12/14-45 Drainage Reconstruction Phase 2 & 3r MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Effective Date Client Project No. Task Order No. 12/14 -45 Engineer Project No. E9Y16745 This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County, Florida ( "Client') and JACOBS PROJECT MANAGEMENT CO. ( "Consultant'), dated November 16, 2011 ( "Agreement'). The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized: Drainage Reconstruction Phase 2 & 3 — EYW — PSO #45 Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of 7 page(s). Pricing N/A Time and Expense per Agreement and Appendix B to the Agreement. X Firm Fixed Price of $ 239,000.00 N/A Other (Describe): Schedule Services may commence on Execution Services will cease by 365 days Other (SEAL) File: MSTR APS — Monroe County BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA By May(Wha CONSULTANT• J ACOBS :EMENT CO By Title AtAuar- ofpa&r n'.4�ot4 F✓� CCU�TY AT i�C°�?EY VE Page 1 of 1 ASS J ,. u i � M ,L,i, EY Exhibit A — (12114 -45) Scope of Services Monroe County Airports Key West International Airport Drainage Reconstruction Phase 2 & 3 — PSO #45 SCOPE OF WORK Jacobs will provide project management, design, permitting and bid phase services for the Drainage Reconstruction Phase 2 & 3 at the Key West International Airport (EYW). BACKGROUND As part of a previous task order, Jacobs prepared an Emergency Drainage Corrective Action Plan for EYW to alleviate flooding on the airfield during storm events that were affected by tidal conditions. In addition, Jacobs performed design and bid phase services for Drainage Reconstruction Phase 1 which consisted of the construction of drainage improvements including exfiltration trench on the west side of the airfield and the rehabilitation of existing drainage wells. Part of the original scope of work in Phase 1 that was not constructed due to lack of available funding was the construction of exfiltration trench on the east side of the airfield, re- grading of turf along the taxiway shoulders, and the installation of backflow prevention devices in the existing drainage wells. These items will be included in the bid documents for this project. DESCRIPTION OF WORK The additional scope of work included in this project consists of the following elements- • Design of additional interconnecting drainage pipes on the airfield • Design of a low berm along the perimeter fence as shown on the attached drawings. • Design of injection drainage wells as shown on the attached drawings Article A — 30% Design The 30% design of the drainage reconstruction will be based on the previously prepared corrective action plan. Additional tasks necessary to develop 30% construction drawings will be completed as outlined below: • Attend (1) project kick -off meeting with the Airport during this phase. • Perform a topographic survey of the proposed improvement areas • Perform a geotechnical investigation • Perform due diligence to determine conceptual design for proposed drainage wells. • Evaluate potential bid alternates and alternatives for the construction based on available funding sources • Develop the project construction schedule • Develop the project construction costs • Develop an outline of the technical specifications required • Develop the Engineer's Report to 30% completion • Perform preliminary hydraulic design for pumps and associated piping • Develop the Construction Drawings including the following: • Title Sheet (1 Sheet) • General Plan (1 Sheet) Page 1 of 7 • Notes and Summary of Quantities(1 Sheet) • General