Loading...
9th Amendment 11/17/2015AMY REAVILIN, CPA CLERK OF CIRCUIT COURT &COMPTROLLER MONROE COUNTY, FLORIDA DATE: December 31, 2015 TO: Rhonda Haag Sustainability Program Manager FROM: Cheryl Robertson Executive Aide to the Clerk of Court & Comptroller c&4 �obw At the November 17, 2015 Board of County Commissioner's meeting the Board granted approval and authorized execution of Item Q6 Approval of Amendment No. 9 with AMEC Foster Wheeler Environment & Infrastructure, Inc. to provide canal restoration water quality improvement services, as provided and funded under EPA Grant Agreement X7- 001340915 -01 entitled Improving Water Quality in Residential Canals. Enclosed is a duplicate original of the above - mentioned for your handling. Should you have any questions, please feel free to contact my office. cc: County Attorney Finance File V 500 Whitehead Street Suite 101, PO Box 1980, Key West FL 33040 Phone: 305- 295 -3130 Fax. 305 - 295 -3663 3117 Overseas Highway, Marathon, FL 33050 Phone: 305- 289 -6027 Fax: 305- 289 -6025 88820 Overseas Highway, Plantation Key, FL 33070 Phone: 852 -7145 Fax: 305- 852 -7146 AMENDMENT NO.9 TO THE CONTRACT FOR ENGINEERING SERVICES FOR THE SELECTION OF CANAL DEMONSTRATION PROJECTS AND HOMEOWNER APPROVAL COORDINATION 1`7 THIS AMENDMENT NO. 9 dated November , 2015 to that Contract dated the 15 day of May, 2013, between AMEC Foster Wheeler Environment & Infrastructure, Inc., "CONSULTANT" and Monroe County, "COUNTY," as amended September 17, 2013 (Al) , November 10, 2013 (A2), April 16, 2014 (A3), December 10, 2014 (A4), December 10, 2014 (A5), February 18, 2015 (A6), May 20, 2015 (A7), and July 15, 2015 (A8). WITNESSETH: WHEREAS, the COUNTY has agreed to proceed with several demonstration projects to test various methods for canal restoration techniques to verify the applicability, feasibility, effectiveness and costs in real time of the techniques on the canals; and WHERES, much progress has been made under this CONTRACT; and WHEREAS, additional services are needed to fulfill an Environmental Protection Agency ( "U.S. EPA ") grant awarded to the COUNTY in October, 2015 to perform bench scale testing for removal of salt from dewatered organic muck, evaluate alternative technologies for addressing organic muck, evaluate alternative technologies for water quality improvements in canals, and develop a business plan for Canal Management; and WHEREAS, such additional services are being 100% funded by the U.S. EPA Grant Agreement X7- OOD40915 -0 awarded to the COUNTY, and; WHEREAS, the EPA grant completion date is July 31, 3016 for completion of such tasks by the COUNTY; and WHEREAS, a CONTRACT time extension from December 31, 2015 to June 30, 2016 is required to allow for AMEC's completion of the EPA grant tasks under this Contract, which allows the County 30 days to get all tasks completed by the grant deadline of July 31, 2016; and NOW, THEREFORE, in consideration of mutual promises, covenants and contracts stated herein, and for other good and valuable consideration, the sufficiency of which is hereby acknowledged, COUNTY and CONSULTANT agree as follows: 1. This AMENDMENT NO. 9 provides an additional Seventy Three Thousand Nine Hundred Nine Dollars and Sixty Six Cents ($73,909.66) for professional services to complete tasks related to bench scale salt leaching, alternative technology evaluations and identification of funding mechanisms for canal restorations and Page 1 of Amendment No. 9 ensure that they are fully completed in accordance with the EPA grant requirements. The overall CONTRACT value is increased from One Hundred Forty Nine Thousand Seven Hundred Ten Dollars and Seventy Four Cents ($149,710.74) to Two Hundred Twenty Three Thousand Six Hundred Twenty Dollars and Forty Cents ($223,620.40). ci" L W W C=) Ll. N 2. AMEC will provide the scope of services as specified in Exhibit "9 -1" attached, including the detailed budget attachment and associated schedule of fees. 3. This Amendment No. 9 shall be effective as of the date above. All work under this Amendment No. 9 shall be completed by June 30, 2016. The Grantee shall be eligible for reimbursement for work performed on or after the effective date of this Amendment through the expiration date of this Amendment No. 9. IN WITNESS WHEREOF, each party caused this AMENDMENT NO. 9 to be executed by its duly authorized representative on the day and year first above written. By: " L6 Signa o Witness Print Name: Date: �k I �\ C.