pounds of stone crab -- 35% of the State's total crab catch;
• 1'/a million pounds of snapper -- 32% of the State's total);
• 1 million pounds of king mackerel -- 25% of the state's catch);
• '/a million pounds of ballyhoo -- 69% of the state's catch);
• '/4 million pounds of tilefish (5% of the state's catch); and
® 1/2 million pounds of grouper (6% of the state's catch).
Stock Island landings alone have a dockside value of $22-24 million and the local
commercial fishermen catch almost half the county's total haul -- approximately 7 million
pounds of lobster, stone crab and finfish annually. This represents 5% of Florida's total
landings and 13% of the state's total value.
The economic significance of the Gulf Seafood parcel as part of Stock Island's productive
working waterfront cannot be overstated.
A recent study entitled Potential Economic Activity Associated with Gttlf Seafood Facility
Key West, Florida 2007 projects the potential economic impacts of an operating facility at
Gulf Seafood. The study projects that a 50-75% share of the Stock Island commercial fishery
landings (valued at $22 million in total) is reasonable at the Gulf Seafood property.5
At a 50% share of the landings, the study indicates that the total annual economic output
for the Gulf Seafood parcel would be:
• $11 million in harvest revenue;
• $3.8 million in wholesale margins;
4 Florida Fish and Wildlife Conservation Commission, Marine Fisheries Information System, 2007 Landings Summary by
County.
5 Thomas J. Murray and Associates, Inc., Potential Economic Activity Associated with Gulf Seafood Facility Key West, Florida
2007; prepared for the Florida Keys Commercial Fishing Association, Inc. (In 1998, NOAA established a set of commercial
Fishing panels to monitor the impacts of sanctuary regulations on commercial fisheries. Thomas Murray and Associates, Inc., was
contracted to set up the commercial fishing panels and collect information to assess their catch and financial performance,
Thomas Murray and Associates also has a subcontract with the University of Miami, Itosenstiel school of Marine and
Atmospheric Science, to collect data directly from fishermen.)
10
Akvfield Grant applicotian Form SAlINV--1
Monroe County, November 2008
• $3.2 million in retail margins;
• Total output of $22.5 million;
• Total income of $14 million; and
The creation of 610 jobs.'
The study's author also notes that these economic impact projections do not include the
potential revenue arising from the commercial boat yard which is part of the facility that
would provide significant additional revenue to the operation. For example, the most recent
data available from the Florida Department of Revenue indicated that Monroe County was
10'h among the state's counties in boating related retail sales including boat yards, reaching
$163 million in FY 2006.
The study also does not include the potential economic impact for fishermen who can now
more freely invest in the expansion of their individual business enterprises and capacity for
production because they will have a permanent and secure location for their present and
future operations.
The purchase and preservation of the Gulf Seafood parcel will allow the local fishing
industry to meet the seafood market's demands well into the 2151 century and will have
additional positive impacts on labor income, business activity, and the continuation of the
Florida Keys' brand as the seafood business center of Florida and the Southeastern United
States.
4. Ownership Type
We are currently developing an ownership model that involves a true partnership with
commercial fishermen.
We are proposing to utilize an
innovative public/private long-
term ground lease partnership
between Monroe County and the
County's licensed, commercial
fishermen to acquire and protect
the Gulf Seafood parcel. This
model is based on Monroe
County's long-term ground leases
used to develop and protect land
for affordable housing in the Keys.
The long-term ground lease is a
vehicle increasingly used to
preserve and protect highly
desirable, common -good land uses.
6 ibid
Stock Island stone crab fisherman with traps on dock
Mayfield Gran! Application Form SAIJI'W-I
Monroe County, November 1008
The County would retain ownership of the land and the property will be preserved as
commercial working waterfront in perpetuity. We then propose to apportion sections of the
property (to include a section of the seawall for dockage, and an area of upland space for trap
and gear storage) and lease these out to individual commercial, licensed fishermen. This
leasehold would restrict the use of the property for commercial fishing uses only in
perpetuity. The leasehold would be assignable but also restricted: the lease holding
fisherman would be able to sell his lease, but only to another working, licensed, commercial
fisherman. The County would monitor each of these transactions.
We are contemplating a long-term Iease period of twenty years. Through this long-term
leasehold, these fishermen will then "own" their dockage and storage space. They will have,
for the first time, a sense of permanency and stability, and the security they need to
comfortably invest in the future of their individual commercial fishing businesses. Currently,
every single Stock Island fisherman, even the top producers, operates from dockage space
without the benefit of leases or
contracts from private owners.
The price for this long-term
leasehold would be approximately
$200,000. We believe based upon
information provided to us by the
fishermen that there are
approximately 20 local licensed,
commercial fishermen with the
interest and requisite financial
ability to purchase these leases.
This would give us the $4 million
in additional funding, beyond the
State grant, that may be necessary
to acquire the parcel. We have
also received indications of
Stock Island Commercial Lobster Boat Operation interest in this arrangement from
fishermen throughout the Keys and
other areas in Florida seeking secure dockage and trap storage. It is certainly possible for us
to "sell" additional leaseholds as the parcel can accommodate up to 75 vessels.
The fishermen are very excited for the opportunity to "own" their own piece of the
working waterfront for their business. They are however reluctant to take any tangible
individual action that demonstrates their willingness to "go independent" and sign onto this
project until they know for sure that the project is being seriously considered for funding.
In addition to the above land lease option, assuming a financial gap of approximately $3.5
million (the difference between the estimated acquisition price of $11 million and the state
grant of $7.5 million), the current property owners will hold a note for the balance of the
acquisition price for a period of at least 5-7 years at a favorable (for the County) interest rate.
12
dfavfreld Gran! Application Form 5A1{NW--1
Monroe County, Norember 2008
This would allow the County and fishermen partners more time to secure financing, if
necessary, and the County will be well positioned to pursue additional funding opportunities
to expand and develop the land for commercial fishing. For example, we've recently been
approached by the Naval Air Station Key West about their high level of interest in our
project (the regional command in Jacksonville has also expressed its support) and the very
good possibility of providing gap grant funds through the Navy's Encroachment Partnership
Program.
NAS Key West staff has indicated that the subject parcel, located within the highest DNL
level in the AICUZ and close proximity to the base (which lies just to the north across the
Baca Chica channel), makes it a perfect project for the program's funding. The naval air
station's flight operations create noise and vibrations and pose other hazards that conflict
with residential use. Opposition from residents within the fly -over areas ultimately affects
the Navy's ability to train their pilots. Successful acquisition of the Gulf Seafood property as
a commercial fishing operation would greatly alleviate a significant future residential
encroachment and limit this conflict. NAS staff is actively attempting to have this project
inserted into their program's current funding cycle. We should have a better idea of where
we are with this funding source within the next month or two.
H. Business
1. Describe the existing or proposed business activities on the site.
Currently the parcel is vacant; there are no existing services. Prior to submission of this
application the owner/developer was advancing with development of this land with
permitting and land clearing for intense resort development. They have agreed to hold off in
order to give the County time to seek these funds for preservation of this unique commercial
fishing working waterfront.
Now the County is proposing to provide dockage and trap storage, the most immediate
needs of our commercial fleet in the Lower Keys. The project can accommodate dockage
(pursuant to Rule 9K-9.006 (3)(a)(1)) for up to 75 commercial fishing vessels and trap
storage space (pursuant to Rule 9K-9.006 (3)(a)(4)) for 100,000 traps. Lower Keys'
fishermen account for approximately 300,000 traps, so storage is a critical need.
In addition, we propose to operate a boat yard on the site. The parcel has a boat ramp and
a commercial vessel boatlift (pursuant to Rule 9K-9.006 (3)(a)(3)). The boat yard will offer a
variety of services and will have room for up to 20 vessels at any one time. While in
operation, Gulf Seafood ran a very successful commercial fishery with upwards of 50 boats
and a very busy boat yard.
All activities and revenues collected shall conform to the purposes of the Working
Waterfront program. All revenues collected shall be directed toward the repayment of any
acquisition costs absorbed by the County and to the ongoing management and maintenance
of the property. However, without this grant, the developer will recommence development of
the property.
