Loading...
05th Amendment 10/21/2015AMY REAVILIN, CPS CLERK OF CIRCUIT COURT &COMPTROLLER Moxnoe couxrr, FLORIDA DATE: November 20, 2015 TO: Rhonda Haag Sustainability Program Manager FROM. • Cheryl Robertson Executive Aide to the Clerk of Court & Comptroller MAN wifflo At the October 21, 2015 Board of County Commissioner's meeting the Board granted approval and authorized execution of Item Q5 Amendment No. 5 to the contract with AMEC Foster Wheeler Environment and Infrastructure, Inc. for the Engineering Design, Permitting, Field Assessments, Project Management and Engineering Support Services for the Canal Demonstration Projects to extend the scope of services at Canal #290 in the Avenues in Big Pine Key for additional Construction Administration and Construction Engineering Inspection Services. Enclosed is a duplicate original of the above - mentioned for your handling. Should you have any questions, please feel free to contact my office. cc: County Attorney Finance File ✓ \ ( b 500 Whitehead Street Suite 101, PO Box 1980, Key West, FL 33040 Phone: 305 - 295 -3130 Fax: 305- 295 -3663 3117 Overseas Highway, Marathon, FL 33050 Phone: 305- 289 -6027 Fax. 305 - 289 -6025 88820 Overseas Highway, Plantation Key, FL 33070 Phone: 852 -7145 Fax: 305- 852 -7146 AMENDMENT NO. 5 TO THE CONTRACT FOR ENGINEERING, DESIGN AND PERMITTING SERVICES FOR THE CANAL DEMONSTRATION PROJECTS THIS AMENDMENT NO. 5, dated October 21, 2015, is entered into between the County and the CONSULTANT, to the Contract For Engineering, Design And Permitting Services, dated the 21' day of May, 2014, as amended September 17, 2014 (Al), February 18, 2015 (A2), May 20, 2015 (A3), and July 15, 2015 (A4) by and between Monroe County Board of County Commissioners, "COUNTY," and AMEC Foster Wheeler Environment & Infrastructure, Inc., "AMEC ". WITNESSETH: WHEREAS, much engineering and administrative coordination work has been performed under the Contract for design and construction oversight of the canal demonstrations projects; and WHEREAS, the organic removal project construction contractor JND Thomas has requested additional time under their construction contract to allow for the removal of muck within a five foot buffer zone of each canal side, which was at the request of the homeowners, and would also provide a more effective water quality improvement; and WHEREAS the schedule for construction, which includes Saturday work, has been extended accordingly; and WHEREAS, additional funds are required to fund the additional CEI onsite inspections by AMEC for the additional time needed; and WHEREAS, an extension of time is required to extend the AMEC contract from December 31, 2015 through February 29, 2016; NOW, THEREFORE, in consideration of mutual promises, covenants and contracts stated herein, and for other good and valuable consideration, the sufficiency of which is hereby acknowledged, COUNTY and AMEC agree as follows: 1. AMEC will provide the scope of services as specified in Exhibit "A -5" attached and made a part of this AMENDMENT No. 5. 2. This AMENDMENT No. 5 provides an additional amount not to exceed Fifty Nine Thousand Two Hundred Twenty Two Dollars and Eighty Six Cents ($59,222.86) for additional CEI construction support services of the organic removal project on canal #290 on Avenue J in Big Pine Key. The overall CONTRACT value is increased from Seven Hundred Twenty Five Thousand Two Hundred Twenty Three Dollars and Twenty Eight Cents ($725,223.28 to Seven Hundred Eighty Four Thousand Four Hundred Forty Six Dollars and Fourteen Cents ($784,446.14.) Page 1 of Amendment No. 5 3. Travel expenses are updated to reflect the revisions to the Monroe County rates. The mileage allowance rate of $0.53 per mile and the subsistence (meal) allowance rates for Breakfast of $6.50, Lunch of $13.50 and Dinner of $27.00 are authorized. IN WITNESS WHEREOF, each party caused this AMENDMENT NO. 5 to be executed by its duly authorized representative on the day and year first above written. ce) o_ tI N C) X11 N AMEC FOSTER WHEELER EVIRONMENT & INFRASTRUCTURE, INC. By: Print name �/C �0 Title: J;' IL ,7 Date: /O — O L - 20 J S" STATE OF FLORIDA COUNTYOF On this L day of 201 , before me, the undersi notary public, Personally appeared / V Q } d0 ri- , known tom to be the Person whose name is subscribed above or who produced As identification, and acknowledged that he /she is the person who executed the above Amendment #5 to Engineering and Design agreement with Monroe County for the purposes therein contained. J F �o � W J EL: 2 BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA 7 By: \ ayor airman By: IXA0 11" 40ki Not u c Print Name My commission expires: ZO I Page 2 of Amendment No. 5 MAGGIE PROENZA- KANAKIS Nohr / Public - State of Florida • MY Comm. Ex*n Mr 20.201$ COMM Is" # FF 179176 ' •�„ IonON tlMw� NMiona Nary Aux. EXHIBIT A -5 AMEC FOSTER WHEELER'S SCOPE OF SERVICES A. Construction Support Services And Engineering During Construction At Canal #290 Organic Removal Construction 1. Scope of Work: The AMEC Foster Wheeler's scope of work associated with the original contract for Engineering, Design and Permitting Services for Canal Demonstration Projects dated May 21, 2014 included work at Canal #290 Big Pine Key the Avenues Organic Removal related to Construction Support Services and Engineering during Construction which was identified as Task 7. The scope included daily site inspections and construction administration for the organic removal project. The Organic Removal project