� O .cam L J Ci3 C3: U- BOARD OF COUNTY COMMISSIONERS OF MONROE CO NTY, FLORIDA By: May//Ch(/an AMEC FOSTER WHEELER ENVIRONMENT & I STR TURE NC. f f �1 r for A EC FOSTE EE ame: �/� � / 7 R- • 1P Title: D/��� /y ft�-11� Date: // AllJ I — , EXHIBIT 9 - 1 WORK PLAN 1.0 Purpose and Project Objectives The Water Quality Protection Program (WQPP) Action Plan of the Florida Keys National Marine Sanctuary (FKNMS) identifies impaired water quality in residential canals as a priority for corrective action (FDEP, 2013). Of the 502 residential canals in the Keys 311 do not meet the State's water quality standards and are a source of nutrients and other pollutants to near shore waters. Water quality problems in residential canals are the result of inadequately treated wastewater and storm water, poor tidal circulation and accumulation of organic debris, and include high biochemical oxygen demand, eutrophication, and production of hydrogen sulfide and increases in fecal bacteria. Monroe County has completed a Canal Management Master Plan (CAMP) which assessed all 502 residential canals and developed a prioritization process for need for restoration. The CMMP identified canals impaired due to low dissolved oxygen, high organic matter, poor flushing, and poor water clarity. The County has also undertaken a Canal Restoration Demonstration Program to evaluate restoration techniques to correct these impairments. During the implementation of the Demonstration Program several data needs have been identified. The objective of the proposed scope of work is to obtain information to address these data needs which will greatly enhance future water quality improvement strategies for canal restorations. These data needs are addressed in four separate tasks and include: 1) evaluation of dredged sediment treatment options that would increase beneficial reuse of dredged canal sediments, 2) evaluation of alternative technologies to vacuum dredging of high organic sediments to include in -situ removal /inactivation of the organics, 3) research and evaluation of available alternative technologies beyond those currently included in the CMMP to identify passive water column treatments to improve water quality that may be more cost effective; and 4) development of a Business Plan that identifies priorities and available funding strategies for future canal restorations and operation and maintenance. 2.0 Methods and Approach 2.1 Description of Maior Tasks •- In order to achieve the objectives defined above, Amec Foster Wheeler proposes to conduct the following tasks. The purpose of this project will be to complete Tasks 1 through 3 and assess their feasibility for broad application. Task 4 can be applied to any restoration and its operation and maintenance that has been accepted as effective. Task 1: Bench Scale Testing to Assist with Beneficial Re-Use of the Organic Sediment Removed from Canal Bottoms Beneficial reuse of the organic muck removed during water quality improvement projects is one of the goals of the Monroe County Sustainability Program and the most cost effective solution to dispose of the material. However, additional testing is required regarding initial Page 1 of Exhibit 9 -1 salt concentrations in the organic muck and effective method(s) to reduce the salt content to concentrations that will allow use of the organic muck as a potential soil amendment. Background: The purpose of this study is to perform a treatability study, consisting of bench scale testing, for beneficial reuse of the dredged organic material removed from residential canals in the Keys. The main objective for this task is to determine the requirements for reducing the salinity in the muck to acceptable levels for use as a soil amendment for landscaping. To provide additional options for beneficial reuse of the canal sediments with no exceedance of Florida Department of Environmental Protection (FDEP) soil standards, Amec Foster Wheeler intends to develop a stand -alone sediment washing technology. The technology must be easy to implement, reliable, economically feasible, and require a small area. A main objective of the testing will be to determine the quantity of water and time required to accomplish successful salt leaching. The initial salt content of the sediments, the desired level of soil salinity after