13
Alatifeld Grant Application Form SAM71V--1
Monroe Countv, Not -ember 1008
2. Explain the service, benefits, and support to the commercial seafood industry.
Despite their high productivity and contribution to the local and state fishing industry, our
licensed, commercial fishermen lack
permanent, secure, safe dockage and
adequate trap storage space. The primary
service of this project is to provide that
permanent dockage and trap storage space
for one of Florida's most valuable fisheries.
Currently, every single commercial
fisherman in Stock Island, even the top
producers, rents his space without benefit of
a lease or contract. In addition, there is no
dockage available for independent licensed
commercial fishermen, who also sometimes
must use their own personal residential
property for trap storage.
This does not allow For a reliable means
for investment and expansion of their Stone Crab Traps Plied High on La Curva pocks
businesses. Stock Island is at risk of losing
these fishermen if the private owners sell their private property. By "owning" their dock space
the commercial fishermen create more stable business environment which our Florida
economy is so dependent upon.
3. Describe the educational activities to be conducted that highlight the historical or
current commercial fishing or aquaculture industry.
The County, in conjunction with the local Florida Sea Grant office, will conduct
educational activities with fishermen to encourage sustainable resource practices and will erect
educational kiosks for the visiting public that will explain the historical and cultural
significance of commercial fishing (pursuant to Rule 9K-9.006 (6)(a) and (b)) as well as
conducting activities such as tours and observations of the commercial fishing operations at
the fishery. We will also coordinate with the local School District which has very limited
opportunities for field trips and the various marine environmental educational organizations
here in the lower Keys: the Reef Relief Environmental Center, Mote Marine Laboratory, and
the new Florida Keys' Eco-Discovery Center in Key West.
4. Explain any activities indirectly supporting the commercial seafood industry.
This project will be providing direct support to the commercial fishing industry by
providing critical dockage and trap storage. The boat ramp, boatlift, and a boat yard operation
will provide important support services. In addition, this property can serve as a hurricane
hole for additional vessels.
Mayfield Grant Application Form SA11i'W-1
Monroe County, November 1008
Describe the current and future demand for the facilities and activities to be provided,
including but not limited 1>
With +I commercial fishing licenses in the Florida Keys. the Stock
Unitedthe largest commercial fishing fleet in the Southern States. Commercial fishing
mentioned
The 1half lobster1 :.
third of the stone A licenses. I
State of Florida Commercial Fishing Licenses, 2007
Florida FWC online database
License Type
Statewide
Monroe County
MEE
Monroe County's fishermen, particularly those in the Lower Keys/Stock Islali
also represent high proportionfederal
• :• - ■ ■ u' - r - FTT"-
In
Florida, Monroer2007
Data from NMFS, SERO Permit Database
1' of Federal
Monroe
• '.�.
AtlanticReef
!SouthiFish
- -��0
WIN.
Alayfreld Grant Application Form 5AfINV-1
Monroe Catty, November 2008
Monroe County's fishermen account for 76% of all of the lobster traps in the
State; and 35% of all the stone crab traps in the State. And the fishermen in the Lower
Keys, which are primarily those in Stock Island, account for 30% of the State's total
number of lobster traps and 12% of the stone crab traps. Monroe County's fishermen
own over 800,000 traps. We lume a need to store 3001700 lobster and crab tra s
within The lather Keys alone.
Number of Lobster and Stone Crab Traps
in Florida, Monroe County and the Lower Keys, 2008
Data from Fla. Fish & Wildlife Conservation Commission, Marathon Laboratory,
Rick Beaver 11-13-08 & Compiled by DRG
Species
Florida
Monroe
% of Fla
Lower
% of
% of
County
Keys
Fla
MC
Lobster
482832
367850
76%
142978
30%
39%
Stone
Crab
1257922
446291
35%
154637
1 12%
1 35%
Totals
1740754
814141
47%
297615
17%
1 37%
B. Geographic region of customer base
The customer base for Stock Island's lobster, stone crab and finfish is broad and
includes domestic markets in Florida and intemationaI markets in Europe and Japan.
There are currently three major buyers of Stock Island's product: Keys Fisheries
(Marathon), Carlos Seafood (Miami), and Empire Seafood (Miami.)
C. Describe competition in the area
Until not very long ago, Stock Island had seven operating fish houses. Today, as a
result of consolidation and redevelopment, two remain: Fishbusterz Fish House, the
only fish house left in the entire Safe Harbor area, and Stock Island Lobster Company,
located in the peninsular area, next to our subject parcel. We are not proposing to
operate a fish house and therefore would not be directly competing with these fish
houses in this activity. The County recognizes the legitimate concerns of the two
current fish house operators in Stock Island and does not propose competition with
these business entities. (However, should either or both of these fish houses sell and
disappear when the market rebounds and redevelopment pressures once again re -exert
themselves, our project would be perfectly positioned to develop and operate a fish
house operation.)
Each of these fish houses also operates dockage and trap storage space, albeit
limited, for the fishermen that use their respective fish houses. Our project parcel
would be competing for vessels to utilize the dockage and trap storage space. Because
we can offer secure, permanent dockage and abundant storage space, our parcel has a
competitive edge.
IV
Movfield Granl Applicalian Form SHIM -I
Monroe Cooney, November 2008
Based upon various discussions, we also believe the potential is great that the project
parcel will attract some fishermen currently based in other areas, such as Miami and
Marathon, or independent operators docked in less than desirable places around the
Keys (such as their own residential properties.) With the potential for attracting
additional fishermen, this project could in fact enhance, not subtract from, the level of
business and amount of product handled by the current fish houses as well as bring
additional customers for the fuel and ice services that the current fish houses also offer.
There are also three current boatyards in Stock Island: Speneer's, 31), and Robbie's
Marine. With several hundred vessels in the fleet, as well as hundreds more
recreational boats, there is sufficient business for all. The former owner of Gulf
Seafood operated a very successful boat yard on the property up until 2005, when the
owners sold the property.
III. Management
1. Description of facility. Identify all existing and all proposed improvements.
A. Describe conditions and sizes of existing structures.
The parcel we are proposing for possible acquisition is an 8-acre boat basin (4.9
acres of upland and 3.1 acres of bay bottom) located on the southeast side of Stock
Island.
The subject parcel is classified
Mixed -Use zoning district and a
Mixed -Use Commercial FLUM,
with a vested right for use as a
commercial fishery.
The property includes 3.13
acres (136,343 square feet) of
submerged land in a protected, U-
shaped basin. (This is private,
non -sovereign submerged land.)
The basis has direct access to
the Boca Chica Channel. This
channel links the Atlantic Ocean
to the east, with the Gulf of
Mexico to the west. The boat
basin has a control depth of 20
feet and the channel entrance has
a control depth of 6-8 feet, which is
ideal for accommodating the larger
as marine working waterfront and lies within a
Subject Parcel's Seawall, Trap Storage Areas, Boat g
Ramp and large, Deep Water Basin
Xf vfield Grant Application Form SRIWIV--1
Monroe Coam(v, November 2008
commercial fishing boats.
The entire basin is bulk -headed with 2,445 linear feet of seawall, sufficient
dockage space for approximately 75 commercial fishing vessels (about 1/3 of the
local fleet). At the western end of the property is a concrete boat ramp.
The fenced, upland area consists of 49 acres (213,615 square feet), has zoning in
place for commercial fishing use and can provide space for 100,000 traps with space
for boat yard/repair services and parking.
The parcel is located along the eastbound land of Peninsular Avenue, which is a
two lane road, and is approximately 250 feet east of Maloney Avenue. The property
is approximately one mile southeast of Overseas Highway, which is the only major
road in the Florida Keys. The street includes a dedicated right-of-way at 60 feet. The
entire site is level and at road grade. The site has no adverse easements or
encroachments.
Formally the site of Gulf Seafood, this parcel has historically and up until 2005,
operated as a commercial fishery. The property was sold in 2005 and is currently
vacant and cleared of all structures (not withstanding the seawall and boat ramp.)
Although currently unutilized, during storms much of the commercial fleet ties up in
this basin for protection, with the owner's permission. The protection from storm
winds in hurricanes is yet another of the parcel's assets.
In addition, grandfathered on the parcel are 4,000 square feet of NROGO (Non -
Residential Rate of Growth Ordinance is the County's commercial permit allocation
system, which would allow us to build an on -site office and future fish house as -of -
right) and one residential ROGO (which would permit us to build a small unit, also
as -of -right, for full-time manager or night-time security guard.) This is a valuable
commodity as development permits are very limited here in Monroe County.