Safety and Phasing Plan(1 Sheet) • Detailed Safety and Phasing Plan(5 Sheets) • Existing Conditions Plan (6 Sheets) • Geotechnical Boring Logs and Location plan(1 Sheets) • Preliminary Drainage Plans (6 Sheets) • Additive Bid Plans (4 Sheets) • Typical Sections (Pavement and Berm) (1 Sheet) • Preliminary Drainage Details (2 Sheets) • Preliminary Drainage Well Details (3 Sheets) • Preliminary Pump Plans & Details (5 Sheets) Conduct an in -house QA/QC review. The in -house QA/QC check will involve an experienced independent individual, depending on each discipline, to conduct a comprehensive check on all documents to be submitted (i.e. plans, specifications, estimates, etc.). Time will be required for engineers and CADD technicians to correct items listed under the in -house QA/QC review. Meet with Airport staff to review the 30% submittal. Address 30% Review Comments 30% Design Deliverables FAA: 2 half size copies of 30% plans, an outline of the technical specifications, and the Preliminary Engineer's Report with cost estimate. FDOT: 2 half size copies of 30% plans, an outline of the technical specifications, and the Preliminary Engineer's Report with cost estimate. County: 2 copies of the 30% plans (1 full size; 1 half size); an outline of the technical specifications, and the Preliminary Engineer's Report with cost estimate. Services for Article A will be provided under a lump sum basis. Article B — 60% Design The 60% design of the drainage reconstruction will be based on the 30% design submittal. Additional tasks necessary to develop 60% construction drawings will be completed as outlined below: • Attend (1) project construction phasing meeting during this phase with the Airport, project stakeholders and the ATCT. • Attend a pre - application meeting with the SFWMD to discuss the project scope and permit requirements. • Coordinate with the electric utility to confirm the location and capacity of proposed electrical service points. • Develop a preliminary Construction Safety and Phasing Plan for review by the Airport and FAA • Update the project construction schedule • Update the project construction costs • Develop preliminary pavement design for reconstruction areas Page 2 of 7 • Develop technical specifications to 60% completion and incorporate Monroe County Front End documents • Develop the Engineer's Report to 60% completion • Update hydraulic design for pump and associated piping • Perform preliminary structural design for drainage wetwell. • Update the Construction Drawings including the following: • Title Sheet (I Sheet) • General Plan (1 Sheet) • Notes and Summary of Quantities(1 Sheet) • General Safety and Phasing Plan(1 Sheet) • Detailed Safety and Phasing Plan(5 Sheet) • Existing conditions plan (6 Sheets) • Geotechnical boring logs and location plan(I Sheet) • Grading and Drainage Plans (6 Sheets) • Additive Bid Plans (4 Sheets) • Typical Sections (Pavement and Berm) (1 Sheet) • Drainage Details (2 Sheets) • Drainage Well Details (3 Sheets) • Pump Plans & Piping Details (5 Sheets) • Erosion Control Plans and Details (6 Sheets) • Electrical Plan (5 Sheets ) • Conduct an in -house QA/QC review. The in -house QA/QC check will involve an experienced independent individual, depending on each discipline, to conduct a comprehensive check on all documents to be submitted (i.e. plans, specifications, estimates, etc.). Time will be required for engineers and CADD technicians to correct items listed under the in -house QA/QC review. • Meet with Airport staff to review the 60% submittal. • Address the 60% Review comments 60% Design Deliverables FAA: 2 half size copies of 60% plans and a CD containing the drawings, project manual and specifications, and Engineer's Report with cost estimate. FDOT: 2 half size copies of plans; and a CD contianing the drawings, project manual and specifications, and Engineer's Report with cost estimate. County: 2 copies of plans (1 full size; 1 half size); 2 copies of project manual and specifications; 2 copies of Engineer's Report with cost estimate. Services for Article B will be provided under a lump sum basis. Article C — 90% Design Based on the review comments from Article B, the design of the draiange reconstruction will be developed to 90% completion. Additional tasks necessary to develop 90% construction drawings will be completed as outlined below: • Attend (1) project design progress meeting during this phase • Prepare and submit SFWMD permit application and respond to one (1) request for additional information Page 3 of 7 • Prepare and submit to SFWMD a Reasonable Assurance Report for the proposed drainage wells. • Finalize the Construction Safety and Phasing Plan based on Airport and FAA comments • Submit at Part 7460 application through the FAA's OEAAA website. • Update the project construction schedule • Update the project construction costs • Develop technical specifications to 90% completion and incorporate Monroe County Front End documents • Develop the Engineer's Report to 90% completion • Finalize hydraulic design for pump and associated piping • Finalize structural design for drainage wetwell. • Update the Construction Drawings including the following: • Title Sheet (1 Sheet) • General Plan (1 Sheet) • Notes and Summary of Quantities(1 Sheet) • General Safety and Phasing Plan(1 Sheet) • Detailed Safety and Phasing Plan(5 Sheet) • Existing conditions plan (6 Sheets) • Geotechnical boring logs and location plan(1 Sheet) • Grading and Drainage Plans (6 Sheets) • Additive Bid Plans (4 Sheets) • Typical Sections (Pavement and Berm) (1 Sheet) • Drainage Details (3 Sheets) • Drainage Well Details (3 Sheets) • Pump Plans & Piping Details (5 Sheets) • Erosion Control Plans and Details (6 Sheets) • Electrical Plan (5 Sheets ) • Electrical Details (3 Sheets) • Conduct an in -house QA/QC review. The in -house QA/QC check will involve an experienced independent individual, depending on each discipline, to conduct a comprehensive check on all documents to be submitted (i.e. plans, specifications, estimates, etc.). Time will be required for engineers and CADD technicians to correct items listed under the in -house QA/QC review. • Meet with Airport staff to review the 90% submittal. • Address the 90% Review comments 90% Design Deliverables FAA: 2 half size copies of 90% plans and a CD containing the drawings, project manual and specifications, and Engineer's Report with cost estimate. FDOT: 2 half size copies of plans; and a CD contianing the drawings, project manual and specifications, and Engineer's Report with cost estimate. County: 2 copies of plans (1 full size; 1 half size); 2 copies of project manual and specifications; 2 copies of Engineer's Report with cost estimate. Services for Article C will be provided under a lump sum basis. Page 4 of 7 Article D —100% Design Based on the review comments and any permit requirements from Article C, the design of the drainage reconstruction will be developed to 100% completion. Additional tasks necessary to develop 100% construction documents will be completed as outlined below: • Finalize the Construction