sediment washing, and the physical and chemical characteristics of sediments are major factors to determine the amount of water needed for reclamation. Methods: Sediments from Canal #266 in Doctor's Arm are proposed to be used for the bench scale study. These sediments meet FDEP soil standards; however their high salinity content ( >16 dSm) limits the potential options for soil reuse. The objective of this study is to reduce salinity to concentrations that have no significant detrimental effects to most plants (<4 dSm). In order to achieve a reliable estimate of the water required to remove the salt, a salt leaching curve will be generated. Sediment porosity and pore volume will be calculated following the procedures described in Wasay et al. 2001. The best alternative to reduce salinity in sediments will be determined by testing: 1) the addition of varying freshwater pore volumes (saturation vs oversaturated sediments), and 2) the effect of contact time (e.g. 12, 24, 48, 268 hrs) before leaching. Dissolution of salt from sediments will be determined by analyzing the electrical conductivity (EC) concentration in the sediment at different time intervals for the different pore volume treatments and in the resulting leachate. Iterative changes in test variables will be attempted until the minimum desired salinity concentration (4 dS /m) is achieved. EC data will be used to develop a salinity leaching curve that will correlate the remaining salinity concentration in the sediment, to the volume of water and contact time required to achieve that concentration. The salinity leaching curve will assess the efficiency of each treatment and will assist in the development of the field soil washing treatment procedure at future dredge projects. Task 2: Alternative Technologies Evaluation to Address Accumulated Organic Material in Canal Bottoms Due to the high cost of muck removal, and the widespread need for this technology in the Keys for canal restorations; an evaluation will be completed to see if alternative technologies may be a viable means to reduce the presence of accumulated muck in a more cost effective way than standard dredging and off -site disposal. Background: The recent contract for the muck removal demonstration projects has a total project cost of $2M for the removal and disposal of 13,000 cubic yards (CY) of muck material; which corresponds to a unit cost $150 /CY. The CMMP estimates that at least 40 canals may benefit from the removal of accumulated organic -rich muck. Therefore, alternative technologies such as capping, thermal desorption, and anaerobic digestion will be evaluated to Page 2 of Exhibit 9 -1 determine if they provide more cost effective methods to reduce the presence and effect of the oxygen- demanding organic sediments. Methods: The first phase of the evaluation that Amec Foster Wheeler will complete will be desktop research to identify technologies that are being used in other industries to address organic matter. The second phase of evaluation will identify the pros and cons for each technology. The alternative technologies will be evaluated based on effectiveness, ability to implement (including permitting), time frame for implementation, and potential reduction in cost. The third phase will be to develop conceptual designs for the top two alternative technologies. Additionally, an engineering cost estimate will be developed for the two alternative technologies by assuming a treatment volume of 5,000 CY of muck, or a 0.5 acre canal if the cost of the technology is area dependent. Task 3: Alternative Technologv Evaluation for Water Ouality Improvements in Canals In this task, Amec Foster Wheeler will identify potential passive remediation technologies, not included in the Monroe County CMMP, that may restore and maintain water quality conditions in canal systems to levels that are consistent with the State water quality criteria for Class III waters. Back r� The current CMMP provided a preliminary list of restoration technologies that had previously been implemented and noted as effective for improving water quality. However, some of the remedial actions being considered, such as removal of accumulated organics from the bottom of the canals, backfilling to remove deep stagnant zones, and pumping to enhance circulation are expensive, highly dependent on mechanical equipment, and have long term maintenance needs