Loading...
Item Q35 19 010 161 Oki 10 VIA 1,, Meeting Date: May 20, 2015 Division: Growth Managgment Bulk Item: Yes No X Department. Planning and Environmental Resources Staff Contact Person/Phone #: Christine Hurlev 289-2517 AGENDA ITEM WORDING: A public hearing to consider approval of a resolution authorizing a special permit allowing a temporary construction staging area and a temporary setback variance at property located along Avenue 1, Big Pine Key (Real Estate #00110960.000000), related to a canal. restoration project (Canal #290). ITEM BACKGROUND: The applicant has requested a special permit to utilize the subject property for a temporary construction staging area. The staging area would facilitate a canal restoration/water quality improvement project being carried out by Monroe County. In addition, the applicant is requesting a temporary setback variance to allow placement of staging equipment in the sideyard setback of the parcel. In addition, the applicant is requesting a variance from the front yard setback to allow the placement of dewatering equipment on the property line at the edge of the right of way of Avenue 1. The property owner for the adjacent parcel (#001 10940.000000) is seeking approval for a similar request under a separate application. If approved, the expected commencement date of the staging area is July 31, 2015 and the approval shall expire one year from the date of commencement on July 31, 2016. Note: The BOCC is considering an amendment to Section 6-3 of the Monroe County Code of Ordinances to allow temporary construction staging to occur temporarily within the setbacks to alleviate increased public expenses and avoid threats to public health and safety, provided the adjacent property owners submit letters of no objections to the temporary variance. The applicant has submitted letters of no objection from the adjacent property owners. PREVIOUS RELEVANT BOCC ACTION: At the December 10, 2014 meeting, the BOCC approved an ordinance establishing §6-3 of the Monroe County Code, which provides the approval process for temporary construction staging areas with a special permit granted by the BOCC. (Ordinance 0 18-2014) At the April 15, 2015 meeting the BOCC approved the advertisement of a Public Hearing for 3:01 pm (approximate) on May 20, 2015 at the Murray Nelson Government Center in Key Largo. STAFF RECOMMENDATIONS: Approval TOTAL COST: N/A INDIRECT COST: N/A BUDGETED: Yes No N/A DIFFERENTIAL OF LOCAL PREFERENCE: _N/A COST TO COUNTY: N/A SOURCE OF FUNDS: N/A REVENUE PRODUCING: Yes No N/A AMOUNT PER MONTH N/A Year - APPROVED BY: County Atty X J IrOMB/Purchasing Risk Management a : DOCUMENTATION: Included X Not Required DISPOSITION: AGENDA ITEM # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 MONROE COUNTY, FLORIDA RESOLUTION NO. -2015 A RESOLUTION OF THE MONROE COUNTY BOARD OF COUNTY COMMISSIONERS APPROVING A SPECIAL PERMIT ALLOWING A TEMPORARY CONSTRUCTION STAGING AREA AND A TEMPORARY SETBACK VARIANCE FOR A CANAL RESTORATION/WATER QUALITY IMPROVEMENT PROJECT AT PROPERTY DESCRIBED AS A TRACT OF LAND IN A PART OF BLOCK 51, SAND'S SUBDIVISION (PLAT BOOK 1, PAGE 65), MONROE COUNTY, FLORIDA AND HAVING REAL ESTATE NUMBER 00110960.000000. WHEREAS, an application was filed for a special permit allowing a temporary construction staging area at a property on Avenue I, Big Pine Key, approximate mile marker 31 (Florida Bay side of the Overseas Highway); and WHEREAS, the property is described as a tract of land in a part of Block 51, Sand's Subdivision (Plat Book 1, Page 65), having real estate (RE) Number: 00110960.000000; and WHEREAS, the Board of County Commissioners of Monroe County, Florida, desires to grant the special permit allowing a temporary construction staging area and temporary setback variance of 25' from the required 25' front yard setback along the Avenue I right-of-way and 10' from the required 10' side yard setback along the western property line; and WHEREAS, the temporary construction staging area would facilitate a canal restoration/water quality improvement project being carried out by Monroe County; and WHEREAS, due notice has been carried out and a public hearing has been held in accordance with Monroe County Section 6-3; and WHEREAS, at said public hearing, the