Drawings including the following: o Title Sheet (1) • General Plan (1) • Notes and Summary of Quantities(1) • General Safety and Phasing Plan(1) • Detailed Safety and Phasing Plan(5) • Existing conditions plan (1) • Geotechnical boring logs and location plan(1) • Grading and Drainage Plans (6 Sheets) • Additive Bid Plans (4 Sheets) • Typical Sections (Pavement and Berm) (1 Sheet) • Drainage Details (3 Sheets) • Drainage Well Details (3 Sheets) • Pump & Piping Details (1 Sheet) • Erosion Control Plans and Details (6 Sheets) • Electrical Plan (4 Sheets ) • Electrical Details (2 Sheets) • Finalize the project construction schedule • Finalize the project construction costs • Finalize the technical specifications and front end documents to 100% completion • Finalize the Engineer's Report • Participate in a Safety Risk Management (SRM) meeting with the Airport regarding the project safety and phasing. • Conduct an in -house QA/QC review prior to each submission. The in -house QA/QC check will involve an experienced independent individual, depending on each discipline, to conduct a comprehensive check on all documents to be submitted (i.e. plans, specifications, estimates, etc.). Time will be required for engineers and CADD technicians to correct items listed under the in -house QA/QC review. 100% Design Deliverables FAA: 2 half size copies of Final Plans and a CD containing the drawings, project manual and specifications, and Final Engineer's Report with cost estimate. County: 2 copies of plans (1 full size; 1 half size); 2 copies of project manual and specifications; 2 copies of Engineer's Report with costs estimate, CD containing Final Drawings and Project Manual for bidding purposes. Services for Article D will be provided under a lump sum basis. Article E — Bid Phase Services Upon completion of the construction documents and at the request of the Airport, Jacobs will prepare the project documents for bidding. Jacobs will perform bidding support services, the following terms will apply: Page 5 of 7 A. The County appoints Jacobs as its Agent, and Jacobs accepts such appointment to perform bid/procurement services on the County's behalf in connection with the project. B. Such services shall be performed under the County's direction and in accordance to such forms, terms and conditions, or modifications or revisions to same as the County may in its sole discretion at any time instruct Jacobs to use. All services shall be carried out in accordance with the procedures mutually agreed upon by the County and Jacobs. C. Jacobs shall not have authority to accept or bind the County in any way to changes, modifications, revisions, alterations, amendments, or supplemental, additional, or different terms and conditions (hereinafter referred to as "deviations ") which may be submitted or requested by a vendor or contractor. Jacobs shall immediately submit any deviations from the County's standard terms and conditions to the County for review by the County's Purchasing Manager or their representative and such deviations shall not be accepted by Jacobs unless Jacobs receives express written approval thereof from the County's Project and/or Purchasing Manager or their representative. D. All documents issued by Jacobs hereunder shall be signed by Jacobs for the County if so directed. The ownership and title of all items purchased hereunder shall pass directly from the selling party to the County, and Jacobs shall at no time be a party to such transaction other than as agent of the County. The County shall have the unilateral