Loading...
06th Amendment 01/20/2016 • , / CLERK OF CIRCUIT COURT & COMPTROLLER is j, K..... �,r ' . 4_s-4„e: , AMY HE AV I ILIN 3 CPA MONROE COUNTY, FLORIDA • �G DATE: February 3, 2016 TO: Rhonda Haag Sustainability Program Manager FROM: Cheryl Robertson Executive Aide to the Clerk of Court& Comptroller Ct && S ur, At the January 20, 2016 Board of County Commissioner's meeting the Board granted approval and authorized execution of the following items: N7 Ratification f Amendment No. 6, whic• •• s '• 0.-s previou,4ly omitted Exhibits A-6 and B-6, to the Contract fo n 's•ervices of the Demonstration Projects, with ler Enviro� : 44ifrastructure, Inc. approved as Item M7 at the December 9, 2 regularly scheduled Board meeting. N8 Rescission of Item M8 from the December 9, 2015 regularly scheduled Board meeting due to a scrivener's error and approval of Amendment No. 6 with Erin L. Deady, P.A. for a pilot project on integrating design of stormwater, tide water and road elements in two communities for sea level rise adaptation and to extend the contract. Enclosed is a duplicate original of the above-mentioned for your handling. Should you have any questions, please feel free to contact my office. cc: County Attorney Finance File I,i 500 Whitehead Street Suite 101,PO Box 1980,Key West,FL 33040 Phone:305-295-3130 Fax:305-295-3663 3117 Overseas Highway,Marathon,FL 33050 Phone:305-289-6027 Fax:305-289-6025 88820 Overseas Highway,Plantation Key,FL 33070 Phone:852-7145 Fax:305-852-7146 AMENDMENT NO. 6 TO THE CONTRACT FOR ENGINEERING, DESIGN AND PERMITTING SERVICES FOR THE CANAL DEMONSTRATION PROJECTS THIS AMENDMENT NO. 6, date Be , is entered into between the County and the CONSULTANT, to the Contract For Engineering, Design And Permitting Services, dated the 21" day of May, 2014, as amended September 17, 2014 (Al), February 18, 2015 (A2), May 20, 2015 (A3), July 15, 2015 (A4) and October 21, 2015 (A5) by and between Monroe County Board of County Commissioners, "COUNTY," and AMEC Foster Wheeler Environment & Infrastructure, Inc., "AMEC". WITNESSETH: WHEREAS, much engineering and administrative coordination work has been performed under the Contract and the three largest demonstration projects are complete or underway with the remaining air curtain and culvert projects in the process of procurement; and WHEREAS, an extension to the overall schedule of the demonstration projects is required to allow time for development of the remaining project solicitations, coordination of the permitting, coordination with the County and construction engineering and inspection (CEI) services; and WHEREAS, the estimated construction completion date for the current demonstration projects, with the exception of the Canal #459 (culvert requiring Navy approval), is July 31, 2016; and WHEREAS, an extension of time is required to extend the Contract from December 31, 2015 to July 31, 2016; and WHEREAS, travel expenses need to be updated to reflect the revisions to the Monroe County rates as approved by the BOCC on March 18, 2015; and WHEREAS, a reallocation of task funds is required for AMEC to provide additional overall project management administration and coordination services for the extended contract period. NOW, THEREFORE, in consideration of mutual promises, covenants and contracts stated herein, and for other good and valuable consideration, the sufficiency of which is hereby acknowledged, COUNTY and AMEC agree as follows: Page 1 of Amendment No. 6 1. Article 2.1.2 is hereby DELETED and REPLACED with the following: 2.1.2 This CONTRACT is effective on the 21s' day of May, 2014 and shall extend through July 31, 2016. Travel expenses as detailed in Exhibit B-6 are updated to reflect the revisions to the Monroe County rates. AMEC shall provide the deliverables as specified in Exhibit A-6 "Revised Deliverable Schedule" and shall submit invoices following Exhibit B-6 "Revised Schedule of Values". 