B. Description and approximate size of the proposed improvements.
A small area of the seawall is in disrepair and has been permitted for repair by the
current owners. Planned improvements to construct new piers and install new fuel
tanks have been permitted by DEP, the Army Corps, and Monroe County. We are
not proposing at this time, due to financial constraints, to conduct these
improvements. None are necessary to the immediate operation of the parcel for
dockage and trap storage. However, the permits remain in effect for several years,
and it is anticipated that we will in the future repair the seawall and perhaps construct
new piers if there is demonstrated demand for additional berthing space.
We do plan to implement the following improvements: water and electrical
infrastructure and replacement or repair of the existing commercial boatlift.
In
Mwfreld Grant Application Form SAIM-1
Monroe County. Norember 1008
2. Identify existing and or proposed easements, concessions, or leases.
There are no existing easements, encroachments, concessions, or leases and none are
proposed at this time.
3. Identify any existing or proposed third party leases including the lessee and the purpose
of the lease.
There are no current third party leases, however we are contemplating the development of
third party leases with commercial fisherman. This is discussed in detail in Section I-4.
4. Identify all short term and long term maintenance requirements
Short term maintenance requirements include general management of the site (security,
maintenance, adherence to regulations), installation of utilities and repair of boat lift.
Potential, but not necessary long-term maintenance requirements will be repair of the
damaged section of the seawall and construction of additional piers/docks.
5. Facility Management Plan
Presently, our management concept includes forming a Management Advisory Committee
consisting of lease -holding and renting fishermen and other designees as directed by the
Board of County Commissioners to oversee the facility's operations. All members of the
Committee will be appointed by the BOCC. General management services will be rendered
by this Committee during year one. A possible appointee to this Committee, and also one of
the top -producing fishermen interested in moving his fishing operation to Gulf Seafood, is
also the former owner of Gulf Seafood. He brings considerable prior experience and
knowledge of the business and the property, and has pledged to assist us in the management
of the project during its first year. For year two, the management services will be bid out
through a Request for Proposal. The Advisory Committee will oversee this process, evaluate
responses to the RFP, and bring its recommendations for a management service provider to
the BOCC. The Advisory Committee will participate in all ongoing management and
operation decisions, meet monthly or quarterly, and make regular recommendations related
to the facility's operations to the BOCC.
6. Discuss current and proposed staff needs.
According the former owner of the Gulf Seafood operation, without a fish house, the
maintenance requirements for the site to operate for dockage and trap storage are minimal
and include such things as monitoring daily activities, maintenance, ensuring adherence with
regulations, including those associated with the Clean Marina/Clean Boatyard program, and
daytime/nighttime security. One full-time Site Manager is anticipated at this time, at least for
year one, and will be overseen by the Management Advisory Committee.
7. Identify the approximated cost for development and operation of the site including
proposed improvements, maintenance, staffing, etc.
In
hlavfreld Cram Application Form Sb1111KI
Monroe County, November 2008
The following are estimates of costs for operation of the site:
Insurance: $ 75,000
Utilities (water and sewer, electric, garbage): $ 50,000
Management: $ 50,000
The following are estimated for the one-time development costs:
Installation of utilities: $100,000
Repair/replacement of boat lift: $200,000
8. Identify funding sources for the development and maintenance of the site.
There are several options for funding these costs. In addition to the commercial
fishermen who will purchase long-term leaseholds, we also anticipate many fishermen
who will not be in a position to purchase leases, but will, instead, rent their dockage and
trap storage space. Conservatively, this could generate a revenue stream of approximately
$300,000 annually. On -going utility costs may be shared among the lease -holding and
renting fishermen. The boat yard can (again, conservatively) generate $120,000
annually. The one-time development costs may be covered by a portion of the Navy's
Encroachment Partnering program grant. These are our best estimates at this time, based
on discussions with the former owner of the Gulf Seafood fishery. We will examine all
potential revenue sources and expenses in far greater detail and make more exact
determinations should our project receive a successful ranking.
Anticipated Revenue:
One-time Revenue:
20 leaseholds x $200,000:
• Navy Encroachment Program Grant
(portion to be used for initial development costs)
Ongoing Revenue:
• Rentals of dock and trap storage space
(other than lease -holding fishermen--
30 fishermen x $850 month x 12 months):
• Boat yard/boat lift services:
20
$ 4,000,000
$ 300,000
$ 306,000
$ 120,000
dlmfeld Gram Application Form SAIN W 1
Monroe County, A'ovember ?OD$
9. Appendix/Exhibits
A. US Geological Survey 7 % minute quadrangle map
B. County Tax Appraiser's map, names of property owners, tax id numbers, and
boundaries
C. Aerial photograph with project site boundary clearly delineated and aerial
photograph of Stock Island with parcel boundary delineated
D. Physical improvements map
E. Conceptual site map
F. Photographs of project site
G. Not applicable
H. Willing Owner Statement
1. Comp PIan objectives and policies
J. Not applicable
K. Not applicable
L. Not applicable
M. Photographs of Parcel's Dockage Facilities
N. Photographs of Parcel's Boat Ramp
O. Photographs of Parcel's Trap and Gear Storage Areas
P. Permits/land lease not necessary, not sovereign submerged land; attached are
permits for potential future improvements
Q. Description of parcel zoning showing commercial fishing uses, including dockage
and trap storage as uses that are permitted as -of -right. Also included letter from
Planning Department confirming proposed uses as permissible.
R. FLUM map and text description
S. Support letter from Florida Keys Commercial Fishermen's Association
T. Evidence of current owners' plans to redevelop property
U. Executive Summary of Environmental Site Assessments I and It
V. Local Press Clippings
21
PROJECT EVALUATION CRITERIA
Answer the following questions, as applicable to the proposed project. Where requested, provide support documentation
or attached Exhibits.
Note: Provide a response to each of the following criteria, either yes or no. If the answer to a criterion is checked no,
move to the next question. if the answer to a criterion is checked yes, provide a response as appropriate and limit your
response to no more than % page. Any criterion that is not addressed or is left blank will not be evaluated and no
points will be awarded.
(1) Location
(a) The Project Site is located within the boundary of a locally designated Community Redevelopment Area as
defined in s. 163.340, F.S. and furthers the adopted community redevelopment plan (10 points).
YES NO X
If yes, provide documentation from the local government that the Project Site is located within a Community
Redevelopment Area. provide a map showing the boundaries of the CRA, and provide a copy of the adopted community
redevelopment plan.
Were all three documents provided in the grant application?
YES . Documented in Exhibit
NO X If documentation is not provided, no points will be awarded.
(b) The Project Site is adjacent to state-owned submerged lands designated as an aquatic preserve identified in
s. 258.39, F.S. (10 points).
YES NO X
If yes, provide documentation from the Department of Environmental Protection's Office of Coastal and Managed Areas,
including a map and letter that the Project Site is adjacent to state-owned submerged lands designated as an aquatic
preserve.
Were both documents provided in the grant application?
YES___, Documented in Exhibit
NO X If documentation from the Department of Environmental Protection's Office of Coastal and Managed
Areas is not provided, no points will be awarded.
(c) The Project Site is located within a municipality with a population less than 30,000 (10 points).
YES NO X
If yes,provide documentation from the FCT web site showing that the Project Site is in a municipality with a population
less than 30.,000.
Was documentation provided in the grant application?
YES . Documented in Exhibit
NO X If documentation is not provided, no points will be awarded
(d) The Project Site is within an area designated as an active "Waterfronts Florida Partnership Community" (9
points).
YES NO X
If yea, provide documentation from the Department of Community Affairs' Waterfronts Florida Partnership, including a
map and letter, that the Project Site is located within an active 'Waterfronts Florida Partnership Community".
Were both documents provided in the grant application?
YES X . Documented in Exhibit
Form SMVVVV-1 (Effective Page 6
NO X If documentation from the Department of Community Affairs' Waterfronts Florida Partnership is not
provided, no points will be awarded.
(e) The Project Site provides services and is located within 15 miles of a state designated aquaculture "High
Density Lease Area" (5 points).
YES NO X
If yes; provide documentation from the Department of Agriculture and Consumer Services, including a map and letter, that
the Project Site is located within 15 miles of a state designated aquaculture "High Density Lease Area".
Were both documents provided in the grant application?
YES Documented in Exhibit
NO X If documentation from the Department of Agriculture and Consumer Services is not provided, no
points will be awarded.