right to have the commitment authority of Jacobs, its employee or this limited agency authorization in its entirety revoked and cancelled at any time, with or without cause. The County shall be obligated directly to the selling party for all payments for materials, equipment, supplies and services procured hereunder. E. The County shall hold Jacobs and its employees harmless from any claims, suits or liabilities arising out of any breach or other failure of performance by any contractor, vendor or supplier under any contract or purchase order issued by Jacobs hereunder. The following task will be performed as part of the bid phase services: • Coordinate with the County Purchasing Department and the Airport to advertise for bids. • Coordinate with the County to provide electronic copies of the bid documents to prospective bidders • Prepare for and attend a project pre -bid conference • Prepare responses to address requests for information from prospective bidders • Prepare and coordinate the issuing one (1) addendum with the County purchasing department. • Revise bid documents as necessary for the addendum • Review bids for responsiveness • Prepare a bid tabulation • Make a recommendation for award based on review of the bid information submitted. Page 6 of 7 ASSUMPTIONS 1. The design will be in accordance with the most current FAA -AIP Advisory Circular listing dated February 11, 2015. 2. It is assumed that the electrical service point for the injection well on the east side of the airfield will be the electrical service for the existing pump station in that vicinity and that this service location has sufficient capacity to accommodate the pump station. 3. It is assumed that the electrical service point for the injection well on the west side of the airfield will be in the vicinity of the existing hangar development and that this service location has sufficient capacity to accommodate the pump station. 4. DEP and ACOE permits are not required based on the current scope of the project. 5. The assumed location of the existing underground utilities in the vicinity of the project will be based on existing EYW Utility Drawings by URS. Subsurface Utility Engineering is not included in the scope 6. Services not included in our scope of work include, but are not limited to, the following: • Construction phase services. • Resident project representative services • Special services not specifically listed above • Other services not described in our scope of work. PROJECT SCHEDULE: The tentative project schedule from the Notice to Proceed date will be as follows: Article A - 30% Design 90 days Article B — 60% Design 60 days Article C — 90% Design 60 days Article D — 100% Design 30 days Article E — Bid Phase Services To be coordinated with County Purchasing Department Page 7 of 7 W 1— Q F- U) W W W LL O z cr- Q O co O m C_ m . C R m O Q m R M 3 O C4 _ N U to o a c 0 �, c m 0 3 m Hl Y c O v m m m ea c • R L O a Q 0 v LU 0 OR O o _ (D J w C c c c C� cn w M d LO M e�- z M O O M O M Lr W m W o o c O p N z Qq �64 MJ� cD z 000000 LU 0 9) 000000 c O o m O r O Q O� N a It Q rn w W LL Z o0 Q 0 v LU 0 OR o _ (D J w C c c c C� cn w M d LO M e�- a M O O M O M m N o o c O p N o 460SGq Qq �64 MJ� V QmUOium 000000 0 000000 c O m Q Q Q Q Q H O� N O Cl) m N V ` LL a ly co EF>K3 Ef3�}EA 44 fA L N q7' M N N 3 O ONO CGM -V IT Cl) 't qt = v r E I Iu Q v LU U £ 7 (D J w C c c c C� cn w d rn�m'N m O O M O M m N o o c O p N IL O O O O W of) COO m V QmUOium J O m Q Q Q Q Q H JACOBS ENGINEERING GROUP Airport project: Monroe County Key