Board considered the argument of all parties present wishing to speak on the matter; and `a 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 WHEREAS, the Board makes the following Findings of Fact and Conclusions of Law: 1. The temporary construction staging area is not inconsistent with any of the criterion provided in Monroe County Code §6-3; NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA, that the preceding Findings of Fact and Conclusions of Law support its decision to approve the request for a special permit, subject to the following conditions: 1. The temporary construction staging area shall only be used in association with the canal restoration project for Canal #290 on Big Pine Key. 2. The expected commencement date of the temporary construction staging area is June 1, 2015. The termination date of the temporary construction staging area shall be no later than June 1, 2016. 3. Upon termination of the temporary construction staging area, the property shall be restored to its prior condition. AND ADOPTED BY THE BOARD OF COUNTY COMMISSIONERS of Monroe County, Florida, at a regular meeting held on the 20t' of May, 2015. Mayor Danny L. Kolhage Mayor pro tem Heather Carruthers Commissioner Sylvia Murphy Commissioner George Neugent Commissioner David Rice BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA C Mayor Danny L. Kolhage (SEAL) ATTEST: AMY HEAVILIN, CLERK Deputy Clerk Approved as to Form and Legal Sufficiency - Assistant County Attorney 1 2 3 4 5 6 7 8 9 IQ 12 13 14 15 i { 4 MEMORANDUM MONROE COUNTY PLANNING & ENVIRONMENTAL RESOURCES DEPARTMENT To: The Monroe County Board of County Commissioners Through: Christine Hurley, AICP, Director of Growth Management Mayte Santamaria, Senior Director of Planning & Environmental Resources From: Michael Roberts; Sr. Administrator/Environmental Resources Date: April 29, 2015 Subject: A public hearing to consider approval of a special permit allowing a temporary construction staging area at property located along Avenue I, Big Pine Key (Real Estate #00110960-000000), related to a canal restoration project (Canal #290) Meeting: May 20, 2015 I REQUEST: The applicant has requested a special permit to utilize the subject property for a temporary construction staging area. The staging area would facilitate a canal restoration project being carried out by Monroe County. ..- Subject Property (Aerial dated 2012) Location: Address: 31449 Avenue I, Big Pine Key, approximate mile marker 31 Legal Description: 25 66 29 Big Pine Key Filled Bay Btm Adj Blk 51 Sands Sub (Plat Book 1, Page 65) Real Estate (RE) Number: 00110960-000000 Page 1 of 4 R 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Applicant: Contractor: JND Thomas Company, Inc. Property Owner: Richard and Lucy Platek IIi:3 mni:Te111►ID71g1welau/:rY[�7►ii A. Size of Site: 0.23 acres (10,000 SF) B. Land Use District: Improved Subdivision (IS) C. Future Land Use Map (FLUM) Designation: Residential Medium (RM) D. Tier Designation: Tier III E. Existing Uses: Residence F. Existing Vegetation / Habitat: Developed and Canal bottom G. Community Character of Immediate Vicinity: Residential H. Flood Zones: VIE III REVIEW OF APPLICATION: The requested temporary staging is to provide a suitable location for a pipeline to run to and from the canal (#290) and to allow the placement of water separation equipment required to extract and dewater the organic material to meet return water turbidity thresholds. The BOCC has the authority to approve temporary construction staging areas in accordance with MCC §6-3. A special permit may be granted by resolution by the BOCC to allow a property to be used as a construction staging area for an off -site project. The BOCC shall hold a public hearing on the request for a temporary construction staging area and shall issue a resolution granting, granting with conditions or denying the request. The resolution shall take effect on the date of enactment by the BOCC. Applicability. A temporary construction staging area for an off -site project is a permitted activity in any land use (zoning) district, provided it is approved by a special permit and meets the criteria set forth in MCC §6-3. This special permit shall approve the temporary construction staging area location and