At the April 20, 2016 Board of County Commissioner's meeting the Board granted approval and
authorized execution of Items:
N2 Approval of Amendment No. 9 to the Contract for Engineering, Design and Permitting Services
of the Demonstration Projects, with AMEC Foster Wheeler Environment and Infrastructure, Inc. for an
internal reallocation of funds to fund the CEI services for the #277 Culvert and the #266 and #287 air
curtain installations, and minimal technical review for the air curtains O&M operations. The Contract
value remains unchanged.
N3 Authorization to enter into Amendment # 1 to the contract with Earth Tech Enterprises, Inc. for
installation of air curtains on Canals #266 and #287 on Big Pine Key to remove the list of subcontractors
from the contract. The contract value remains unchanged.
Enclosed is a duplicate original of the above -mentioned for your handling. Should you have any questions,
please feel free to contact my office.
County Attorney
Finance
File V
500 Whitehead Street Suite 101, PO Box 1980, Key West FL 33040 Phone: 305-295-3130 Fax: 305-295-3663
3117 Overseas Highway, Marathon, FL 33050 Phone: 305-289-6027 Fax. 305-289-6025
88820 Overseas Highway, Plantation Key, FL 33070 Phone: 852-7145 Fax: 305-852-7146
AMENDMENT NO.9
TO THE CONTRACT
FOR
ENGINEERING, DESIGN AND PERMITTING SERVICES
FOR THE
CANAL DEMONSTRATION PROJECTS
THIS AMENDMENT NO. 9, dated April 20, 2016, is entered into between the County and the
CONSULTANT, to the Contract For Engineering, Design And Permitting Services, dated the
21' day of May, 2014, as amended September 17, 2014 (Al), February 18, 2015 (A2), May 20,
2015 (A3), July 15, 2015 (A4), October 21, 2015 (A5), January 20, 2016 (A6) and March 23,
2016 (A7 and A8) by and between Monroe County Board of County Commissioners,
"COUNTY," and AMEC Foster Wheeler Environment & Infrastructure, Inc., "AMEC".
WITNESSETH:
WHEREAS, much engineering and administrative coordination work has been performed under
the Contract for design and construction oversight of the canal demonstrations projects; and
WHEREAS, the culvert installation project construction contractor Douglas N. Higgins, Inc. and
the air curtain installation projects construction contractor EarthTech Enterprises each has a 60
day construction schedule for which AMEC CEI services will be required; and
WHEREAS, the Operations and Maintenance period for the air curtains extends for a period of
two years, during which time AMEC will be needed to provide technical review of the activities
and reports only during the first six months of activities; and
WHEREAS, funds are required to fund the CEI onsite inspections by AMEC for the time needed
for these two projects; and
WHEREAS, funds are required to provide technical review of the operation and maintenance
performance of the Canal #266 and #287 air curtain projects during the first six months of
operation
NOW, THEREFORE, in consideration of mutual promises, covenants and contracts stated
herein, and for other good and valuable consideration, the sufficiency of which is hereby
acknowledged, COUNTY and AMEC agree as follows:
1. AMEC will provide the scope of services as specified in Exhibit "A-9" attached and made a
part of this AMENDMENT No. 9.
2. This AMENDMENT No. 9 provides a reallocation of previously funded tasks totaling Forty
Four Thousand Two Hundred Ninety Nine Dollars and Six Cents ($44,299.06). $16,431.75 of
existing funds from Canal #290 CEI Task 10 approved in Amendment #5, $21,723.31 of
existing funds from Canal #459 Task 1, and $6,144.00 of existing funds from Canal #459 Task 2
shall be reallocated to the tasks for the construction support services at Canal #277 culvert
installation project, Canal #266 and #287 air curtain installation projects, and technical review of
Page 1 of Amendment No. 9
the air curtains operation for the first six months which is needed to ensure the system operates
per design and in an optimal manner. The overall CONTRACT value will remain unchanged
from the current Nine Hundred Sixty Two Thousand and Thirty Five Dollars and Forty Four
Cents ($962,035.44)
IN WITNESS WHEREOF, each party caused this AMENDMENT NO. 9 to be executed by its
duly authorized representative on the day and year first above written.