and costs. Other technologies not previously implemented in the Keys canals may offer options for cost effective restorations. Methods: This study shall seek to identify passive and low energy intensive technologies. The passive technology investigation will primarily focus on the implementation of aquaculture (use of organisms, such as macro algae and filter feeders) to improve water quality, and microbes and fungi to promote anaerobic digestion. Additionally, the research will also focus on identifying less intensive technologies that may be capable of achieving the same results as more robust or expensive technologies; such as using check dams or sheet piles to isolate the deeper impaired zones in the canals rather than uniform backfilling. Phase I will consist of data mining to identify all passive technologies, which have been implemented or evaluated to improve water quality. A special emphasis will be placed on technologies that improve low dissolved oxygen and eutrophication issues. Phase II will consist of a matrix development to evaluate which of the alternatives identified in Phase I better address the water quality issues in the Keys canals. The matrix will consider the five principal requirements for the selection of remedies established by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, section 121 of the Superfund Statute), EPA's nine criteria for evaluating remedial alternatives, as well as additional considerations specifically related to canal restorations in the Keys. Phase III will consist of developing a conceptual design for the top two alternative technologies identified in Phase I1. Task 4: Development of a Business Plan for Canal Management Canal restorations require a reliable and equitable funding mechanism in order to ensure implementation of the CMMP and long term operations and maintenance of the restoration Page 3 of Exhibit 9 -1 systems. Adequate long term and guaranteed funding is required to improve the water quality in the impaired canals in order to meet state water quality standards. Background: Upon completion of the demonstration restoration projects underway, Monroe County is financially challenged to undertake further canal restoration efforts due to a lack of resources and long -term operation and maintenance funding strategy. With minimal funding currently committed to additional canal restorations, a method to fund the required restorations is paramount to moving forward and accomplishing the goals of the CMMP. Task 4 is designed to set forth a path for creating the critically needed resources to keep the program moving forward. Methods: Development of a Business Plan will estimate expenditures and priorities for a 10 year program of canal restorations and maintenance, including analysis of available funding strategies for distribution of costs using available legal authority, tools and policies. This scope will include Amec Foster Wheeler research and development of recommendations, steps for implementation for potential Municipal Services Taxing Units (MSTU's) or similar tools for maintenance and construction activities. The Business Plan will include implementation steps, a timeline, identification of potential barriers, and strategies for engagement of stakeholders. Cash flow analysis and cost of service are forecast for at least a five -year period and possibly for a 15 -20 year horizon, along with revenue or resource options and implementation strategies. Upon completion of the Business Plan, the County will have a practical guide to achieving its strategic goals. Strategy and Process Refinement is the kickoff event for the overall project, and will engage County leadership and staff to refine the overall process and to: 1) Establish a Canal Financial Advisory Committee of senior representatives from across the County to provide input and feedback on the development and integration of funding analysis and the implementation of the CMMP. 2) Hold two briefings of the County leadership to discuss and capture findings and issues for effective decision - making on the implementation of the canal restoration program. The initial meeting with the senior leadership will capture objectives, expectations, identification of acceptable funding options for the long -term management of the Canal Restoration program. An additional leadership briefing will held for presentation of the draft Business Plans. The Business Plan will focus on an document: 1) Defined goals and priorities; 2) Defined services and capital investments in the Canal Restoration program; 3) Identification and analysis of funding options available to the County, including barriers and implementation requirements; 4) Prioritization of funding options with recommendation on mix of resources; and, 5) Analysis of implementation strategies for new funding options and a process for moving forward to implementation. 