West international Airport Drainage Reconstruction Phase 2 & 3 (Design and Bidding) JOB HOUR AND FEE ESTIMATE Article D: IOU'-'. Desi.n Subconsultants S - Expenses S 2.140 Cost Plus Fee Total S 20.562 FT Proj. Sr. Prot' Sr- Prsjed.,. ,. Sr. C.4DD WORK ITE%l Director 61ana er E "ncer E Designer Tech Clerical TOTAL Participate in Safty Risk Management meeting with 1 12 24 1 the Airport Finalize Technical Specifications and Front End 2 g to 2 Documents 3 Finalize Project Construction Schedule 2 2 4 4 Finalize Engineer's Report 2 4 4 4 14 5 Finalize construction quantities and cost estimate 2 2 4 1 8 6 Prepare the following plans a. Title Sheet (I Sheet) 2 2 1 b. General Plan (! Sheol c. Votes and Summary of Quantities (1 Sheet) 2 2 d. General Phasing and Safety Plan (1 Sheet) 2 2 4 e. Detailed Phasing and Safety Plan (5 Sheets) 4 4 8 E Existing Conditions H Sheet) 2 2 4 g. Geotechnical locations and bore logs ( I Sheet) 2 2 h. Grading and Drainage Plans (6 Sheets) 4 4 8 16 Incorporate Phase I Elements as Bid Alternates (4 2 2 4 Sheets) 4 j. Typical Sections i l Sheet) - - IL Drainage Details (2 Sheets) 4 4 8 1. Drainage Well Details (3 Sheets) 4 4 8 m. Pump & Piping Details (5 Sheets) 4 6 10 o. Erosion Control Plans (6 Sheets) 2 4 6 o. Electrical Plan l5 Sheets) 8 4 12 p. Electrical Details 13 Sheets) 6 2 8 7 QMQC 4 4 TOTAL HOURS 34 4 40 12 56 0 164 RATE .00 S 220 E:t S 140.0 S 123.00 S 90.00 S 85.00 S 90.00 S 58.00 -- I ROLL ESTISIATE S S 4 S 492 S 3 ,600 S 1.020 S 5.040 S - S 18.422 S S S - Task Expenses: I Rental Car (2 visits a $80/visit) S 160 1 Gas for Car Rental On -Site (2 visits) = S t00 TOTAL PAYROLL S 18,422 Subconsultants S - Expenses S 2.140 Cost Plus Fee Total S 20.562 1 Lodging (2 visits a S240ivisit) S 480 t Airfare (2 visits a S700ivisit) S 1.400 Total Expenses S 2,140 JACOBS ENGINEERING GROUP Airport: Project: Monroe County Kay 1Neat International Airport Om—ge Reconstruction Phase 2 & 3 (Design and Bidding) JOB HOUR AND FEE ESTIMATE Artide B: W% Ile — 1.14 Rental Car (_ 11.114 r S80rvlad) S 160 614 Gas fm Car Renal On -Site 0 visits) = S 100 1.14 lodging (2 risiv,(§ S240: visit) $ 480 1.14 Airfare (_ vists * S70o:v SI0 Roy Sr. hoj. Sr. Prajed 80 2 Gaston Rmt3ICar(IMPi - J.SI(X) Sr. C.ADD 100 Total Espm— S WORT rlrLr4 Dke— M-.0 r Eaghreer F eiaecr F-0— eer Dew er Teel Chid TOLLL P-cpare fa and d0md me (t) Project nakeholder y R I meeting with Airoon and ATCT Prepare ten and attend a preapPlimtim meeting with y 8 2 SFVWD 3 Coordinate with dodaic dility m service lomtions 4 8 Develop Preliminary Con asin Construction Safety and Phg.5 g 26 4 Plan fa review by Airport and FAA 1 5 Develop paveinen design far reconstntction arms Develop 60°6 Tedtoical Spraifications and Front End __ 6 Docum®ts 7 Update Project Construction Schedule _ 6 8 Develop Engineers Eldon to 50 % completion 16 8 28 Update construcam quantities and east csturute for y g 12 9 60% dacmnmts Verify hydraulic desist fa purnp and assaiated ; g In PiPmg Perform preliminary structural design fm drainage y g 16 1 l wawells 12 Prepare the following Plans rl Title Sheet (1 Short) - J b. General Plan (l Short) - - 1 e. Notes and Summary ofQu nu.