use and shall not override or substitute for any other provision of the Florida Building Code and Monroe County Code that require an additional type of building permit, certification or approval. Criteria. Approval of such a special permit shall be granted only if the following criteria are met: (1) The temporary construction staging area shall serve a project being carried out in the vicinity of the construction staging area: In compliance. The proposed staging area is adjacent to Canal #290 which is one of the approved canal restoration demonstration projects. (2) The temporary construction staging area shall serve a project being carried out by a governmental agency: In compliance. Page 2 of 4 (File #2015-042) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 The canal restoration project is being carried out by Monroe County, Florida. (3) The temporary construction staging area shall be not be located in a tier I designated area: In compliance. The proposed staging area would be located on a property that is in a tier III designated area. (4) The property subject to the request shall be posted and surrounding property owners within 300 feet shall be notified in writing at least 15 days prior to the BOCC public hearing, with the notice located so it shall be easily visible from all public streets and public ways abutting the property: Compliance to be determined prior to public hearing. Planning & Environmental Resources Department staff shall carry out the notification as required. (5) Prior to establishment of the temporary construction staging area, a special building permit approving any associated temporary structure shall be issued in accordance with MCC §6-112: Compliance to be determined. A permit pursuant to MCC §6-112 will be required for the storage container and temporary fencing . (6) No clearing or filling shall occur to accommodate the temporary construction staging area: In compliance. The proposed staging area would be located on a property that is predominately scarified. No clearing or filling shall occur to accommodate the staging area. (7) Other than fencing, no temporary structure associated with a temporary construction staging area shall be located in any required setback unless the BOCC determines the temporary construction staging may occur temporarily within the setbacks to alleviate increased public expenses and avoid threats to public health and safety: In compliance pending Temporary Setback Variance Approval. The applicant is requesting a variance from the sideyard setback adjacent to Parcel 00110940-000000, which is also proposed as a staging area under a separate application. The requested variance is to allow the placement of dewatering equipment on the property line between the two parcels. In addition, the applicant is requesting a variance from the front yard setback to allow the placement of dewatering equipment on the property line at the edge of the right of way of Avenue I. Note: The BOCC is considering an amendment to Section 6-3 of the Monroe County Code of Ordinances to allow temporary setback variances on May 20, 2015. If the BOCC approves the amendment to §6-3 and this request for Canal 290, the Resolution for this request will be issued after the effective date of the Ordinance. Page 3 of 4 (File #2015-042) 1 (8) The temporary construction staging area shall be compatible with existing uses on 2 surrounding properties, as determined by the BOCC. If necessary, prior to issuance of a 3 special permit allowing the temporary construction staging area, the board may attach 4 conditions to any special permit approval to a) avoid substantial harm to public health or 5 safety; b) avoid substantial harm to, or impairment of the normal use of, a public place; 6 and/or c) avoid substantial harm to the environment. Depending on the nature and 7 anticipated duration of the use, as a condition of approval to the special permit, the board 8 reserves the right to: a) Provide a deadline for termination of the construction staging 9 area; b) Limit the hours of operation; c) Limit the type of equipment and materials on the 10 site; d) Require fencing, landscaping and/or other screening to limit potential visual and 11 noise impacts of the use on adjacent property owners; and e) Require surface water 12 management improvements to the affected site: In compliance. 