12/14-56 Hangars Add. DesignA MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Effective Date Client Project No. Task Order No. 12/14 -56 Engineer Project No. E9Y16756 This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County, Florida ( "Client ") and JACOBS PROJECT MANAGEMENT CO. ( "Consultant "), dated November 16, 2011 ( "Agreement ") as ammended by Amendment #1, dated October 17, 2012 ( "Addendum "). The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized: MTH Hangars Additional Design, FBC Update & Phased Package. Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of 6 page(s). Pricing N/A Time and Expense per Agreement and Appendix B to the Agreement. X Firm Fixed Price of $ 58,702.00 N/A Other (Describe): Schedule Services may commence on Execution Services will cease by 365 days Other BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA By T N6 or/Qoirman CONSULTANT: J ACOBS PROJECT MAN EMENT CO B Title t5 �_ V (P Page 1 of 1 Exhibit A — Scope of Work (12/14 -56) Monroe County Florida Keys Marathon International Airport New Storage Hangars — Additional Design, FBC Update & Phased Package — PSO # 56 EXISTING CONDITIONS The existing site is undeveloped with a Florida Department of Transportation easement located on the south side of the property. Existing potable water, sewer, and electric utility services are available on the south side of the property along Rick Turner Rd. Jacobs previously provided site planning and preliminary engineering for the development of 11 new hangars at the Florida Keys Marathon Airport under separate task order, PSO #11. Jacobs also provided detailed design services and bidding for the hangars and associated site development. Jacobs provided civil, architectural, structural, mechanical, electrical and plumbing engineering documents for a new 20,400 square foot +/- (11 bays within 2 buildings) aircraft hangars for the storage of aircraft located at the Florida Keys Marathon Airport in Marathon, PSO #34. The eleven shade hangars on the northeast side of RW 25 along Taxiway E have exceeded their useful life span and are also within the Runway Protection Zone (RPZ) of Runway 25. These shade hangars will be demolished after the construction of the eleven new hangars on the southeast side of RW 25 along Taxiway A, therefore removing the RPZ obstruction. Jacobs also develop the detailed civil design documents to include the demolition of the existing shade hangars and associated paved hangar pads and taxiway connectors in PSO #34. This project was previously bid but the proposals exceeded the funding sources. Therefore, this project will be repackaged to accommodate a phased construction. SCOPE OF WORK Jacobs will provide additional design services, review and incorporate additional requirements of the new Florida Building Code (FBC) 5 th Edition - 2014, and repackage the Construction Documents to accommodate phased construction for grant funding purposes for the New Storage Hangars project at The Florida Keys Marathon International Airport (MTH). DESCRIPTION OF WORK The additional design services, FBC implementation, repackage of Construction Documents for phased construction and construction phase services will provide the following: ARTICLE A — ADDITIONAL DESIGN SERVICES Page 1 of 6 During the detailed design phase of the New Storage Hangars the adjacent hangars needed to be reviewed to establish building separations required by the FBC and the National Fire Protection Association (NFPA) codes. At the 30% it was determined that the adjacent Hangar was not built to code which ultimately had impacts on the configuration of the planning approved New Storage Hangars and the overall hangar configuration and required a redesign. A site visit was required to investigate the existing conditions of the adjacent hangar and additional codes review for that hangar was necessary. Drawings of the hangar in question were developed to support the investigative process. After the data collection was complete a meeting with the Monroe County Fire Review was held to discuss our code interpretation and our approach to the fire protection of the new hangar. It was determined that the best solution was to change the layout of the new hangars which required substantial change to the design drawings. In addition, deep foundations were required for the new hangars as mandated by Monroe County Amendments to the FBC. This required significant additional structural foundation engineering and design. The previously completed Geo Technical Report had to be revised with additional calculations to accommodate deep foundation design. This task was completed by our sub consultant Tierra South Florida. The specific tasks Jacobs will perform are: Data Collection 1. Perform site visit to review adjacent Antique Air hangar Building Design 1. Develop alternate hangar layouts and review with owner and tenants 2. Revise all of the design documents; Civil, Structural, Architectural, Mechanical, Electrical and Plumbing engineering to accommodate a new hangar configuration approved by the owner and tenants. 