Loading...
12/14-44 Drainage Reconstruction Constructionr " se by 365 da s BOARD OF COUNTY COMMISSIONERS HEAVILIN, CLERK OF MO OE COUNTY, FLORID O ��f t S�l By " - ` MayorThaimAn CONSULTANT: J ACOBS EMU CT MA GE NT CO B Witnes - - -- Title File: MST — Monroe County Page 1 of I MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Effective Date ` 1 J5J15 Client Project No. Task Order No. 12/14 -44 o r-+ 11 w s== x p. rn ° al a Cl� co r- - --4 r, 3c r*i Engineer Project No. E9Y16721 This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County, Florida ( "Client ") and JACOBS PROJECT MANAGEMENT CO. ( "Consultant "), dated November 16, 2011 ( "Agreement"). The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized: Drainage Reconstruction Construction Phase Services - EYW — PSO #44 Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of 3 page(s). Pricing N/A Time and Expense per Agreement and Appendix B to the Agreement. X Firm Fixed Price of $ 62,320.00 N/A Other (Describe): Schedule Services may commence on Execution Exhibit A — Scope of Work (12/14-44) Monroe County Key West International Airport Drainage Reconstruction Construction Phase Services — PSO # 44 SCOPE OF WORK Jacobs will provide construction support services for the Drainage Reconstruction project at Key West International Airport (EYW). This PSO is a supplement to the previously approved PSO #21. The Airport has determined that due to the work taking place at night and work being located within the Secure Identification Display Area (SIDA) that they would like Jacobs to provide full -time Resident Project Representative (RPR) services instead of part-time RPR services by their subconsultant Perez & Associates. These construction phase services will provide the following: ASSUMPTIONS Construction phase services are based on the following durations for the Base Bid and Additive Bids- ■ Base Bid — 60 Calendar Days In the event the construction duration exceeds the calendar days listed above, Jacobs reserves the right to revise our proposal. Jacobs Project Management Company will invoice on a percent complete, including expenses, to compensate the level of effort required for each assignment. All as -built drawings to be provided to Jacobs in electronic (AutoCad) format and hard copy (printed) format. AMENDMENT TO ARTICLE E - RESIDENT PROJECT REPRESENTATIVE (RPR) 1. Coordinate and attend progress meetings with the contractor, Airport, and any other interested parties, as required prior to construction (e.g. Staging area coordination, setting up Contractor's trailer.). 2. Attend pre - construction conference. 3. Provide full -time RPR services for the work associated with the project. The RPR for the project shall have field experience in the type of work to be performed, be fully qualified to make interpretations, decisions, field computations, and have knowledge of testing requirements and procedures. The RPR shall be responsible for the following: • Checking of construction activities to ensure compliance with the plans and specifications. Inform the contractor and County of any work, which is in non- compliance. Page 1 of 3 5 • Coordinate quality assurance tests and verify they are performed at the frequency stated in the specifications. • Review certifications for conformance with the specifications. • Document quantities of materials used on the project by actual measurements and computations in a field notebook or computer printout retained in a folder. • Maintain a set of working drawings on the job site, which can be used to prepare "As- Built" drawings. • Review the test reports and certifications for conformance with the specifications and maintain a file for all reports and certifications. • Inform the County of deficiencies so corrections can be made and retesting performed. • Jacobs does not have control over or charge of and shall not be responsible for construction means, methods, techniques, sequences or procedures of construction or for safety precautions and programs in connection with the work, since these are solely the CONTRACTOR'S responsibility under the contract for construction. • Jacobs shall make every reasonable effort to ensure that the CONTRACTOR completes the work in accordance with the current approved schedule and carries out the work in accordance with the contract documents. • Review close out documentation. • Review payment requests and certified payrolls from the contractor. • Maintain a diary, which will contain entries made and signed by the resident engineer. Each entry should include the following, plus any additional pertinent data: a. Date and weather conditions. b. Names of important visitors. c. Construction work in progress and location. d. Size of contractor's work force and equipment in use. e. Number of hours worked per day for contractor and subcontractors. 4. Attend final inspection and create punch list. 5. Attend follow up site visit to confirm completion of punch list items. Services for Article E will be provided under a lump sum basis. Page 2 of 3 PROJECT SCHEDULE: The tentative complete project schedule is as follows: Item Duration (Calendar Days) Pre - Construction Meeting /Mobilization 30 Base Bid 60 Punch List - Closeout 30 Page 3 of 3 JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Key West International Airport Project: Drainage Reconstruction - Construction Phase Services - PSO #44 (12/14 -44) FEE SUMMARY BASIC SERVICES Article E:RPR Services Hours Fee DBE AMOUNT 440 $ 62,320 $ (9,900) Total Basic Services Lump Sum Fee 440 $ 62,320 $ 9,900 DBE Percentage - 15.89% Page 1 of 2 JACOBS ENGINEERING GROUP Airport: Project: JOB HOUR AND FEE ESTIMATE Monroe County Key West International Airport Drainage Reconstruction - Construction Phase Services - PSO #44 (12114.44) Article E. Task 9 from PSO#21 WORK ITEM Proj. Director Sr. Proj. Manager Sr. Engineer Project Engineer Engineer Designer Sr. CADD Tech Clerical TOTAL 1 Attend Pre - Constriction Meeting $ 700.00 Lodging/Meals Per Diem (5240 per day) 10 240.00 an. Airfare (4xS700fr ip) $ 2,800 10 2 Perform fidl -time resident inspection services (5 days per week ai 10 hr/da 4 Airfare (2xS700JTnp) $ 1,400 Lodging/Meals Per Diem (2 Days/5240 per day) S 480 0 a, Base Bid - 60 Calendar Days 400 400 3 Attend Final Inspection 10 10 4 Attend Punch List Follow Up Inspections (Assuan 2) 20 20 0 0 TOTAL HOURS 0 0 0 440 0 0 440 RATE $ 220.00 S 195.00 S 140.00 $ 123.00 I 1 S 90.00 1 $ 85.00 $ 90.00 $ 58.00 PAYROLL ESTIMATE $ - 1 $ - I $ - S 54 1 $ $ S 50,120 Article E. Task 9 from PSO#21 Pena & Associates (Deduct Fee) S (9,900) Total Subs $ (9,900) Task Expenses: 1 Airfare (1 x S700Nrip) $ 700.00 Lodging/Meals Per Diem (5240 per day) S 240.00 an. Airfare (4xS700fr ip) $ 2,800 Lodging/Meals Per Diem (52 Days /$240 per day) $ 12,480 4 Airfare (2xS700JTnp) $ 1,400 Lodging/Meals Per Diem (2 Days/5240 per day) S 480 TOTAL PAYROLL S 54,120 Subconsultants $ (9,900) Expenses S 18, 100 Lump Sum Fee Total S 62,320 TOTAL FEE BASE BID S 6220 Total Expenses S 18,100 Page 2 of 2