Loading...
1st Amendment 03/18/2015 AMY HEAVILIN, CPA CLERK OF CIRCUIT COURT & COMPTROLLER ._ • MONROE COUNTY,FLORIDA DATE: March 26, 2015 TO: Kevin Wilson Director of Engineering ATTN: Pamela Hancock FROM: Lindsey Ballard, D.CS?.- At the March 18, 2015 Board of County Commissioner's meeting the Board granted approval and authorized execution of Item C35 Amendment 1, in the amount of$149,987, to the professional services contract with TY Lin International for the relocation of Atlantic Boulevard at Higgs Beach Park. Enclosed is a duplicate original executed on behalf of Monroe County,for your handling. Should you have any questions, please feel free to contact me. CC: County Attorney(Electronic copy) Finance ,/File •C SCANNED gm, axis 500 Whitehead Street Suite 101,PO Box 1980,Key West,FL 33040 Phone:305-295-3130 Fax:305-295-3663 3117 Overseas Highway,Marathon,FL 33050 Phone:305-289-6027 Fox:305-289-6025 88820 Overseas Highway,Plantation Key,FL 33070 Phone:852-7145 Fax:305-852-7146 Amendment 1—TY LIN INTERNATIONAL 19t Amendment to Contract for Professional Services between Owner and Engineer Atlantic Boulevard Road Relocation Project The first amendment to Contract (herein, after "Amendment") between Owner and Engineer for the Design and Permitting Services for the Relocation of Atlantic Boulevard, entered into between Momoe C unty ("Owner" or "County") and TY LIN INTERNATIONAL is made and entered into this, lay of �tu.2.-- ,2015, in order to amend the contract as follows: Witnesseth WHEREAS, on August 20, 2014, the parties entered into a contract for the design and permitting of the relocation of Atlantic Boulevard at Higgs Beach in Key West, Florida; and WHEREAS, the new alignment was set based on site limitations such as existing infrastructure, historic gravesites, and permitting restrictions; and WHEREAS, the existing dog park, the existing racquetball court, and connections to West Martello Tower will be impacted by the road realignment project; and WEREAS, Monroe County has a TDC grant that expires on September 30, 2015 to replenish the sand on Higgs Beach; NOW, THEREFORE, in consideration of the mutual promises, covenants, and agreements stated, herein, and for other good and valuable consideration, the sufficiency of which hereby acknowledged, the Owner and the Engineer agree as follows: 1) Article II, 2.1 is revised as follows: "CONSULTANT'S Scope of Basic Services consists of those described in Attachment A of the contract and Exhibit A of Amendment 1." 2) Article VII, 7.1.1.1 of the contract is revised as follows: "The COUNTY shall pay the CONSULTANT monthly, in current funds for percentage of progress completed for each task based on the hourly rates outlined in Attachment B— Consultant Hourly Rates in the contract. The total Not to Exceed Amount of$526,790.70 will apply to this agreement. " 3) In all other respects, the original Contract dated August 20,2014 remains unchanged. 1 et I. Amendment 1-TY LIN INTERNATIONAL IN WITNESS WHEREOF, each party caused this Agreement to be executed by its duly authorized representative on the day and year first written above. / � ` / �� BOARD OF COUNTY COMMISSIONERS i4` ) "Amy Heavilin, CPA, Clerk OF MONROE COUNTY, FLORIDA e By: vNtr iG10%�f"'DQLLCC1GyiL By: \/y.�1-eiC Deputy Clerk Y Mayor/Chai?Man�J Date: mW'lh /fT''i a0/5 IrkCAwY a SavrMA ((::33pp �� MY COMMISSION 4,EEP394T1 1#... az ERPIRES Janaaly29,2017 (Seal) ARF EvmdTbm Mary Pak lkdnw$Aere CO SULTANT Attest: BY: ya I/JS& • By: _t i_ I/u_6?V1 Title: A ►�t I •I • Title: Adt•LieSe, dui Patti+F END OF AGREEMENT OE COU TT RNEY P OVED F RM ISTANT OUNTY TT RNEY Dale 2 4 /S 2 Ms. Patricia Smith Higgs Beach Additional Services February 2, 2015 Page 2 EXHIBIT"A" SCOPE OF SERVICES 1. Project History Higgs Beach was designated in 1948 by Monroe County(COUNTY, Owner) with a total area of approximately 16.5 acres. It is affectionately known in the community as the "Local's Beach." Located between White Street and Reynolds Street, Higgs Beach is bifurcated by Atlantic Boulevard, which provides primary access for many residents and visitors to the area. The sandy beach areas are located on the south side of the roadway as well as a restaurant (Salute! On the Beach), a pedestrian walkway, beach tables, parking areas, and other beach amenities. On the north side of Atlantic Boulevard, six asphalt tennis courts,two small parking lots,a playground, a dog park, and an FAA tower are found. 