3.0 Deliverables 3.1 Bi- Annual Reports — Bi- annual progress reports will be prepared and submitted to Monroe County for the period ending November 30, 2015 and May 30, 2016. These reports will consist of updates on progress toward work objectives, approach, results to date, any problems encountered, actions taken to resolve problems, discussion of remaining tasks, and expenditures to date. Page 4 of Exhibit 9 -1 3.2 Task Deliverable Items and Schedule Task 1- Bench Scale Testing to Assist with Beneficial Re-Use of the Organic Sediment Removed from Canal Bottoms: A report will be prepared detailing the bench scale test method and results along with a recommended soil washing methodology. Schedule: within 3 months of Notice -to- Proceed (NTP). Task 2 - Alternative Technologies Evaluation to Address Accumulated Organic Material in Canal Bottoms: A report will be prepared compiling the applicable alternative technologies, components of each technology, method of implementation, and potential ability to reduce the cost of muck removal. A ranking matrix will be included supporting a discussion on the development of the matrix. Two conceptual designs and engineering cost estimates will be prepared. Schedule: within 6 months of NTP. Task 3 - Alternative Technology Evaluation for Water Ouality Improvements in Canals: A report will be prepared summarizing the findings of the data mining, which will include a description of all applicable technologies, a ranking matrix of the identified technologies with supporting discussion on the development of the matrix. Two conceptual designs and cost estimates will be prepared. Schedule: within 8 months of NTP. Task 4 - Development of a Business Plan for Canal Management: 1. Two meetings, documented by meeting minutes, with County leadership to discuss funding mechanism, Business Plan content, analysis financial factors and overall implementation policies. 2. Draft Business Plan for addressing long -range program planning and funding for the CMMP. Schedule: Completion within 9 months of NTP. 4.0 Fees Amec Foster Wheeler will complete the above tasks for a not to exceed fee of $73,909.66 based upon the contract labor rates as presented in Table 1. Additional staff may be deemed necessary to complete the work beyond those identified in Table 1 and they will billed per the contract rate schedule also attached. Page 5 of Exhibit 9 -1 Table 1 Monroe County Canal Water Quality Improvements - Budget Detail Task 1 Bench Scale Testing to Assist with Beneficial Re -Use of the Muck Removed from Canal Bottoms Staff 1 $71.00 x hours - $0.00 Staff II - Pam Belloti $77.00 x 28 hours - $2,156.00 Project - Katherine Deliz $86.00 x 24 hours - $2,064.00 Senior- Stephen Hanks $109.00 x 6 hours - $654.00 Princi aWroect Manager - Wendy Blondin $155.00 x 12 hours - $1,860.00 Senior Principal - William Tucker $159.00 x 6 hours - $954.00 Chief Engineer/Scientist $194.00 x 5 hours - $0.00 CADD /Drafts erson 1 $66.00 x 10 hours - $0.00 Admin 11 - Maggie Kanakis $52.00 x 6 hours - $312.00 Laoor auoco[ai Expenses Laboratory expenses $1,000.00 x 1 Misc lab supplies $76.66 x 1 Sample Shipping $200.00 x 1.15 Expense Total: Total Task 1 Task 2 Alternative Technologies Evaluation to Address Accumulated Organic Material in Canal Bottoms w,uuu.uu $1,000.00 $76.66 $230.00 $1,306.66 $9,306.66 Staff 1 $71.00 x hours - $0.00 Staff II - Jeremy Paris $77.00 x 30 hours - $2,310.00 Project - Greg Coming $86.00 x 65 hours - $5,590.00 Senior- Stephen Hanks $109.00 x 80 hours - $8,720.00 Principal/Project Manager - Wendy Blondin $155.00 x 12 hours - $1,860.00 Senior Principal - Lance Lumbard $159.00 x 8 hours - $1,272.00 Chief Engineer/Scientist - Ricardo Fraxedas $194.00 x 5 hours - $970.00 CADD /Drafts erson I $66.00 x 10 hours - $660.00 Admin 11 $52.00 x 15 hours - $780.00 Task 3 Alternative Technology Evaluation for Water Quality Improvements in Canals