Item N12JXL ,# 0 AGENDA ITEM SUMMARY Meeting Date: February 10, 2016 Department: Sustainability /Projects Bulk Item: Yes — No X Staff Contact /Phone #: Rhonda Haag, 453-8774 AGENDA ITEM WORDING: Approval of Amendment No. 7 to the Contract for Engineering, Design And Permitting Services of the Demonstration Projects, with AMEC Foster Wheeler Environment and Infrastructure, Inc. to increase the scope of services to provide Additional Engineering Services related to a new sixth Canal Restoration Demonstration Project in amount not to exceed $35,365.10. ITEM BACKGROUND: Services include: Additional Assessment, Design, Procurement, Access Coordination, and Permitting Services for a Canal Restoration Demonstration Project for In -Place Muck Reduction at Canal #48 in Key Largo, or alternate located if needed, in Monroe County. The Canal #48 In place muck aeration installation project is the first project to be conducted after the initial set of the Canal Restoration Demonstration Projects, and is designed to evaluate the cost and effectiveness of utilizing an in sim aeration technology which introduces oxygen to stimulate bacteria and other organisms to degrade the accumulated muck. The presence of the muck has depleted the dissolved oxygen levels in the canal waters and the removal of the muck and addition of oxygen will help to restore the canal waters to State Department of Environmental Protection Dissolved Oxygen standards. Canal #48 in Key Largo on Sound Drive was selected utilizing the Canal Management Master Plan ranking criteria. If an access agreement for equipment cannot be obtained, alternative canals include #84 Rock Harbor, #349 CudJoe, or #345 Cudjoe. The traditional methods of reducing the amount of accumulated muck require the removal of the material and are expensive and disruptive of the use of the canal. The County wants to test alternative methods that may be less expensive for the muck removal process. This project will be the new sixth demonstration canal project to be implemented. This canal is among the worst as to water quality in the entire County. 2 1 OFIRE111,1711 PREVIOUS RELEVANT BOCC ACTION: • 12-11-13: Approval to advertise an RFQ for the design and permitting of the canal demo projects. • 02-19-14: Approval to negotiate a contract for the design and permitting of the canal demo projects. • 05-21-14: Approval of contract with AMEC for design, permitting, field assessment tasks including bathymetric surveys, mangrove assessment, tidal studies for hydraulic modeling and geotechnical studies; project management and engineering support during construction for six (6) of the seven (7) demonstration canals in unincorporated Monroe County. The Eden Pines "Pumping" project was not yet included. • 9-17-14: Approval of a Grant Agreement S-0723 from the Florida Department of Environmental Protection (FDEP) for funding of services for engineering construction support services and the installation of a culvert on Canal #472 Geiger Key that is the 3rd ranked canal demonstration project in the Canal Management Master Plan for culvert installation. The project will be funded up to $ 100,000 in funds provided by FDEP, the County will fund the remainder. 0 9-17-14: Approval of Amendment No I to provide additional services related to engineering support during construction for the 3rd ranked culvert demonstration project at Canal #472 Geiger Key as funded under DEP grant 5-0723. a 2-18-15: Approval of Amendment No. 2 to change the company name from AMEC Environment & Infrastructure, Inc. to Amec Foster Wheeler Environment & Infrastructure, Inc. and add the subcontractor 'Davis Environmental Solutions' 9 5-20-15: Approval of Amendment No. 3 to extend the contract expiration date from June 30, 2015 to December 31, 2015 at no additional cost to the County. ® 7-15-15: Approval of Scribner error correction to Amendment No. 3. * 7-15-15: Approval of Amendment No. 4 to provide additional funds for Construction Administration and Construction Engineering Inspection Services for the Organic Removal project at Canal #266 in Big Pine, and add overall project management services from July 16, 2015 through December 31, 2015. ® 10-21-15: Approval of Amendment No. 5 to increase the scope of services at Canal 4290 in the Avenues in Big Pine Key for additional budget for Construction Administration and Construction Engineering Inspection services. ® 12-09-15 Approval of Amendment #6 for an extension of project schedule, update of travel rates, and reallocation of existing funds between project tasks. a 1-20-12015 Approval of revised Amendment #6 which included missing Exhibits. CONTRACT/CONTRACT CHANGES: Additional Engineering Services related to a new sixth Canal Restoration Demonstration Project including: Additional Assessment, Design, Procurement, Access Coordination, and Permitting for a Canal Restoration Demonstration Project for In -Place Muck Reduction at Canal #48 in Key Largo, Monroe