Loading...
13th Amendment 11/22/2016 KEVIN MADOK, CPA MONROE COUNTY CLERK OF THE CIRCUIT COURT & COMPTROLLER DATE: January 9, 2017 TO: Rhonda Haag, Director Sustainability & Projects FROM: Pamela G. Hanc •�, l eputy Clerk SUBJECT: November 22nd BOCC Meeting Enclosed is a duplicate original of the following agenda item that was approved at the above - mentioned meeting date: S6 Amendment No. 13 to the contract for Engineering, Design and Permitting Services of the Demonstration Projects, with AMEC Foster Wheeler Environment and Infrastructure, Inc. to provide Construction Engineering, Environmental Inspections and Construction Administration Services in the amount of $88,612.00 related to Canal #83 muck removal, backfilling and air curtain project in Key Largo. Should you have any questions, please feel free to contact me at ext. 3130. Thank you. cc: County Attorney Finance File AMENDMENT NO. 13 TO THE CONTRACT FOR ENGINEERING, DESIGN AND PERMITTING SERVICES FOR THE CANAL DEMONSTRATION PROJECTS NovewL i'c Act to THIS AMENDMENT NO. 13, dated , Aet-e + , is entered into between the County and the CONSULTANT, to the Contract For Engineering, Design And Permitting Services, dated the 21' day of May, 2014, as amended September 17, 2014 (Al), February 18, 2015 (A2), May 20, 2015 (A3), July 15, 2015 (A4), October 21, 2015 (A5), January 20, 2016 (A6), March 23, 2016 (A7 and A8), April 20, 2016 (A9), May 18, 2016 (A10), August 17 2016 (All), and September 21,2016 (Al2) by and between Monroe County Board of County Commissioners, "COUNTY," and AMEC Foster Wheeler Environment & Infrastructure, Inc., "AMEC ". WITNESSETH: WHEARAS, the CONTRACT provides for engineering and construction oversight services for the canal demonstration projects; and WHEREAS, the organic removal, backfilling, and air curtain installation project Canal #83 Rock Harbor construction contractor Adventure Environmental Inc. provided a 120 day construction schedule for which AMEC CEI services will be required; and. WHEREAS, AMEC will provide daily engineering and environmental site inspections and construction administration services for the construction activities; and WHEREAS, funds are required to fund the CEI onsite inspections by AMEC for the time needed for the project; and NOW, THEREFORE, in consideration of mutual promises, covenants and contracts stated herein, and for other good and valuable consideration, the sufficiency of which is hereby acknowledged, COUNTY and AMEC agree as follows: 1. AMEC will provide the scope of services as specified in Exhibit "A -13" attached and made a part of this AMENDMENT No. 13. The minimum services will include construction engineering and environmental inspections and construction administration services for the Canal #83 organic removal, backfilling, and air curtain PROJECT. 2. This AMENDMENT No. 13 provides $88,612 in new funding for the completion of the construction engineering and environmental inspections and construction administration services for the PROJECT in Key Largo. The overall CONTRACT value will change for this task from the current One Million Seventy Thousand Nine Hundred Sixty Five Dollars and Forty Four Cents (1,070,965.44) to an amount not to exceed One Million One Hundred Fifty Nine Thousand Five Hundred Seventy Seven Dollars and Forty Four Cents (1,159,577.44). Page 1 of Amendment No. 13 1 . SS WHEREOF, each party caused this AMENDMENT NO. 13 to be executed by its duly � M a K � epresentative on the day and year first above written. � . �o . BOARD OF COUNTY COMMISSIONERS E t p OF MONROE COUNTY, FLORIDA By: 4-.-..,.4 A _ By: A 44 P• Deputy Clerk Mayor/Chairman Date: "11'41' 1 AMEC FOSTER WHEELER EVIRONMENT & INFRASTRUCTURE, INC. ONROE COUNTY All. EY BY - . M A RO D A i / Print name: /∎l — cl® 1 raXebS CYNTHIA • HALL L f T OUNT�t AT Title: C�� 2 G •�/'/i? ASSISTAN , _ o C/ Date Date: /2 /' /, *_—a .TI rn STATE OF FLORIDA - I E- COUNTY OF �l Y� V i \J Gtc -Q- ,.. .-- -r, On this J_ day of Deeetn)70_16 before me, the undersigned not ublic, J -- 7 Personally appeared R CAYC� Ilea X - & J , own to me to the cr.. Person whose name is subscribed above or who produce As identification, and acknowledged that he /she is the person who executed the above Amendment No. 13 to Engineering and Design agreement with Monroe County for the pu . os - I : ein c s n e . i1 va r y 'f.lic d Y)'1\ ; 66ig NQ f " " " "' RE Print Name ,, Notar Pub MAGGIE P lic O - State NZA- KANAKIS of Florida ' /2i' . Z� My commission expires: 1 Se •. ;. f � =� Commission # FF 179176 ° -, ,4, Bonded through National Notary Assn. Page 2 of Amendment No. 13 EXHIBIT A -13 Amec Foster Wheeler's SCOPE OF SERVICES A. Construction Support Services and Engineering during Construction at Canal #83 Organic Removal, Backfilling, and Air Curtain Installation 1. Scope of Work: Amec Foster Wheeler will provide construction engineering and