2. AMEC will provide the ongoing scope of services as specified in Exhibit C-6 "AMEC FOSTER WHEELER'S SCOPE OF SERVICES" attached and made a part of this AMENDMENT No. 6. 3. This AMENDMENT No. 6 reallocates $42,437.30 from the engineering design services for Canal #459 (culvert requiring Navy approval) to General Project Management Services instead, specifically Tasks 3-7. The design services for Canal #459 (requiring Navy approval) will not be completed until additional funds are located and BOCC approval received. The overall CONTRACT value remains the same at Seven Hundred Eighty Four Thousand Four Hundred Forty Six Dollars and Fourteen Cents ($784,446.14). 4. All other provisions of the Contract For Engineering, Design And Permitting Services, dated the 21st day of May, 2014, as amended September 17, 2014 (Al), February 18, 2015 (A2), May 20, 2015 (A3), July 15, 2015 (A4) and October 21, 2015 (A5) not inconsistent herewith, shall remain in full force and effect. THE REMAINDER OF THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK. Page 2 of Amendment No. 6 IN WITNESS WHEREOF, each party caused this AMENDMENT NO. 6 to be executed bytes duly authorized representative on the day and year first above written. Z 70 t�7 CD C- �- BOARD OF COUNTY COMMISSIC ff ERS -v OF MONROE C UNTY, FLORIDA -;• w By: Ma r/C an AMEC FOSTER WHEELER EVIRONMENT & INFRASTRUCTURE, INC. Y Tint name: �J AP [►'G%V itle: 1 /'• LI-a- �1 Vj 'el,44 Date: //ZP& —T� STATE OF FLORIDA COUNTY OF �'/ ,:. On this 4- day /of d �wI , 20&,'-b-efore me appeared %i%� lChue� &,67r yv-- , known ,the undersigned notary public, Personally to me to be the Person whose name is subscribed above or who produced As identification, and acknowledged that he/she is the person who executed the above Amendment #6 to Engineering and Design agreement with Monroe County for the purposes therein contained. By. Not ic e A Print Name My commission expires: jZa ZO Page 3 of Amendment No. 6 Seal .,.f r— M C "rl CD mt4uk— ln,i N[A KANAKIS Notary Public - State of Florida My Comm. Expires Mar 20, 2019 Co"ssW N FF 179176 0nWd VnesA lldlesY llwrr Am. Exhibit A-6 Revised Deliverable Schedule for Demonstration Canals from Original Contract Revised by Amendments #3, #4, #5 and #6 Canal Task Original Amendment Amendment Amendment Contract #3 Revised #4 and #5 #6 Revised Completion Contract Revised Contract Date Completion Contract Completion Date Completion Date Date Canal #266 Task 1: Additional 90 days August 31, Big Pine Key Data from NTP 2015 Collection/Processing Task 2: Preliminary 90 days August 31, Design - 30% from NTP 2015 Documents Task 3: Permitting 135 days October 30, from NTP 2015 Task 4: 60% 120 days October 30, Construction from NTP 2015 Documents Task 5: 100% 225 days October 30, Construction from NTP 2015 Documents Completion Submittal Task 6: Bid Support 300 days October 30, from NTP 2015 Task 7: Construction Not December June 30, 2016 Support Services and specified 31, 2015 Required due Engineering During to re - Construction for Air advertisement Curtain Installation of RFP for the air curtain installation Canal #287 Task 1: Additional 90 days August 31, Big Pine Key Data from NTP 2015 Collection/Processing Task 2: Preliminary 90 days August 31, Design - 30% from NTP 2015 Documents Task 3: Permitting 135 days October 30, from NTP 2015 Task 4: 60% 120 days October 30, Construction from NTP 2015 Documents Task 5: 100% 225 days October 30, Construction from NTP 2015 Documents Completion Submittal Task 6: Bid Support 300 days I October 30, Page 1 of Amendment No. 6 Exhibit A-6 from NTP 2015 Task 7: Construction Not December June 30, 2016 Support Services and specified 31, 2015 Required due Engineering During to re - Construction advertisement of RFP for the air curtain installation Canal #290 Task 1: Additional 90 days May 29, Big Pine Key Data from NTP 2015 Collection/Processing Task 2: Preliminary 90 days May 29, Design - 30% from NTP 2015 Documents Task 3: Permitting 135 days May 29, from NTP 2015 Task 4: 60% 129 days May 29, Construction from NTP 2015 Documents Task 5: 100% 225 days June 30, Construction from NTP 2015 Documents Completion Submittal Task 6: Bid Support 300 days October 30, from NTP 2015 Task 7: Construction Not December Amendment April 15, 2016 Support Services and specified 31, 2015 #5 Revised Required to Engineering During Completion complete all Construction Date project close February out items 29, 2016 including permits Canal #459 Task 1: Additional 90 days December Project on Geiger Key Data from NTP 31, 2015 hold (requiring Collection/Processing Navy approval) Task 2: Preliminary 90 days December Project on Design - 30% from NTP 31, 2015 hold Documents Task 3: Permitting 135 days December Funds moved from NTP 31, 2015 to General Project Management Task Task 4: 60% 120 days December Funds moved Construction from NTP 31, 2015 to General Documents Project Management Task Page 2 of Amendment No. 6 Exhibit A-6 Task 5: 100% 225 days December Funds moved Construction from NTP 31, 2015 to General Documents Project Completion Submittal Management Task Task 6: Bid Support 300 days December Funds moved from NTP 31, 2015 to General Project Management Task Task 7: Construction Not December Funds moved Support Services and specified 31, 2015 to General Engineering During Project Construction Management Task Canal #277 Task 1: Additional 90 days October 30, Big Pine Key Data from NTP 2015 Collection/Processing Task 2: Preliminary 90 days October 30, Design - 30% from NTP 2015 Documents Task 3: Permitting 135 days November from NTP 30, 2015 Task 4: 60% 120 days November Construction from NTP 30, 2015 Documents Task 5: 100% 225 days November Construction from NTP 30, 2015 Documents Completion Submittal Task 6: Bid Support 300 days December from NTP 31, 2015 Task 7: Construction Not December July 31, 2016 Support Services and specified 31, 2015 Required due Engineering During to RFP Construction opening on December 29, 2015 Canal #29 Task 1: Additional 90 days May 29, Key Largo Data from NTP 2015 Collection/Processing Task 2: Preliminary 90 days May 29, Design - 30% from NTP 2015 Documents Task 3: Permitting 135 days May 29, from NTP 2015 Task 4: 60% 120 days May 29, Construction from NTP 2015 Documents Task 5: 100% 225 days October 30, Page 3 of Amendment No. 6 Exhibit A-6 Construction from NTP 2015 Documents Completion Submittal Task 6: Bid Support 300 days November from NTP 30, 2015 Task 7: Construction Not December Support Services and specified 31, 2015 Engineering During Construction Overall 12 months July 15, Amendment July 31, 2016 Project after NTP 2015 #4 Revised Required to Management Completion provide Date services for December the 31, 2015 completion of the air curtain and Canal #277 culvert demonstration projects. Note: NTP = Notice to Proceed which for the original contract was May 21, 2014 Page 4 of Amendment No. 6 Exhibit A-6 EXHIBIT B-6 AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. 