(f) The Project Site is within an area designated as a "Rural Area of Critical Economic Concern" (4 points).
YES NO X
If yes, provide documentation from the FCT web site showing that the Project Site is in "Rural Area of Critical Economic
Concern".
Was the documentation provided in the grant application?
YES__, Documented in Exhibit
NO X If documentation is not provided, no points will be awarded.
(2) Economic Consideration
(a) The proposed project provides an economic benefit to the community (10 points);
YES X NO
If yes, discuss how the acquisition, development and management of the Project Site will provide an economic benefit to
the community.
Stock Island is the primary working waterfront and one of the last operational ports for commercial fishing in the
Florida Keys, Landing 7 million pounds of stone crab, lobster and finfish valued at $22 million, the Stock Island working
waterfront area is a unique, invaluable, and irreplaceable asset for the Monroe County and the state economies. And
yet, all of the commercial fishing working waterfront in Stock Island is in private ownership.
The subject parcel, located in Stock Island, is the single most important working waterfront properties for commercial
fishing in the lower Florida Keys, The project can accommodate dockage for up to 75 commercial fishing vessels (about
% of the local fleet)., a diversity of risheries. stone crab, spiny lobster, and ffnfish, and 100, 000 traps (about 113 of the local
fleet's total traps..)
This single site has the capacity to handle 50-75% of the total landings in Stock island. At a 50% share of the landings,
the total annual economic output for the Gulf Seafood parcel would be; $11 million in harvest revenue; $3.8 million in
wholesale margins;, $3.2 million in retail margins; total output of $22,5 million,- total income of $14 million; and the creation
of 610 jobs,
(b) The Project Site is located in a municipality or in the unincorporated county with a growth rate that exceeds
the average growth rate for the state, as shown by population increase since the last census (10 points);
YES NO X
If yes, provide documentation from the FCT web site showing that the Project Site is in an area that exceeds the average
growth rate for the state, as shown by population increase since the last census.
Was the documentation provided in the grant application?
YES . Documented in Exhibit
NO X If documentation is not provided, no points will be awarded
Form SMVVW-1 (Effective ) Page 7
(c) The Project Site has sustained hurricane damage in the past 5 years such that operating capacity was
reduced or normal operations were interrupted for a period of not less than two weeks (5 points).
YES NO X
If yes, provide documentation showing that the Project Site has sustained significant hurricane damage in the past 5
years, including identifying the hurricane and provide a state or federal document verifying that the project site sustained
significant hurricane damage such as a copy of the Department of Environmental Protection's Emergency Authorization
for the repair of the docking facility.
Was the documentation provided in the grant application?
YES . Documented in Exhibit
NO X If documentation is not provided, no points will be awarded
(3) Site Suitability/Readiness
(a) The Project Site contains existing structures that can be used or require only minor improvements, for use as
commercial saltwater fisheries or aquaculture operations (points may be awarded based on the following
criteria):
(1) Docking facility for commercial fishing vessels (12 points);
YES X NO
If yes, describe the existing facility, condition of the existing structure and proposed uses for the docking facility.
The subject parcel contains a seawall of 2,445 linear feet, in a deep -water, 3-acre, protected basin. Ready for
use an day one.
Provide photographs of the docking facility.
Were photographs of the existing docking facility provided?
YES X , Documented in Exhibit M
NO If photographs are not provided, no points will be awarded
(2) A Seafood House or other buildings to be used for Working Waterfronts Business (10 points);
YES NO X
If yes, describe the existing facility; condition of the existing structure, and proposed uses for the facility,
Provide photographs of the facility..
Were photographs of the existing facility provided?
YES . Documented in Exhibit
NO X I If photographs are not provided, no points will be awarded
(3) Boat ramp for commercial fishing vessels (8 points);
YES X NO
If yes, describe the existing facility, condition of the existing structure and proposed uses for the boat ramp.
The parcel contains a concrete boat ramp at its westem end that is excellent condition.
Provide photographs of the boat ramp.
Were photographs of the existing boat ramp provided?
YES X . Documented in Exhibit N
NO If photographs are not provided, no points will be awarded
Forth 5 -1 (Effective ) Page 8
(4) Storage area for traps, nets, and other gear needed for commercial fishing or aquaculture operations
(4 points);
YES X NO
If yes, describe the existing area and proposed uses for the storage area.
The parcel contains almost 4 acres of upland space for traps and gear storage. Ready for use on day one
Provide photographs of the storage area.
Were photographs of the storage area provided?
YES X , Documented in Exhibit O
NO If photographs are not provided, no points will be awarded
(b) The Project Site has a submerged land lease from the Board of Trustees, Environmental Resource Permit, or
Wetland Resource Permit for the existing or proposed docking facility (7 points);
YES X NO
If yes, provide a copy of the submerged land lease from the Board of Trustees, Environmental Resource Permit, or
Wetland Resource Permit for the existing or proposed docking facility.
The project does not involve the use of sovereign submerged lands„ therefore no land lease or permits are
required. (The parcel's current owners also have received all permits necessary to repair the small damaged portion
of the seawall to construct piers and to install fuel tanks We may decide to cany out this work in the future. We
included copies of these permits in this exhibit.)
The subject parcel has 2,500 linear feet of existing seawall that requires no permits for use for dockage as the
zoning is mixed use, in which commercial fishing uses (including commercial vessel dockage) is an as -of -right use.
(A description of and list of permissible uses in an MU Land Use District is contained in the next exhibit.)
Was the documentation provided in the grant application?
YES X . Documented in Exhibit P
NO If documentation is not provided, no points will be awarded
(c) The Project Site has obtained all necessary permits from the local government for existing or proposed uses
on the uplands (7 points);
YES X NO
If yes, discuss the existing or proposed uses of the upland and what local permits are required.
No permits are required for our proposed uses of dockage and trap storage on the subject parcel. Commercial
fishing uses (including trap storage) is an as -of right uses as per the parcel's mixed -use zoning. (A description of and
list of permissible uses in an MU Land Use District is contained in the exhibit)
A teller from the Monroe County Planning Department is also attached stating that proposed uses on the uplands
are permitted as per the parcel's zoning.
Was the documentation provided in the grant application?
YES X . Documented in Exhibit_
NO If documentation is not provided, no points will be awarded
(d) The proposed project will be acquired using a less -than -fee Working Waterfront Covenant for all of the land to
be acquired (5 points).
YES NO X
If yes, describe the existing or proposed activities that will be conducted to further continuation of Working Waterfront
activities in that area.
Form SIVIM--1 (Effective ) Page 9
Provide an affidavit from the owner that they are willing to sell the development rights off the property and continue to
operate the site to further the continuation of Working Waterfront activities on the site.
Was the affidavit provided?
YES . Documented in Exhibit
NO X If the affidavit is not provided, no points will be awarded
(e)The Project Site will participate in Florida's Clean Marina Program (4 points).
YES X NO
The applicant will work with the Department of Environmental Protection to implement a Clean Marina Program at the
Project Site,
We pledge to implement a Clean Marina/Clean Boat Yard program at the project site.
(4) Financial Contribution
(a) Providing a share of the eligible Match. The Applicant is committed to:
(1) Provide a Match between 25 percent to 34 percent of the Project Costs, or, for Small Local Governments as
defined in 9K-9.002(21) and Nonprofit Working Waterfront Organizations, a Match between 10 percent and 19
percent of the Project Costs (5 points); or
YES NO
(2) Provide a Match of 35 percent or more of the Project Costs, or, for Small Local Governments as defined in
9K-9.002(21) and Nonprofit Working Waterfront Organizations, a Match of 20 percent or more of the Proiect
Costs (10 points).
YES X NO
(The proposed project match is 32% Monroe County is a small local government; ourpopulation is 35,000.)
(b) The applicant has committed to major restoration of an existing docking facility for commercial fishing
vessels or to construct a new docking facility for commercial fishing vessels (8 points);
YES NO X
For the major restoration of an existing docking facility, describe the existing docking facility, condition of the existing
docking facility, what repairs the applicant will do to bring the structure into working condition, and proposed uses of the
structure.
For the construction of a new docking facility„ describe the size of the proposed docking facility and the proposed use of
the structure.
Provide photographs of the existing facility or the area for the proposed structure.
The proposed docking area needs to be located in a minimum of 3 feet of water at Mean Low Water and not located over
any sea grass beds.
