12/14-49 Conceptual Drainage Study i"
AMY HEAVILIH, CPA
CLERK OF CIRCUIT COURT & COMPTROLLER
4//K._,
MONROE COUNTY,FLORIDA
DATE: December 13, 2016
TO: Don DeGraw,
Director of Airports
ATTN: Beth Leto,
Airport Business Manager
FROM: Cheryl Robertson Executive Aide to the Clerk of Court & Comptroller 0 K -
At the October 19, 2016 Board of County Commissioner's meeting the Board granted approval and
authorized execution of Item C14 Approval of Time Extension only (no increase in original
cost) with Jacobs Project Management Co. For Task Order No. 12/14-49 Services
Authorized: Conceptual Drainage Study at the Florida Keys Marathon International
Airport
Enclosed is a duplicate originals executed on behalf of Monroe County,for your handling. Should you
have any questions,please feel free to contact me.
cc: County Attorney
Finance
File /
500 Whitehead Street Suite 101,PO Box 1980,Key West,FL 33040 Phone:305-295-3130 Fax:305-295-3663
3117 Overseas Highway,Marathon,FL 33050 Phone:305-289-6027 Fox:305-289-6025
88820 Overseas Highway,Plantation Key,FL 33070 Phone:852-7195 Fax:305-852-7146
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
TASK ORDER FORM
Effective Date Task Order No. 12/14-49 .
Client Project No. Engineer Project No. E9Y16749 .
This Task Order is entered into on the effective date noted above pursuant to the "Master
Agreement for Professional Services" between Monroe County, Florida ("Client") and JACOBS
PROJECT MANAGEMENT CO. ("Consultant"), dated November 16, 2011 ("Agreement").
The Agreement is ineoporated herein and forms an integral part of this Task Order.
Services Authorized: Conceptual Drainage Study -MTH—PSO#49
Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and
incorporated herein, which Exhibit A is marked with the above noted Task Order No. and
consists of 2_page(s).
Pricing --c .n
':_, r—
o k7
n t �' -n
N/A Time and Expense per Agreement and Appendix B to the Agreement. --,- w o
co
X Firm Fixed Price of$ 34.941.00 -- v
N/A Other(Describe): ,`_-
_ cn
Schedule (THIS IS A TIME EXTENSION REQUEST) o .-.
Services may commence on Execution (Date approved by County. 8/27/15) .
Services will cease by 575 days .
Other
BOARD OF JN C MM TONERS
A
. •itir,,:MY HEAVILIN,CLERK OF MONRO RIDA
in i BY
NEAV11JN CLERKMayor/Chairman1y/ - . I �0 d5o71 CONSULTANT:
__ P LERK /213 i(i, COBS PROJECT MANAGEMENT CO
44,
! _
W itnelb __. itle _
rile' MSTft.7PS—Bdonroe County //f R
Page 1 of`T- 4
•
•
Exhibit A—Scope of Work(12114-39)
Monroe County
The Florida Keys Marathon International Airport
Conceptual Drainage Study—PSO#39
SCOPE OF WORK
The Florida Department of Transportation (FDOT) maintains two (2)dry detention ponds on
Airport property at the Florida Keys Marathon International Airport(MTH)that treat runoff from
Overseas Highway(US 1). One pond is located on the west end of the Airport and the other on
the east end of the Airport. The FOOT ponds are located within easements granted to the
FDOT by Monroe County,the owner and operator of MTH. The County has requested that
Jacobs evaluate the potential to reduce or eliminate the dry ponds by replacing them with
drainage wells. Reducing or eliminating the ponds, would free up additional land area for
aviation related development. In addition, the study will explore the potential to relocate the
ponds, once a new conceptual size has been determined. Jacobs will provide professional
services related to the evaluation of the potential to reduce the footprint of the dry ponds by
other treatment methods such as drainage wells. More specifically the services shall include
the following tasks:
ARTICLE A—DATA COLLECTION
1. Jacobs'will contact FDOT regarding the availability of record drawings, geotechnical
investigations and stormwater calculations related to the capacity of the dry ponds and
review the information provided by FDOT.
2. Jacobs will review the available information related to the permit for the system on file with
the South Florida Water Management District(SFWMD).
3. Jacobs will perform a field investigation of the ponds on-site at MTH and meet with Airport
staff to determine alternatives for reduction in footprint or relocation of the ponds.
Services for Article A will be provided under a lump sum basis.
ARTICLE B—ANALYSIS AND CONCEPTUAL PLAN
1.
2. Based on the information obtained in Article B, Jacobs will perform stormwater calculations
to determine the potential capacity of proposed drainage wells located on the Airport to
provide capacity to replace the dry detention ponds.
3. Jacobs will prepare up to three(3)conceptual plans for reduction of the footprint of the west
and east ponds. The conceptual plans will also evaluate the potential to relocate the ponds
based on the conceptual sizes determined by the stormwater calculations. The conceptual
plans will take into consideration the restrictions in place on the Airport Layout Plan and
preferred locations for development.
Page 1 of 2
4. Jacobs will prepare a rough order of magnitude costs for the construction of the wells and •
related infrastructure improvements associated with the reduction in footprint of the ponds.
5. Jacobs will review the conceptual plans and cost estimates with the Airport to determine the
preferred option.
6. Jacobs will meet with FDOT and SFWMD separately to review the preferred option and
determine the feasibility of implementing the option based on feedback from the agencies.
7. Jacobs will prepare a summary report that contains the record information, calculations,
conceptual plans and a summary of the meeting with the Airport and agencies. The report
will also include a recommendation for implementation of the plan and potential project
schedule.
Services for Article B will be provided under a lump sum basis.
ASSUMPTIONS
• The study does not include any topographic survey or geotechnical investigations.
• Jacobs will make assumptions regarding the potential capacity of the drainage wells
based on record information.
• The study does not include any detailed design or preparation of construction
documents.
• The Airport shall provide record information regarding FDOT easements and property
leases in the vicinity of the easements.
• The study does not include the preparation of any permit applications.
• Jacobs Project Management Company will invoice on a percent complete, including
expenses, to compensate the level of effort required for each assignment.
PROJECT SCHEDULE:
The tentative complete project schedule is as follows:
Item Duration (Calendar Daysl
Data Collection 15
Draft Report and Review with Airport 30
Final Report 15