acc,1oc.uu Staff 1 $71.00 x hours - $0.00 Staff II- Jeremy Paris $77.00 x 30 hours - $2,310.00 Project - Katherin Deliz $86.00 x 50 hours - $4,300.00 Senior - Stephen Hankns $109.00 x 80 hours - $8,720.00 Principal/Project Manager - Wendy Blondin $155.00 x 12 hours - $1,860.00 Senior Principal/Senior Project Manager - Lance Lumbani $159.00 x 20 hours - $3,180.00 Chief Engineer/Scientist - Ricardo Fraxedas $194.00 x 5 hours - $970.00 CADD /Drafts erson I - Jose Milan $66.001 x 10 hours - $660.00 Admin II - Maggie Kanakis 1 $52.001 x 1 10 hours 1 - $520.00 .WWI rasnJ Task 4 Identification of Funding Mechanisms for Canal Restorations yzz, *zu.uU Staff 1 $71.00 x hours - $0.00 Staff II $77.00 x hours - $0.00 Project $86.00 x hours - $0.00 Senior $109.00 x hours - $0.00 Princi I/Pmject Manager - Wendy Blondin $155.00 x 12 hours - $1,860.00 Senior Principal/Senior Project Manager - David Bulova $159.00 x 15 hours - $2,385.00 Chief Engineer/Scientist $194.00 x hours - $0.00 Chief Financial Anal st - Elizabeth Treadwa $231.00 x 56 hours - $12,936.00 CADD /Drafts erson I 1 $66.00 x I hours - $0.00 Admin II - Maggie Kanakis 1 $52.00 x 1 8 hours - $416.00 Airfare Rental car Hotel Per diem Total Task 4 TOTAL PROJECT BUDGET: Lauor ouototai 101 r,oyr.uu $500.000 2 $1,000.00 $45.000 4 days $180.00 $250.000 4 days $1,000.00 $47.000 4 days $144.00 Total Expenses $2,324.00 $19,921.00 $73,909.66 pl&mjecls \monroe munWmj mngmntAs 8/2512015 Amec Foster Wheeler Environment & Infrastructure, Inc. 2014 Schedule of Fees Personnel A. Professional (Engineer, Geologist, Scientist and Project Management) Staff I $71.00 /hour Staff II $77.00 /hour Project $86.00 /hour Senior $109.00 /hour Principal /Project Manager $155.00 /hour Senior Principal /Senior Project Manager $159.00 /hour Chief Engineer /Scientist $194.00 /hour B. Technical Services (Engineering and Science) Technician I $45.00 /hour Technician II $55.00 /hour Senior Technician I $60.00 /hour Senior Technician II $70.00 /hour Project Administrator /Project Coordinator /Subcontract Administrator /Project Accountant $75.00 /hour Technical Writer /Document Production $ 78.00 /hour CADD /Draftsperson (includes PC /CAD) I $66.00 /hour CADD /Draftsperson (includes PC /CAD) II $101.00.hour Admin I $40.00 /hour Admin II $52.00 /hour C. Surveying Services Field Surveyor I $43.00 /hour Field Surveyor II $47.00 /hour Survey Technician I $67.00 /hour Survey Technician II $72.00 /hour Survey Chief $75.00 /hour D. Information Management Software Engineer $92.00 /hour Data Technician $132.00 /hour Senior Software Engineer $162.00 /hour Business Analyst $132.00 /hour E. Contract Labor From time to time, Amec Foster Wheeler retains outside Professional and Technical labor on a temporary basis to meet peak workload demands. Such contract labor will be charged at 10% markup. II. Expenses A. Travel Expenses 1. Transportation: Company pickup truck /personal vehicle, per mile —current allowable rate per County and Florida State Statutes a. Company pickup truck per day - $75.00 b. Common carrier or car rental multiplies by (to be the amounts authorized by Section 112.062, Florida Statutes 2. Per Diem Expenses: direct expenses in accordance with Florida State Statutes B. Disposal of Hazardous Waste Samples Samples of waste will be disposed by permitted methods after a determination is made that the waste is defined by RCRA to be hazardous. Due to the requirements for some hazardous assessments, disposal and invoicing of incurred expenses may take place after invoicing of the originally contracted work. C. Equipment / Other Expenses (Does not include personnel) Digital Field Documentation Equipment (cameras, $75.00 /day (min 2 days water level & measuring tape, GPS units, etc.) Geophysical Equipment (GPR Equipment) $1,000.00 /day (min 2 days) Underwater Camera Equipment /Video up to 50 $1,900.00 /day feet depth and low turbidity Environmental Monitoring & Sampling $100.00 to $450.00 /day Equipment (dust, OVA, Air monitoring, Noise Depending upon the equipment and scale Meter, Light Meter) required Special equipment or supplies, permits, shipping Actual cost x 1.15 charges, special printing or other items not customarily provided by Amec D. Communications In -house costs for long distance phone, telex, telecopier, postage — project labor charges x 5% III. Subcontract Subcontract services will be invoiced at a cost multiplied by 1.15