2nd Change Order 07/20/2016AMY REAVILIN, CPA CLERK OF CIRCUIT COURT &COMPTROLLER MONROE CWHIY, FLORIDA DATE. September 14, 2016 TO: Judith Clarke Director of Engineering ATTN.- Breanne Erickson, Senior Engineering Technician FROM. • Cheryl Robertson Executive Aide to the Clerk of Court & Comptroller CAL At the July 20, 2016 Board of County Commissioner's meeting the Board granted approval and authorized execution of Items: C 1 Approval of Amendment 8 to the contract with Metric Engineering, Inc for Engineering Design and Permitting Services for the US 1 Bayside Shared Use Path/Pedestrian Bridge Over Marvin Adams Waterway Project to extend the expiration date of the contract to March 31, 2017 at no additional cost. C2 Approval of Change Order 2 to the construction contract with Douglas N. Higgins, Inc for the Lake Surprise Estates (Key Largo) Roadway and Drainage Improvements Project to incorporate sea level rise adaptation and to adjust some quantities to actual vs "as bid" amounts for an additional cost of $397,468.43. C3 Approval to award bid and approve a contract with H&R Paving, Inc. For Construction of the Sexton Cove Estates (Key Largo) Roadway and Drainage Improvements project in the amount of $1,105,342.35. C8 Approval of Amendment 1 to the contract with Metric Engineering Inc for Engineering Design and Permitting Services for the Pigeon Key Ramp Restoration Project to transfer funds from the Foundation Investigation task to the Geotechnical task for a lead survey, with no change to the original total contract amount. C 14 Approval of Amendment 1 to Agreement with T. Y. Lin International For Engineering Design and Permitting Services for the Stock Island I Roadway and Drainage Improvement Project for additional design services for the sea level rise adaptation initiative at an additional cost of $34,752.00. Enclosed is a duplicate original executed on behalf of Monroe County, for your handling. Should you have any questions, please feel free to contact me. CC: County Attorney, Finance, and File 500 Whitehead Street Suite 101, PO Box 1980, Key West FL 33040 Phone: 305-295-3130 Fax. 305-295-3663 3117Overseas Highway, Marathon, FL 33050 Phone: 305-289-6027 Fax. 305-289-6025 88820 Overseas Highway, Plantation Key, FL 33070 Phone: 852-7145 Fax: 305-852-7146 T MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Lake Surprise Roadway and Drainage Project CHANGE ORDER NO: 2 INITIATION DATE: 6/24/16 TO CONTRACTOR: D.N. Higgins, Inc. CONTRACT DATE: 7/15/15 The Contract is changed as follows: The original Contract Sum...................................................................................$2,664,839.50 Net change by previously authorized Change Orders.....................................................$70,818.85 The Contract Sum prior to this Change order was......................................................$2,735,658.35 The Contract Sum will be increased by this Change Order ............................................. $397,468.43 The new Contract Sum including this Change Order is................................................$3,133,126.78 The Contract Time will be increased by 98 calendar days The date of Substantial Completion as of the date of this Change Order is 1/13/17. Detailed description of change order and justification: As a result of weather days, approved holidays and additional work, the contract completion date is extended by 98 days. As a result of incorporating sea level rise adaption into the project and revising quantities of some bid items to reflect actual quantity versus as bid quantity(see items with asterisk``), the contract amount is increased by $397,468.43. Bid Item Description +/- Quantity Unit cost $ Amount 1 Mobilization(survey) increase 1 LS $1,760.00 $1,760.00 *6 Removal of existing concrete pavement increase 330 SY $70.00 $23,100.00 7 Re ular Excavation increase 1583.70 CY $21.00 $33,257.70 8 Geos nthetic Reinforce Soil Slopes increase 5069 SY $5.45 $27,626.05 9 1 Optional Base, Base Group 06 increase 4294 SY $17.50 $75,145.00 Asphalt Concrete Su er ave increase 18 TN $154.00 $2,772.00 Millingdecrease 807 SY $4.00 $3,228.00 E2.1 Inlets DT Bot, Type F <10' increase 2 EA $4,900.00 $9,800.00 Replace S95 and S97 structures increase 2 EA $812.34 $1,624.68 Inlet tops increase 7 EA $400.00 $2,800.00 13 1 Inlets DT Bot, Type F >10' decrease 1 EA $6,800.00 $6,800.00 a Manhole P-8 <10' decrease 3 EA $5,800.00 $17,400.00Draina a Manhole P-8 >10' increase 5 EA $7,500.00 $37,500.00 18" Solid Pie increase 36 LF $160.00 $5,760.00 P14Draina French Drains increase 727 LF $270.00 $196,290.00 Valle Gutter — Concrete increase 21 LF $40.00 $840.00 Performance Turf Sod increase 2207 SY $3.00 $6,621.00 Total Change Order 2 Amount $397,468.43 This Change Order 2 is 14.91 % of the original contract price and 14.53% of the revised contract amount after Change Order 1. v N� Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: The BOCC instructed the Engineering Department to consider sea level rise in existing and future road construction projects. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ® No ❑ If Yes, explanation as to why it is not subject for a calling for bids: This road project is currently under construction. • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: During construction, the county requested that the project design be modified by the engineer of record to consider sea level rise projected elevations. The elevation changes affected the bid items listed in the change order. Additionally, quantities for several bid items have changed from the "as bid" quantity and the revised actual quantity is reflected in the change order as well. CONTRACTOR (DN HIGGINS): � la 7 ,f 0 ft i- I b b t A-S P, Date ENGINEERING SERVICES DIRECTOR:- x t/B / f Date MAYOR: � / / Date 0 t ".—TORNEY R cQ r,":, —0 Ac— Z: