Loading...
4th Amendment 12/10/2014AMY REAVILIN, CPA CLERK OF CIRCUR COURT &COMPTROLLER xaxnoe roam, FLORIDA DATE: January 6, 2015 TO: Roman Gastesi County Administrator ATTN: Connie Cyr FROM: Lindsey Ballard, D.C\V At the December 10, 2014, Board of County Commissioner's meeting the Board granted approval and authorized execution of Item M8 Amendment No. 4 to the contract with AMEC for the selection of canal demonstration projects and homeowner coordination services to provide additional services related to homeowner approvals for implementation of the active demonstration projects, a time extension of two hundred seventy three (293) days retroactive from September 30, 2014 to July 15, 2015, and an increase in budget of $14,935.50. Enclosed is a duplicate original of the above - mentioned for your handling. Should you have any questions, please feel free to contact my office. cc: County Attorney Finance ,/File OR" 500 Whitehead Street Suite 101, PO Box 1980, Key West FL 33040 Phone: 305 -295 -3130 Fax: 305- 295 -3663 �D 3117 Overseas Highway, Marathon, FL 33050 Phone: 305 - 289 -6027 Fax: 305- 289 -6025 88820 Overseas Highway, Plantation Key, FL 33070 Phone: 852 -7145 Fax: 305 - 852 -7146 440 S c A . AMENDMENT NO.4 TO THE CONTRACT FOR ENGINEERING SERVICES FOR THE SELECTION OF CANAL DEMONSTRATION PROJECTS AND HOMEOWNER APPROVAL COORDINATION THIS AMENDMENT NO. 4 dated December 10, 2014 to that Contract dated the 15` day of May, 2013, as amended September 17, 2013 and November 10, 2013, and April 16, 2014 by and between Monroe County, "COUNTY," and AMEC Environment & Infrastructure, Inc., "CONSULTANT"; WITNESSETH: WHEREAS, the COUNTY has agreed to proceed with several demonstration projects to test various methods for canal restoration techniques to verify the applicability, feasibility, effectiveness and costs in real time of the techniques on the canals; and WHERES, much progress has been made under this CONTRACT; and WHEREAS, additional services are needed to coordinate the participation of the hundreds of homeowners living on the canals of the six active County demonstration projects; and WHEREAS, additional time is required to complete the process of homeowner participation approval and participation in the demonstration projects; NOW, THEREFORE, in consideration of mutual promises, covenants and CONTRACTs stated herein, and for other good and valuable consideration, the sufficiency of which is hereby acknowledged, COUNTY and CONSULTANT agree as follows: 1. This AMENDMENT NO.4 provides an additional amount not to exceed Fourteen Thousand Nine Hundred and Thirty Five Dollars and Fifty Cents ($14,935.50) for homeowner coordination services. The overall CONTRACT value is increased from Ninety Seven Thousand Two Hundred Seventy Five Dollars and Thirty Eight Cents ($97,275.38) to One Hundred Twelve Thousand Two Hundred and Ten Dollars and Eighty Eight Cents ($112,210.88). 2. This CONTRACT shall be extended by 293 days, retroactively from September 30, 2014 to July 20, 2015. A final payment request form shall be submitted by July 15, 2015. 3. AMEC will continue to provide assistance in obtaining homeowner approvals for implementation of the demonstration projects as specified in Exhibit "4 -1" attached, including budget attachment and schedule of fees. Page 1 of Amendment No. 4 e .. �-W-WgNESS WHEREOF, each party caused this AMENDMENT NO. 4 to be executed by its t#ul 4uthorized representative on the day and year first above written. (SEAL ) BOARD OF COUNTY COMMISSIONERS Attest', RK OF MONROE COUNTY, FLORIDA By: � By: Deputy Clerk yorkAairman Date: &(O. (Seal) AMEC ENVIRONMENT & INFRASTRUCTU INC. Attest: By: MONROE COUNTY ATTORNEY PROVED�� FO, M NATILEENE W. CAS / S / EL ASSISTANT COUNTY ATTORN Y Date By: WITNESS By: WITS SS Page 2 of Amendment No. 4 EXHIBIT 4 - 1 SCOPE OF SERVICES ASSISTANCE WITH OBTAINING HOMEOWNER APPROVALS FOR IMPLEMENTATION OF CANAL RESTORATION DEMONSTRATION PROJECTS There are numerous tasks that are required to obtain the necessary homeowner approvals for implementing the Monroe County funded Canal Demonstration Projects. Owner Approval Agreements AMEC will work to obtain the required agreements with homeowners to implement the six canal demonstration projects currently under design/permitting: • Canal #29 Backfilling • Canals #277 and #459 Culverts • Canal #266 Organic Removal and Weed Barrier • Canal #290 Organic Removal, and • Canal #287 Weed Barrier AMEC will obtain the homeowner approvals required for the South Florida Water Management District's Environmental Resource Permit, United States Corp of Engineer's Permit and Florida Keys National Marine Sanctuary's Permit. AMEC will assist Monroe County staff in preparing draft agreements for Monroe County review with proposed equipment staging areas and construction areas and provide conceptual design details of the proposed construction. AMEC will assist Monroe County in obtaining homeowner signatures on the access agreements. AMEC will