Provide documentation from a surveyor, engineer or environmental consultant, showing that the docking area is located in
at least 3 feet of water at Mean Low Water and that there no grass beds in the docking area.
Was the documentation of the docking area and photographs of the existing facility or area of the proposed structure
provided?
YES . Documented in Exhibit
NO X If the documentation and photographs are not provided, no points will be awarded
Porn SMVWV-1 �Ef ective J Page 10
(c) The applicant has committed to major restoration of an existing Seafood House or other building(s) used for
Working Waterfront Business or to construct a new Seafood House or other buildings of at least 1,000 square
feet to be used for Working Waterfront Business (6 points);
YES NO X
For the major restoration of an existing structure, describe the existing structure, condition of the existing structure, what
repairs the applicant will do to bring the structure into working condition, and proposed uses of the structure.
For the construction of a new building, describe the proposed size of the new structure (minimum of 1,000 square feet)
and the proposed use of the structure.
Provide photographs of the existing facility or the area for the proposed structure.
Were photographs of the existing facility or area of the proposed structure provided?
YES Documented in Exhibit
NO X If the photographs are not provided, no points will be awarded
(d) The applicant has committed to major restoration of an existing boat ramp for commercial fishing vessels or
to construct a new boat ramp for commercial fishing vessels (4 points).
YES X NO
For the major restoration of an existing boat ramp, describe the condition of the existing boat ramp, what repairs the
applicant will do to bring the structure into working condition, and proposed uses of the structure.
While restoration of the concrete boat ramp is not necessary, we are committed to restoration or replacement of the
commercial vessel boat lift which is a necessary component of the boat ramp operation. We have estimated this cost to
be approximately $200, 000 and is included in our project development costs.
Was the documentation of the boat ramp area and photographs of the existing facility or area of the proposed structure
provided?
YES X . Documented in Exhibit N
NO If the documentation and photographs are not provided, no points will be awarded
(5) Community Planning
(a) The project is located in a Future Land Use category, zoning district, or overlay district that has been
identified for the protection and preservation of Working Waterfronts (5 points);
YES X NO
If yes; provide a copy of the map showing that the Project Site is located in a Future Land Use category, zoning district, or
overlay district that has been identified for the protection and preservation of Working Waterfronts. Provide a description
of the purpose of the Future Land Use category, zoning district; or overlay district and how it furthers the protection and
preservation of Working Waterfronts.
Our proposed project parcel ties within a mixed -use zoning district. As per the Monroe County Code 9.5-219, "the
purpose of the Mixed -Use district is to establish or conserve areas of mixed -uses, including commercial fishing, resorts,
residential, institutional and commercial uses, and preserve these as areas representative of the character, economy
and cultural history of the Florida Keys." Section 9.5-248 discusses allowable uses within mixed -use districts;
commercial fishing is listed as an as -of -right uses The subject parcel is in a Mixed -Use Commercial FLUM, which states
as its intent to preserve working waterfronts. FLUM map and description of zoning district is included in exhibits.
Was a copy of the map and description of the category or district provided?
YES X , Documented in Exhibit R
NO If a copy of the map and description are not provided, no points will be awarded
Form SM -1 fEective j Page 11
(b) The project furthers local government comprehensive plan objectives and policies that ensure the protection
and preservation of Working Waterfronts for use by commercial fishermen, aquaculturists, or business entities
that support these industries (5 points);
YES X NO
If yes, identify which objectives or policies are furthered, provide a summary of the policy or objective, and describe how
the local government's comprehensive plan's objectives and policies further the protection and preservation of Working
Waterfronts for use by commercial fishermen, aquaculturists, or business entities that support these industries.
Monroe County's Year 2010 Comprehensive Plan contains the following Goals, Policies or Objectives that further the
protectionlpreservation of working waterfront for commercial rishing: Goal 212, Policy 212.1.3, Policy 219, Objective
502.1, Policy 502.1.1, 502.1.2, Policy 101.4.5 recently amended and approved by DCA.
In addition, Goals 1, 2, 1.3, 5, and 8 of the Stock Island Master Plan, which was formally adopted by our Commission
as part of the County's Comprehensive Plan further the protection/preservation of commercial fishing, the provision of
space for working waterfront and its supporting industries, and the enhancement of the community's Fishing character.
Copies of theses comprehensive plan's objectives and policies that ensure the protection and preservation of Working
Waterfronts for use by commercial fishermen are in exhibit.
Were copies of the policies or objectives provided?
YES X , Documented in Exhibit I
NO If a copy of the policies or objectives are not provided, no points will be awarded
(c) The project furthers local government comprehensive plan objectives and policies to provide facilities that
promote and educate the public about the economic, cultural and historical heritage of Florida's traditional
Working Waterfronts (3 points).
YES X NO
If yes, identify which objectives or policies are furthered, provide a summary of the policy or objective, and describe how
the local government's comprehensive plan's objectives and policies further the provision of facilities that promote and
educate the public about the economic, cultural and historical heritage of Florida's traditional Working Waterfronts.
Goals 5 and 8 of the Stock Island Master Plan discuss the promotion of maritime uses and commercial fishing as a
part of our heritage and culture through public an street signage and design guidelines.
Copies of the Stock Island Master Plan's objectives and policies to enhance efforts to promote and educate the
public about the economic, cultural and historical heritage of Florida's traditional Working Waterfronts are in the
exhibit
Were copies of the policies or objectives provided?
YES X . Documented in Exhibit —I
NO If a copy of the policies or objectives are not provided, no points will be awarded
(6) Public Education
(a) The Project Site provides a permanent structure containing displays of artifacts and other items open to the
public that provide information about the economic, cultural or historic heritage of Florida's traditional Working
Waterfronts (4 points);
YES NO X
If yes, describe the proposed permanent structure and the types of artifacts and other items to be displayed that will
provide information about the economic, cultural or historic heritage of Florida's traditional Working Waterfronts to the
public. Describe the approximate location of the structure and how public access to the structure will be provided.
Form SM -1 (Effective ) Page 12
(b) The Project Site contains a structure(s) that is listed on the National Register of Historic Places administered
by the National Park Service (3 points);
YES NO X
If yes, provide documentation from the Division of Historical Resources, including a map and letter, that the structure(s)
located on the Project Site is listed on the National Register of Historic Places.
Were both documents provided in the grant application?
YES . Documented in Exhibit
NO If documentation from the Division of Historical Resources is not provided, no points will be awarded.
(c) Interpretive kiosk or signs will be provided that educate the public about the economic, cultural, or historic
heritage of Florida's traditional Working Waterfronts (2 points).
YES X NO
If yes, describe the proposed kiosk or signs that will educate the public about the economic, cultural, or historic heritage of
Florida's traditional Working Waterfronts. Describe the approximate location of the kiosk or sign and how public access to
the kiosk or sign will be provided.
The County. in conjunction with the local Florida Sea Grant once, will conduct educational activities with fishermen
to encourage sustainable resource practices and will erect educational kiosks for the visiting public that will explain
the local historical and cultural significance of commercial fishing as well as conducting activities such as tours and
observation of commercial fishing operations at the fishery. These kiosks will be place in visible and accessible
locations at or near the entrance. We will also coordinate educational outreach with the Monroe County School
District and the various manne environmental/educational facilities in the lower Keys.
Form S -1 (Effective ) Page 13
REQUIRED EXHIBITS
Each of the following exhibits is required to be submitted with the grant Application. Provide a label and tab for each
exhibit and please ensure that all exhibits are legible and of an appropriate scale. If two or more exhibits are
consolidated, make sure this is reflected on the exhibit label. If a specific exhibit is not applicable, include an exhibit page
with a statement that it is "Not Applicable." Locate the exhibits behind the project evaluation criteria section of the
Application.
Exhibits
A. United States Geological Survey 7 112 minute quadrangle map with the boundary of the Project Site clearly
delineated.
B. County Tax Appraiser's map clearly delineating the Project Site boundary, names of the property owners, and parcel
tax identification numbers, and ownership boundaries using an appropriate scale.
C. Aerial photograph (1 inch = 2,000 feet or greater detail) with the Project Site boundary clearly delineated.
D. Physical improvements map of an appropriate scale that clearly delineates all existing physical improvements,
alterations, or disturbances occurring on the Project Site, and including all cleared areas, buildings, roads, fences, docks,
power lines, billboards, boat ramps, parking areas and known easements and rights -of -ways, and the approximate
acreage of the foregoing.