County, Florida. Additional $35,365.10 in funding. TOTAL COST: S 35,365.10 Amend 7 INDIRECT COST: BUDGETED: Yes X _No DIFFERENTIAL OF LOCAL PREFERENCE: N/A COST TO COUNTY: $ 35,365.10 SOURCE OF FUNDS: Infrastructure Funds REVENUE PRODUCING. Y,10 No X AMOUNT PER MONTH Year APPROVED BY: County Attya OMB/Purchasing�� Risk Managemen I WHOU1 I tie] *0100 1 Ira P , 011JUVIOT Ulm, Contract with: Arnec Foster Wheeler Contract #,A-7 Effective Date: February 10, 2016 Expiration Date: Jul 31, 2016 Contract PurpoDescription: This Amendment authorizes an increase in the scope of services to the Engineerin mid 1LOW) t-711-11-731 Contract Manager: Rhonda Haa 8774 CAD M.S. #26 (Department/Stop #) Total Dollar Value of Contract: $ Total Current Year Portion: $ 35,365.10 Contract A7 819.911.24 Budgeted? YesN No F] Acco-untCodes: 304-23Ill -560630-PE1302-530340 Grant: $ County Match: ADDITIONAL COSTS Estimated Ongoing Costs: $.� For: N/A (Not included in dollar value above) (eg. maintenance, utilities, janitorial, salaries, etc.) AN'S RN VM UP I TW=s 14"All 0 M CGJ;E.'JM l TO THE CONTRACT i a46! ! ! { ! ! THIS AMENDMENT NO. 7, dated February 10, 2016, is entered into between the County .. the CONSULTANT, Contract Design Permittingdated -. -, County Board of County Commissioners, "COUNTY," and AMEC Foster Wheeler Environment & WITNESSETH- work hasaccomplished imr ! demonstration projects, two of r e'* organicail. dredging .techniques; i' WHEREAS,a1itional methods of 1 are expensive1 the canal and the COUNTY wants to test alternative methods that may be less expensive or muck removal process; i, ! r- # i- a i i ■III i 4 4 r' CanalWHEREAS, the T i projectS;luate the cost and effectiveness of utilizing an in place aeration technology which introduces oxygen to stimulate bacteria and other organisms to degrad; the accumulated 1, WHEREAS, AMEC shall complete additional design, coordinationand project.permitting services for the sixth demonstration project for in -place muck aeration demonstration NOW, THEREFORE, in consideration of mutual promises, covenants and contracts stated herein, and for other goodand valuable consideration,of ! acknowledged, COUNTY and AMEC agree as follows: provide the scir. of services as specifiedr attached andmade a part ithisAMENDMENT No. 2. This AMENDMENT No. 7 provides an additional amount not to exceed Thirty Five Thousani Three Hundred Sixty Five Dollars and Ten Cents ($35,365.10) to provide Additional Engineering Services for additional Assessment, Design, Procurement, Access Coordination, and Permittine, Services related to the sixth canal restoration demonstration project for III -Place XhIck Aeration a, Canal -948 in Key Largo, Monroe County, Florida. The overall CONTRACT value is increased from Seven Hundred Eighty FourThousand Four HundredForty! #' Fourteen 8. iai '1, to Eighti'..... i Nineteen Thousand Eight Hundred Eleven r d Twenty Four Cents . fAVITNESS WHEREOF, each party caused this AMENDMENT NO. 7 to be executed by its duly authorized representative on the day and year first above written. (SEAL) Attest: CLERI By: Deputy Clerk M I I 7i �p iq� i LIM STATE OF FLORI COUNTY OF 0 On this IL day of 20 1 j4 before me t] ZOSMEMM to me to be the Person whose name is subscribed above or who produced As identification, and acknowledged that he/she is the person who executed the above Amendment #7 to Engineering and Design agreement with Mon -roe County for the purposes therein contained. By:,, 1 Nota�' blic Print Name My commission expires: 11 ASS MI P -',E COUNI OVED A� M " =77 EXHIBIT A-7 1Af1%r_M&TPA%W = 416MU11VIV1410 FA 1. Scope of Work: Amec Foster Wheeler assisted the County in selecting a canal site for implementation of the alternative canal restoration technology of In -place Muck Reduction. Canal #48 in Key Largo was selected utilizing the following criteria: Canal Management Master Plan canal ranking criteria of Poor Water Quality One of the highest priority Poor canals needing restoration No identified major permitting issues with the site location Presence of an area for potential staging area use Snail size to niTinize cost. The attached figure shows the canal location. If an access agreement for equipment cannot b�; obtained at Canal #48, the following canals will be alternatives: #84 Rock Harbor, #349 Cudjoe, or #345 Cudjoe. Amec Foster Wheeler's scope of services will include the following tasks. Task 1: Site Conditions Survev and Staqinc3/Eau!Dment Area Coordinatio-E Site Conditions Survey This initial task consists of a site visit to verify the aerial photo and Canal Management Master Plan database information including site access, potential staging area conditions, and other ,zite logistical and permitting items. A site sketch and site photographs will be obtained. zmuff=,Mma■ ,!, gi Task 2: Procurement of Construction Contractor Amec Foster Wheeler will complete the following tasks related to procurement of a construction contractor for the in -place