Loading...
1st Amendment 07/20/2016AMY REAVILIN, CPA CLERK OF CIRCUR COURT &COMPTROLLER MONROE COUNTY, FLORIDA DATE: September 14, 2016 TO: Judith Clarke Director of Engineering ATTN.• Breanne Erickson, Senior Engineering Technician FROM. • Cheryl Robertson Executive Aide to the Clerk of Court & Comptroller (',C At the July 20, 2016 Board of County Commissioner's meeting the Board granted approval and authorized execution of Items: C 1 Approval of Amendment 8 to the contract with Metric Engineering, Inc for Engineering Design and Permitting Services for the US 1 Bayside Shared Use Path/Pedestrian Bridge Over Marvin Adams Waterway Project to extend the expiration date of the contract to March 31, 2017 at no additional cost. C2 Approval of Change Order 2 to the construction contract with Douglas N. Higgins, Inc for the Lake Surprise Estates (Key Largo) Roadway and Drainage Improvements Project to incorporate sea level rise adaptation and to adjust some quantities to actual vs "as bid" amounts for an additional cost of $397,468.43. C3 Approval to award bid and approve a contract with H&R Paving, Inc. For Construction of the Sexton Cove Estates (Key Largo) Roadway and Drainage Improvements project in the amount of $1,105,342.35. C8 Approval of Amendment 1 to the contract with Metric Engineering Inc for Engineering Design and Permitting Services for the Pigeon Key Ramp Restoration Project to transfer funds from the Foundation Investigation task to the Geotechnical task for a lead survey, with no change to the original total contract amount. C 14 Approval of Amendment 1 to Agreement with T. Y. Lin International For Engineering Design and Permitting Services for the Stock Island I Roadway and Drainage Improvement Project for additional design services for the sea level rise adaptation initiative at an additional cost of $34,752.00. Enclosed is a duplicate original executed on behalf of Monroe County, for your handling. Should you have any questions, please feel free to contact me. CC: County Attorney, Finance, and File ✓ 500 Whitehead Street Suite 101, PO Box 1980, Key West, FL 33040 Phone: 305-295-3130 Fax: 305-295-3663 3117 Overseas Highway, Marathon, FL 33050 Phone: 305-289-6027 Fax: 305-289-6025 88820 Overseas Highway, Plantation Key, FL 33070 Phone: 852-7145 Fax: 305-852-7146 0 THIS AMENDMENT 1 to the CONTRACT is entered into this 20th day of July, 2016 between Monroe County, whose address is 1100 Simonton Street, Room 2-216 Key West, Florida 33040, hereafter the "COUNTY" and Metric Engineering Inc., a Corporation of the State of Florida, whose address is 13940 S.W. 136"' Street, Suite 200, Miami, FL 33186, hereafter referred to as "CONSULTANT". WHEREAS, on the 15th day of April, 2015 the parties executed a contract authorizing the Consultant to perform Professional Services for the Design and Permitting Services for the Pigeon Key Ramp Restoration Project for a sum not to exceed $205,959.71 (including $19,512.00 construction phase services); and WHEREAS, a lead survey (as described in Attachment A) is required for the project which was not included in the original CONSULTANT Geotechnical task, however there are funds remaining in the Foundation Investigation task and therefore funds will be transferred from the Foundation Investigation task to the Geotechnical task; and NOW THEREFORE, in consideration of the mutual promises contained herein, the COUNTY and CONSULTANT agree to amend Paragraph 7.1.1 of the contract as follows: Foundation Investigation task reduced $2,300.00 from $48,706.09 to 8 405.00. Geotechnical Task for Lead Survey increased $2,300.00 from $19,695.00 to $21.105.00. Total Contract Amount remains $205,959.71. FORCE and EFFECT. In all other respects the Contract approved at the April 15, 2015 BOCC meeting remains in full force and effect. (Remainder of page intentionally left blank) Amendment 1 — Pigeon Key Ramp Restoration Project Page 1 of 2 July 20, 2016 In WITNESS WHEREOF each party hereto has caused this