E. Conceptual site plan that clearly delineates the Project Site boundary and shows the approximate location of all
proposed site improvements.
F. One set of labeled photographs of the Project Site which depict all on -site features on the Project Site and including,
waterbodies, shorelines, historical features and existing improvements. Each photograph submitted shall include a legend
that identifies the photograph location and key features that the photograph is intended to depict.
G. If applicable, evidence of status as a Nonprofit Working Waterfront Organization as defined in subsection 9K-
9.002(16), F.A.C.
H. A signed statement from the owner(s) of each parcel indicating their willingness to consider an offer to purchase their
parcel(s). If it is a less than fee acquisition, provide an affidavit from the owner that they are willing to sell the
development rights off the property and to continue to operate the site as a Working Waterfront.
I. A copy of each Local Comprehensive Plan objective and policy cited in the grant Application that applies to the Project
Site. Please highlight or underline the applicable plan directive being referenced.
J. If the Applicant is a Nonprofit Working Waterfront Organization, evidence of status of the organization, including
documentation from the Internal Revenue Service that the organization is recognized as a 501(c) organization, a copy of
the Bylaws, and a copy of the Articles of Incorporation.
K. If the Applicant is a Nonprofit Working Waterfront Organization, they shall provide documentation that they have funds
on hand, or letters of commitment to provide the funds prior to closing on the Project Site: (1) Fee simple acquisition, an
amount equal to ten percent of the Project Cost shall be set aside as a management endowment fund for the Project Site,
or (2) Less than fee Working Waterfront Covenant, an amount equal to five percent of the Project Cost shall be set aside
as a management endowment fund for the Project Site.
L. If the Applicant is a Nonprofit Working Waterfront Organization, they shall provide a guaranty or pledge by a Local
Government, the Water Management District, or the Board of Trustees to act as a backup manager to take over the
responsibility for management of the Project Site in the event the Nonprofit Working Waterfront Organization is unable to.
Form SMWW-1 (Effective ) Page 14
Gulf Seafood
Legal Property Information
m n
® E
C ® Z. 1 f^ ® N �CCj
JuLu c�J �Zz y Cg
mx J-0mgmoo a
ro
k
I,
IL
a
"
i
v
v a
-
a
lo
a
r
v
0
!Lo
s
a
its
Lit k
lldid�lllllil�lld,1
I�Il�dl�lll ! del: �
01111HP111111111H
r�931�f"�r1Ya_I�Y.ua .
Schedule A
Lots 42, 43, 44. 44, 45. 46, 52, 53, 54, 55, 56 AND 57, Square 45, vOCK ISLAM, according to the
Platthereaf, as recorded in Plat Book 1, at Page(s) 55, of the Public Records of Monroe County, Florida.
VWU9YA
A parcel of submerged land in Boca Chica Channel In Section 35-67-25, tvlonrae County, Plorida, more
particularly described as follows: Beginning at the Soulhwest corner of Lot 57 of Block 45 of a plat titled
"Ali Lots 1, 2, 3, 4, 5, 6, SeeVon 35, Lot 2, Section 36; Lot 3, Section 26; Lot 2, Section 34, Stock Mend,
Township 67 South, Range 25 Bast!'; recorded 3n Plat Book 1, Page 55 of the Public ll ecorda of Monroe
County; Florida, nut But along the North line of Peninsula Avenue, extended a distance of 590 feet;
thence Worth 20 degrees 15 minutes'Jest 350 feet; thence North 75 degrees 15 m inutes West 600 feet;
thence tun Southwest 395 feet, morn or less, to the Northwest corner of Lot 42, Block 45 of the above
mentioned plat; thence meander the shoreline'd60 feet, more or leas, back to the point of beginning.
AND ALSO
Parcel A:
BEG1NN1NG at the Southeast corner of Lot 57 of Bioek 45 of a plat tilled "All Lots t, 2, 3, 5, 6, Section
35; Lot 2, Section 36:l.qt 3, Section 26; Lot 2, Section 34, Stock Island, Township 67 South, Range 25
Bast'; recorded in Plat Book 1, Page 55 of the Public Records of Monroe County, 17iorida, nut East along
the North line of Peninsula Avenue, extended a distance of590 feet; thcgceN 21']81�0% W for243.1.6
feet to the POINT OF BEGINNING of filled submerged lands, and along the mean high water lime of
boulder riprep and a concrete seawall; thence N.89020'I011E., a distance of 21.14 (feet; thence
N.06107'08" W., a distance of 9.45 feet; thence •8.83°30' 14"B., a distance of 10.18 fept; thence
W.70"24'l 1 "E., a distance of 13.58 feet; thence N.57°25tT E., a distance of 8.87 Peet; thence
N.39" 29'29"E., a distance of 2,67 feet; thence N13"15'05"E., a distance of 8.01 feet; thence
N.01°39146"W., a distance of 11.34 feet; thenceN.05"22'34"W., a distance -of 3.4.3 feet; hence
N 09°59'46"W., a distance of 19.49 Peet; thence N.17°01' l8" W, a distance of 13.08 feet; thence
N.1263710 I "W., a distance of 4.93 feet; thence N.22" 16'051 W., a distance of 9.58 fact; tharce
N.24024'31"W., a distance of 11.38 feet; thenceN.36°23'27"V, a distance of 9.40 feet; thence
N.34" 10'32"W., a distance of t4.54 feet; thence N.50930'16"W., a distance of 7.92 feet; thence
N.621121541W., a distance of7.71 feet;.thenceN.71°17'S8"W., a diataoce of7.45 feet; thence
N.76"44126"W., a distance of 15.23 fast; thence W.83"07'53"W., a distance of 15.31 #het; thence
N.81°25159"W., a distance of 33,36 feet; thence N.8110354" W., a distance of 47.18 feet; thence
N.7r00'04"W., a distance of 20.34 feet; thence N.81°59'0611W., a distance of 24A5 feet; thence
N.7293 W 17" W., a distance of 32.97 feet', thence N.70"54'32" W., a distance of 37.07 fect; thence
N.76° I P0011W., a distance of 14:09 feet; thence N.7414 t' 13"W., a distance of 7.60 feet; thence
N.76°37'38" W., a distance of 2 L93 feet; thence *N.77°2817"W., a distance of 36.03 feet; thence
N.7r25'41 "W., a distance of 13,08 feet; thence N.72°37'12."W., a distance of] 7.85 fceh themes
N.80°08122"W„ a distance of 34,96 feet; thence N.80"23'53" W., a distance of 24.04 feet; thence
NA 1 °01'20" W, a distance of 32.27 feet; thence N:80°25'36"W,, a distance of 45.95 feet; thence
N.81124110"W., a distance of 40.35 feet; thence 14.79"06'00" W., a distance of 16.60 feet; thence
N.83'12'55"W., a distance of 25.09 feet; thence N.84°06'28"W., a distance of 14.84 feet; thence
N.88°15142" W., a distance of 15.71 feet; thence 5.48"25' 10" W., a distance of 13:73 feet; thence S
76"18'20" E for n distance of 557.22 feet; thence S 2101812011 E far a distance of 106,83 feet to the Point
of Beginning.
