Loading...
Ramp Installation 03/07/2017TASK ORDER FOR PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES BETWEEN MONROE COUNTY AND BENDER & ASSOCIATES ARCHITECTS, P.A. FOR EAST MARTELLO SANCHEZ GALLERY ADA RAMP INSTALLIATION KEY WEST, FLORIDA In accordance with the Consultant Agreement for Professional Architectural and Engineering Services, made and entered into on the 21" day of January, 2015, and as amended on the 18 day of January, 2017, between MONROE COUNTY, hereinafter referred to as the "County," and BENDER & ASSOCIATES ARCHITECTS, P.A., hereinafter referred to as "Consultant," where professional services are allowed if construction costs do not exceed Two Million and 00 /100 ($2,000,000.00) Dollars, or for study activity if the fee for professional services for each individual study under the contract does not exceed Two Hundred Thousand and 00 /100 ($200,000.00) Dollars, (hereinafter referred to as the "Agreement "). All terms and conditions of the referenced Agreement apply to this Task Order, unless this Task Order amends, adds, or modifies a provision or an Article of the Agreement of which will be specifically referenced in this Task Order and the amendment, addition, or modification shall be precisely described. These additions apply only to the project referenced in this Task Order. This Task Order is effective on the _? of jnorc,� 2017. WHEREAS, on October 17 2012, the BOCC approved a Contract with Consultant for the East Martello Tower ADA Upgrades in the amount of Fifteen Thousand and 00 /100 ($15,000.00) Dollars in accordance with the annual Contract for Professional Services dated January 20, 2010, as renewed on November 20, 2013, and terminating on January 19, 2015; and WHEREAS, grant funding for the ADA Upgrades during the county -wide ADA Compliance projects ran out before the East Martello project could begin; and WHEREAS, the Tourist Development Council (TDC) awarded the County funding for the East Martello ADA Upgrades in fiscal year 2016; and WHEREAS, during construction it was determined that access to the Sanchez Gallery at East Martello needed ADA access by constructing an ADA ramp; and NOW THEREFORE, in consideration of the mutual promises contained herein, the County and Consultant agree to this Task Order based on their current annual Professional Architectural and Engineering Services Agreement dated January 21, 2015, and as amended on January 18, 2017, for Professional Services associated with the Sanchez Gallery Ramp as follows: 1. In accordance with Article II SCOPE OF BASIC SERVICES of the Professional Architectural and Engineering Services Agreement, the Consultant will perform services as described below: a. Consultant shall conduct an on -site evaluation of existing conditions, develop details for discussion, conduct a meeting with the County and Key West Art and Historical Society staff and provide a draft and final report. This evaluation will be referred to as the Consultant's "assessment findings" and will be utilized to determine the scope of the construction bid. b. Consultant shall utilize the scope of work required in the assessment findings as the basis of design and then detail these areas on the construction documents. The Consultant shall prepare drawings and specifications that comply with the Secretary of the Interior's Standards and coordinate with and obtain approvals from the County, State Division of Historical Resources, and the Key West Historic Architectural Review Commission (HARC). c. Consultant shall provide construction bidding services to include evaluating qualifications' submittals, listing contractors meeting the requirements, evaluating all bids, and making a recommendation for award. Consultant shall attend the pre -bid conference(s) and respond to bidder questions by addenda. d. Consultant shall provide construction administration services including: conducting, at a minimum four (8) on -site progress meetings to confirm compliance with the contract documents, filing field reports, approving contractor's submittals, answering contractor's questions, reviewing and recommending approval of contractor invoices, and final punch list /acceptance. 2. In accordance with Article VII paragraph 7.1.1, the County shall pay the Consultant a lump sum fee of Five Thousand Three Hundred and 00 /100 ($5,300.00) Dollars paid on percent complete basis for the following phases: a. Assessment & Design — consisting of a final assessment report— $1,500.00 upon document review and approval by the Director of Project Management. b. Construction Documents — consisting of drawings and specifications setting forth in detail the requirement for the construction of the project — $2,500.00 upon document review and approval by the Director of Project Management. c. Construction Administration - $1,300.00 upon final acceptance. All other Terms and Conditions of the Task Order shall remain in accordance with the Agreement dated January 21, 2015, and as amended on January 18, 2017. IN WITNESS WHEREOF, each party caused this Task Order to be executed by its duly authorized representative. DIREC "I' R, PROJECT MANAGEMENT IV Doug Sposito CONSULTANT: Beiidei° WAssocAa ��rchitects, P.A. MONFRE COUNTY ATTORNEY'S OFFICE R10 A O RM PATRICIA FABLES ASSISTAN COUNTY A70RNE ELATE• - -/