3. Additional Structural design and engineering to accommodate deep foundations. 4. Additional calculations required for the Geotechnical report to accommodate deep foundations. Work performed by Tierra South Florida. 5. Additional QA/QC on revised hangar layout drawing set. Civil Design 1. Develop alternative site plans with reconfiguration of the proposed hangars in accordance with FBC and NFPA based on the condition of the adjacent Antique Air hangar. 2. Modify the site plan to accommodate the relocation of the existing Sherriffs trailer and modify entrance to avoid existing trees. Page 2 of 6 3. Revise all of the civil design documents including site plan, grading and drainage plan, and utility plan based on new hangar configuration approved by the owner and tenants. 4. Update the project quantities based on revised civil documents 5. Additional QA/QC on updated civil drawing set. Services for Article A will be provided under a lump sum basis. ARTICLE B — FBC IMPLEMENTATION & PHASED PACKAGE The existing construction documents, based on the 2010 Florida Building Code (FBC), will be updated to include the requirements of the newly implemented FBC 5 th Edition 2014. In addition the Construction Documents will be repackaged to allow phased construction to accommodate grant funding. The specific tasks Jacobs will perform are: Data Collection 1. Code research for the new 2014 FBC and applicable codes, all disciplines, structural, architectural, mechanical, electrical, and plumbing. Building Design 1. Implement the requirements of the new FBC and applicable codes in the Construction Documents; all disciplines, structural, architectural, mechanical, electrical, and plumbing. 2. Assemble the revised Construction Documents into two separate packages to accommodate distinct grant funding sources. Documents shall include the final drawings for following: • Title sheet including index of drawings, abbreviations, schedule of material indications, and schedule of notations and symbols. • An area location map and legal description of property. • Life - safety plans to show exit strategy, rated doors, emergency wall openings and ramps. Fire extinguishers, emergency lighting, exit signs, smoke and fire dampers, and other life safety- equipment relevant to the facility shall be indicated by symbol. • Floor plans including: All dimensions and any target notes explaining the extent of work, wall types, or other component, assembly or direction regarding the construction. • Exterior elevations showing location of the rain water leaders, openings and light fixtures. • Interior elevations showing all restroom elevations. • Building and wall sections to establish vertical controls and construction types for the Project. • Details of the following: Doorjamb, head and sill conditions. Wall types. Window head, sill and jamb conditions. Interior signage to include room identification, emergency exiting and equipment signs, and any other items pertinent to the identification of the project. • Room finish and door schedules coordinated with the floor plans. Page 3 of 6 • Structural Engineering foundation plans, structural schedules and details. • Structural foundation analysis and calculations. • Mechanical Engineering: Detail of ventilation system (if required) to communicate the design intent and coordination with other disciplines. • Electrical Engineering: Drawings for lighting, including circuiting and luminaire identification and switching. Convenience outlets and circuiting. Power systems and equipment. Panel schedules, applicable installation details, general legend and abbreviations. • Construction Phasing Plan • Site Plan • Site Details • Pavement Marking Plan • Utility Plan & Details • Grading and Drainage Plan & Details • Erosion Control Plan & Details • Existing Site Plan for Phase 2 • Demolition Plan for Phase 2 • Paving Plan & Details for Phase 2 • Address comments from client and permitting agencies. 3. Revise Project Manual and technical specifications. 4. Revise Design Report, Cost Estimate and schedule 5. Coordinate and distribute plans. 6. Quality Assurance and Quality Control (QA/QC) 7. Address permitting comments Civil Design 1. Update Technical Specifications and Bid Form 2. Update construction quantities and cost estimate for two (2) bid schedules 3. Update construction drawings including landscape plans into two (2) bid schedules 4. Attend up to two (2) coordination meetings with the County. 5. Coordinate with FDOT to modify existing drainage easement. Services for Article B will be provided under a lump sum basis. Article C — Bid Phase Services Upon completion of the construction documents and at the request of the Airport, Jacobs will prepare the project documents for bidding. Jacobs will perform bidding support services, the following terms will apply: Page 4 of 6 A. The County appoints Jacobs as its Agent, and Jacobs accepts such appointment to perform bid /procurement services on the County's behalf in connection with the project. B. Such services shall be performed under the County's direction and in accordance to such forms, terms and conditions, or modifications or revisions to same as the County may in its sole discretion at any time instruct Jacobs to use. All services shall be carried out in accordance with the procedures mutually agreed upon by the County and Jacobs. C. Jacobs shall not have authority to accept or bind the County in any way to changes, modifications, revisions, alterations, amendments, or supplemental, additional, or different terms and conditions (hereinafter referred to as "deviations ") which may be submitted or requested by a vendor or contractor. Jacobs shall immediately submit any deviations from the County's standard terms and conditions to the County for review by the County's Purchasing Manager or their representative and such deviations shall not be accepted by Jacobs unless Jacobs receives express written approval thereof from the County's Project and /or Purchasing Manager or their representative. D. All documents issued by Jacobs hereunder shall be signed by Jacobs for the County if so directed. The ownership and title of all items purchased hereunder shall pass directly from the selling party to the County, and Jacobs shall at no time be a party to such transaction other than as agent of the County. The County shall have the unilateral right to have the commitment authority of Jacobs, its employee or this limited agency authorization in its entirety revoked and cancelled at any time, with or without cause. The County shall be obligated directly to the selling party for all payments for materials, equipment, supplies and services procured hereunder. E. The County shall hold Jacobs and its employees harmless from any claims, suits or liabilities arising out of any breach or other failure of performance by any contractor, vendor or supplier under any contract or purchase order issued by Jacobs hereunder. The following task will be performed as part of the bid phase services: • Coordinate with the County Purchasing Department and the Airport to advertise for bids. • Coordinate with the County to provide electronic copies of the bid documents to prospective bidders • Prepare for and attend a project pre -bid conference • Prepare responses to address requests for information from prospective bidders • Prepare and coordinate the issuing one (1) addendum with the County purchasing department. • Revise bid documents as necessary for the addendum • Review bids for responsiveness • Prepare a bid tabulation Make a recommendation for award based on review of the bid information submitted. Page 5 of 6 QUALIFICATIONS AND ASSUMPTIONS For the purpose of providing a stipulated fee amount, this proposal has ben based on the following qualifications and assumptions: ■ Jacobs Project Management Company will invoice on a percent complete, including expenses, to compensate the level of effort required for each assignment. COMPENSATION See attached spreadsheet. PROJECT SCHEDULE The tentative complete project schedule is as follows: Item Duration (Calendar Days) Article A — Additional Design Services 15 days Article B — FBC Implementation & Phased Package 90 days Page 6 of 6 JACOBS ENGINEERING GROUP 09.18.15 Airport: Monroe County Florida Keys Marathon International Airport Project: New Storage Hangars - Additional Design, FBC update & Repackage (12/14 -56) FEE SUMMARY BASIC SERVICES Article