(I Sheet) _ 4 6 d General Phasing and Safery Plan (1 Shea) 4 4 12 e. Detailed Phasing and Satiety Plan (6 Sheets) 8 I'_ E E fisting Conditions (j Shea) - 4 g. Gmtechniml Iona —and bare logs (I Shat) b. Grading and Drainage Plans (6 Sheers) y 16 24 48 IncorPomte Phase 1 hlaomts as Bid Alianatm(4 y g Ili Sheds) j. iypiral 3ations 0 Shed) - 1 n D,—g, Details (2 Shots) 4 8 12 I. Drainage well Ddads 0 Sheets) 1 l6 rn. Ptanp & Piping Daunts (5 Sheets) 16 o. Ermine Control Pietas (Elb—) a 8 (, o. Electrical Plan (5 Shin '_4 64 13 QAQC 5 _ 14 Revtew mating with O S 8 15 Address 60 % Renew 4 1 8 1 TOTAL HOURS 6 3' 86 0 11 18 138 0 424 RAtE S "0.00 S 195.00 5 140.00 5 123 -00 S 90.00 5 85.00 S 90.00 PAYROLL ESTRHATE S 1.3=0 S 640 S I'_.040 S - 5 10?69 5 4.080 S 1'_.4'1 5 S - L" Emenses: 1.14 Rental Car (_ 11.114 r S80rvlad) S 160 614 Gas fm Car Renal On -Site 0 visits) = S 100 1.14 lodging (2 risiv,(§ S240: visit) $ 480 1.14 Airfare (_ vists * S70o:v SI0 S 1.400 2 Remai Car (I trip 'A SWIriPs) 5 80 2 Gaston Rmt3ICar(IMPi - J.SI(X) 5 100 Total Espm— S _320 TOTAL PAYROLL S 46JO Subcousultants S - Etpensm S 2.320 Cost Pius Fa Total S 48.680 JACOBS ENGINEERING GROUP Anpert: Pr iect Monroe County Key West International Airport Drainage Reconstruction Phase 2 & 3 (Design and Bidding) JOB HOUR AND FEE ESTIMATE 4rtidu A: 9u ^ DIY ie It TOTAL PAYROLL S 33,770 Avvom & A—i lets S 25,610 Tterra South Florida S 10,000 Prot. Sr. Proj. Sr. Project Subconsultmts S Sr. C-ADD S 69.310 Exp— WO))()L"Widi Director 6fatu ^er Cost Pius Fee Total Evpocec 106,290 Tech Ckrical TOT.41. Prepare for and anmd one (1) project design kick -off 1,13 Rental Car (3 vises 'g, S801"it) 8 12 1,13 Gas for Car Rental On -Sae (3 visas) = S 150 20 I counting S 720 2 Pertorm Topographic Survey Sulwmsuilaut Avuuw &. —iaro 0 3 Perform Geotahniral lit —ugamu Subcoosultaot Tierra South Fonda 4 Perform Due Diligence Regarding Drainage Wells Sub —Runt AECOM 0 5 Evaluate Potemml Bid Alranauves 4 8 12 6 Develop outline of Teelmuai SpwfiC tfons 4 8 12 7 Develop Pmjem Coastruatmn SChednle 8 8 Develop Pretiminary Engineer's Report to 30% 8 16 4 28 8 completion Develop waunuawn yuanutim and cost mumate for 4 g ; 16 9 3n% driL m P erform hydroub, design far pump and assoicated 24 24 10 Piping 11 Prtpare the following plaru 2 2 a. Title Shea (1 Shea) b. General Plan (1 Sheaf 2 4 6 e Notes and Summany of Quamms f l Sheet) 2 4 6 d. General Phasing amd Safety Plan (I Sheet) 4 4 8 Deeaded Phmmg and Safety FlFla (6 Sheets) 4 4 4 12 E L Existing Conditwns 16 Sheer) 4 4 4 12 Gwta:hmcal local— and bore togs (1 Shunt) 2 2 4 h. Preliminary Drainage Plans (6 Sheet,) 4 8 12 Inwrpomtc Pbase 1 EI—b as Bid Al —1. (4 4 Sheets) j. Typical Seclwns (I Shunt) 4 4 8 k. Pre in wary Drainage Daails (2 Sheers) 8 8 16 L Prinary Drainage Well Daails (3 Sheds) elim 8 16 24 m. Pre)imm Pinup Pp Statmn Pl & Details l5 Shea:i 6 IU 16 12 QA QC 6 6 12 13 R,,,— meamg with Owner 8 8 14 Add— 30 %Review Comments 6 4 8 l8 TOTAL HOURS 6 22 76 U 90 24 82 0 300 RATE S 220.00 S 195.00 S 140.00 S 123.0 S 90.00 S 85.00 S 90.0 S 58.0 PAYROLL ESTIMATE S 1120 15 4290 S 10,640 S - S 8,1(10 S 2.040 S 7,380 15 -13, 33,?70 1.13 Airfare 3 —1u; d: S70Nvisa) S 2.10 m p S 3 l0 TOTAL PAYROLL S 33,770 Avvom & A—i lets S 25,610 Tterra South Florida S 10,000 AECOM S 33,700 Subconsultmts S 69.3110 S 69.310 Exp— S 3210 Cost Pius Fee Total S 106,290 Task Ememn: 1,13 Rental Car (3 vises 'g, S801"it) S 240 1,13 Gas for Car Rental On -Sae (3 visas) = S 150 1,13 Lodging (3 visas'! S240/v6a) S 720 1.13 Airfare 3 —1u; d: S70Nvisa) S 2.10 m p S 3 l0 JACOBS ENGINEERING GROUP Airport: Project: Monroe County Key Nest Intematlonal Airport Drainage Reconstruction Phase 2 S 3 (Design and Bidding) JOB HOUR AND FEE ESTIMATE TOTAL PAYROLL S 42.470 5 - S S Task Emeo 1.13 Rental Car (z visits C S80'r'isit) S 160 1.13 Gas for Car Rental On- Site (- sia a) = S 100 Subcomsultmts S - Etpeases S 2 2.140 Cost Plus Fee Twat S 44.610 I,13 its Lodging(= vis 5"I.