environmental site inspections and construction administration services for the Canal #83 Project. Adventure Environmental Inc. was selected as the construction contractor for the Canal #83 Project and provided a 120 day construction schedule for completion. Below are the services to be provided: a) Site Inspections: Amec Foster Wheeler will provide up to five hours of onsite oversight for the project Monday through Friday during field construction activities through March 2, 2017 and prepare daily work reports showing contractors activities, equipment, maintenance of traffic and environmental compliance. b) Construction Administration — Amec Foster Wheeler will provide consultation and advice to County regarding the Contractor's performance of the Contract. Amec Foster Wheeler will liaise with the County, homeowners, and other stakeholders as necessary to administer the construction contract through the estimated March 2, 2017 project completion date. 2. Deliverables: • Daily work reports • Progress pay estimates with back up documentation • Final Pay Estimate with back up documentation • Final "As -Built Plans" • Material certifications • Environmental Inspection Reports • Progress and Final Photographs (Electronic Files) 3. Budget: $ 88,612 A detailed cost spreadsheet is attached. Additional staff may be utilized as per the contract rate schedule. 4. Estimated Completion Date: Total Project Completion date of March 2, 2017. Page 1 of Exhibit A -13 ¥s$ /f ■ 88 8. 8 # &II■ 2 §�(§ d c _ J e 0 en kk f $§§ ° ° � • ) � I; - - _ & _Ne .0 2 & g a ems§■ § i /§- 882 5 8 § a■� § - _ �� a & | 0■- to 2 2 ;� & a 0 0 - «t I 0 2 ! CO § §� ■ } « § a § 2 E ° a 00 = B ` o =§ k \ k a 0■ c 8 qmm • 41881 4 a£ e, a. t §§ 2 8 } ■ k \ I ) / o £EBg 75 0 )i.5$) $!2)! /}))) k • \ ! E0 \ a } ■ « 0) o = { k 3 \ � \ .8, t u- 1 t l w § tfl 2 l�2J 4 . 7 k ! }k�kk § W 0 ! c « / � � ■ IQ § }. § 2 0 § } a / 2 § k $■ < 1 / q a }%j Amec Foster Wheeler Environment & Infrastructure, Inc. 2015 Schedule of Fees I. Personnel A. Professional (Engineer, Geologist, Scientist and Project Management) Staff I $71.00 /hour Staff II $77.00 /hour Project $86.00 /hour Senior $109.00 /hour Principal /Project Manager $155.00 /hour Senior Principal /Senior Project Manager $159.00 /hour Chief Engineer /Scientist $194.00 /hour B. Technical Services (Engineering and Science) Technician I $45.00 /hour Technician II $55.00 /hour Senior Technician I $60.00 /hour Senior Technician II $70.00 /hour Project Administrator /Project $75.00 /hour Coordinator /Subcontract Administrator /Project Accountant Technical Writer /Document Production $ 78.00 /hour CADD /Draftsperson (includes PC /CAD) I $66.00 /hour CADD /Draftsperson (includes PC /CAD) II $101.00.hour Admin I $40.00 /hour Admin II $52.00 /hour C. Surveying Services Field Surveyor I $43.00 /hour Field Surveyor II $47.00 /hour Survey Technician I $67.00 /hour Survey Technician II $72.00 /hour Survey Chief $75.00 /hour D. Information Management Software Engineer $92.00 /hour Data Technician $132.00 /hour Senior Software Engineer $162.00 /hour Business Analyst $132.00 /hour • E. Contract Labor From time to time, Amec Foster Wheeler retains outside Professional and Technical labor on a temporary basis to meet peak workload demands. Such contract labor will be charged at 10% markup. II. Expenses A. Travel Expenses 1. Transportation: Company pickup truck /personal vehicle, per mile — current allowable rate per County and Florida State Statutes a. Company pickup truck per day - $75.00 b. Common carrier or car rental multiplies by (to be the amounts authorized by Section 112.062, Florida Statutes 2. Per Diem Expenses: direct expenses in accordance with Florida State Statutes B. Disposal of Hazardous Waste Samples Samples of waste will be disposed by permitted methods after a determination is made that the waste is defined by RCRA to be hazardous. Due to the requirements for some hazardous assessments, disposal and invoicing of incurred expenses may take place after invoicing of the originally contracted work. C. Equipment / Other Expenses (Does not include personnel) Digital Field Documentation Equipment (cameras, $75.00 /day (min 2 days water level & measuring tape, GPS units, etc.) Geophysical Equipment (GPR Equipment) $1,000.00 /day (min 2 days) Underwater Camera Equipment/Video up to 50 $1,900.00 /day feet depth and low turbidity Environmental Monitoring & Sampling $100.00 to $450.00 /day Equipment (dust, OVA, Air monitoring, Noise Depending upon the equipment and scale Meter, Light Meter) required Special equipment or supplies, permits, shipping Actual cost x 1.15 charges, special printing or other items not customarily provided by Amec D. Communications In -house costs for long distance phone, telex, telecopier, postage — project labor charges x 5% 111. Subcontract Subcontract services will be invoiced at a cost multiplied by 1.15