13 14 The BOCC reserves the right to attach such conditions to any special permit approval at 15 the May 20, 2015 public hearing. 16 17 (9) The property shall be restored to its prior condition: Compliance to be determined upon 18 termination of the staging area. 19 20 IV RECOMMENDATION: 21 22 The Growth Management Division recommends approval. Page 4 of 4 (File #2015-042) APPLFCA NO MONROE COUNTY I R F:' C I r H ) PLANNWG & ENVIRONAIENTAL RESOURCES DEPAIRTMENT IP I V y } FJ CICCIJR0 E, C C.. Request for a Temporary Construction Staging Area Special Use Permit An application must be deemed complete and in compliance with the Monroe County Code by the staff prior to the item being scheduled for review by BOCC. Date of Submittal: 3 102 115 Month Day Year Applicant/Agent Authorized to Act for the Property Owner: Jeff Verbance - JND Thomas Company, Inc. Jeff Verbance Applicant (Name of Person, Business / Organization) Name of Person Submitting this Application 12001 N. Research Pk" #236 Orlando, FL 32826 Mailing Address (Street, City, State and Zip Code) 954.683.5229 jeffv@jndthomas.com Daytime Phone Email Address Property Owner of Construction Staging Area Property: Richard C and Lucy Platek Richard Platek (Name/Entity) Contact Person 333 Grand Central Avenue, Amityville, New York 11701-3747 Mailing Address (Street, City, State and Zip Code) 631-691-1759 Daytime Phone rplatek@optonline.net Email Address Location and Legal Description of Construction Staging Area Property: (If in metes and bounds, attach legal description on separate sheet) Filled Bay Bottom Adj 51 Sand's Big Pine Key Block Lot Subdivision Key 00110960-000000 1131423 Real Estate (RE) Number Alternate Key Number 31449 Avenue I, Big Pine Key, FL 33043 31 Street Address (Street, City, State, Zip Code) Approximate Mile Marker Page 1 of 3 �a�r �'vu nui 20112 A PPLVl:C`A F 10,�S,' Location and Legal Description of Project Property: (If in metes and bounds, attach legal description on separate sheet) The project is hydraulic dredging of organic material from the canal bottom of the canal located between Avenues I and J, in Big Pine Key. Block Lot Subdivision Key 00110960-000000 and all parcels on both sides of canal (properties extend Into center of canal) - refer to Sheet C110 in design plans Real Estate (RE) Number Alternate Key Number MM 31 Street Address (Street, City, State, Zip Code) Approximate Mile Marker Governmental Agency Involved in Project: Monroe County Sustainability Department Please note that the 1gMp9M construction sWing area mgy only serve a ro'ect being carried out by a governmental agency. Land Use District Designation of Construction Staging Area Property: Improved Subdivision (IS) Tier Designation of Construction Staging Area Property: Tier 3 Please note that a temporary construction staging area may not be located in a tier I designated area. Present Land Use of Construction Staging Area Property: Mobile Home/Paved side yard All of the following most be submitted in order to have a complete application submittal: (Please check as you attach each required item to the application) Completed application form Proof of ownership (i.e. Warranty Deed) Current property record card(s) from the Monroe County Property Appraiser Photograph(s) of site from adjacent roadway Written description of project, including: o The commencement and termination dates of the construction staging area; o The hours of operation; o The types of equipment and materials to be stored within the construction staging area; o Any proposed fencing, landscaping and/or other screening; and o Any proposed surface water management improvements Please note that no clearing or filling shall occur to accommodate the temporary construction staging area. ❑ Construction Management Plan, stating how impacts on near shore water and surrounding property will be managed (i.e. construction barriers, hay bales, flagging) ❑ Site Plan 00 Typed name and address mailing labels of all property owners within a 300 foot radius of the property. This list should be compiled from the current tax rolls of the Monroe County Property Appraiser. In the event that a condominium development is within the 300 foot radius, each unit owner must be included 0 Radius report from Monroe County Property Appraiser supporting the required labels If applicable, the following must be submitted in order to have a complete application submittal: Notarized Agent Authorization ❑ Boundary Survey Page 2 of 3 pti<� If va ised Deg ,,e ruher 2 flif4 ❑ Vegetation Survey ❑ Landscape Plan ❑ Stormwater/ Surface Water Management Plan If deemed necessary to complete a full review of the application, the Planning & Environmental Resources Department reserves the right to request additional information. 