1st Amendment 01/20/2016AMY HEAVILIN CPA
CLERK OF CIRCUIT COURT & COMPTROLLER
MONROE COUNTY, FLORIDA
DATE: February 2, 2016
TO: Judith Clarke, Director Engineering
ATTN.• Breanne Erickson, Senior Engineering Technician
FROM. • Cheryl Robertson Executive Aide to the Clerk of Court & Comptroller
At the January 20, 2016 Board of County Commissioner's meeting the Board granted approval and
authorized execution of Items:
C5 Approval of Amendment 1 to task order with =+ 'one. for engineering design and
permitting services for Lake Surprise Estates (Key Largo)'`Woadway and Drainage Improvements
project. The amendment adds fieldwork and preliminary analysis to adapt the project for sea level rise
(SLR) projections based on 2015 tidal data for an additional fee of $27,240.
C8 Approval to award a contract to Kisinger Campo & Associates, the highest ranked respondent,
for Design & Permitting Services for the Garrison Bight Bridge Repair Project.
C9 Approval of a task order with CDM Smith, Inc. for engineering design and permitting services
for the Key Largo 11 Roadway and Drainage Improvements project. This task order is being awarded
under the On Call contract for Professional Services.
Enclosed is a duplicate original executed on behalf of Monroe County, for your handling. Should you
have any questions, please feel free to contact me.
CC: County Attorney
Finance
File
500 Whitehead Street Suite 101, PO Box 1980, Key West FL 33040 Phone: 305-295-3130 Fax: 305-295-3663
3117Overseas Highway, Marathon, FL 33050 Phone: 305-289-6027 Fax: 305-289-6025
88820 Overseas Highway, Plantation Key, FL 33070 Phone: 852-7145 Fax: 305-852-7146
AMENDMENT 1 TO TASK ORDER FOR
ON CALL PROFESSIONAL SERVICES BETWEEN MONROE COUNTY AND
EAC CONSULTING, INC.
FOR
KEY LARGO (LAKE SURPRISE ESTATES) ROADWAY AND DRAINAGE
IMPROVEMENTS PROJECT
In accordance with the Continuing Contract for On Call Professional Engineering
Services made and entered on the 16th day of January 2014 between Monroe County
hereinafter referred to as the "County" and EAC Consulting, Inc. hereinafter referred to
as "Consultant" where design services are allowed if construction costs do not exceed
$2,000,000.
All terms and conditions of the referenced Contract For On Call Professional
Engineering Services apply to the Task Order, unless the Task Order modifies an Article
of the Agreement of which will be specifically referenced in this Task Order and the
modification shall be precisely described.
This amendment is retroactively effective to December 8th, 2015.
Article II Scope of Basic Services, Paragraph 2.1.1 is amended as follows:
The scope of services for the Key Largo (Lake Surprise Estates) Roadway And Drainage
Improvements project will be revised as detailed in Attachment A to conduct fieldwork
and preliminary analysis to adapt the project for sea level rise projections based on 2015
tidal data.
Article VII Compensation, Paragraph 7.1 is amended to include the following:
The Consultant shall be paid monthly; the following additional lump sum task amount will
apply:
Task 6: Additional Services:
Tasks
Descriptions
Fee
1
Data Collection & Review - Lump Sum
$9,480.00
2
Preliminary Analysis - Lump Sum
$13,480.00
Project Management -LumSum
$3,780.00
Reimburseables
$500.00
TOTAL LUMP SUM
$27,240.00
All other details of the Task Order executed on May 21, 2014 remain in effect.
Amendment 1 to Lake Surprise Estates
EAC Consulting, Inc.
January 20, 2016
Page 1 of 6
IN WITNESS WHEREOF, each party caused the Amended Task Order to be executed
by its duly authorized representative.
Consultant
EAC Consulting, Inc.
Signature
U041,wl
Print Name/Title
Date: / 4 4 // ip
Witness:
Date Sign t6re Date
S��Y�YIk ?I YAdcX
Print Name
BOARD OF COUNTY COMMISSIONERS
OF MONROE COUNTY, FLORIDA
by:
Mayor/Ch rma
', 1. •/,�.. v
''��((/fi
(fi�(rr
((((//��11 j�lfjnff���jj j1Jj���a�� ����(}
2
M
Q
;-
O t'
W
CD
A
_
Amendment I to Lake Surprise Estates
EAC Consulting, Inc.
January 20, 2016
Page 2 of 6
Attachment A
Amendment 1 to Lake Surprise Estates
EAC Consulting, Inc.
January 20. 2016
Page 3 of 6
EAL
EAC Consulting, Ine.