2015 REVISED SCHEDULE OF VALUES Personnel A. Professional (Engineer, Geologist, Scientist and Project Management) Staff I $71.00/hour Staff II $77.00/hour Project $86.00/hour Senior $109.00/hour Principal/Project Manager $155.00/hour Senior Principal/Senior Project Manager $159.00/hour Chief Engineer/Scientist $194.00/hour B. Technical Services (Engineering and Science) Technician I $45.00/hour Technician II $55.00/hour Senior Technician I $60.00/hour Senior Technician II $70.00/hour Project Administrator/Project Coordinator/Subcontract Administrator/Project Accou ntant $75.00/hour Technical Writer/Document Production $ 78.00/hour CADD/Draftsperson (includes PC/CAD) I $66.00/hour CADD/Draftsperson (includes PC/CAD) II $101.00.hour Admin I $40.00/hour Admin II $52.00/hour C. Surveying Services Field Surveyor I $43.00/hour Field Surveyor 11 $47.00/hour Survey Technician I $67.00/hour Su rvey Tech n icia n II $72.00/hour Survey Chief $75.00/hour D. Information Management Software Engineer $92.00/hour Data Technician $132.00/hour Senior Software Engineer $162.00/hour Business Analyst $132.00/hour E. Contract Labor From time to time, Amec Foster Wheeler retains outside Professional and Technical labor on a temporary basis to meet peak workload demands. Such contract labor will be charged at 10% markup. II. Expenses A. Travel Expenses 1. Transportation: Comoanv pickup truck/personal vehicle. per mile — current allowable rate per County and Florida State Statutes a. Company pickup truck per day - $75.00 b. Common carrier or car rental multiplies by (to be the amounts authorized by Section 112.062, Florida Statutes 2. Per Diem Expenses: direct expenses in accordance with Florida State Statutes B. Disposal of Hazardous Waste Samples Samples of waste will be disposed by permitted methods after a determination is made that the waste is defined by RCRA to be hazardous. Due to the requirements for some hazardous assessments, disposal and invoicing of incurred expenses may take place after invoicing of the originally contracted work. C. Equipment / Other Expenses (Does not include personnel) Digital Field Documentation Equipment (cameras, $75.00/day (min 2 days water level & measuring tape, GPS units, etc.) Geophysical Equipment (GPR Equipment) $1,000.00/day (min 2 days) Underwater Camera Equipment/Video up to 50 $1,900.00/day feet depth and low turbidity Environmental Monitoring & Sampling $100.00 to $450.00/day Equipment (dust, OVA, Air monitoring, Noise Depending upon the equipment and scale Meter, Light Meter) required Special equipment or supplies, permits, shipping Actual cost x 1.15 charges, special printing or other items not customarily provided by Amec D. Communications In-house costs for long distance phone, telex, telecopier, postage — project labor charges x 5% III. Subcontract Subcontract services will be invoiced at a cost multiplied by 1.15 EXHIBIT C-6 AMEC FOSTER WHEELER'S SCOPE OF SERVICES A. Project Management During Implementation of the Installation of Canal Restoration Demonstration Projects consisting of the Canal #290 Organic Removal, Canal #266 Air Curtain Installation, Canal #287 Air Curtain Installation and Canal #277 Culvert Installation 1. Scope of Work: AMEC will provide general project management services for a 7 month period extending from January 1, 2016 through July 31, 2016 for overall management during the construction of the Canal Restoration Projects including: Canal #290 organic removal, Canal #266 and #287 Air Curtains, and Canal #277 culvert. A cost has been included based upon providing a project manager for approximately 20% of the time during the 7 month time frame. This task will include RESTORE coordination, client communications, attendance at meetings, homeowner coordination, preparation of project updates, assistance with preparation of materials and attendance at the upcoming Canal BOCC Workshop, and monthly invoicing. This scope extends the services included in the Amendment No. 4 which currently terminates on December 31, 2015. 2.Overall Project Management Deliverables: Monthly project status reports and monthly invoices detailing work activities performed within the month. Canal Workshop presentation materials Meeting presentations Meeting minutes. 3. Project Management Budget: $ 42,437.30 The attached spreadsheet provides the labor details. Additional staff may be utilized on these projects, as needed, per the Contract Schedule of Values also attached. 