C: Bid Phase Services N/A TOTAL BASIC SERVICES LUMP SUM PROJECT FEE 456 $ 58,702 Hours Fee Article A: Additional Design Services - Data Collection 24 $ 4,931 Article A: Additional Design Services - Building 88 $ 10,741 Article A: Additional Design Services - Civil 44 $ 4,650 Article B: FBC & Phased Package - Data Collection 42 $ 4,614 Article B: FBC & Phased Package - Building 148 $ 14,306 Article B: FBC & Phased Package - Civil 110 $ 19,460 Article C: Bid Phase Services N/A TOTAL BASIC SERVICES LUMP SUM PROJECT FEE 456 $ 58,702 JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Florida Keys Marathon International Airport Project: New Storage Hangars-Additional Design,FBC update&Repackage(12/14-56) krticle A:.Xdditional Design Services-Data Collection Olik Sr. Sr. c r Sr.Project Project Structural Mechanical Sr. Electrical CADD WORK ITEM Manager Architect Engineer Engineer Engineer Engineer Tech Clerical TOTAL 1 Perform site visit 8 8 s 24 TOTAL HOURS 8 8 0 8 0 0 0 0 24 RATE $ 195.00 $ 100.00 $ 113.00 $ 110.00 $ 75.00 $ 130.00 $ 60.00 $ 58.00 -- PAYROLL ESTIMATE $ 1,560 $ 800 $ - $ 880 $ - $ - $ - $ - $ 3,240 Task Subconsultants TOTAL PAYROLL $ 3,240 Total Subconsultants Subconsultants $ Expenses $ 1,691 Lump Sum Fee Total $ 4,931 Task Expenses: Mileage(380 miles round trip @ 1 $0.555/mi)x 1 S 211.00 1 Airfare($700 round trip)x 1 $ 700.00 TOTAL FEE S 4,931 1 Meals and Per Diem($70)x 4 $ 280.00 1 Lodging($225 pr/ngltt)x 2 $ 500.00 Reproduction/Misc. $ - Total Expenses $ 1,691.00 JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Florida Keys Marathon International Airport Project: New Storage Hangars-Additional Design,FBC update 8 Repackage(12/14-56) Article A:Additional Design Services-Building Sr.Project Project Sr.Structural Sr.Mechanical Sr.Electrical WORK ITEM Stanager Architect Engineer Engineer Engineer Engineer ('ADD Tech Clerical TOTAL I Develop alternate hangar layouts 2 10 2 Revise the following plans General Notes,Abbreviations&Code info a(3) I l b General Plan/Reference Site Plan(I) 44 9 c Life Safety Plan(1) 2 4 I d Architectural Plans(4)(Floor plan&RCP) 8 2 10 e Architectural Elevations(I) 2 4 6 f Building sections(4) 2 2 4 g Foundation Plan(2) _ 4 6 h Structural Schedules&Details(2) 2 4 6 i Typical Sections(2) _ _ 4 j Site Electrical(I)and Floor Plans(2) I 4 5 k Enlarged Plan(I),Electrical Details(1)and I I Specifications Sheet(I) I Plumbing Plan(3) 1 4 m Mechanical Plans(3) I 4 5 3 Structural design deep foundations • 2 10 4 Geotechnical Report revised report Tierra South Florida 5 QA/QC 2 2 TOTAL HOURS 0 21 12 5 11 1 38 0 88 RATE S 195.00 S 100.00 S 113.00 S 110.00 S 75.00 S 130.00 S 60.00 S 58.00 PAYROLL ESTIMATE S - S 2,100.00 S 1,356.00 S 550.00 S 825.00 S 130.00 S 2,280.00 S - $ 7,241.00 Task Expenses: TOTAL PAYROLL S 7,241 Subconsultants S 3,500 Expenses S Lump Sum Fee Total S 10,741 Ink Subconsultants Tierra South Florida $ 3,500.00 TOTAL FEE S 10,741 JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Florida Keys Marathon International Airport Project: New Storage Hangars-Additional Design,FBC update 8 Repackage(12/14-56) 8rticle B:EH( S Phased Package-(-is it Proj. Sr.Proj. Sr. Project Sr.CADD WORK ITEM Director Manager Engineer Engineer Engineer Designer Tech Clerical TOTAL Develop alternative site plans with reconfiguration of 1 the proposed hangars in accordance with FBC and 2 NFPA based on the condition of the adjacent Antique l- Air hangar Modify site plan to accommodate relocation of existing 2 Sherrills trailer and avoid existing trees 2 2 8 1- Revise civil documents including site plan.grading and drainage plan,and utility plan. 2 2 8 2 14 4 Update project quantities based on revised civil 2 2 4 documents. 5 Additional QA/QC on updated civil documents 2 2 TOTAL HOURS 0 2 8 8 0 24 0 2 44 RATE S 220.00 S 195.00 S 140.00 S 123.00 S 90.00 S 85.00 S 90.00 S 58.00 PAYROLL ESTIMATE S - S 390 S 1,120 S 984 S - S 2.040 S - S 116 S 4,650 TOTAL PAYROLL S 4,650 S Subconsultants S - Expenses S Cost Plus Fee Total S 4,650 Task Eanenses: Rental Car(0 visits(r�,S65/visit) Gas for Car Rental On-Site= Lodging(0 visits($225/visit per person) Airfare(0 visits @ S700/visit per person) Misc Total Expenses 5 - 101.kl.I F.F. S 4,6'(1) JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Florida Keys Marathon International Airport Project: New Storage Hangars-Additional Design,FBC update&Repackage(12/14-56) Article B:FBC&Phased Package-Data Collection -- - Sr. Jr. Sr. Electrical Sr.Project Project Structural Mechanical CADD �iORI<ITEM Manager Architect Engineer Engineer Engineer Engineer 'Tech Clerical TOTAL, 1 Code Research FBC Revision 2 8 8 8 8 42 TOTAL HOURS 2 8 8 8 8 8 0 0 42 RATE S 195.00 $ 100.00 $ 113.00 $ 110.00 $ 75.00 $ 130.00 $ 60.00 $ 58.00 — PAYROLL ESTIMATE S 390 $ 800 $ 904 $ 880 $ 600 S 1,040 $ - S - S 4,614 Tuk Subconsultants TOTAL PAYROLL $ 4,614 Total Subconsultants Subconsultants $ - Expenses $ Lump Stun Fee Total S 4.6 14 Task Expenses: TOTAL FEE $ 4,614 Total Expenses $ - r JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport Florida Keys Marathon International Airport Project: New Storage Hangars-Additional Design,FBC update&Repackage(12/14-56) Article B:FBC&Phased Package-Building Sr.Project Project Sr.Structural Sr.Mechanical Sr.Electrical WORK ITEM Manager Architect Engineer Engineer Engineer Engineer C ADD Lech Clerical TOTAL Implement Requirements of the 2014 I&2 FBC&assemble Construction Documents into two phases Revise the following plans a.Title Sheet(l) I 2 3 b.General Notes,Abbreviations&Code info I I I 4 8 (3) c.General Flan/Reference Site Plan(I) I 4 5 d.Life Safety Plan(1) I I 2 e.Architectural Plans(4)(Floor plan&RCP) 4 I S f.Architectural Elevations(I) I 2 3 g.Budding sections(4) I 2 3 h.Architectural Schedules and Details(I) 4 10 14 i.Foundation Plan(2) 4 10 14 j.Structural Schedules&Details(2) 2 10 12 k.Typical Sections(2) 2 8 10 I.Site Electrical(1)and Floor Plans(2) 4 8 12 Enlarged Plan(1),Electrical Details(I)and m.Specifications Sheet(1) I 4 5 n.Plumbing Plan(3) 2 4 6 o.Mechanical Plans(3) 2 3 Revise Project Manual and Technical Spas. _ 4 2 2 2 2 4 Revise Design Report 4 2 2 2 10 5 Coordinate and distribute plans 4 4 6 QA/QC 4 4 2 2 2 14 7 Address permitting comments No Charge 0 TOTAL HOURS 11 29 15 II 0 12 68 2 148 RATE S 195.00 S 100.00 S 113.00 S 110.00 S 75.00 S 130.00 S 60.00 S 58.110 PAYROLL ESTIMATE S 2,145.00 S 2,900.00 S 1,695.00 S 1,210.00 S - 'S 1,560.00 S 4,080.00 S 116.00 $ 13,706.00 Task Expenses: TOTAL PAYROLL S 13,706 Printing 10044 submission Plans-4 sets C S50/set S 200.00 Specifications-4 sets C 550/set) S 200.00 Subeonsultants S - Misc. S 200.00 Expenses S 600 Total Expenses S 600.00 Lump Sum Fee Total S 14,306 Task Subcensultants S - I TOTAL FEE S 14,306 JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Florida Keys Marathon International Airport Project: New Storage Hangars-Additional Design,FBC update 8 Repackage(12/14-56) Article B:FBC&Phased Package-Civil Proj. Sr.Proj. Sr. Project Sr.CADD WORK ITEM Director Manager Engineer Engineer Engineer Designer Tech Clerical TOTAL I Update Technical Specifications and Bid Form 4 4 _ 10 Update construction quantities and cost estimate for 2 2 bid schedules . 4 4 10 3 Update Constuction Drawings into 2 bid schedules 2 4 8 16 2 40 Attend up to two(2)coordination meetings with 12 12 24 County 5 Coordination with FDOT to Modify Easement 8 8 8 2 26 TOTAL HOURS 0 14 30 24 8 28 0 6 _ 110 RATE _ _ S 220.00 $ 195.00 S 140.00 S 123.00 S 90.00 S 85.00 S 90.00 S 58.00 PAYROLL ESTIMATE 5 - $ 2,730 S 4,200 S 2,952 S 720 S 2,380 5 - S 348 S 13,330 TOTAL PAYROLL S 13,330 Mitchell Planning and Design Update Landscape Plans $ 2,000 S 2,000 Subconsultants $ 2,000 Expenses S 4,130 Cost Plus Fee Total $ 19,460 Task Expenses: 4 Rental Car(2 visits @ S65/visit) S 130 4 Gas for Car Rental On-Site= S 200 4 Lodging(2 visits @ 5225/visit per person) S 900 4 Airfare(2 visits @$700/visit per person) S 2,800 Misc S 100 Total Expenses S 4,130 TOTAL HE6 S 19,460I JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Florida Keys Marathon International Airport Project: New Storage Hangars-Additional Design,FBC update&Repackage(12/14-56) t rticle D: Bid Phase Sen ices Proj. Sr.Proj. Sr. Project Sr.CADD WORK ITEM Director Manager Engineer Engineer Engineer Designer Tech Clerical TOTAL t Coordinate bid advertisement and posting of bid documents with the County 0 2 Prepare for and attend the Pm-Bid Conference 0 3 Prepare responses to RFtslssue Addenda 0 4 Revisions to Bid Drawings 0 5 Review Bids for Responsiveness 0 6 Prepare a Bid Tabulation 0 7 Make Recommendation for Award 0 TOTAL HOURS 0 0 0 0 0 0 0 0 0 RATE S 220.00 S 195.00 S 140.00 S 123.00 S 90.00 S 85.00 S 90.00 S 58.00 PAYROLL ESTIMATE S - S - S - S - S - S - S - S - S - TOTAL PAYROLL S - S Subconsultants S - Expenses $ Cost Plus Fee Total $ - Task Expenses: 2 Rental Car(I visit C$65/visit) 2 Gas for Car Rental On-Site= 2 Lodging(I visit @$225/visit) 2 Airfare(1 visits G$700/visit) Misc Total Expenses S - TOTAL FEE S -I