—P cDi,
hY
STATE OF FLORIDA,
COUNTY OF 4/V1'!/ _
On this 3Z day
Personally appeared
Person whose name
BOARD OF COUNTY COMMISSIONERS
OF MONROE CO TY, FLORIDA
By: # �./�
May /'C- hakpodn
AMEC FOSTER
& INFRASTRoU(
l) T- h- a I i IR ra r 9-k
Date: ' 1\-311 19
=Q-
20e�before me, the undersigned notary public,
subscribed above or who produced
to me tObe the
As identification, and acknowledged that he/she is the person who executed the
above Amendment No. 9 to Engineering and Design agreement with Monroe County
for the purposes therein contained.
4"-Si '
By: a /-
Notary lic /^
Print Name
My commission expires:
.h
rJ
0
:s
MA GGIE PHOENZA-KANAKIS
r Notary Public -State of Florida
• 5 My Comm. Expires Mar 20, 2019
%;�F�" Commission M FF 179176
S Bonded through National Nolary Assn.
Page 2 of Amendment No. 9
EXHIBIT A-9
AMEC FOSTER WHEELER'S SCOPE OF SERVICES
A. Construction Support Services And Engineering During Construction At Canal #277
Culvert Installation and Canal #266 and #287 Weed Barrier Installation and Review of
Operation and Maintenance Data for #266 and #287 Air Curtains
1. Scope of Work:
The AMEC Foster Wheeler's scope of work associated with the original contract for Engineering,
Design and Permitting Services for Canal Demonstration Projects dated May 21, 2014 included
work at Canal #277 Big Pine Key the Tropical Bay Subdivision Culvert Installation, Canal #266
Big Pine Key the Doctors Arm Subdivision Air Curtain Barrier, and Canal #287 Big Pine Key the
Atlantic Estates Subdivision Air Curtain related to Construction Support Services and Engineering
during Construction which was identified as Task 7 for each project. The scopes included daily site
inspections and construction administration for the projects. The culvert installation project
construction contractor Douglas N. Higgins, Inc. and the weed barrier installation projects
construction contractor Earth Tech Enterprises has proposed a 60 day construction schedule and
requested to extend the work week to include Saturdays. The original contract dated May 21, 2014
Task 7 for the Culvert Installation included 21 days for oversight and the Air Curtain Installation
projects included a total of 14 days for oversight.
Douglas N. Higgins has provided a schedule with a construction completion date to June 27, 2016.
Earth Tech Enterprises has provided a schedule with a construction completed date to July 17, 2016.
Additionally, the original scope of work for Canals #266 and #287 did not include any technical
review time of the air curtain operation for the first six months which is needed to ensure the system
operates per design and in an optimal manner. Additional funds are required to fund the additional
CEI onsite inspections by AMEC for the additional time needed by the contractor to complete the
projects and to review the operational data of the two air curtains. The specific scope includes:
a) Site Inspections: AMEC will oversight the concurrent projects Monday through Friday
during field construction activities through July 17, 2016 and prepare daily work reports
showing contractors activities, equipment, maintenance of traffic and environmental
compliance. AMEC will contact site superintendent via phone on Saturday's to determine a
status update.
b) Construction Administration - AMEC will provide consultation and advice to County
regarding the Contractor's performance of the Contract. AMEC will liaise with the County,
homeowners, and other stakeholders as necessary to administer the construction contract
through the estimated July 17, 2016 project completion date.
c) Review of Operation and Maintenance Data — AMEC will review the Contractors'
operational and maintenance data for the air curtains at Canals #266 and #287 for a six month
period after system startup. AMEC will provide recommendations to the Monroe County
and the Contractor as needed.
2. Deliverables:
• Daily work reports
• Progress pay estimates with back up documentation
• Final Pay Estimate with back up documentation
• Final "As -Built Plans"
Page 1 of Exhibit A-9
• Material certifications
• Environmental Inspection Reports
• Progress and Final Photographs (Electronic Files)
• Email communications related to air curtain system performance.
3. Budget: $ 44,299.06
A detailed cost spreadsheet is attached. Additional staff may be utilized as per the contract rate
schedule.
4. Estimated Completion Date: Total Project Completion date of December 31, 2016.
Page 2 of Exhibit A-9
Attachment to Exhibit A-9
AMEC Foster Wheeler, E&I, Inc.
