2nd Amendment 10/21/2015 2"a Amendment to Contract for Professional Services Between Owner and Engineer Atlantic Boulevard Road Relocation Project The second amendment to contract (herein, after "Amendment") between Owner and Engineer for the Design and Permitting Services for the Relocation of Atlantic Boulevard, entered into between MONROE COUNTY ("Owner" or "COUNTY") and T.Y. LIN INTERNATIONAL ("Engineer" or "CONSULTANT") is made and entered into this 21" day of October, 2015, in order to amend the contract as follows: Witnesseth WHEREAS, on August 20, 2014, the parties entered into a contract for the design and permitting of the relocation of Atlantic Boulevard at Higgs Beach in Key West, Florida; and WHEREAS, on March l8, 2015 the Is Amendment to Contract was entered into increasing the scope of services to include the relocation of the existing dog park, develop new pedestrian connections south of the relocated roadway, replenishment of the beach sand, and relocate the racquetball court and squash court; and WHEREAS, submission of the 60% design for the relocation of Atlantic Boulevard revealed inconsistencies with the approved Higg's Beach Master Plan documents; NOW THEREFORE, in consideration of the mutual promises, covenants, and agreements stated herein, and for other good and valuable consideration, the sufficiency of which hereby acknowledged, the Owner and Engineer agree as follows: 1) The original contract dated August 20, 2014 and as amended on March 18, 2015 remain intact with the exception to re-design and re-submit the 30% and 60% design documents to meet the master plan. The additional scope of services are as follows: a) 30% Design Documents - The CONSULTANT will re-analyze, re-design and provide supporting calculation as necessary for the re-alignment of Atlantic Blvd. as well as the parking lots, walkways, and park features as described in the contract documents. CONSULTANT will submit a new 30% level design document with a justification report describing in detail all the recommended deviation from the master plan and the engineering/architectural reasons for the deviation. The COUNTY will present these ---- ---- documents to the City of Key West Planning Director for review and comment. b) 60% Design Documents - Upon approval by the City of Key West, the CONSULTANT will proceed to finalize and re-submit the 60% design documents as described in the original contract and I" amendment. c) Submittals--Construction Plan submittals will be based on the following phases: • Phase One-30%plans will contain the following: o Key Sheet (will be under originally scoped plan set) . a General Notes(will be under originally scoped plan set) o Preliminary Roadway and Parking Lot Layout --(1"40') o Preliminary Dog Park Layout-(I"=40') o Preliminary Walkway Layout -(I"=40') o Preliminary Landscape and Hardscape Layout - for dog park and connectivity walkways(I"=40') o Preliminary Racquetball and Pickle-Ball court Layout o Preliminary Civil Site, Landscape, and Hardscape Details o Preliminary Probable Opinion of Costs • Phase One Submittal - The phase one (30%) plans package will be transmitted to the COUNTY's Project Manager in II" X 17" hard copy format with a CD containing all files and associated calculations and reports, as well as the Justification Report addressed to the City of Key West. • Phase One Review - The COUNTY will distribute plan sets to all affected parties for a three week review period including the City of Key West Planning department for approval of the master plan deviations. At the conclusion of the review period the COUNTY's project Manager will transmit all comments to CONSULTANT for comment resolution and disposition. CONSULTANT will provide all comments in spreadsheet form to the COUNTY's Project Manager with all comments addressed. CONSULTANT and COUNTY's Project Manager will meet within one week after submitting comment spreadsheet to address and provide final disposition of all comments before proceeding to Phase Two(60%)plans. • Phase Two-60%plans will contain the following: o Key Sheet(will be under originally scoped plan set) o General Notes(will be under originally scoped plan set) o Tabulation of Quantities o Roadway and Parking Lot Layouts-Paving, Grading,and Drainage(I"=40') o Dog Park Layout-Paving, Grading, and Drainage(1"=40') o Walkway Layout-Paving, Grading, and Drainage(1"=40') o Landscape and Hardscape Layout - for dog park and connectivity walkways (will not be additional scope and included under originally scoped plan set as a true 60%package was not submitted for Landscape and Hardscape) o Racquetball and Squash Court Layout(will be under originally scoped plan set) o Racquetball and Pickle-Ball court Arch./Struct.Drawings (will be under originally scoped plan set) o Civil Site,Landscape,and Hardscape Details o Drainage Details (NTS) o Special Details(NTS) o Drainage Calculation o Permit Application responses and coordination o Probable Opinion of Costs • Phase Two Submittal - The Phase Two (60%) plans package will be transmitted to the COUNTY's Project Manager in II" X 17" hard copy format and with a CD containing all files and associated calculation and reports. • Phase Two Review - The COUNTY will distribute plan sets to all affected parties for a three week review period. At the conclusion of the review period the COUNTY's Project Manager will transmit all eonuncnts to CONSULTANT for comment resolution and disposition. CONSULTANT will provide all comments in spreadsheet form to the COUNTY's Project Manager with all comments addressed. CONSULTANT and COUNTY's Project Manager will meet within one week after submitting comment spreadsheet to address and provide final disposition of all comments before proceeding to Phase Three(100%)construction documents and specifications. • Phase Three — 100% Plans shall be submitted per the previously approved contract and amendment. 2) Article VII, 7.1.1 of the contract dated August 20, 2014 is revised as follows: The COUNTY shall pay the CONSULTANT monthly, in current funds for percentage of progress completed for each task. The total not to exceed amount of $575,708.70 includes this 2nd Amendment of $48,918.00. 3) Article II, 2.3 of the contract dated August 20,2014 is revised as follows: Delete: Ms. Patricia(Trish) Smith, AICP Monroe COUNTY Transportation Program Manager 102050 Overseas Highway,Room 212 Key Largo, Florida 33037 Add: Mr. Doug Sposito, Director of Project Management 1100 Simonton Street —Room 2-216 Key West, FL 33040 4) In all other respects, the original Contract dated August 20,2014 and as amendment on March 18, 2015 remains unchanged. IN WITNESS WHEREOF, each party caused this Agreement to be executed by its duly authorized rep .ve on the day and year first written above. b<r, r•'A, Clerk BOARD OF COUNTY COMMISSIONERS i { ti OF M ( COUNTY, FLORID /�y/1JL.e Innl lZ 1 By: . '°•.y + 'epu , Clerk Mayor/Chairman by Date: erev"�'•",, __ONLY E$ANMMA r., arcawssaxt�atem (Seal) - txmaes za,2mr CONSU ITANT " Bonded Initiatory Attest: ii — — a nclenpt" T.Y. LIN TE' i AL/HJ ROSS By: a ,CIA_ l C 1,.1 ' • By: Fanoi$`• 3. A ots oiPg Title: LA,LV.I 1 ! 1 At a a l' t Title: P‘s<as.."C.- US..- 4w)0.---1 1 J COUP) P""' "rd JVED ii� P d PEC1[ ASSISTAN1 v - ate IY L L5