Loading...
1st Change Order 09/21/2016AMY REAVILIN, CPA CLERK OF CIRCUIT COURT &COMPTROLLER MONROE COUNTY, FLORIDA DATE. October 21, 2016 TO: Judith Clarke Director of Engineering ATTN. Breanne Erickson, Senior Engineering Technician FROM. • Cheryl Robertson Executive Aide to the Clerk of Court & Comptroller 3e- At the September 21, 2016 Board of County Commissioner's meeting the Board granted approval and authorized execution of Items: C8 Amendment 1 to Small County Outreach Program (SCOP) Agreement with Florida Department of Transportation (FDOT) for the Card Sound Bridge Repair Project which corrects Exhibit B of original agreement. Updated Exhibit B reflects change in fund distribution amounts for Fiscal Year 15/16 and Fiscal Year 16/17. The total contract amount has not changed. This item is not fully executed; please return to the Clerk for finalization. C 12 Approval of a Task Order in the amount of $20,010 with HDR Engineering, Inc. to provide negotiation support during negotiations with Transcore and Florida Turnpike Enterprise (FTE) for the Card Sound Toll conversion to electronic tolling. Transcore will be providing electronic toll collection system and equipment while FTE will provide tolling conversion and transaction processing. This task order is being awarded under the On -Call contract for Professional Services. C 17 Approval of Amendment to Traffic Signal Maintenance and Compensation Agreement and approval of Attachment 1: Revised Terms and Conditions with the Florida Department of Transportation (FDOT). This amendment and attachment replace the previous agreement in its entirety and allow for reimbursement for replacement or repair of traffic signals and devices damaged as a result of third parties or other causes that were not caused by Monroe County. There is no change to the annual compensation amounts with this amendment. This item is not fully executed; please return to the Clerk for finalization. 500 Whitehead Street Suite 101, PO Box 1980, Key West, FL 33040 Phone: 305-295-3130 Fax. 305-295-3663 3117 Overseas Highway, Marathon, FL 33050 Phone: 305-289-6027 Fax: 305-289-6025 88820 Overseas Highway, Plantation Key, FL 33070 Phone: 852-7145 Fax: 305-852-7146 C 19 Approval of task order with Kisinger Campo & Associates, Corp. for services for the Duck Key Bridge Replacement Cultural Resource Assessment Survey (CRAS) for the amount of $159,979.26. The task order is being awarded under the On Call Contract for Professional Services. C24 Approval of Change Order # 1 to the contract with Coastal Gunite Construction Company for the Card Sound Bridge Repair Project to increase the contract amount by $726,253.85 for Increased Scope Of Work. CC: County Attorney Finance File/ 500 Whitehead Street Suite 101, PO Box 1980, Key West, FL 33040 Phone: 305-295-3130 Fax: 305-295-3663 3117 Overseas Highway, Marathon, FL 33050 Phone: 305-289-6027 Fax: 305-289-6015 88820 Overseas Highway, Plantation Key, FL 33070 Phone: 852-7145 Fax. 305-852-7146 MONROE COUNTY ENGINEERING CONTRACT CHANGE ORDER PROJECT TITLE: Card Sound Bridge Repair Project CHANGE ORDER NO: 1 INITIATION DATE: 8/17116 TO CONTRACTOR: CONTRACT DATE: 1/20116 The Contract is changed as follows: The original Contract Sum..................................................................... $2,969,512.25 Net change by previously authorized Change Orders..................................................$0 The Contract Sum prior to this Change Order was......................................