construction contractor JND Thomas has requested additional time under their construction contract to allow for the removal of muck within a five foot buffer zone of each canal side, which was at the request of the homeowners, and would also provide a more effective water quality improvement. The contractor also requested to extend the work week to include Saturdays. JND Thomas provided an updated schedule which extended their construction completion date to February 5, 2016. Additional funds are required to fund the additional CEI onsite inspections by AMEC for the additional time needed by the contractor to complete the project. An extension of time is also required to extend the AMEC contract from December 31, 2015 through February 29, 2016; a) Site Inspections: AMEC will oversight the contractor for up to 4 hours a day for Monday through Saturday field construction activities through February 5, 2016 and prepare daily work reports showing contractors activities, equipment, maintenance of traffic and environmental compliance. b) Construction Administration - AMEC will provide consultation and advice to County regarding the Contractor's performance of the Contract. AMEC will liaise with the County, homeowners, and other stakeholders as necessary to administer the construction contract through the estimated Feb 5, 2016 project completion date. 2. Deliverables: • Daily work reports • Progress pay estimates with back up documentation • Final Pay Estimate with back up documentation • Final "As -Built Plans" • Material certifications • Environmental Inspection Reports • Progress and Final Photographs (Electronic Files). 3. Budget: $ 59,222.86 A detailed cost spreadsheet is attached. Additional staff may be utilized as per the contract rate schedule. 4. Estimated Completion Date: Total Project Completion date of February 5, 2016. Page 1 of Exhibit A -5 AMEC Foster Wheeler, E&I, Inc. Client Monroa County oar: 101112015 Scope: Engineering Support during Construction of the Organic Removal at Canal 9299, Big Pine Key Rahn,-: Amendment SS dated October 21, 2015 AMEC Fcater Made, Leber Cl —Hicad ni Disciolim HourIv Rate EaginaeI 9 Suppon During Contebuclon CA and CEI during construction HOURS COST P— LPro Slog 155. 38 8 Stag 11 -J_ Pas 7 8 1 Senor 1. 5 hen H.M. 5109. 20 v 270 Senor Tech 11- ONea Oa0aak Tech S- 70. 19 LABOR SUBTOTAL 6211 662 N. LMIT RATES 3UNST ACTUALS eety COST PER UNIT CA and CEI during conbuadon UNITS COST Gaa (60.53/mMe) Tumid Mater nlnlal $0.53 534000 10 5.7W 1370. 7132 TOTAL CIS and CA Scope far Canal SM: $ 59,722Je Amec Foster Wheeler Environment & Infrastructure, Inc. 2015 Schedule of Fees Personnel A. Professional (Engineer, Geologist, Scientist and Project Management) Staff I $71.00 /hour Staff II $77.00 /hour Project $86.00 /hour Senior $109.00 /hour Principal /Project Manager $155.00 /hour Senior Principal /Senior Project Manager $159.00 /hour Chief Engineer /Scientist $194.00 /hour B. Technical Services (Engineering and Science) Technician I $45.00 /hour Technician II $55.00 /hour Senior Technician I $60.00 /hour Senior Technician II $70.00 /hour Project Administrator /Project Coordinator /Subcontract Administrator /Project Accountant $75.00 /hour Technical Writer /Document Production $ 78.00 /hour CADD /Draftsperson (includes PC /CAD) I $66.00 /hour CADD /Draftsperson (includes PC /CAD) II $101.00.hour Admin I $40.00 /hour Admin II $52.00 /hour C. Surveying Services Field Surveyor I $43.00 /hour Field Surveyor II $47.00 /hour Survey Technician I $67.00 /hour Survey Technician II $72.00 /hour Survey Chief $75.00 /hour D. Information Management Software Engineer $92.00 /hour Data Technician $132.00 /hour Senior Software Engineer $162.00 /hour Business Analyst $132.00 /hour E. Contract Labor From time to time, Amec Foster Wheeler retains outside Professional and Technical labor on a temporary basis to meet peak workload demands. Such contract labor will be charged at 10% markup. II. Expenses A. Travel Expenses 1. Transportation: Company pickup truck /personal vehicle, per mile —current allowable rate per County and Florida State Statutes a. Company pickup truck per day - $75.00 b. Common carrier or car rental multiplies by (to be the amounts authorized by Section 112.062, Florida Statutes 2. Per Diem Expenses: direct expenses in accordance with Florida State Statutes B. Disposal of Hazardous Waste Samples Samples of waste will be disposed by permitted methods after a determination is made that the waste is defined by RCRA to be hazardous. Due to the requirements for some hazardous assessments, disposal and invoicing of incurred expenses may take place after invoicing of the originally contracted work. C. Equipment / Other Expenses (Does not include personnel) Digital Field Documentation Equipment (cameras, $75.00 /day (min 2 days water level & measuring tape, GPS units, etc.) Geophysical Equipment (GPR Equipment) $1,000.00 /day (min 2 days) Underwater Camera Equipment/Video up to 50 $1,900.00 /day feet depth and low turbidity Environmental Monitoring & Sampling $100.00 to $450.00 /day Equipment (dust, OVA, Air monitoring, Noise Depending upon the equipment and scale Meter, Light Meter) required Special equipment or supplies, permits, shipping Actual cost x 1.15 charges, special printing or other items not customarily provided by Amec D. Communications In -house costs for long distance phone, telex, telecopier, postage — project labor charges x 5% III. Subcontract Subcontract services will be invoiced at a cost multiplied by 1.15