Loading...
09th Amendment 04/20/2016AMY REAVILIN, CPA CLERK OF CIRCUR COURT 8 COMPTROLLER MONROECOUNTY, FLORIDA DATE: July 19, 2016 TO: Rom stesi Cou dministrator ATTIC• Linke allard Exee Aide 0,01)010 //ac� %! Susfa.�r?Q y FROM Cheryl Robertson Executive Aide to the Clerk of Court & Comptroller Ck At the April 20, 2016 Board of County Commissioner's meeting the Board granted approval and authorized execution of Items: N2 Approval of Amendment No. 9 to the Contract for Engineering, Design and Permitting Services of the Demonstration Projects, with AMEC Foster Wheeler Environment and Infrastructure, Inc. for an internal reallocation of funds to fund the CEI services for the #277 Culvert and the #266 and #287 air curtain installations, and minimal technical review for the air curtains O&M operations. The Contract value remains unchanged. N3 Authorization to enter into Amendment # 1 to the contract with Earth Tech Enterprises, Inc. for installation of air curtains on Canals #266 and #287 on Big Pine Key to remove the list of subcontractors from the contract. The contract value remains unchanged. Enclosed is a duplicate original of the above -mentioned for your handling. Should you have any questions, please feel free to contact my office. County Attorney Finance File V 500 Whitehead Street Suite 101, PO Box 1980, Key West FL 33040 Phone: 305-295-3130 Fax: 305-295-3663 3117 Overseas Highway, Marathon, FL 33050 Phone: 305-289-6027 Fax. 305-289-6025 88820 Overseas Highway, Plantation Key, FL 33070 Phone: 852-7145 Fax: 305-852-7146 AMENDMENT NO.9 TO THE CONTRACT FOR ENGINEERING, DESIGN AND PERMITTING SERVICES FOR THE CANAL DEMONSTRATION PROJECTS THIS AMENDMENT NO. 9, dated April 20, 2016, is entered into between the County and the CONSULTANT, to the Contract For Engineering, Design And Permitting Services, dated the 21' day of May, 2014, as amended September 17, 2014 (Al), February 18, 2015 (A2), May 20, 2015 (A3), July 15, 2015 (A4), October 21, 2015 (A5), January 20, 2016 (A6) and March 23, 2016 (A7 and A8) by and between Monroe County Board of County Commissioners, "COUNTY," and AMEC Foster Wheeler Environment & Infrastructure, Inc., "AMEC". WITNESSETH: WHEREAS, much engineering and administrative coordination work has been performed under the Contract for design and construction oversight of the canal demonstrations projects; and WHEREAS, the culvert installation project construction contractor Douglas N. Higgins, Inc. and the air curtain installation projects construction contractor EarthTech Enterprises each has a 60 day construction schedule for which AMEC CEI services will be required; and WHEREAS, the Operations and Maintenance period for the air curtains extends for a period of two years, during which time AMEC will be needed to provide technical review of the activities and reports only during the first six months of activities; and WHEREAS, funds are required to fund the CEI onsite inspections by AMEC for the time needed for these two projects; and WHEREAS, funds are required to provide technical review of the operation and maintenance performance of the Canal #266 and #287 air curtain projects during the first six months of operation NOW, THEREFORE, in consideration of mutual promises, covenants and contracts stated herein, and for other good and valuable consideration, the sufficiency of which is hereby acknowledged, COUNTY and AMEC agree as follows: 1. AMEC will provide the scope of services as specified in Exhibit "A-9" attached and made a part of this AMENDMENT No. 9. 2. This AMENDMENT No. 9 provides a reallocation of previously funded tasks totaling Forty Four Thousand Two Hundred Ninety Nine Dollars and Six Cents ($44,299.06). $16,431.75 of existing funds from Canal #290 CEI Task 10 approved in Amendment #5, $21,723.31 of existing funds from Canal #459 Task 1, and $6,144.00 of existing funds from Canal #459 Task 2 shall be reallocated to the tasks for the construction support services at Canal #277 culvert installation project, Canal #266 and #287 air curtain installation projects, and technical review of Page 1 of Amendment No. 9 the air curtains operation for the first six months which is needed to ensure the system operates per design and in an optimal manner. The overall CONTRACT value will remain unchanged from the current Nine Hundred Sixty Two Thousand and Thirty Five Dollars and Forty Four Cents ($962,035.44) IN WITNESS WHEREOF, each party caused this AMENDMENT NO. 9 to be executed by its duly authorized representative on the day and year first above written. —P cDi, hY STATE OF FLORIDA, COUNTY OF 4/V1'!/ _ On this 3Z day Personally appeared Person whose name BOARD OF COUNTY COMMISSIONERS OF MONROE CO TY, FLORIDA By: # �./� May /'C- hakpodn AMEC FOSTER & INFRASTRoU( l) T- h- a I i IR ra r 9-k Date: ' 1\-311 19 =Q- 20e�before me, the undersigned notary public, subscribed above or who produced to me tObe the As identification, and acknowledged that he/she is the person who executed the above Amendment No. 9 to Engineering and Design agreement with Monroe County for the purposes therein contained. 4"-Si ' By: a /- Notary lic /^ Print Name My commission expires: .h rJ 0 :s MA GGIE PHOENZA-KANAKIS r Notary Public -State of Florida • 5 My Comm. Expires Mar 20, 2019 %;�F�" Commission M FF 179176 S Bonded through National Nolary Assn. Page 2 of Amendment No. 9 EXHIBIT A-9 AMEC FOSTER WHEELER'S SCOPE OF SERVICES A. Construction Support Services And Engineering During Construction At Canal #277 Culvert Installation and Canal #266 and #287 Weed Barrier Installation and Review of Operation and Maintenance Data for #266 and #287 Air Curtains 1. Scope of Work: The AMEC Foster Wheeler's scope of work associated with the original contract for Engineering, Design and Permitting Services for Canal Demonstration Projects dated May 21, 2014 included work at Canal #277 Big Pine Key the Tropical Bay Subdivision Culvert Installation, Canal #266 Big Pine Key the Doctors Arm Subdivision Air Curtain Barrier, and Canal #287 Big Pine Key the Atlantic Estates Subdivision Air Curtain related to Construction Support Services and Engineering during Construction which was identified as Task 7 for each project. The scopes included daily site inspections and construction administration for the projects. The culvert installation project construction contractor Douglas N. Higgins, Inc. and the weed barrier installation projects construction contractor Earth Tech Enterprises has proposed a 60 day construction schedule and requested to extend the work week to include Saturdays. The original contract dated May 21, 2014 Task 7 for the Culvert Installation included 21 days for oversight and the Air Curtain Installation projects included a total of 14 days for oversight. Douglas N. Higgins has provided a schedule with a construction completion date to June 27, 2016. Earth Tech Enterprises has provided a schedule with a construction completed date to July 17, 2016. Additionally, the original scope of work for Canals #266 and #287 did not include any technical review time of the air curtain operation for the first six months which is needed to ensure the system operates per design and in an optimal manner. Additional funds are required to fund the additional CEI onsite inspections by AMEC for the additional time needed by the contractor to complete the projects and to review the operational data of the two air curtains. The specific scope includes: a) Site Inspections: AMEC will oversight the concurrent projects Monday through Friday during field construction activities through July 17, 2016 and prepare daily work reports showing contractors activities, equipment, maintenance of traffic and environmental compliance. AMEC will contact site superintendent via phone on Saturday's to determine a status update. b) Construction Administration - AMEC will provide consultation and advice to County regarding the Contractor's performance of the Contract. AMEC will liaise with the County, homeowners, and other stakeholders as necessary to administer the construction contract through the estimated July 17, 2016 project completion date. c) Review of Operation and Maintenance Data — AMEC will review the Contractors' operational and maintenance data for the air curtains at Canals #266 and #287 for a six month period after system startup. AMEC will provide recommendations to the Monroe County and the Contractor as needed. 2. Deliverables: • Daily work reports • Progress pay estimates with back up documentation • Final Pay Estimate with back up documentation • Final "As -Built Plans" Page 1 of Exhibit A-9 • Material certifications • Environmental Inspection Reports • Progress and Final Photographs (Electronic Files) • Email communications related to air curtain system performance. 3. Budget: $ 44,299.06 A detailed cost spreadsheet is attached. Additional staff may be utilized as per the contract rate schedule. 4. Estimated Completion Date: Total Project Completion date of December 31, 2016. Page 2 of Exhibit A-9 Attachment to Exhibit A-9 AMEC Foster Wheeler, E&I, Inc. Client Monroe County Data: 31"12010 Stops: Construction Support Services And Engfnwring During Construction At Canal #277 Culvert Installation and Canal 0200 and 0287 Air Curtain Installation and Review of Operation and Maintenance Data fw 0200 and 0287 Air Curt ins,Big Pins Key Reference: Amendment fm dated April 20, 2010 AMEC FeeW YRueler labor C DisciplintRaft &mk~arg SuPpert During ConetrYeaon and Review a Operation CA and CEt during construction, Review of Oprallon and Maintenance of Air Curtains HOURS COST WeBbrgln /NsalorF noaz SMtll-Jrem Pant ConWrEYon AdmineeaYon E 155. 2 7 1 Sanw 1- 1lrika P Can tOf.60 1 2 Senior Tetra II - DwM DaWYc Tech Services lim OC 13 LABOR SUBTOTAL 07 $40-366 a. UNIT RATES SUBM T ACTUALS only COST PER UNR CA and CEl dud" ca4bu 1bn. ReWea aOprrlon and MaIn wrrco of AM CurfYm U UTS COST Oae ($0.531n1.) Turbid L1Nr rental �.� � 5 alp. 0010 1032 f 1 TOTAL CM and CA Tor Canal #277, i2M.W a2f7: f �� Amec Foster Wheeler Environment & Infrastructure, Inc. 2015 Revised Schedule of Values I. Personnel A. Professional (Engineer, Geologist, Scientist and Project Management) Staff $71.00/hour Staff II $77.00/hour Project $86.00/hour Senior $109.00/hour Principal/Project Manager $155.00/hour Senior Principal/Senior Project Manager $159.00/hour Chief Engineer/Scientist $194.00/hour B. Technical Services (Engineering and Science) Technician I $45.00/hour Technician II $55.00/hour Senior Technician I $60.00/hour Senior Technician II $70.00/hour Project Administrator/Project Coordinator/Subcontract Administrator/Project Accountant $75.00/hour Technical Writer/Document Production $ 78.00/hour CADD/Draftsperson (includes PC/CAD) I $66.00/hour CADD/Draftsperson (includes PC/CAD) II $101.00.hour Admin I $40.00/hour Admin II $52.00/hour C. Surveying Services Field Surveyor I $43.00/hour Field Surveyor II $47.00/hour Survey Technician I $67.00/hour Survey Technician II $72.00/hour Survey Chief $75.00/hour D. Information Management Software Engineer $92.00/hour Data Technician $132.00/hour Senior Software Engineer $162.00/hour Business Analyst $132.00/hour E. Contract labor V From time to time, Amec Foster Wheeler retains outside Professional and Technical labor on a temporary basis to meet peak workload demands. Such contract labor will be charged at 10% markup. II. Expenses A. Travel Expenses 1. Transportation: Company pickup truck/personal vehicle per mile — current allowable rate per County and Florida State Statutes a. Company pickup truck per day - $75.00 b. Common carrier or car rental multiplies by (to be the amounts authorized by Section 112.062, Florida Statutes 2. Per Diem Expenses: direct expenses in accordance with Florida State Statutes B. Disposal of Hazardous Waste Samples Samples of waste will be disposed by permitted methods after a determination is made that the waste is defined by RCRA to be hazardous. Due to the requirements for some hazardous assessments, disposal and invoicing of incurred expenses may take place after invoicing of the originally contracted work. C. Equipment / Other Expenses (Does not include personnel) Digital Field Documentation Equipment (cameras, $75.00/day (min 2 days water level & measuring tape, GPS units, etc.) Geophysical Equipment (GPR Equipment) $1,000.00/day (min 2 days) Underwater Camera Equipment/Video up to 50 $1,900.00/day feet depth and low turbidity Environmental Monitoring & Sampling $100.00 to $450.00/day Equipment (dust, OVA, Air monitoring, Noise Depending upon the equipment and scale Meter, Light Meter) required Special equipment or supplies, permits, shipping Actual cost x 1.15 charges, special printing or other items not customarily provided by Amec D. Communications In-house costs for long distance phone, telex, telecopier, postage — project labor charges x 5% III. Subcontract Subcontract services will be invoiced at a cost multiplied by 1.15