%7t)) S 180 1.13 Abthre ( visits m S'W viap S 1.100 'i u •muses S 1-140 Pry Sr. Rej. 1r. Project G. CARD WORK UILM Dhm Eaysm 4 ' ea Teel Clerical T(YTAL. 1 Prepare for and anand.me (1) project design meeung 8 8 2 Prepare and submit the SFWMD permit application 3 _ 8 44 Prepare and submit m SF WMD a Reasmahle Subconsuhanp 3 .Asswence Report for the proposed drainage wells Finalize Construction Safay and Phasing Plan and g ; 14 4 submit 7 460 through OEAAA website dcsl Specifications and From End Develop 90°6 Tami 1 16 20 3 Documents 2 6 Update Project Construction Schedule - 7 Des'dop Engineer's Report to 90°6 completion _ 16 I6 34 Update construchw quantities and cost estimate for 1 ; 8 8 90 °6 Jocmnemts Furahze h)draWic design for Pump and associated 1 4 9 Pip g 10 Finalize structural design for drainage wmrells 4 4 8 I I Prepare the fbllowmg Plans 4 a. Title Sheet (I Sheol - - 3 6 b. Gmeml Plan I I Shea) _ e. Notes and Summa o Quanuties (I Shea) Summary - 1 b d. Gemeral Phasing and Sofa) Plan (I Shea) 1 3 8 e. Detailed Phasing and Safety Plan (S Sheets) 1 8 12 i L Euswog Condiums (I Shat) - g Gaotechniwl locations and bore Logs (t Shea) - - 1 h. Grading and Drainage Plans (6 Sheets) 4 16 , 44 . Incoriv -'t Phase l Elements as Bid:Utemates (4 ; 4 8 Sheets) 4 j. Typical Sections (1 Shat) k. arls(Sbeetsl Dramage Da 2 - 4 3 8 1. Drainage W'etl Derails (3 Sheets) S 8 16 m Pump & Piping Details (5 Sheets) 6 I IS 3 6 o. Erosion Con- —16 Sheds) - o. Electrical Plan (5 Sheers) '_0 _0 JO p. Electrical DetaiLs (3 Sheets) �4 16 J0 11- QAQ(' ; 1 6 13 Review meeting with Owner 8 B 14 Address 911 °a Review Comments 3 3 g 16 TOT.. -U. HOURS 4 22 74 0 1'_6 38 L'8 0 402 RATE S ' 5 195.00 5 140.W S 1_ 00 S 90.00 S 85.00 S 90.00 S 58.00 -- PAYROLL ESTLMATE S 880 S ;'9U 5 10.360 S - 5 11.340 S 3,080 S 71,5 S - S 42.470 TOTAL PAYROLL S 42.470 5 - S S Task Emeo 1.13 Rental Car (z visits C S80'r'isit) S 160 1.13 Gas for Car Rental On- Site (- sia a) = S 100 Subcomsultmts S - Etpeases S 2 2.140 Cost Plus Fee Twat S 44.610 I,13 its Lodging(= vis 5"I.%7t)) S 180 1.13 Abthre ( visits m S'W viap S 1.100 'i u •muses S 1-140 JACOBS ENGINEERING GROUP Airport: Proj ect: Monroe County Key West International Airport Drainage Reconstruction Phase 2 8: 3 (Design and Bidding) JOB HOUR AND FEE ESTIMATE TOTAL PAYROLL S 16.626 Subconsultants S - Expcnses S 2,010 Cost Plus Fee Total S 18,636 Task Expenses: 2 Rental Car (I visit A S80ivisit) S 80 Gas for Car Rental On -Site (1 visit) $ 50 2 Lodging (2 visits g 5240 /visit) S 480 2 Airfare (2 visits d S700rvisit) S (,400 Total xpenses S 2,010 WORK ffEm _... _. Proj. Director Se. Proj. Manager Sr. Engineer Project Engineer Engineer Designer Sr. CADD Tecb Clerical TOTAL. ' I Coordinate bid ads cruscment and posting ofbid documents with the County 5 16 2 Prepare for and attend the Pre -Bid Conference I- - 4 28 3 Prepare responses to RFIs, Issue Addenda a 15 1 40 4 Revisions to Bid Drawings a 8 S 4 32 Review Bids for Responsiveness 1 4 8 6 Prepare a Bid Tabulation a 6 10 7 Make Recommmendation for Award 2 2 4 TOTAL HOURS 0 38 12 0 36 0 d3O 12 138 RATE S 220.00 S 195.00 S 140.00 S 123.00 S 90.00 S 85.00 S 5 58.00 - -- PAYROLL ESTIMATE S - S 7,410 S 1,680 $ - S 3,240 S - $S S 696 S 16 ,626 TOTAL PAYROLL S 16.626 Subconsultants S - Expcnses S 2,010 Cost Plus Fee Total S 18,636 Task Expenses: 2 Rental Car (I visit A S80ivisit) S 80 Gas for Car Rental On -Site (1 visit) $ 50 2 Lodging (2 visits g 5240 /visit) S 480 2 Airfare (2 visits d S700rvisit) S (,400 Total xpenses S 2,010