communicate with homeowners to answer their questions related to the restorations. AMEC will assist Monroe County staff in preparing draft agreements for Monroe County review for proposed equipment installation areas and provide final design details of the proposed equipment and associated enclosures and electric hookups. AMEC will assist Monroe County in obtaining homeowner signatures on the access agreements. AMEC will communicate with homeowners to answer their questions related to the restorations. DELIVERABLE: Monthly activity reports summarizing work completed that month, next month's action items and projected schedule. Due to the unknown and variable nature of the scope of work contained in this task (e.g. first time setting up these agreements in Monroe County, inaccessible homeowners) it is proposed that AMEC will perform these serves on a time and material basis not to exceed the authorized amount. The attached spreadsheet provides the estimated hours by the anticipated staff level. A labor rate sheet is also included for additional potential staff levels that may be involved in this scope of work. Total Cost Amendment #4, Not to Exceed: $ 14,935.50 Page 3 of Amendment No. 4 ATTACHMENT Page 4 of Amendment No. 4 Cost Estimate Monroe County Homeowner Approval Coordination Amendment #4 11/19/2014 5:41 PM Amendment #4 - Cost Estimate for Services Related to Obtaining Homeowner Approvals Estimated Labor Title Labor Category Contract Rate Hours Total Cost Senior Project Manager A $159.00 20 $3,180.00 Principal /Project Manager A $155.00 47 $7,285.00 Senior Engineer A $109.00 10 $1,090.00 Project Staff A $86.00 15 $1,290.00 GIS /CADD I B $66.00 10 $660.00 Admin 11 B $52.00 20 $1,040.00 Subtotal Labor: $14,545.00 Expenses Unit Rate Quantity Total Cost Misc (copying, postage) per letter $1.32 100 $132.00 Mileage per mile $0.445 500 $222.50 Misc per event $36.00 1 $36.00 Subtotal Expenses: $390.50 TOTAL PROJECT COST: $14,935.50 11/19/2014 5:41 PM AMEC ENVIRONMENT & INFRASTRUCTURE, INC 2414 SCHEDULE OF FEES (STANDARD A) I. Personnel A. Professional (Engineer, Geologist, Scientist and Project Management) Staff I $71.00 /hour , Staff II $77.00 /hour Project I $86.00 /hour Senior $109.00 /hour Princioal /Project Manager $155.00 /hour Senior Principal/Senior Project Mara er $159.00 /hour Chief Engineer/Scientist $194.00 /hour B. Technical Services (Engineering and Science) Technician I $45.00 /hour Technician II $55.00 /hour Senior Technician I $60.00 /hour Senior Technician II $70.00 /hour Project Administrator /Project Cocrdinator /Subcontract Administrator /Project Accountant $75.00 /hour Technical Writer /Document Processor $78.00 /hour CADD /Drafts erson includes PC/CAD I $66.00 /hour CADD /Drafts erson includes PC /CAD II $101.00 /hour Admin I $40.00 /hour Admin II $52.00 /hour C. Surveying Services Field Surveyor I $43.00 /hour Field Surveyor 11 $47.00 /hour Survey Technician I $67.00 /hour Survey Technician 11 $72.00 /hour Surrey Party Chief $75.00 /hour D. Information Management Software Engineer $92.00 /hour Data Technician $132.00 /hour Senior Software Engineer $162.00 /hour Business Analyst $132.00 /hour AMEC EwRCNME!IT & INFRASTRUCTURE, INC 2014 SCHEDULE OF FEES (STANDARD A) PAGE 2 E. Contract Labor From time to time, AMEC retains outside Professional and Technical labor on a temporary basis to meet peak workload demands. Such contract labor will be charged at a 10% markup.. II. Expenses A. Travel Expenses 1. Transportation: Company pickup truck/personal vehicle, per mile - $0.44- a. Company pickup truck per day - $75.00 b. Common carrier or car rental multiplies by (as covered in 7.3.1 of the Contract to be the amounts authorizes by Section 112.062, Florida Statutes) 2. Per Diem Expenses: direct expenses in accordance with Florida State Statutes B. Disposal of Hazardous Waste Samples Samples of waste will be disposed by permitted methods after a determination is made that the waste is defined by RCRA to be hazardous. Due to the requirements for some hazardous assessments, disposal and invoicing of incurred expenses may take place after invoicing of the originally contracted work. C. Equipment / Other Expenses (Does not include personnel) Digital Field Documentation Equipment $75.00 /day (min 2 days) (cameras, water lever & measuring tapes, GPS units, etc. Geophysical E quipmen t GPR Equipment) $1,000 1da min 2 days Underwater Camera Equipment/Video up to $1,900.00 1day 50 feet de and low turbidi Environmental Monitoring & Sampling Equipment $100.00 to $450.00 /day (Dust, OVA, Air Monitoring, Noise Meter, Light Meter) Depending on the equipment and scale re quired Special equipment or supplies, permits, Actual cost x 1.15 shipping, charges, special printing or other items not customarily provided by AMEC D. Communications In -house costs for long- distance phone, telex, telecopier, postage — project labor charges x 5% III. Subcontract Subcontract services will be invoiced at a cost multiplied by 1.15.