Client Monroe County
Data: 31"12010
Stops: Construction Support Services And Engfnwring During Construction At Canal #277
Culvert Installation and Canal 0200 and 0287 Air Curtain Installation and Review of Operation
and Maintenance Data fw 0200 and 0287 Air Curt ins,Big Pins Key
Reference: Amendment fm dated April 20, 2010
AMEC FeeW YRueler labor C
DisciplintRaft
&mk~arg SuPpert During ConetrYeaon and Review a Operation
CA and CEt during construction, Review of Oprallon and Maintenance of Air Curtains
HOURS COST
WeBbrgln /NsalorF noaz
SMtll-Jrem Pant
ConWrEYon AdmineeaYon
E
155.
2
7
1
Sanw 1- 1lrika
P Can
tOf.60
1
2
Senior Tetra II - DwM DaWYc
Tech Services
lim OC
13
LABOR SUBTOTAL
07
$40-366
a. UNIT RATES SUBM T ACTUALS only
COST PER
UNR
CA and CEl dud" ca4bu 1bn. ReWea aOprrlon and MaIn wrrco of AM CurfYm
U UTS COST
Oae ($0.531n1.)
Turbid L1Nr rental
�.�
�
5
alp. 0010
1032
f 1
TOTAL CM and CA Tor Canal #277, i2M.W a2f7:
f
��
Amec Foster Wheeler Environment & Infrastructure, Inc.
2015 Revised Schedule of Values
I. Personnel
A. Professional (Engineer, Geologist, Scientist and Project Management)
Staff
$71.00/hour
Staff II
$77.00/hour
Project
$86.00/hour
Senior
$109.00/hour
Principal/Project Manager
$155.00/hour
Senior Principal/Senior Project Manager
$159.00/hour
Chief Engineer/Scientist
$194.00/hour
B. Technical Services (Engineering and Science)
Technician I
$45.00/hour
Technician II
$55.00/hour
Senior Technician I
$60.00/hour
Senior Technician II
$70.00/hour
Project Administrator/Project
Coordinator/Subcontract Administrator/Project
Accountant
$75.00/hour
Technical Writer/Document Production
$ 78.00/hour
CADD/Draftsperson (includes PC/CAD) I
$66.00/hour
CADD/Draftsperson (includes PC/CAD) II
$101.00.hour
Admin I
$40.00/hour
Admin II
$52.00/hour
C. Surveying Services
Field Surveyor I
$43.00/hour
Field Surveyor II
$47.00/hour
Survey Technician I
$67.00/hour
Survey Technician II
$72.00/hour
Survey Chief
$75.00/hour
D. Information Management
Software Engineer
$92.00/hour
Data Technician
$132.00/hour
Senior Software Engineer
$162.00/hour
Business Analyst
$132.00/hour
E. Contract labor
V
From time to time, Amec Foster Wheeler retains outside Professional and Technical labor on a
temporary basis to meet peak workload demands. Such contract labor will be charged at 10% markup.
II. Expenses
A. Travel Expenses
1. Transportation: Company pickup truck/personal vehicle per mile — current allowable rate per
County and Florida State Statutes
a. Company pickup truck per day - $75.00
b. Common carrier or car rental multiplies by (to be the amounts authorized by Section
112.062, Florida Statutes
2. Per Diem Expenses: direct expenses in accordance with Florida State Statutes
B. Disposal of Hazardous Waste Samples
Samples of waste will be disposed by permitted methods after a determination is made that the waste is
defined by RCRA to be hazardous. Due to the requirements for some hazardous assessments, disposal
and invoicing of incurred expenses may take place after invoicing of the originally contracted work.
C. Equipment / Other Expenses
(Does not include personnel)
Digital Field Documentation Equipment (cameras,
$75.00/day (min 2 days
water level & measuring tape, GPS units, etc.)
Geophysical Equipment (GPR Equipment)
$1,000.00/day (min 2 days)
Underwater Camera Equipment/Video up to 50
$1,900.00/day
feet depth and low turbidity
Environmental Monitoring & Sampling
$100.00 to $450.00/day
Equipment (dust, OVA, Air monitoring, Noise
Depending upon the equipment and scale
Meter, Light Meter)
required
Special equipment or supplies, permits, shipping
Actual cost x 1.15
charges, special printing or other items not
customarily provided by Amec
D. Communications
In-house costs for long distance phone, telex, telecopier, postage — project labor charges x 5%
III. Subcontract
Subcontract services will be invoiced at a cost multiplied by 1.15