2. Description of the Additional Project Components The purpose of this proposal is to provide an additional Scope of Services (SoS)to provide the COUNTY with a complete set of design plans for the additional components related to the relocation of Atlantic Boulevard at Higgs Beach in Key West, Florida. This additional SoS includes the following: • Construction documents for the re-location of the existing dog park. • Coordination of dog park layout with proposed fitness trail (by others) • Construction documents for the south-side connections between the new Atlantic Boulevard alignment, the Martello Tower, existing restaurant, beach and other amenities • Construction documents for the re-located racquetball court with one outdoor squash court. • Construction Documents and Permitting for Higgs Beach replenishment. T.Y. Lin H.J.! Ross (TYLI, CONSULTANT)will conduct the following activities: • Conduct the necessary due diligence, including a topographic survey of the Higgs Beach area • Design and Permitting of the Higgs Beach Replenishment project. • Paving, Grading, and Drainage designs for Dog Park, walkways, and connections to existing facilities 4 Ms. Patricia Smith Higgs Beach Additional Services February 2, 2015 Page 3 • Landscape Architecture design for Dog Park, walkways, and connections to existing facilities • Perform architectural and structural design for the re-located racquetball court with one outdoor squash court. • Meet with permitting and regulatory agencies with Owner to review added scope items. • Prepare final design plans in accordance to Monroe County Public Works and other applicable standards including specifications package and technical special provisions, if any. 3. Scope of Services a. Dog Park Design The CONSULTANT will analyze, design and provide supporting calculations as necessary and prepare construction documents to support the development of a new relocated Dog Park to the north of the relocated roadway. The size of the new Dog Park will be equivalent in area to the existing Dog Park(approximately 1.5 ac). The scope will include Landscape Architecture for the park hardscape and landscape components, and Civil Engineering to address the Paving, Grading and Drainage components of the project. In addition, our services will include coordination with the consultant responsible for the fitness trail at the northeast corner of the park which will have to be modified to accommodate the new Dog Park. b. South-Side Connectivity The CONSULTANT will analyze, design and provide supporting calculations as necessary and prepare construction documents to support the development of new pedestrian connections south of the relocated roadway. The pedestrian connections will connect the relocated roadway sidewalks and parking lots to the existing and proposed facilities south of the roadway including Martello Tower,the restaurant, and the beach. Ms.Patricia Smith Higgs Beach Additional Services February 2, 2015 Page 4 The scope will include Landscape Architecture for the walkways and open spaces hardscape and landscape components, and Civil Engineering to address the Paving, Grading and Drainage components of the walkways. c. Beach Replenishment Design The CONSULTANT will prepare the design for the beach sand replenishment project to support permit documents. The design plans will include: • Dimensioned Site Plan • Grading Plan • Cross-sections • Agency Coordination/Permitting o The CONSULTANT will coordinate with FDEP to prepare the required CCCL permit for the sand replenishment project. The CONSULTANT will prepare the necessary permit applications and support documents to meet permitting requirements. Responses to regulatory Request for Additional Information (RAI) will be prepared within regulatory timeframes. One (1) RAI is anticipated. • Mean High Water Survey o Establish the Mean High Water Line (MHWL) along the ocean front boundary of the project. o Take elevation cross sections at 50-foot intervals in order to interpolate the MHWL elevation. o Update the previously performed Map of Topographic Survey (Atlantic Boulevard) in order to depict the MHWL • Cost Estimate/Contractor Coordination o The CONSULTANT will prepare an Engineer's Estimate of Probable Construction Cost to assist the County in determining the quantity of sand that may be imported for restoration. The CONSULTANT will also assist the COUNTY in the identification of potential contractors and suppliers. • Construction Phase Services o The CONSULTANT will perform construction phase services to consists of site visits during construction (estimated I week), review of shop drawings, responses to Request for Information (RFI), and project close out. Sand will be visually inspected for compliance with permit specifications. Ms. Patricia Smith Higgs Beach Additional Services February 2, 2015 Page 5 d. Relocated Racquetball Court and Squash Court The CONSULTANT will analyze, design and provide supporting calculations as necessary and prepare construction documents to support the relocation of the existing racquetball court (full reconstruction), and a new squash court at a location yet to be determined. The scope will include the Civil, Architecture, and Structural Engineering required to design and permit this component of the project. 4. SUBMITTALS Construction Plan submittals will be based on the following phases: • Phase One-60%Plans will contain the following: o Key Sheet(will be under originally scoped plan set) o General Notes(will be under originally scoped plan set) o Preliminary Tabulation of Quantities o Preliminary Dog Park Layout—Paving, Grading, and Drainage(1"=40') o Preliminary Walkway Layout—Paving, Grading, and Drainage (1"=40') o Preliminary Beach Replenishment Plans (under separate cover for advanced procurement) _ o Preliminary Landscape and Hardscape Layout—for dog park and connectivity walkways o Preliminary Racquetball and Squash Court Layout o Preliminary Racquetball and Squash Court Arch./Struct. Drawings o Preliminary Civil Site, Landscape, and Hardscape Details o Drainage Details(NTS) o Special Details(NTS) o Preliminary Drainage Calculations o Preliminary Permit Applications o Preliminary Probable Opinion of Costs • Phase One Submittal The Phase One(60%) plans package will be transmitted to the COUNTY'S Project Manager in 11"x17" hard copy format and with a CD containing all files and Ms. Patricia Smith Higgs Beach Additional Services February 2,2015 Page 6 associated calculations and reports. • Phase One Review The COUNTY will distribute plan sets to all affected parties for a three week review period. At the conclusion of the review period the COUNTY'S Project Manager will transmit all comments to CONSULTANT for comment resolution and disposition. CONSULTANT will provide all comments in spreadsheet form to the COUNTY'S Project Manager with all comments addressed. CONSULTANT and COUNTY'S Project Manager will meet within one week after submitting comment spreadsheet to address and provide final disposition of all comments before proceeding to Phase Two (90%) plans. • Phase Two- 90%Plans will contain the following: o Key Sheet(will be under originally scoped plan set) o General Notes(will be under originally scoped plan set) o Tabulation of Quantities o Dog Park Layout—Paving, Grading, and Drainage (1"=40') o Walkway Layout—Paving,Grading, and Drainage(1"40') o Beach Replenishment Plans (under separate cover for advanced procurement) o Landscape and Hardscape Layout—for dog park and connectivity walkways o Racquetball and Squash Court Layout o Racquetball and Squash Court Arch./Struct. Drawings o Civil Site, Landscape, and Hardscape Details o Drainage Details(NTS) o Special Details(NTS) o Drainage Calculations o Permit Application responses and coordination o Probable Opinion of Costs • Phase Two Submittal The Phase Two(90%)plans package will be transmitted to the COUNTY'S Project Manager in 11"x17" hard copy format and with a CD containing all files and associated calculations and reports. • Phase Two Review The COUNTY will distribute plan sets to all affected parties for a three week review period. At the conclusion of the review period the COUNTY'S Project Manager will transmit all comments to CONSULTANT for comment resolution Ms. Patricia Smith I-Eggs Beach Additional Services February 2, 2015 Page 7 and disposition. CONSULTANT will provide all comments in