Loading...
12/14-49 Conceptual Drainage Study i" AMY HEAVILIH, CPA CLERK OF CIRCUIT COURT & COMPTROLLER 4//K._, MONROE COUNTY,FLORIDA DATE: December 13, 2016 TO: Don DeGraw, Director of Airports ATTN: Beth Leto, Airport Business Manager FROM: Cheryl Robertson Executive Aide to the Clerk of Court & Comptroller 0 K - At the October 19, 2016 Board of County Commissioner's meeting the Board granted approval and authorized execution of Item C14 Approval of Time Extension only (no increase in original cost) with Jacobs Project Management Co. For Task Order No. 12/14-49 Services Authorized: Conceptual Drainage Study at the Florida Keys Marathon International Airport Enclosed is a duplicate originals executed on behalf of Monroe County,for your handling. Should you have any questions,please feel free to contact me. cc: County Attorney Finance File / 500 Whitehead Street Suite 101,PO Box 1980,Key West,FL 33040 Phone:305-295-3130 Fax:305-295-3663 3117 Overseas Highway,Marathon,FL 33050 Phone:305-289-6027 Fox:305-289-6025 88820 Overseas Highway,Plantation Key,FL 33070 Phone:852-7195 Fax:305-852-7146 MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Effective Date Task Order No. 12/14-49 . Client Project No. Engineer Project No. E9Y16749 . This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County, Florida ("Client") and JACOBS PROJECT MANAGEMENT CO. ("Consultant"), dated November 16, 2011 ("Agreement"). The Agreement is ineoporated herein and forms an integral part of this Task Order. Services Authorized: Conceptual Drainage Study -MTH—PSO#49 Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of 2_page(s). Pricing --c .n ':_, r— o k7 n t �' -n N/A Time and Expense per Agreement and Appendix B to the Agreement. --,- w o co X Firm Fixed Price of$ 34.941.00 -- v N/A Other(Describe): ,`_- _ cn Schedule (THIS IS A TIME EXTENSION REQUEST) o .-. Services may commence on Execution (Date approved by County. 8/27/15) . Services will cease by 575 days . Other BOARD OF JN C MM TONERS A . •itir,,:MY HEAVILIN,CLERK OF MONRO RIDA in i BY NEAV11JN CLERKMayor/Chairman1y/ - . I �0 d5o71 CONSULTANT: __ P LERK /213 i(i, COBS PROJECT MANAGEMENT CO 44, ! _ W itnelb __. itle _ rile' MSTft.7PS—Bdonroe County //f R Page 1 of`T- 4 • • Exhibit A—Scope of Work(12114-39) Monroe County The Florida Keys Marathon International Airport Conceptual Drainage Study—PSO#39 SCOPE OF WORK The Florida Department of Transportation (FDOT) maintains two (2)dry detention ponds on Airport property at the Florida Keys Marathon International Airport(MTH)that treat runoff from Overseas Highway(US 1). One pond is located on the west end of the Airport and the other on the east end of the Airport. The FOOT ponds are located within easements granted to the FDOT by Monroe County,the owner and operator of MTH. The County has requested that Jacobs evaluate the potential to reduce or eliminate the dry ponds by replacing them with drainage wells. Reducing or eliminating the ponds, would free up additional land area for aviation related development. In addition, the study will explore the potential to relocate the ponds, once a new conceptual size has been determined. Jacobs will provide professional services related to the evaluation of the potential to reduce the footprint of the dry ponds by other treatment methods such as drainage wells. More specifically the services shall include the following tasks: ARTICLE A—DATA COLLECTION 1. Jacobs'will contact FDOT regarding the availability of record drawings, geotechnical investigations and stormwater calculations related to the capacity of the dry ponds and review the information provided by FDOT. 2. Jacobs will review the available information related to the permit for the system on file with the South Florida Water Management District(SFWMD). 3. Jacobs will perform a field investigation of the ponds on-site at MTH and meet with Airport staff to determine alternatives for reduction in footprint or relocation of the ponds. Services for Article A will be provided under a lump sum basis. ARTICLE B—ANALYSIS AND CONCEPTUAL PLAN 1. 2. Based on the information obtained in Article B, Jacobs will perform stormwater calculations to determine the potential capacity of proposed drainage wells located on the Airport to provide capacity to replace the dry detention ponds. 3. Jacobs will prepare up to three(3)conceptual plans for reduction of the footprint of the west and east ponds. The conceptual plans will also evaluate the potential to relocate the ponds based on the conceptual sizes determined by the stormwater calculations. The conceptual plans will take into consideration the restrictions in place on the Airport Layout Plan and preferred locations for development. Page 1 of 2 4. Jacobs will prepare a rough order of magnitude costs for the construction of the wells and • related infrastructure improvements associated with the reduction in footprint of the ponds. 5. Jacobs will review the conceptual plans and cost estimates with the Airport to determine the preferred option. 6. Jacobs will meet with FDOT and SFWMD separately to review the preferred option and determine the feasibility of implementing the option based on feedback from the agencies. 7. Jacobs will prepare a summary report that contains the record information, calculations, conceptual plans and a summary of the meeting with the Airport and agencies. The report will also include a recommendation for implementation of the plan and potential project schedule. Services for Article B will be provided under a lump sum basis. ASSUMPTIONS • The study does not include any topographic survey or geotechnical investigations. • Jacobs will make assumptions regarding the potential capacity of the drainage wells based on record information. • The study does not include any detailed design or preparation of construction documents. • The Airport shall provide record information regarding FDOT easements and property leases in the vicinity of the easements. • The study does not include the preparation of any permit applications. • Jacobs Project Management Company will invoice on a percent complete, including expenses, to compensate the level of effort required for each assignment. PROJECT SCHEDULE: The tentative complete project schedule is as follows: Item Duration (Calendar Daysl Data Collection 15 Draft Report and Review with Airport 30 Final Report 15 Page 2 of 2