AND ALSO
Parcel B:
13SOTNN1Na at the Southeast corner ofLot 57 of Block 45 of a plat titled "All Lots 1, 2, 3, 5, 6, Section
35; Lot 2, Section 36, Lot 3, Section 26; Lot 2, Section 34; Stock Island, Township 67 South, Range 25
East"; recorded in flat Hook 1, Page 55-of the Public Records of Monroe County, Florida, ring East
along -the North line ofPbninsul a Avenue, extended a distance of 590 feet; thence N 21/1181201 W for
115.15 feet to the POW OF BEGIMINU of filled subu►erSed lands, and along thq mean hlgh water
line of boulder rlprap and a concrete seawall; thence S.87°2642"E., a distance of 16.48 feet, thane
S.'86°51'21 "E., a distance of 26.54 feet; thence N.89115236"E., a distance of 41.54 feet, then e
N.86030'05"E., a distance of 11_$ feet;thence 5.66059'15"E,,:n distance of7.21 *at; thence
8.60019'40"E., a distance of t2.71 feet; thence S.56 44'07"E., a distance of 13.68 past; thence
5.2404T264B., a distance of 14.92 feet; thence S.17°33' 13"E., a distance of 11.74 fact; thence
8.0'P48'01" $„ a distance of 7.61 feet; thence S.0692745" V, a distnnge of 8.01 feet; ibeace
S.20°23126" W., a distance of 12.20 fact; thence S.22105'47"'PV., a distance of 1147 feet; thence
3.22" 15'35"W., a distance of 7.1 I feet; thence S.27° 13'z 1"W., a di3tanee of 5.55 fCC4 thence
N.861119130"W., a distance of 18.34 fbet thence S.B6017'41"W.y a distance of 27,45 feet; thence
S.81°39109"W., a distance of 22.56 feet•, thence S.83"42'23"W., z distance of l4,26 fact thence
21°I8'20' W for a distance of 1.05.a I feet to die Point of Beginning,
> rL
t
IL -M e
cd Z e u e
c M
E E
Z ❑Z
En Ul :E
tn 5
rm Z- la 242 4
I
Z
Zoning and FLUM
for
"Gulf Seafood" Property
VOTR I1 �
The principal purpose of the Mixed Use/ Commercial land use category is to provide for the
establishment of commercial land use (zoning) districts where various types of commercial retail and
office may be permitted at intensities which are consistent with the community character and the natural
environment. Employee housing and commercial apartments are also permitted. In addition, Mixed
Use/Commercial land use districts are to establish and conserve areas of mixed uses, which may include
maritime industry, light industrial uses, commercial fishing, transient and permanent residential,
institutional, public, and commercial retail uses.
This land use category is also intended to allow for the establishment of mixed use development patterns,
where appropriate. Various types of residential and non-residential uses may be permitted; however,
heavy industrial uses and similarly incompatible uses shall be prohibited. The County shall continue to
take a proactive role in encouraging the maintenance and enhancement of community character and
recreational and commercial working waterfronts.
In order to protect environmentally sensitive lands, the following development controls shall apply to all
NONNI PUMP I 111�11 ililill' SIMM
1. only low intensity commercial uses shall be allowed;
STLIXIMMUMNUM "Sirk
SMELM9 =.
l
"., fl 0*, m t+.1 t.i p1, 11' H L 11 • .'.* ill. A,'. iIYLY* wmNei° IS
11 the# '1 Ir`}-1 use
k:l(` ",1. .;..tAb&am sbml on the I Lmd, Use iel SI11'. d:..`Y 1-'d
m F M
I. A I L
1 I +i P.07...
H
.. .III t14.
II
I+l �I.�a'I1l YI4�1i Ila*�
s
')e k
Ii/ � + f�� ♦
� 14� ..y
R A Ila •ll , �} 1 ..`.l�n •! Ilel��
� A ! 11. a
• 1 a� �' f
I 1+
� I I
w t.e
a 1. 1.��;• ��ll--,� ,.i+ llI it
I, [All. 4"It #v-„
1 • I� Y� 1 r'l 1� 1=��1!" �51+ Fr'
i I Ili �1�� �w
--: ! A I�If. `1� �..
ii
a, Y¢
(a)The following uses are permitted as of right in the mixed use district:
(I)Detached residential dwellings,
2),Commercial retail-. low- and medium -intensity and office uses, or any combination thereof of less
than 2,500 square feet of floor area;
(3)lnstitutional residential uses, involving less than ten dwelling units or rooms;
vacation rental use, of commercial apartments is prohibited;
(5)Commercial recreational uses limited to:
a. Bowling alleys;
b. Tennis and racquet ball courts;
c. Miniature golf and driving. rang
d. Theaters;
e. Health clubs; and
f. Swimming pools;
(6)Commercial fishing;
(7)Manufacture, assembly, repair, maintenance and storage of traps, nets and other fishing equipment;
(8)lnstitutional uses and accessory residential uses involving less than ten dwelling units or rooms;
(9)Public buildings and uses;
(10)Home occupations —Special use permit required;
(I I)Community parks;
(12)Accessory uses;
(13)Vacation rental use of detached dwelling units is permitted if a special vacation rental permit is
obtained under the regulations established in section 134-1
(14)Replacement of an existing antenna -supporting structure pursuant toAsection Lc n 146-5(2);
(I 5)Collocations on existing antenna -supporting structures, pursuant to secl ion 146-i
___(3);
(16)Attached wireless communications facilities, as accessory uses, pursuant tolsection 1_46-5(4);
(17)Stealth wireless communications facilities, as accessory uses, pursuant to section 146-1151(5);
(I 8)Satel I ite earth stations less than two meters in diameter, as accessory uses, pursuant to section
146:j(6),
(19)Attached and unattached residential dwellings involving less than six units, designated as
employee housing as provided for in section 130- l 6 1; and
(20)Wastewater nutrient reduction cluster systems that serve less than ten residences.
M 7
standards and procedures set forth in_ELiaLger 110, article III:
(I)Attached residential dwelling units, provided that:
a.The total number of units does not exceed four, and
A
I fol I'M! I log q
a.The parcel of land proposed for development does not exceed five acres;
b.The parcel proposed for development is separated from any established residential use by a
class C bufferyard, and
c.All outside lighting is designed and located so that light does not shine directly on any
established residential use;
(3)(Cornmercial retail, low- and mediurn- intensity and office uses or any combination thereof of
greater than 2,500 but less than 10,000 square feet of floor area, provided that access to U.S. I by way
of.
a.An existing curb cut;
b.A signalized intersection; or
c.A curb cut that is separated from any other curb cut on the same side of U.S. I by at least 400
feet;
(4)Commercial retail, high -intensity uses, and office uses or any combination thereof of less than
2,500 square feet of floor area, provided that access to U.S. I is by way of:
a.An existing curb cut;
M signalized intersection; or
c.A curb cut that is separated from any other curb cut on the same side of U.S. I by at least 400
feet;
-us Mwrm- 1mr-4me =--rnnirn
I III I
I I I I I I V I I I I I I P I I I I I I Ili: IJECH MCMMMZ��
b.Access to U.S. I is by way of:
LAn existing curb cut;
2.A signalized intersection; or
3.A curb cut that is separated from any other curb cut on the same side of U.S. I by at least
400 feet;
c.Tourist housing uses, including vacation rental uses, of commercial apartments are prohibited;
(6)lnstitutional residential uses involving ten or more dwelling units or rooms, providing that:
a. The use is compatible with land use established in the immediate vicinity of the parcel
proposed for development;
b. Access to U.S. I is by way of.
LAn existing curb cut;
2.A signalized intersection; or
3.A curb cut that is separated from any other curb cut on the same side of U.S. I by at least
400 feet;
c. Tourist housing uses, including vacation rental use, of institutional residential dwelling units
is prohibited;
(7)Hotels of fewer than 50 moms, provided that:
a. The use is compatible with established land uses in the immediate vicinity; and
b. One or more of the following amenities is available to guests:
2.Marina; and
3.Tennis courts;
(8)Campgrounds, provided that:
a. The parcel proposed for development has an area of at least five acres;
b. The operator of the campground is the holder of a valid county business license;
c. If the use involves the sale of goods and services, other than the rental of camping sites or
recreational vehicle parking spaces, such use does not exceed 1,000 square feet and is designed
to serve the needs of the campground; and
jOA'&"pMW—X.,v1:v_;e1 Lft-riwvAbpwi- m-*m at least
a class C bufferyard;
a. The parcel proposed for development is less than two acres;
b. The parcel proposed for development is separated from any established residential use by at
least a class C bufferyard; and
c. All outside storage areas are screened from adjacent uses by a solid fence, wall or hedge at
least six feet in height;
(I O)Park-s and community parks;
(I I)Satellite earth stations greater than or equal to two meters in diameter, as accessory uses, pursuant
to s don 14675(6); and
(12)Attache1 and unattached residential dwellings involving six to 18 units, designated as employee
housing as provided for ins.e.c.I.J.P.O.- 1307161
(c)The following uses are permitted as major conditional uses in the mixed use district subject to the
ctandards and procedures set forth inShapter FIO, article HE
(I)Commercial retail, low- and medium -intensity uses, and office uses or any combination thereof of
greater than 10,000 square feet in floor area, provided that access to U.S. I is by way of -
a. An existing curb cut;
b. A signalized intersection; or
c. A curb cut that is separated from any other curb cut on the same side of U.S. I by at least 400
feet;
(2)Commercial retail, high -intensity uses, and office uses or any combination thereof of greater than
2,500 square feet in floor area, provided that access to U.S. I is by way of -
a. An existing curb cut;
b. A signalized intersection; or
c. A curb cut that is separated from any other curb cut on the same side of U.S, I by at least 400
feet;
rlm= 1�
a. The structures are designed and located so that they are visually compatible with establish
residential development within 250 feet of the parcel proposed for development; and
b. The parcel proposed for development is separated from any established residential use by
class C bufferyard; I
(4)Marinas, provided that:
i. The parcel proposed for development has access to water at least four feet below mean sea
level at mean low tide;
b. The sale of goods and services is limited to fuel, food, boating, diving and sport fishing
products;
- r-Atiff MA-1Q"MA-9 med from ad'acent uses bN a solid fence _vAU_gLbg_dqe at
least six feet in height; and
class C bufferyard within a side yard setback 1f ten feet;
a. The hotel has restaurant facilities on or adjacent to the premises;
b. Access to U.S. I is by way of-
L An existing curb cut;
1 A signalized intersection; or
least 400 feet;
PW1?%rr1
class C bufferyard;
ME=
or a medical services facility;
b. The helinort or seanlane port is a Federal Aviation Administration certified landing
c. T�e laidi!tg ajtd depxure &p;prtackes di, x(tt �.ms (tver es;Oliskef resitextiA uses i-Fr kx+wY.