1, the Applicant, certify that I am familiar with the information contained in this application, and that to the best of MI, ed such information is true, complete and accurate. Signature of Applicant.- Date: 3 A .,%%s%Mf_1R t1 PP,6, I/,, Sworn before me thin day of .•'��p� or!e ' .� Zy. •: TF07ft7 Notary Public '";? My Commission Expires ' �I � 1110 Please send the complete application package to the Monroe County Planning & Environmental Resources Department, Marathon Government Center, 2798 Overseas Highway, Suite 400, Marathon, FL 33050. Page 3 of 3 gel R iy(d r,)c6,cctuV2fliV 4 Project Details Parcel ID # 00110960-000000 {Canal #290 between Avenues I and J, Big Pine Ivey, _ Parcel ID #00110960-000000 l 0 ° - 31449 Avenue I, Platek Property Proposed Staging Area Description of Project: This project is part of the Water Quality Improvement Program being funded by Monroe County for Canal Restoration Demonstrations. The purpose of the project is to hydraulically vacuum dredge the accumulated weed rack along the bottom of the unnamed manmade canal located between Avenues I and J in Big Pine Key, Florida to a maximum depth of - 8.9 feet Mean Low Water. Due to weed rack loading and lack of flushing, a layer of decomposing weed rack (organic muck) has accumulated along the bottom of the canal which consumes oxygen and prevents the inhabitance of fish or other marine organisms. The project entails hydraulically removing the organic muck layer within the canals to the limestone bottom to promote a viable benthic community. Six inches of sand will be placed on the limestone canal bottom after dredging to assist in promoting seagrass growth. Commencement and Termination Dates of Construction Staging Area: July 1, 2015 through September 30, 2015 Hours of Operation: 8 AM — 6 PM Monday through Friday Types of Equipment and Materials to be Stored in Staging Area: 1. Pipeline run to and from the canal and placement of water separation equipment required to extract and dewater the organic material to meet return water NTU turbidity thresholds. Equipment includes shaker/mix tank, clarifier, and belt presses. 2. Additionally, trucks and other equipment will need to enter the property to place and remove the containers and the final dewatered dredge spoil material. Setbacks and Request for Variances: A 20 foot shoreline setback can be met on the eastern property boundary and a 20 foot setback can be met along the canal as the property line extends to the middle of the canal. A variance is being reguested alon the western grogeM boundaEY for a 0 foot setback to accommodate all the a ui meat. The adjoining arcel on the western side Parcel #00110940-000000 is also a part of the dewatering staldng area. A variance is being requested along the front of the propedy for a 0 foot setback as the dewatering a ui ment needs to extend into the Right -of -Way in order to fit all the required equipment. Proposed Fencing, Screening or Landscaping: A temporary construction fence consisting of 6 foot high chain link fence with canvas privacy screening will be placed on the property extending to the front of the property staging area continuing west connecting with fence on Parcel ID 00110940-00000 property. Project Details Parcel ID # 00110960-000000 Any Proposed Surface Water Management Improvements: The Contractor will be required to implement best management practices within the staging area to control all storm water runoff. The Contractor will provide a final Erosion and Sediment Control plan based upon the Sediment and Erosion Control Plan presented on the Design Drawings. Current Vegetation: Parcel 00110960-000000, the Platek property, maintains no natural features. The