contract to be executed by its duly authorized representative. BOARD OF qQUNF& COMMISSIONERS OF METRIC ENGINEERING, INC. MONROE Ik�' BY: BY' zxews vaa qp rman TITLE: vlze PtaeslACHr The f egoing instrument was acknowledged before me N, Clerk this day of I k 4e 2016, by a,--tsUT7 Who is ( personally knovW to me to ( )produced a driv icense as identifi ' n. NOT B IC, TE OF LORIDA ile45n'e- S,, �s4e virtA Print, type of stamp commissioned name of notary JESSIE SANTISTEVAN . •i Notary Public - State of Florida My Comm. Expires Apr 3, 2017 Commission #F EE 862218 'x o -.n r Cn r'1 .7) �� � ••+ J Amendment 1 — Pigeon Key Ramp Restoration Project Page 2 of 2 July 20, 2016 Attachment A I �Informationtion&A"�To Build On Englneeang . ConsWtlng • Testing June 3, 2016 Mr. Douglas Ruggiano, P.E. Metric Engineering 13490 SW 136 Street Suite 200 Miami, Florida 33186 Re: Proposal for Lead -Based Paint Survey Pigeon Key Ramp Pigeon Key, Monroe County, Florida PSI Proposal No. 0784-146315-2 Dear Mr. Ruggiano: Professional Service Industries, Inc. (PSI) is pleased to present this proposal to perform a lead -based paint inspection of the Pigeon Key Ramp located in Pigeon Key, Florida. Background PSI understands the survey will be performed on the bridge structure that is scheduled to be renovated. The bridge is approximately 262 linear feet in length. Scope of Work The purpose of the lead -based paint survey is to assist the facility owner and contractor performing the renovation in complying with requirements of OSHA 29 CFR 1926.62 — Lead in Construction, Resource Conservation and Recovery Act (RCRA), Toxic Substances Control Act (TSCA), and the Universal Waste Rule (UWR) governing the disposal of hazardous waste. PSI will collect paint chip samples to assess the potential presence of LBP hazards that may exist on the affected bridge components. PSI will collect one paint chip sample from each of the different bridge components observed. All samples will be analyzed for total lead using Flame Atomic Absorption Method. (SW 846 3050B*/7000B). Detailed records will be kept describing each sampling location selected, the condition of the substrate and paint for each sample, and anything unusual about the testing conditions. Final Report PSI will provide two copies of a final report for the bridge within fifteen working days from the time of the survey, provided no delays such as access to the structure are incurred. The letter report will summarize field observations and laboratory analytical results. Project Schedule & Cost Estimates It is proposed that the fee for the performance of the outlined services be determined on a lump sum basis for the lead -based paint survey, including the collection and analysis of up to 10 paint chip samples. Professional Service Industries, Inc. • 7950 N.W. 64 Street • Miami, FL 33166 • 305/471-7721 . Fax 305/593-1915 Asbestos Renovation Survey Proposal June 3, 2016 PSI Proposal No. 0784-146315-2 Services as Described Above - Lump Sum: $2,300.00 PSI appreciates the opportunity to propose on your project. After your review of this proposal, if you have any questions, please contact us. If this proposal is acceptable to you, please sign below as notice to proceed and return one copy of this proposal intact to our office. We will proceed with the work upon receipt of proposal authorization. PSI will schedule a site visit within two (2) days from receipt of signed authorization and provide the report within fifteen (15) working days from the time of the survey. If this proposal is acceptable to you, please return a letter of authorization along with one copy of this proposal intact to our office. We will proceed with the work upon receipt of proposal authorization. Respectfully submitted, PROFESSIONAL SE VICE INDUSTRIES, INC. IL E. John Emerson, ASP, FLMA Karen M. Deshon, P.E. Senior Project Manager Department Manager EJE/KMD Attachments: Proposal Authorization and Payment Instructions General Conditions Page 2 of 4 S2 —� .