1st Change Order 03/09/2015MONROE CouNTY SOLID WASTE MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Two (2) Hazardous Material Prefabricated Storage Sheds, Long Key Transfer Station and Cudjoe Key Transfer Station CHANGE ORDER NO: 001 DATE: March 2, 2015 CONTRACTOR: CONTRACT DATE: 04/06/2014 SeaTech, Inc. P. O. Box 420529 Summerland Key, FL 33042 The Contract is changed as follows: As a result of permit delays and a required flood elevation permit change to raise the slabs at Cudjoe Key Transfer Station 24 inches and the slab at Long Key Transfer Station 12 inches, contract increased by $10,700.00 for additional concrete material and a time extension of 84 days was required for contractor to complete the project and provide proper closeout documentation. The original Contract Sum ........................................ ............................... $202,611.00 Net change by previously authorized Change Orders ....... ..............................$ 0.00 The Contract Sum prior to this Change Order was ..................... ....................$202,611.00 The Contract Sum will be increased by this Change Order ..............................$ 10,700.00 The new Contract Sum including this Change Order is ............... ....................$213,31 1.00 The Contract Time will be increased by eighty -four (84) days. The date of final completion date as of this Change Order is December 12, 2014. Not valid until signed by CONTRACTOR and the OWNER CONTRACTOR: 3 � I� , Tk SeaTech, I c. Date ADMINISTRATOR, SOLID WASTE PUBLIC WORKS /ENGINEERING: DIVISION DIRECTOR COUNTY /DEPUTY ADMINISTRATOR: ZK� fe-& 3 1 1 1 f /s Rosa Washingt Date i ! M E M O R A N D U M DATE: March 9, 2015 TO: Lindsey Ballard, Deputy Clerk FROM: Beth Leto, Public Works RE: CO #1 — SeaTech, Inc. Enclosed please find fully- executed original of Change Order #1 for two (2) Hazardous Material Storage Sheds increasing contract time by eighty -four (84) days for permit delays and changing contract sum by $10,700 for required flood elevation permit change to raise concrete slabs at the Cudjoe Key and Long Key Transfer Stations. The change order was executed by Debbie Frederick, Deputy County Administrator, today (3/9/2015), in accordance with Ordinance 026 -1998. Should you have any questions, please feel free to contact me at x4560. cc: Ann Riger F L���OML� D 3 in•is D Lb-