muck aeration project with the option to include a supplemental technology such as use of microbes: • Prepare a draft Request for Proposal package for solicitation of proposals which will include a technical scope, proposal requirements, selection criteria, and draft contract. • Respond to applicable Proposers' RFI's and assist in the preparation of Addenda, including making revisions to the Proposal Bidding Documents, as required. • Attend a Pre -Proposal Conference and site walk-through and assist in preparation of meeting minutes • Conduct a Responsibility Review of the Proposals • Consult with and provide technical support and assistance to the County as required. Task 3: Design and Permitting Preliminary Design Amec Foster Wheeler will review the selected contractor's design plans and prepare a preliminary design package that can be utilized for permitting. The preliminary design plans will include an existing site plan, proposed site plan, erosion and sediment control plans, and construction details. Amec Foster Wheeler will coordinate and hold pre -application permitting meetings with the South Florida Water Management District (SFWMD), USACE, Florida Keys National Marine Sanctuary (FKNMS) and Monroe County using the preliminary design plans. Permit Applications Amec Foster Wheeler will incorporate comments received during the pre -application meetings to complete and submit local, state, and federal permit applications as required, using the final design plans. Permit applications will be submitted to the following agencies: • SFWMD • USACE • FKNMS • Monroe County. Amec Foster Wheeler will respond to up to two Requests for Additional Information (RAI) for each permit application. If there is a major permitting issue related to the Contractors supplemental technology that requires more extensive additional information responses, Monroe County will be contacted to determine how to proceed. Monroe County will pay all required permit application and permit fees. Final Design Amec Foster Wheeler will incorporate any required agency comments into a final design plan set to be utilized by the contractor for construction. Page 2 of Amendment No. 7 xhibitA-7 A scope and cost estimate for Construction Administration and Construction Engineering are not included as they cannot be determined until a design is selected and a Contractor's construction schedule is known. 2. Deliverables: Task 1: Site conditions Summary, Bathymetric and Staging Area Topographic Suveys, Staging Area Access Agreements. Task 2: A final Request for Proposal package, addendums as required, and an evaluation checklist of the received proposals. Task 3: Final design plans and permits from the SFWMD, USAGE, FKNMS, and Monroe County Building Department. 3. Budget: $ 35,365.10 The attached spreadsheet provides the labor details. Additional staff may be utilized on these projects, as needed, per the Contract Schedule of Values also attached. a. Completion Date: July 31, 2016 0---R rr-p-m M w Ta I i -1 m Amec Foster Wheeler Environment & Infrastructure, Inc. 2015 Revised Schedule of Values Personnel A. Professional (Engineer, Geologist, Scientist and Project Management) Staff I 1 $77.00/hour Project:,.11 ■ 09.00 Principal/Pro 11 --------------------- Chief Engineer/Scientist 11 B. Technical Services (Engineering and Science) Technician. 1 1 . i; Technician 01 . 1 'J 1 Senior10 ., Project A d 0 Coordinator/SubcontractAdministrator/Project Accountant Technical -Writer/DocumentProduction qt 1 1 1 . .(includes! ,. 1 1 AIl f . . . AD !' 11 1 4 1 . ; ., r1 C. Surveying Services Field Surveyor 1 $43.00/hour Field Surveyor 11 j $47.00/hour Survey Technician I 67.00/hour Survey Technician II $72,00/hour Survey Chief $75.00/hour D. Information Management E. Contract Labor From time to time, Amec Foster Wheeler retains outside Professional and Technical labor on a 11. Expenses A. Travel Expenses 1. Transportation: Company pickup truck/personal vehicle -per mile-- current allowable rate per County and Florida State Statutes m. Company pickup truck per day '$7Sl0 b. Common carrier or car rental multiplies by (to be the amounts authorized by Section 112I62 Florida Statutes 2. Per Diem Expenses: direct expenses in accordance with Florida State Statutes defined by RCRA to be hazardous. Due to the requirements for some hazardous assessments, disposal and invoicing of incurred expenses may take place after invoicing of the originally contracted work. C. Equipment / Other Expenses (Does not include personnel) Digital Field Documentation Equipment (cameras, $75.00/day (min 2 days water level & measuring tape, GP5 units, etc.) Underwater Camera Equipment/Video up to 50 $1,900-00/day feet depth and low turbidity Environmental Monitoring & Sampling $100.00 to $450.00/day Equipment (dust, OVA, Air monitoring, Noise Depending upon the equipment and scale Meter, Light Meter) required Actual cost x 1.15 customarily provided by Amec 1111l. Subcontract