existing surface soil conditions are described as an "urban complex" consisting of fill material covered with a small aggregate pea gravel. There are no plants located on the parcel. Li C) L 0 ji 0 m 0 Q < Q0 Q�� 2K r1r) < 0) CL z 0 > 0 Ir- Z < 0 LP (J� LO F- 0) <=— � uSo 0 F- CD 0 L 0 x 0 L'i 0 CY U Q- < < EffCU CD j± < D §I- L w ,;4- = m > < < N C) -12 < C) Q LJ 00 < (-) -- Q CD > CO <u _.Lj Li- Lj 01) ff- C) 0 ) C) < x Li C) C-) CL X U < CL < 0 LLJ Ckf z F- CL 0 90 clf < C, 0- < CL 0 r 7) 0 JT O w W p 0 (n F O Ii U 2 n C14 tnOOdCL O rr Z O O _.. U W Y F Z ItU 0 F N W m y. to Lu W 7 t Q _ Q w W U z �,� z Z -i W q l j L� d J N Y O Z a U Z F C7 - --- - - ---- -- -... p Z� j O Z Q Z iw ._.....•� Q wOwaoLLJ F 3v 50 _ w d�0 QW ' U < O wmwomL) 0 4wm^a vs — a- o- o w >ow�F O l z M z (n — _ a{ W F- 64 Z � X W w Q' Y N N gs t/) j O x k Z x Mild z i } a rq Y 'q U 4 0FJ WF Z w= Z 9 wUFw O 6^ Lj Q d N EnT �tY'L` UD 5✓ r p O O �•1.; a z w O 0 a Q Q u:F OCR Li F +% Wp In U U z O X Op w�2 „.. ill W? > �F�O Om O M p O O U Q ,. IL Alfil u e _ �w �. � �w�g6thn.`,� S' R Fr }` � � � r„ Y +: r..� ,� .� N a P �, ^ ., " / - r *C�.. S _ �y G A,! �� "O .... �� J+� f x 4 y ✓ � �FP� � "�y : A .. e .y .,., x .t �' �..' f �. R � i� a � �'N�" �� � �d� �' � �. *. 5 �o �.. � �� °� {�; u .�ntt�Y�+=gt�' f /! 1� ,� t� f _ �J +1 tli Q aas PIP y v xv K i fie 9 f I I x W 61, 61 11 1 IN h pt: gag a U11 I R HIM fits ox x Ej fr$aT 9 g 19 1b I y I IN gag a. a r w 2 ti v 4 11 t: L. a W a IV Re ttffSad R , Nall PIP HNI 011R.211il; 1-2.121 lit INTAE 14; .2z K 1sad 114 Re R .9 8, 0 �v a pp ur' �ti s a o StQ] e �� de2•I till 17 M LA F �e dad t to i 1 j( t � � g ♦ � c� d]� S� E $0 � i t t( ei � E �kg�� ! 4 i ``t; ,• •! YYd' f f�:f#� E �� f eft . "• !�. ti �4 ` i?ii i! t. , ' t, di e all 11 d e fl of �� Lai a. 4E U i t r.- � � yro�Vox�i silk � � I � S. Y v r d Y C tl ® < p�uuuu li u 1, iiow� MAY To: Edgar Braswell IV — 31466 Avenue 1. Big Pine Key, FL From: JND Thomas Company, Inc. Re: No Objection Letter for Temporary Use Setback Variance Request i 1. Proposed temporary staging address: 31449 Ave I. Big Pine Key, FL 33043 2. The purpose of the project is to hydraulically vacuum dredge the accumulated weed rack along the bottom of the unnamed manmade canal located between Avenues I and J in Big Pine Key, Florida, Pipeline run to and from the canal and placement of water separation equipment required to extract and dewater the organic material to meet return water NTU turbidity thresholds. Equipment includes shaker/mix tank, clarifier, and belt presses 31441 Ave I 31449 Ave I I? -. a I+• ., _. _ _...- ErktingStruttures .—.,... a..� Ptope+ty Line ... ........... .r. ..,.,.... SLrawWaad,es ..y..._._...:- R ral Return water PIpe�Mc Dredge hn wmt pipelim Own rinlr fence hale Canal 290 3. I, C•!:.i IC e" adjacent property owner do not object to the temporary setback variances to allow construction staging to occur temporarily within the setbacks at property located at: 31449 Ave 1. Big Pine Key, FL. Signature Print Name: Date: To: Basil Boma Jr. — 31454 Ave. I Big Pine Key, FL From: JND Thomas Company, Inc. Re: No Objection Letter for Temporary Use Setback Variance Request 1. Proposed temporary staging address: 31441 Ave L Big Pine Key, FL 33043 2. The purpose of the project is to hydraulically vacuum dredge the accumulated weed rack along the bottom of the unnamed manmade canal located between Avenues I and J in Big Pine Key, Mlorids, Pipeline run to and from the canal and placement of water separation equipment required to extract and dewater the organic material to meet return water NTU turbidity thresholds. Equipment includes shalaWini c tank, clarifier, and belt presses 31441 Ave I 31449 Ave I it04i E I� 1 ' I.r 1 p y m 314UU co M =F I Waalrsaucwns woaear use suawweddles Roll +.