bird rookeries;
d. If there are established residential uses within 500 feet of the parcel proposed for
Avelopment, the hours of operation shall be limited to daylight; and
e. The use is fenced or otherwise secured from entry by unauthorized persons;
b. The parcel proposed for development is separated from any established residential use by a
class C bufferyard; and
c. The use is compatible with land uses established in the immediate vicinity of the parcel
proposed for development;
(8) Boat building or repair in conjunction with a marina or commercial fishing use, provided that:
a. The parcel proposed for development has access to water at least four feet below mean sea
level at mean low tide;
b. The sale of goods and services is limited to fuel, food, boating, diving and sport fishing
products;
c. All outside storage areas are screened from adjacent uses by a solid fence, wall or hedge at
least six feet in height-, and
d. The parcel proposed for development is separated from any established residential use by a
class C bufferyard;
(9)Mariculture;
(I O)New antenna -supporting structures, pursuant to sectio ' n I ' 46 '
(I I)Land use overlays A, E, PF, subject to the provisions of article IV of this chapter;
(12)Attached and unattached residential dwellings involving more than 18 units, designated as
employee housing as provided for in section-1-30- 11§1,
(I 3)Wastewater treatment facilities and wastewater treatment collection systems serving uses located
in any land use district, provided that:
a. The wastewater treatment faci I ity and wastewater treatment collection systems are in
compliance with all federal, state, and local requirements;
b. The wastewater treatment facility, wastewater treatment collection systems and accessory uses
shall be screened by structures designed to be architecturally consistent with the character of the
surrounding community and shall minimize the impact of any outdoor storage, temporary or
permanent; and
c. In addition to any district boundary buffers set forth in chiter 114. article IV, a planting bed,
eight feet in width, to be measured perpendicular to the exterior of the screening structure shall
be established with the following:
1. One native canopy tree for every 25 linear feet of screening structure;
2. One understory tree for every ten linear feet of screening structure and the required trees
shall be evenly distributed throughout the planting bed;
3. The planting bed shall be installed as set forth in -, ter . .... ...IJ4.......... , article IV, and maintained
....
in perpetuity; and
4. A solid fence may be required upon determination by the planning director.
fCade 1979. §9.5-248, Ord Ao, 33-1986,§9-218, Ord AV 40-1987,§56, Ord \o J.9-1989, § I(PD66L). (PD89)1- Ord. Va4-
1997, § 20: Ord, No. 28-1999. § 2: Ord A o 53-2000 § 11, Ord, No. 27-2001, § 21- Ord, No. 33-2001, § 3; Ord. No, 003-2002,
1: Ord. No, 018-2002, § 14,° Ont Na. 032-2002. § I: Ord A er 007-2003, § 21 Ord No. 03 7-2006, § 61
Sec. 130-256. - Standards.
(a) No structure or land in the county shall hereafter be developed, used or occupied at an intensity or
density greater than the standards set out in this article. No density shall be allocated for any land
designated as mangroves on the existing conditions map,
(b) The density and intensity provisions set out in this section are intended to be applied cumulatively so
that no development shall exceed the total density limits of this article. For example, if a development
includes both residential and commercial development, the total gross amount of development shall
not exceed the cumulated permitted intensity of the parcel proposed for development. The following
illustrates the intent of this section:
cornDination Or inese Ises, p --- - ---
square feet of office space (one-third of the allowed density for office) and ten hotel rooms (two-
M -f at develon
j-
W RIM-11UP.N.W.1ja �4'1 �ll�B�,111111!lill!�:11111111111111���i�1111!ill��Iiiijllll�11111111 I
The maximum residential density and district open space shall be in accordance with the followirr.
table: I
Land Use District I Allocated Density Maximum Net Density
DU/Acre DU/Buildable Area
........... ... ...... . . .......... . . . . ..... — -- --------
Mixed use 1.0 12.0
(Affordable housing) 1.0 1.0
M-039=M
AN
(Employee housing) 11.0
I
I'low. 'tr rr 07M W V
IN T.
I �L "! IL ILISLn -@ICL 1; M1 T
MU, UC, SC, CFV, CFA, EFSD districts have a maximum net density of 0.
(Code 1979, § 9.5-262; Ord. No. 33-1986, § 9-302; Ord. No, 26-1995, § 1', Ord. No. 041-2003§ 1)
Sec. 130-162. - Maximum hotel -motel, recreational vehicle and institutional residential densities.
Maximum hotel -motel, recreational vehicle and institutional residential densities shall be in
accordance with the following table:
Land Use Allocated Max. Net Density O.S.R.*
District and Use Density (Roorns/Buddable Acre)
'(Roorns/Acre)
Mixed use:
Hotel 10.0 15.0 0.2
Inst. res. 5.0 20.0 0.2
-------------- ............. ...
Rec. rental 10.0*
10.0* 0.2
(Code 1979, § 9.5-267' Ord. No, 33-1986, § 9-307-1 Ord. No. 19-1989, § 1(PD106))
Sec. 130-164. - Maximum nonresidential land use intensities and district open space.
Maximum nonresidential land use intensities and district open space shall be in accordance with the
following table -
Land Use District Maximum Floor O.S.R.*
Area Ratio
Mixed use:
.......... 'retail:
......... ............... ........... . . . ...
m m e rcj: a-i _r'eta. i 1:
. ........ . r -- - ------------
j
Low intensity 30.35 0.20
. .. ..............
Medium intensity 0.25 0.20
Institutional
0.30
Outdoor recreational
0.10
Public buildings and uses
0.30
Commercial fishing
_ `
0.40
Light industry
0.30
LAST STAND COMMENTS TO BOCC
Gulf Seafood Property ® Stan hayfield Working Waterfront Program
March 18, 20I5 - marathon - Agenda Item P-2
Good afternoon, Mayor and Commissioners. My name is Deb Curlee, I live
on Cudjoe Key, and I'm speaking on behalf of Last Stand.
Last Stand strongly supports the County purchasing the Gulf Seafood
property on Stock Island with the help of the Stan Mayfield Working
Waterfront Program funding.
We believe the maintenance of a healthy commercial fishing industry in the
Keys is vital: to our quality of life;
to our island identity; and
to our local economy.
Often when you are asked to make a decision, you hear comments about
protecting our tourism industry. Last Stand believes visitors come here to
enjoy the "Keys experience", and that includes eating fresh, local seafood.
It is important that you support measures to maintain working waterfront
locations throughout the County.
With a large proportion of commercial fishing landings in the County coming
into Stock Island - about 44% of the annual catch, the Gulf Seafood
property represents an important resource.
Right now the BOCC has a unique opportunity to acquire the Gulf Seafood
property on Stock Island, given the attractive offering price and availability
of $2 million in Stan Mayfield grant funding.
With development pressures increasing throughout the Keys, Last Stand
urges you to pursue the purchase of the Gulf Seafood property.
We appreciate this opportunity to provide comments.
Thank you.
V`C'