$2,969,512.25 The Contract Sum will be changed by this Change Order ............................... $726,253.85 The new Contract Sum including this Change Order is.................................$3,695,766.10 The Contract Time will be increased by...............................................................0 days The date of Substantial Completion as of the date of this Change Order is .............. 2/15/17 Detailed description of Change Order: As a result of deficiencies discovered after construction began, project quantities have increased as shown in the attached. In an effort to avoid further delays in bridge repairs, it is best to add these quantities to the ongoing project. This change is not due to an error or omission and was not identified or expected to be identified prior to construction. The Contract Value has increased $726,253.85. Class IV concrete $44,033.22 Spall repair $312,790.40 Reinforcing steel $4,978.68 Wrap fender piles $81,528.00 Fender structural steel, nuts, bolts o Washers & PLT $108,311.55 N Treated timber, structural $174,612,00 Total amount of this Change Order $726,253,85 This Change Order is 24.46% of the original contract price. CONTRACTOR: ENGINEERING SERVICES DIRECTOR: Date /Z'm/ fi%44*ar-4- 0144-&/C4/ l%?S//[v Tr___LeT r---ti- ZW66 e119ent Date Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ❑ No ❑ • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ® No ❑ If Yes, explanation as to why it is not subject for a calling for bids: This bridge repair project is currently under construction. • Project Engineer approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: During construction, additional repair quantities were discovered as a result of progressive deterioration. One Penn Plaza New York, NY 10119 Main: +1-305-872-8445 www.pbworld.com August 18, 2016 Mr. Clark Briggs Monroe County Engineering 1100 Simonton St. Rm 216 Key West, Fl. 33040 Card Sound Bridge Repair Project Subject: Change Order No. 1 Concurrence Financial Project No.: 431917-1-3801 FDOT Contract No.: G0320 Dear Mr. Briggs: Coastal Gunite Construction Company along with Parsons Brinckerhoff performed a survey of the concrete deterioration on the Card Sound Bridge. Additional areas of spall repair have been identified as well as additional splicing of pile on the fender system. Evaluation of the topside of the bridge has not been performed to date. Parsons Brinckerhoff has reviewed the Summary of Quantities submitted and I concur with the contractor's estimate for a change order in the amount of $726,253.85 Sincerely, PARSONS BRINCKERHOFF f . Keith Duke Project Administrator cc: Pomsit Chakkaphak P.E. DCN: PBA-CO028 PB File: 101.2 r-Ca/iSi/L COASTAL GUNITE CONSTRUCTION COMPANY July 22, 2016 Mr. Clark Briggs Senior Project Manager Monroe County 1100 Simonton Street, Rm 2-216 Key West, FL 33040 PROJECT: FINANCIAL PROJECT NO.: FDOT CONTRACT NO.: PRIME CONTRACTOR: Dear Mr. Briggs: Card Sound Bridge Repair 431917-1-3801 G0320 Coastal Gunite Construction Company Due to anticipated overruns in project quantities presented in the attached, Coastal Gunite Construction Company requests a Change Order in the amount of $726,253.84 (Seven Hundred Twenty Six Thousand Two Hundred Fifty Three Dollars and Eighty Four Cents). Please contact me at 941-744-5500 should you have any questions or concerns. Sincerely, Martin Emmrich COASTAL GUNITE CONSTRUCTION COMPANY HOME OFFICE 16 WASHINGTON STREET POST OFFICE BOX 977 CAMBRIDGE, MARYLAND 21613 410.228.8100 FAX:410.228.8589 SOUTHEAST REGION 1001 THIRD AVENUE WEST SUITE 300 BRADENTON, FLORIDA 34205 941.744.5500 FAX: 941.744.9880 0 z r4 X u N Q ID Qp�p 'Q 1LA f X Z .