December 8, 2015
Judy,
Judith S. Clarke, P.E. t,et's get this started so we can incorporate
Director of Engineering Services the best SLR info into the onstructioo. \% e
Monroe County Engineering can get B C a R atio in January
1100 Simonton St, Room 216 ke\ tm%
Key West, FL 33040
Re: Fee proposal to perform preliminary analysis to Identify adjacent properties and structures within
right of way to be Impacted by the sea level rise (SLR) considerations in Roadway and Drainage
Improvements design for Lake Surprise Estate Subdivision
Dear Ms Clarke;
EAC Consulting Inc. (EAC) is pleased to submit this fee proposal to Monroe County to provide civil engineering
rvi in reference to County's request to incorporate Sea Level Rise (SLR) considerations with respect to
infrastructure improvements proposed within Lake Surprise Estate
Backaround & Scope of Services:
Monroe County has conducted a sea level rise study and the recommendation from the study to maintain roadway
elevations at a minimum 2.93 feet NGVD. Accordingly, the County inlands to ensure compliance with units requirement
by elevating the roadways within the subdivision to accomplish a m n rot m edge of pavement elevation at 2.93 fl NGVD
and maintaining a 2% roadway cross slope cross section. The County requires EAC Consulting, Inc., to perform a
preliminary analysis to determine the following:
1. Identify the adoc ent properties of the roadways that will be impacted by raising the eevation of due roadway
2. Identify the gruetures within the right of way that *11 be impacted by the raising of the elevation of die roadway.
The Wlowvtg roadways segments are assumed to be impacted and thus will be included in the analysis.
• Long Key Road (From largo Road to North End)
• Lower Matecumbe Road (From Plantation Road b North End)
• Largo Road (From Grassy Road to Plantation Road)
• Plantation Road (From Largo Road to Upper Matecumbe Road)
• Upper Malecumbe Road (250 LF From Plantation Road)
• Lake Sutpiise 050 LF From Private Community — West End)
• Vaca Road (250 LF From West End)
• Bahia Honda Road (From East End to Largo Road)
• Big P'ime Road (From East End to Largo Road)
• Summerland Road (From East End to Overseas Highway/ US-1)
• Largo Road (From Bahia Honda Road to Big Pine Road)
Task 1— Data Collection and Review:
• §ALWtdc EAC will conduct site visits to identify any obstacle for tie-ins, harmonization, dratnage or gravity
wall construction to Incorporate in the survey and analysis Based on the amount of houses two days have been
allocated for the site visits.
Task 2 — Prallming[y Analysis:
EAC will review the sea level rise report which is provided by the County to incorporate into the analysis. The
elevation difference between the raised edge of pavement and the eAsting right of way boundary every 100 fee:
will be analyzed to determine the effect of time haaMnizalipn_
815 NW 57 Ave", Site 402 No* FL 33126 Whone 305-264-2557 I Fax' 305-2644363 1 www etucorouftcom I CA Y 70.1
Amendment I to lake Surprise Estates
EAC Consulting, Inc.
January 20, 2016
Page 4 or 6
Defterables
EAC shall flattish to the County a letter report identifying the houses that will be impacted and dvA requiring survey and
agreements between the property owners and the county for hanttorrfzation. The letter report will also identify the structures
that need to be adjusted due to the elevation change.
Schedule:
EAC Wil provide the report on December 18, 2015.
Fee and Costs:
Our tee proposal is sumunartzed as follows:
Tasks
Descriptions
Fee
1
Data Collection & Review — Lump Sum
$g 480.00
2
Preliminary — Lump Sum
$13,480.00
Pruied Management —Lump Sum
$3, 780.00
Reimburseables
$500.00
TOTAL LUMP SUM)
su 40.00
We thank you for the opportunity and look forward to work with the County on this project.
Sincerely,
EAC Consulting, Inc
Shanmin Siddi ue, P.E.
Senior Project Manager
Amendment I to take Surprise Estates
EAC Consulting, Inc.
January 20,2016
Page 5 of 6
Consutig, anc
iSNW S701A1�aue, SuTe�71
.. Fl 3312b
I842551 FAX(305}-,WV
�W-
CONTRACT FEE COMPUTATION BASIC SERVICES
Desaip6ort Lab SlrpriraAti611o1n1 Sel,rias Mama Sa teril Rw
Ittrtayal4�noer�t�
NOlACiMiY
d *
IAanlan
Wtaget
Ma tm
Sedu
Enow
Ila m
Rqed
Er4w
Wmars
Su, E4
Tetir m
Minn
TOTAL
Auy
Noul7
R*
Noun
Cost or
I 1w
i IV)
sm
16
4
m
slim
Cetec6ottandJ
d
15
+o
V
k
24
1140D
iOTAIIiIItISOIfRS
444
112
172
$7$900
50,1&00
SU,00000
$3.7102 a i> z 1 •
M740
p1Si FJMN OF COST ELE1Bn
TOBASICACTMTIES
TOTAL CON
IRACT FEE
WJATIOR
{Chid; Apptoplb &4
Iti
Tcwkt ysawycros
�2)fhget�h
a%
&bar-. yRehge 0M
(olOYxtAdrnusaNe P*d")} WS •t
SuMcW:
WTahl•SA, A
TOTAL FEE w SUM)
1101 d TOW SIM
$3.740
$3,740
$3,140
$9
OafaCderic�abiienw
TbTM
53,7�
0,4E0.00
SI3,4E0.00
$27X
S28,T40�0
Ptap w Br
FaCCOhSJIir� HC
Dew& & 2015
Br
FAcc". m "C,
Daft 0, 2015
it7,7�0
Amendment 1 to take Surprise Estates
EAC Consulting, Inc.
January 20, 2016