� M RnumwatmgpePro a�� Dlad a InRuem oipeYne � - audn Mk hms Gera Canal 290 3. L adjacent property owner do not object to the temporary setback variances to allow construction staging to occur orarily within the setbacks at property located at: 31441 Ave I. Big >'ine KM� F-L. Signature: 00 (40� . Print Nam .QTr Date: _. �'71 6 �� To: Herbert Steele — 31442 Ave. I & 31424 Ave I. Big Pine Key, FL From: JND Thomas Company, Inc. Re: No Objection Letter for Temporary Use Setback Variance Request I. Proposed temporary staging address: 31449 Ave L Big Pine Rey, FL 33043 2. The purpose of the project is to hydraulically vacuum dredge the accumulated weed nick along the bottom of the unnamed manmade anal located between Avenues I and J in Big Pine Key, Florida, Pipeline run to and from the canal and placement of water separation equipment required to extract and dewater the organic material to meet return water NTU turbidity thresholds. Equipment includes shakedmix tank, chufiier, and belt presses 31441 Ave I 31449 Ave I Ic Ir LI I � 9 >o 314W) A ° LW i CO r I. _---'. — 1 mttina Spdetwa� -m 9trawNhddbs ---•.-- . t:aU `•r•r IMUMWatarpi wIna Dred�elnftooNplpdne +� qwM lak hots o^ Gae Cana1290 ' f a 3. I, andRS t Cirtu &adjacent property owner do not object to the temporary setbao variances to AND construction staging to occur temporarily within the setbacks at property located at: 31449 Ave I. Big Pine Key_ FL. Signature: Sigoatme: --..,�_ _ �_4S.1 Print Name• t Print Name Date: 2i� I Dater q ZS�- l To: Stephen and Lynda Spellman — 31470 Ave. J Big Pine Key, FL From: JND Thomas Company, Inc. Re: No objections Letter for Temporary Use Setback Variance Request 1. Proposed temporary staging address: 31449 Ave I. Big Pine Key, FL 33043 2. The purpose of the project is to hydraulically vacuum dredge the accumulated weed rack along the bottom of the unnamed manmade canal located between Avenues I and J in Big Pine Key, Florida, Pipeline run to and from the canal and placement of water separation equipment required to extract and dewater the organic material to meet return water NTU turbidity thresholds. Equipment includes shaker/mix tank, clarifier, and belt presses ff, � Ex sti�apr SLf49Cturd=m �. • . xm. PrOPLIy Uql( • ,. """ araiW�ra�i�m��mmamum�srmrmus+sn, jV�°N 1:�3�Q�CS ;r crwnm. ueumemo P"et„ er W�xter pPpeB-E- �;,w� �"s'�.^^¢Po-°� �r.��!�r�t uiao'rrrrc• C. Pe Canal 29 3. I, , and adjacent property owner do not object to the temporary setback variances to allow construction staging to occur temporarily within the setbacks at property located at: 31441 Ave 1. Big Pine Key, FL. Signature: �--signature: 4 Print Name: Print Name: �°� .� Date: � Date: ---� To: Stephen and Millicent Konop — 31364 Ave. J Big Pine Key, FL From: JND Thomas Company, Inc. Re: No objections Letter for Temporary Use Setback Variance Request 1. Proposed temporary staging address: 31449 Ave I. Big Pine Key, FL 33043 2. The purpose of the project is to hydraulically vacuum dredge the accumulated weed rack along the bottom of the unnamed manmade canal located between Avenues I and J in Big Pine Key, Florida, Pipeline run to and from the canal and placement of water separation equipment required to extract and dewater the organic material to meet return water NTU turbidity thresholds. Equipment includes shaker/mix tank, clarifier, and belt presses 1iP the �O • • F. oms st—tum,.. Pr,rpert1,- Ole `^t mw.���+ti�+ Strew waddkt Botum water Olpei'+e D^edge,r0urrrt u,w�— Char. -.r. temp ,. .., fete CsnaC 290 3. I. . and adjacent property owner do not object to the temporary setback variances to allow construction staging to occur temporarily within the setbacks at p erty located at: 31441 Ave I. Big Pine Key. FL. Signature: Signature: Print Name:g( `' \�Print Name: Date: ! Date: V4.10 ( t To: David Bell Jr. — 31441 Ave. I., Big Pine Key, FL From: JND Thomas Company, Inc. Re: No Objection Letter for Temporary Use Setback Variance Request 1. Proposed temporary staging address: 31449 Ave I. Big Pine Key, FL 33043 2. The purpose of the project is to hydraulically vacuum dredge the accumulated weed rack along the bottom of the unnamed manmade canal located between Avenues I and J in Big Pine Key, Florida, Pipeline run to and from the canal and placement of water separation equipment required to extract and dewater the organic material to meet return water NTU turbidity thresholds. Equipment includes shaker/mix tank, clarifier, and belt presses 3'@44 � Ave I 1449 Ave I V 3. I, adjacent property owner do not object to the temporary setback variances to allow construction staging to occur temporarily within the setbacks at property located at: 31449 Ave I. Big Pine Key, FL. Signature: Signature Print Name: PA✓1 Print Name., _. m..._ r... Date: yz2 /{_