-1 �M-'I rl N Lm f�I1 I O u Z Z N pp Q IC S V1 p 8 1 Q 7 M O 02 00 11 N f �olnmlol M conn P. rn N rI rl 1 W 0 C N M O .-i 00 a 1 r i ? to to to to to C4 w0Ln O F q? cn m m umi N 00 O� � OI 00 O 1 Q n VI n O n 06 N M' m< M I 1 Nrl rl rl rl N I W t/f to 4R +/L to t O aFa�al+? n N 10 N O NN I M 808888� LU S n Q N Q OQ d tvi t a V1 00 ri V1 V) I n 1D 00 0 N In $$$$CO W d e 00 2 to tM1 to L1 N to F U pp11 Q N Ln fOY1 e1 V1 M m 0 cr ~ u u. U m J < W m J m 7 V f0 F' i 2 0 � ca O v v 6 d 3 m � Y 2 O u y .: .6 U {7� n a A L 2 N yVC ba r U to V1 6 1 1- w w V a w C 7 o w cc C w ` N 3 d 2 m m V1 d In m .. �y t n .+ � n I �a g 4 a v v 400-4-5, Class IV Concrete (Pile Splices) Name Qty Estimated Total Splice Length (LF) CY/LF of Splice Total Volume (CY) Length/Splice (LF) Mix# 06-1257-01 66 6 396 0.0504 20.0 Class IV Pile Jacket Calculations Name Length (IN) Width (IN) Area (SQIN) Volume/LF (CY) Jacket Cross -Sectional Area 36 36 1296 Orig. Pile Cross -Sectional Area 24 24 576 Pile Cross -Sectional Area @ 6" 12 12 144 Spall Area of Annulus Including Spall - - 1152 0.296296 400-4-5, Class IV Concrete (Pile Jackets) Name Qty (LF) Jacket Annulus (FT) Spall De (FT) Volume LF CF Total Volume CY Mix# 457-074 21 0.5 0.5 8.0 6.2 Class IV 470-1-3, Restore Spalled Areas Plan CIF @ 100% Contract Amount Contractor Survey Location Plan CIF Growth CIF CIF Tower Piers 512.4 1,024.70 1,794.00 Column 201.3 402.6 933.9 Footer 223.6 447.1 860.1 Strut 87.5 175 — Intermediate Bent 9.6 19.2 — 180.2 Caps Underdeck 23.9 47.8 — 47.8 Top Deck, Sidewalk, 416.1 832.2 — 832.2 Rails TOTAL 967.3 1,934.70 2,095.00 2,854.20 41S-1-5, Reinforcing Steel, Substructure (Pile Splices) Name Qty Length/pc (ft) Weight/pc (lb) Total Length (ft) Total Weight (lb) #10 Dowel #8 Rebar #4 Stirrup 264 264 792 5.0 21.5 1320.0 5.8 15.5 1531.2 3.8 2.5 3009.6 5676.0 4088.3 2016.4 11780.7 415-i-S, Reinforcing Steel, Substructure (Tower Piers) Name Total to Date (LB) # Piers to Date # Piers Remaining Estimate(d T Total Qty #5 Rebar 660 8 20 2310.0 Name Length/pc (IN) MY Total Length (LF) 3-Pile Upper Cable Wrap 388 20 646.7 3-Pile Lower Cable Wrap 424 20 706.7 2-Pile Battered Upper Cable Wrap 316 32 842.7 2-Pile Battered Lower Cable Wrap 361 32 962.7 2-Pile Upper/Lower Cable Wrap 296 32 789.3 3948.0 Pay item UOM = EA, Table provided for informational purposes only. 460-1-13, Structural Steel Rehab - Bolt, Nut, Wash & Plt Item Quantity LB Unit Total LBS 38" bolts 72 6.7 482.40 30" bolts 189 5.4 1020.60 28" bolts 256 5 1280.00 Washers 517 0.2 103.40 Nuts 517 0.2 103.40 Nails 3576 0.0145 51.83 I 3U41.b3 I Weight Source: External Link 10D nails = 69/lb TIMBER SUMMARY (Total Fender System Item Qty Needed 10"x10"x16' 104 2"x12"x16' 22 2" x 6" x 2.5' 596 TIMRFR SUMMARY SA% wars_ all clearance markers_ deck clank & strin¢ers Item Nee FBM MB Element Whaler & Clearance Marker 10" x 10" x 16' 85 11307 11.3 Stringer 2" x 12" x 16' 22 704 0.7 Deck Plank 2" x 6" x 2.5' 596 1490 1.5 13.5 K*1=1 470-1, Treated Timber (100% Replacement) Item Item Qty Needed FBM MB Whaler & Clearance Marker 10" x 10" x 16' 104 13866.66667 13.9 Stringer 2" x 12" x 16' 22 704 0.7 Deck Plank 2" x 6" x 2.5' 596 1490 1.5 16.1 470-1, Treated Timber (80% wales, all clearance markers, deck plank & stringers) Element Item Qty Needed FBM MB Whaler & Clearance Marker Stringer Deck Plank 10" x 10" x 16' 2" x 12" x 16' 2" x 6" x 2.5' 84.8 22 596 11306.7 704.0 1490.0 11.3 0.7 1.5 13.5