spreadsheet form to the COUNTY'S Project Manager with all comments addressed. CONSULTANT and COUNTY'S Project Manager will meet within one week after submitting comment spreadsheet to address and provide final disposition of all comments before proceeding to Phase Three(100%) construction documents and specifications. • Phase Three- 100% Plans shall contain the following: o Key Sheet(will be under originally scoped plan set) o General Notes (will be under originally scoped plan set) o Final Tabulation of Quantities o Final Dog Park Layout—Paving,Grading, and Drainage (1"=40') o Final Walkway Layout—Paving, Grading, and Drainage(1"=40') o Final Beach Replenishment Plans (under separate cover for advanced procurement) o Final Landscape and Hardscape Layout—for dog park and connectivity walkways o Final Racquetball and Squash Court Layout o Final Racquetball and Squash Court Arch./Struct. Drawings o Final Civil Site,Landscape, and Hardscape Details o Final Drainage Details(NTS) o Final Special Details(NTS) o Final Drainage Calculations o Final Permits o Final Probable Opinion of Costs o Technical Special Provisions(signed and sealed) o Other Specification Requirements from COUNTY • Phase Three Submittal The Phase Three (100%) is the complete set of documents to for biding purposes. The Phase Three (100%)plans package will be transmitted to the COUNTY'S Project Manager in 11"x17"hard copy format signed and sealed and with a CD containing all files and associated calculations and reports. The CONSULTANT will assist the COUNTY as requested in evaluation of the bids,attendance at preconstruction meeting and answering prospective bidder questions. • Post Design Services Ms. Patricia Smith Higgs Beach Additional Services February 2,2015 Page 8 At the COUNTY'S request the CONSULTANT will provide a separate proposal to be available during construction for shop drawing reviews,answering Request for Information (RFIs), make necessary revisions based on field or unforeseen conditions and other support services the COUNTY may desire. 5. ITEMS NOT INCLUDED • Bid& Award Services • Construction Phase Services other than what is described for the Beach Replenishment Project. 6. INFORMATION TO BE PROVIDED TO TY LIN I HJ ROSS • Access to the site • Any pertinent information available 7. ADDITIONAL SERVICES The above scope of services represents "basic services" to be performed as part of our lump sum price. Additional services beyond the scope of these basic services will only be performed on an as needed basis and with approved authorization. If additional services are required, CONSULTANT will prepare a separate scope of services and labor cost. S. COMPENSATION CONSULTANT will perform the Work detailed in this Proposal for a Total Lump Sum fee of One Hundred and Forty-Nine Thousand Nine Hundred and Eighty-Seven Dollars and 00 cents ($149,987.00). This includes an allowance for potential Permit Fees in the amount of $2,500.00. Exhibit"B"provides a detailed estimate of the Man-Hours and Fees. Ms. Patricia Smith Higgs Beach Additional Services February 2, 2015 Page 9 EXHIBIT"B" FEE ESTIMATE HIGGS BEACH ADDITIONAL PROFESSIONAL ENGINEERING SERVICES Monroe County Higgs Beach Additional Professional Engineering Services Fee and Cost Detail s g = LL n. m w' a I. o HOURLY WAGE RATES $175.00 $160.00 $125.00 $63.50 1.0 DOG PARK DESIGN-CIVIL 1.1 Construction Documents 20 40 60 80 200 $22,480 1.2 Cost Estimate 4 2 4 0 10 $1,520 2.0 SOUTH SIDE CONNECTIVITY DESIGN-CIVIL 2.1 Construction Documents 16 20 40 60 136 514818 2.2 Cost Estimate ' 4 2 4 0 10 S1620 3.0 BEACH RESTORATION 3.1 Design Plans 4 8 16 24 52 55,504 3.2 Coordination/Permitting with FDEP 8 4 16 16 44 $5,056 3.3 Cost Estimate/Contractor Coordination 4 2 4 0 10 $1,520 3.4 Construction Phase Services 4 8 48 16 76 $8,996 4.0 RACQUETBALL AND SQUASH COURTS 4.1 Structural Construction Documents(LA to provide Arch.Design) 20 60 80 120 280 $30,72C 4.2 Cost Estimate 4 2 4 0 10 51.520 Subtotal $93.646 SUMMARY OF HOURS 88 148 276 316 828 SUBTOTAL-SALARIES S15,400 $23,680 $34,500 $20,066 $93,646 MHW SURVEY $4,149 LANDSCAPE ARCHITECTURE-FERNANDEZ-BERAUD $45,010 ALLOWANCE FOR PERMIT FEES $2,500 DIRECT EXPENSES(5%of TY Lin 1 HJR Fee) $4,682 TOTAL LUMP SUM FEE $149,987 iTY IL1 NI INTERNATIONAL/H-J-ROSS