4. Completion Date: July 31, 2016 TOTAL ALL TASKS: $42,437.30 Page 1 of Amendment No. 6 Exhibit C-6 AMEC Foster Wheeler, E&I, Inc. Client Monroa County Data: 11/17/2015 Scope: Overall Project Management Services from January 1, 2014 through July 31, 2016 Reference. Amendment #e dated December 9, 2015 AMEC F-W VmeeW Labor ClaaeNkatlau Dlaci ine Haul Rab R—lead Teak 7: Engineering Support Dudrq ConstrucNan Overall Pmlect Managemonl HOURS COST Luc eWni Man 155. 219 5339 PGmin II Ad— 722 LABOR SUBTOTAL 303 $41 109 A. UNIT RATES 3USMITACTUALSony COSTPER UNIT Overall Project Managamanl UNITS COST Gee ($0.53�mib) Shi in and bbconterence die $0.53 5208.30 2 1 0110. 1 2O3. Ex t TOTAL Overall Prollrom Managemant S 42437.30 Nob: AJ011bnal start mv v an the, Proiect as needed per en Contract Schedule of Values Amec Foster Wheeler Environment & Infrastructure, Inc. 2015 Revised Schedule of Values I. Personnel A. Professional (Engineer, Geologist, Scientist and Project Management) Staff I $71.00/hour Staff II $77.00/hour Project $86.00/hour Senior $109.00/hour Principal/Project Manager $155.00/hour Senior Principal/Senior Project Manager $159.00/hour Chief Engineer/Scientist $194.00/hour B. Technical Services (Engineering and Science) Technician I $45.00/hour Technician II $55.00/hour Senior Technician I $60.00/hour Senior Technician II $70.00/hour Project Administrator/Project Coordinator/Subcontract Administrator/Project Accountant $75.00/hour Technical Writer/Document Production $ 78.00/hour CADD/Draftsperson (includes PC/CAD) I $66.00/hour CADD/Draftsperson (includes PC/CAD) II $101.00.hour Admin I $40.00/hour Admin II $52.00/hour C. Surveying Services Field Surveyor I $43.00/hour Field Surveyor II $47.00/hour Su rvey Tech n icia n I $67.00/hour Su rvey Tech n icia n II $72.00/hour Survey Chief $75.00/hour D. Information Management Software Engineer $92.00/hour Data Technician $132.00/hour Senior Software Engineer $162.00/hour Business Analyst $132.00/hour E. Contract Labor From time to time, Amec Foster Wheeler retains outside Professional and Technical labor on a temporary basis to meet peak workload demands. Such contract labor will be charged at 10% markup. II. Expenses A. Travel Expenses 1. Transportation: Company pickup truck/personal vehicle, per mile —current allowable rate per County and Florida State Statutes a. Company pickup truck per day - $75.00 b. Common carrier or car rental multiplies by (to be the amounts authorized by Section 112.062, Florida Statutes 2. Per Diem Expenses: direct expenses in accordance with Florida State Statutes B. Disposal of Hazardous Waste Samples Samples of waste will be disposed by permitted methods after a determination is made that the waste is defined by RCRA to be hazardous. Due to the requirements for some hazardous assessments, disposal and invoicing of incurred expenses may take place after invoicing of the originally contracted work. C. Equipment / Other Expenses (Does not include personnel) Digital Field Documentation Equipment (cameras, $75.00/day (min 2 days water level & measuring tape, GPS units, etc.) Geophysical Equipment (GPR Equipment) $1,000.00/day (min 2 days) Underwater Camera Equipment/Video up to 50 $1,900.00/day feet depth and low turbidity Environmental Monitoring & Sampling $100.00 to $450.00/day Equipment (dust, OVA, Air monitoring, Noise Depending upon the equipment and scale Meter, Light Meter) required Special equipment or supplies, permits, shipping Actual cost x 1.15 charges, special printing or other items not customarily provided by Amec D. Communications In-house costs for long distance phone, telex, telecopier, postage — project labor charges x 5% III. Subcontract Subcontract services will be invoiced at a cost multiplied by 1.15